ASAP Methodology
2
Objectives
Tools and Accelerators
The 5 Phases
Agenda
Review/Feedback/Conclusion
3
Objectives
4
Objectives
• To discuss the use of the Accelerated SAP approach for conducting a
rapid R/3 implementation
• To explain how the Accelerated SAP Roadmap is used to facilitate
implementation.
• To identify the tools and accelerators used for performing ASAP.
• To discuss the integration of the Roadmap with the R/3 Reference Model
and the Implementation Guide (IMG).
5
The R/3 Procedural Model
• SAP’s original implementation methodology.
• Good for large, complex organizations looking to implement R/3 in
stages.
Create
Interfaces and
Enhancements
Establish
Reporting
Establish
Archiving
Management
Establish
Archiving
Management
Perform
Final Test
Establish
Global
Settings
Establish
Company
Structure
Establish
Master
Data
Perform
Final
Test
Create
Go - Live
Plan
Create
User
Documentation
Set Up
Production
Environment
Train
Users
Establish
System
Administration
Transfer Data
to Production
System
Support
Productive
Operation
Optimize
System
Use
Set Up System
Environment
Train Project
Team
Define
Functions and
Processes
Design
Interfaces and
Enhancements
Project
Preparation
Quality
Con-
ceptual
Design
Quality
Appli-
cation
System
Quality
Pro-
duction
System
Check Check
Check
Project Management
System Maintenance and Release Upgrade
Organization and
Conceptual Design
Detailed Design
and System Set-Up
Preparations for
Going Live
Productive
Operation
Copyright, SAP AG.
6
The Procedure Model
• The SAP core tool that describes the activities needed when
implementing SAP.
• It’s like a detailed project plan of all the steps and tasks involved
during the implementation process.
Tools  Business Engineering  Customizing
Basic Functions  Procedural Module
• It’s useful for large, complex organizations wishing to implement
R/3 in stages.
• However, this is being replaced with the Accelerated SAP
method of implementation.
7
Accelerated SAP
The Implementation Solution
• Q&A Database
• ASAP Roadmap
• Knowledge Corner
• BP Masterlist
• Accelerators
PC
Based
Tools
Training & Education, InfoDB, SAPNet
OSS Support, Quality Assurance
Service
• Implementation
Guide
• Reference Model
• Profile Generator
• Change Request
Management
R/3
Resident
Tools
Methodology
Implementation Assistant R/3 Business Engineer
8
What is Contained Within ?
• The ASAP Roadmap:
– A Step-by-step procedures and recommendations
• Tools:
– The ASAP Implementation Assistant:
• A navigation tool for the Roadmap, questionnaires, templates, and check
lists.
• Q&A database for documenting requirements.
– R/3 Business Engineer tools for creating the Business Blueprint (conceptual
design) and for configuration.
• R/3 Services and Training:
– All the services are available for ASAP projects, including consulting, training,
hotline, Early Watch, OSS, Info DB.
9
The Implementation Assistant
• The Implementation Assistant (IA) is a PC based application made up of
numerous tools and templates developed to support the ASAP
implementation approach
 The IA is the primary
tool and framework for
executing the ASAP
methodology.
10
Organization of the Implementation Assistant
• ASAP Roadmap
• Implementation Accelerators
• Project Plan
• Question and Answer Database
• Issues Database
• Business Process Procedures
• Knowledge Corner
• Glossary
• Help
Tree structure
Search tool
11
Organization within the Implementation
Assistant
Phase
Work Package
Activity
How-To
Accelerators
Task
Deliverable
Who
12
The structural organization of the
ASAP Roadmap and the
definitions for the Implementation
Assistant are as follows:
Phase - the major organizational steps of the ASAP Roadmap
Work packages - assigned to specific project teams
Activities - assigned to specific team members
Tasks How To’s
Accelerators
& Tools
Organization within the ASAP Roadmap
13
Phase Information
Phase level information consists of the purpose of the Phase, general
instructions on how to complete it, and the work packages that are
organized to complete the phase.
Purpose
General
Instructions
Work Packages
14
Work Package Information
Work Package level information consists of the purpose of the work
package and the activities that are organized to complete the Work
Package.
Purpose
Activities
15
Activity Information
Activity level information consists of the purpose of the Activity, general
instructions on how to complete it, the trigger for starting this activity, the
input needed, the expected results, and any templates or accelerators that
can be used to complete the activity.
Trigger
Input
Outcome
Output
Tool/Accelerator
16
Task Information
Task level information consists of the purpose of the Task, the suggested
procedure for completing the task, the personnel responsible, and any
templates, accelerators, or How-To’s that can be used to complete the
tasks.
Purpose
Task Procedure
Result(s)
Role(s)
Tool/Accelerator
17
Tools and Accelerators
18
Accelerated SAP Tools and Accelerators
• Implementation Assistant
Roadmap
• Tool: A self-contained appl. used to
perform work packages, activities
and larger tasks.
• Accelerator: Templates, models,
questionnaires created with
applications and used to perform
smaller tasks or roles.
19
Examples of ASAP Tools and Accelerators
• Accelerators
– Project Plans (MS Project or MS Excel)
– Cut-over Plan Template
– Products of the Knowledge Corner
– Business Process Procedures
• Tools
– SAP Concept Check Tool
– Question and Answer Database
– Open Issues Database
– Business Process Master List
20
Implementation Assistant Example
Project task: Define the Organizational Structure of the client.
Phase - Phase 2: Business Blueprint
Work packages - Business Organization Structure
Activities - Define Business Organization Structure
Tasks • Schedule Organization Structure Workshop
• Distribute Organization Structure Guidelines
• Conduct Organization Structure Workshop
• Recommend and Approve Organization Structure
21
Implementation Assistant Example (cont.)
Project task: Define the Organizational Structure of the client.
Tasks • Schedule Organization Structure Workshop
• Distribute Organization Structure Guidelines
• Conduct Organization Structure Workshop
• Recommend and Approve Organization Structure
Procedure
Tools/
Accelerators
• Conduct Session 1
• Develop Org Structure
• Conduct Session 2
• Q&A db
• Enterprise Area Scope Document
• Organization Structure Presentation Template
22
Key ASAP Deliverables from each phase
1 2 3 4 5
Project
Plan
Scope
Authorizations
that will be req
Reports to be
written
Conversions
to be made
Req. Interfaces
identified
Bus. Processes
identified
Org. Structure
defined
Reports
written
Interfaces
established
Conversion
made
Business
Process
Procedures
Test Cases
End User
Training
Materials
Test Plan
Test mat.
Go-Live Plan
x
x
x
x
x
x
x
x
x
x
System
Performance
Evaluation
Baseline
Scope
Business Process
Master List
Business
Blueprint
A Working
System
Realization
Final
Preparation
Project
Preparation
Go
Live
23
Example of Project Duration
1
2
3
4
5
Project Preparation 12%
Business Blueprint 15%
Realization 46%
Baseline 12%
Final Configuration 13%
Integration Test 21%
Final Project 19%
Go Live & Support 8%
Total 100%
PHASE %
24
The 5 Phases
25
Phase 1: Project Planning and Preparation
Key Work Packages
Project
Setup &
Kick-off
Project
Environment
Definition
L1 Training
Project
Standards &
Procedures
Definition
Phase
review and
sign-off
Scope
definition and
Planning
Org Change Management
Project Management
26
Project Planning and Prep - Who, What &
Where?
Secondary Responsibility
Primary Responsibility
Chng
Mgmt
Complian
ce
Steering
Commite
e
PMO FuncT
eam
Dev.
Team
Quality Plan, Phase Sign-
off Template
Training plan template
Evaluation template
Technical blueprint
document
Landscape strategy
document
Project Management
templates, OCM
Templates
Project Scope template
Migration Strategy
document
Project Kick-off template
Infrastructure requirement
template, Project plan
template, Project Charter,
business user deliverables
Accelerators
10%
Project Standards and
Procedures definition
10%
Scope definition and
planning
Project set-up and
kick-off
Quality review and
sign-off
L1 Training
Project Environment
Definition
Business
Team
Offshore-
ability
Tech.
Team
Work packages
27
Phase 2 : Business Blueprinting
Key Work Packages
Establishing
Dev System
L2 Training
Org Structure
Definition
Finalize
Technical
landscape
Business
process
Definition
Org Change Management
Project Management
Development
procedures/
Standards
Phase
sign-off
GAP Analysis
28
Business Blueprinting - Who, What &
Where?
Secondary Responsibility
Primary Responsibility
Training strategy and plan
Organizational impact analysis
40%
20%
30%
30%
20%
30%
10%
Offshore
-
ability
Phase sign-off template
Quality Review and sign-
off
ABAP development checklist,
RICEF Complexity Model,
Technical specification
Development procedures
and standards
Gap analysis, GAP closure
document
Gap Analysis
Blue Pint workshop guidelines,
Blue Print template, Functional
requirement templates
Migration Strategy document,
Gap list
Business Process
Definition
Chng
Mgmt
Complia
nce
Steering
Commte
PMO Func
Team
Dev.
Team
Sample Landscape strategy
Key Accelerators
Technical Design
Planning
Organizational
Structure Definition
L2 Training
Establish Dev
Environment
User
Group
Tech.
Team
Work packages
29
Phase 3: Realization
Key Work Packages
RICEFW
development
User Roles
and
Authorizations
Final scope
configuration
and
Confirmation
Base Line
Configuration
Develop
Quality
Assurance
Environment
Final
Integration
Testing
End-user
training
documentatio
n
Establish
Production
Environment
Org Change Management
Project Management
Phase review
and sign-off
30
Realization - Who, What and Where?
Secondary Responsibility
Primary Responsibility
End User Training Schedule
Change Readiness Plan
Organization Design
Phase review and sign-off
30%
SAP Installation Manual
Establish Production
environment
50%
Integration Test strategy
template, Test scripts
Integration Testing
30%
SAP Installation Manual
Develop Quality Assurance
environment
50%
SAP Best Practices, Config
document template, Change
Request Form Template
Final scope configuration and
confirmation
Chng
Mgmt
Complia
nce
Steering
Commte
PMO Func
Team
Dev.
Team
Training document
template
Functional, Technical
specification templates,
Code review checklist,
Migration framework with
re-usable SAP migration
objects
SAP Best Practices,
Config document template
Key Accelerators
50%
Baseline Configuration
50%
End User Training
documentation
50%
User Roles and Authorizations
70%
RICEF Development
User
Group
Offshore-
ability
Tech.
Team
Work packages
31
Phase 4: Final Preparation and cut-over
Key Work Packages
Performance
Tests
Post go-live
Support plan
Final cut-over
preparations
SAP Go Live
Check
preparation
Final Review
and Cut-over
End User
Training
Production
Cutover Plan
Org Change Management
Project Management
User
Acceptance
Test
32
Final Preparation and cut-over - Who,
What and Where?
Secondary Responsibility
Primary Responsibility
Final review and Cut-over
20%
Final cutover preparations
10%
Go, No-go decision pack
Post Go-Live support plan
10%
Production support
process
Production cut-over plan
Chng
Mgmt
Complia
nce
Steering
Commte
PMO FuncT
eam
Dev.
Team
Cut-over plan template
Test scripts
Training plan template
Accelerators
30%
End User Training
10%
SAP Go Live Check
preparation
30%
Performance tests
20%
User Acceptance Test
Business
Team
Offshore-
ability
Tech.
Team
Work packages
33
Phase 5: Post Go-Live Support
Key Work Packages
Post Go-Live
Review
Project
Sign-off
Production
system
Hand-over
Org Change Management
Project Management
34
Post Go-Live Support - Who, What and
Where?
Secondary Responsibility
Primary Responsibility
Chng
Mgmt
Complia
nce
Steering
Commte
PMO FuncT
eam
Dev.
Team
KT approach, Support
Transition plan
Support process template
Accelerators
30%
Post Go-Live
Review
Project sign-off
30%
Production
system handover
(*)
Busines
s Team
Offshore-
ability
Tech.
Team
Work packages
Notes:
(*) If the production support team based out of offshore, more than 60% of this
task can be handled from offshore
35
36
Ajay Kaushik +91 9177848097 ajay.kaushik@cxi.net
Thank you!

ASAP_Methodology.pptx

  • 1.
    From offshore leadershipto global leadership… ASAP Methodology
  • 2.
    2 Objectives Tools and Accelerators The5 Phases Agenda Review/Feedback/Conclusion
  • 3.
  • 4.
    4 Objectives • To discussthe use of the Accelerated SAP approach for conducting a rapid R/3 implementation • To explain how the Accelerated SAP Roadmap is used to facilitate implementation. • To identify the tools and accelerators used for performing ASAP. • To discuss the integration of the Roadmap with the R/3 Reference Model and the Implementation Guide (IMG).
  • 5.
    5 The R/3 ProceduralModel • SAP’s original implementation methodology. • Good for large, complex organizations looking to implement R/3 in stages. Create Interfaces and Enhancements Establish Reporting Establish Archiving Management Establish Archiving Management Perform Final Test Establish Global Settings Establish Company Structure Establish Master Data Perform Final Test Create Go - Live Plan Create User Documentation Set Up Production Environment Train Users Establish System Administration Transfer Data to Production System Support Productive Operation Optimize System Use Set Up System Environment Train Project Team Define Functions and Processes Design Interfaces and Enhancements Project Preparation Quality Con- ceptual Design Quality Appli- cation System Quality Pro- duction System Check Check Check Project Management System Maintenance and Release Upgrade Organization and Conceptual Design Detailed Design and System Set-Up Preparations for Going Live Productive Operation Copyright, SAP AG.
  • 6.
    6 The Procedure Model •The SAP core tool that describes the activities needed when implementing SAP. • It’s like a detailed project plan of all the steps and tasks involved during the implementation process. Tools  Business Engineering  Customizing Basic Functions  Procedural Module • It’s useful for large, complex organizations wishing to implement R/3 in stages. • However, this is being replaced with the Accelerated SAP method of implementation.
  • 7.
    7 Accelerated SAP The ImplementationSolution • Q&A Database • ASAP Roadmap • Knowledge Corner • BP Masterlist • Accelerators PC Based Tools Training & Education, InfoDB, SAPNet OSS Support, Quality Assurance Service • Implementation Guide • Reference Model • Profile Generator • Change Request Management R/3 Resident Tools Methodology Implementation Assistant R/3 Business Engineer
  • 8.
    8 What is ContainedWithin ? • The ASAP Roadmap: – A Step-by-step procedures and recommendations • Tools: – The ASAP Implementation Assistant: • A navigation tool for the Roadmap, questionnaires, templates, and check lists. • Q&A database for documenting requirements. – R/3 Business Engineer tools for creating the Business Blueprint (conceptual design) and for configuration. • R/3 Services and Training: – All the services are available for ASAP projects, including consulting, training, hotline, Early Watch, OSS, Info DB.
  • 9.
    9 The Implementation Assistant •The Implementation Assistant (IA) is a PC based application made up of numerous tools and templates developed to support the ASAP implementation approach  The IA is the primary tool and framework for executing the ASAP methodology.
  • 10.
    10 Organization of theImplementation Assistant • ASAP Roadmap • Implementation Accelerators • Project Plan • Question and Answer Database • Issues Database • Business Process Procedures • Knowledge Corner • Glossary • Help Tree structure Search tool
  • 11.
    11 Organization within theImplementation Assistant Phase Work Package Activity How-To Accelerators Task Deliverable Who
  • 12.
    12 The structural organizationof the ASAP Roadmap and the definitions for the Implementation Assistant are as follows: Phase - the major organizational steps of the ASAP Roadmap Work packages - assigned to specific project teams Activities - assigned to specific team members Tasks How To’s Accelerators & Tools Organization within the ASAP Roadmap
  • 13.
    13 Phase Information Phase levelinformation consists of the purpose of the Phase, general instructions on how to complete it, and the work packages that are organized to complete the phase. Purpose General Instructions Work Packages
  • 14.
    14 Work Package Information WorkPackage level information consists of the purpose of the work package and the activities that are organized to complete the Work Package. Purpose Activities
  • 15.
    15 Activity Information Activity levelinformation consists of the purpose of the Activity, general instructions on how to complete it, the trigger for starting this activity, the input needed, the expected results, and any templates or accelerators that can be used to complete the activity. Trigger Input Outcome Output Tool/Accelerator
  • 16.
    16 Task Information Task levelinformation consists of the purpose of the Task, the suggested procedure for completing the task, the personnel responsible, and any templates, accelerators, or How-To’s that can be used to complete the tasks. Purpose Task Procedure Result(s) Role(s) Tool/Accelerator
  • 17.
  • 18.
    18 Accelerated SAP Toolsand Accelerators • Implementation Assistant Roadmap • Tool: A self-contained appl. used to perform work packages, activities and larger tasks. • Accelerator: Templates, models, questionnaires created with applications and used to perform smaller tasks or roles.
  • 19.
    19 Examples of ASAPTools and Accelerators • Accelerators – Project Plans (MS Project or MS Excel) – Cut-over Plan Template – Products of the Knowledge Corner – Business Process Procedures • Tools – SAP Concept Check Tool – Question and Answer Database – Open Issues Database – Business Process Master List
  • 20.
    20 Implementation Assistant Example Projecttask: Define the Organizational Structure of the client. Phase - Phase 2: Business Blueprint Work packages - Business Organization Structure Activities - Define Business Organization Structure Tasks • Schedule Organization Structure Workshop • Distribute Organization Structure Guidelines • Conduct Organization Structure Workshop • Recommend and Approve Organization Structure
  • 21.
    21 Implementation Assistant Example(cont.) Project task: Define the Organizational Structure of the client. Tasks • Schedule Organization Structure Workshop • Distribute Organization Structure Guidelines • Conduct Organization Structure Workshop • Recommend and Approve Organization Structure Procedure Tools/ Accelerators • Conduct Session 1 • Develop Org Structure • Conduct Session 2 • Q&A db • Enterprise Area Scope Document • Organization Structure Presentation Template
  • 22.
    22 Key ASAP Deliverablesfrom each phase 1 2 3 4 5 Project Plan Scope Authorizations that will be req Reports to be written Conversions to be made Req. Interfaces identified Bus. Processes identified Org. Structure defined Reports written Interfaces established Conversion made Business Process Procedures Test Cases End User Training Materials Test Plan Test mat. Go-Live Plan x x x x x x x x x x System Performance Evaluation Baseline Scope Business Process Master List Business Blueprint A Working System Realization Final Preparation Project Preparation Go Live
  • 23.
    23 Example of ProjectDuration 1 2 3 4 5 Project Preparation 12% Business Blueprint 15% Realization 46% Baseline 12% Final Configuration 13% Integration Test 21% Final Project 19% Go Live & Support 8% Total 100% PHASE %
  • 24.
  • 25.
    25 Phase 1: ProjectPlanning and Preparation Key Work Packages Project Setup & Kick-off Project Environment Definition L1 Training Project Standards & Procedures Definition Phase review and sign-off Scope definition and Planning Org Change Management Project Management
  • 26.
    26 Project Planning andPrep - Who, What & Where? Secondary Responsibility Primary Responsibility Chng Mgmt Complian ce Steering Commite e PMO FuncT eam Dev. Team Quality Plan, Phase Sign- off Template Training plan template Evaluation template Technical blueprint document Landscape strategy document Project Management templates, OCM Templates Project Scope template Migration Strategy document Project Kick-off template Infrastructure requirement template, Project plan template, Project Charter, business user deliverables Accelerators 10% Project Standards and Procedures definition 10% Scope definition and planning Project set-up and kick-off Quality review and sign-off L1 Training Project Environment Definition Business Team Offshore- ability Tech. Team Work packages
  • 27.
    27 Phase 2 :Business Blueprinting Key Work Packages Establishing Dev System L2 Training Org Structure Definition Finalize Technical landscape Business process Definition Org Change Management Project Management Development procedures/ Standards Phase sign-off GAP Analysis
  • 28.
    28 Business Blueprinting -Who, What & Where? Secondary Responsibility Primary Responsibility Training strategy and plan Organizational impact analysis 40% 20% 30% 30% 20% 30% 10% Offshore - ability Phase sign-off template Quality Review and sign- off ABAP development checklist, RICEF Complexity Model, Technical specification Development procedures and standards Gap analysis, GAP closure document Gap Analysis Blue Pint workshop guidelines, Blue Print template, Functional requirement templates Migration Strategy document, Gap list Business Process Definition Chng Mgmt Complia nce Steering Commte PMO Func Team Dev. Team Sample Landscape strategy Key Accelerators Technical Design Planning Organizational Structure Definition L2 Training Establish Dev Environment User Group Tech. Team Work packages
  • 29.
    29 Phase 3: Realization KeyWork Packages RICEFW development User Roles and Authorizations Final scope configuration and Confirmation Base Line Configuration Develop Quality Assurance Environment Final Integration Testing End-user training documentatio n Establish Production Environment Org Change Management Project Management Phase review and sign-off
  • 30.
    30 Realization - Who,What and Where? Secondary Responsibility Primary Responsibility End User Training Schedule Change Readiness Plan Organization Design Phase review and sign-off 30% SAP Installation Manual Establish Production environment 50% Integration Test strategy template, Test scripts Integration Testing 30% SAP Installation Manual Develop Quality Assurance environment 50% SAP Best Practices, Config document template, Change Request Form Template Final scope configuration and confirmation Chng Mgmt Complia nce Steering Commte PMO Func Team Dev. Team Training document template Functional, Technical specification templates, Code review checklist, Migration framework with re-usable SAP migration objects SAP Best Practices, Config document template Key Accelerators 50% Baseline Configuration 50% End User Training documentation 50% User Roles and Authorizations 70% RICEF Development User Group Offshore- ability Tech. Team Work packages
  • 31.
    31 Phase 4: FinalPreparation and cut-over Key Work Packages Performance Tests Post go-live Support plan Final cut-over preparations SAP Go Live Check preparation Final Review and Cut-over End User Training Production Cutover Plan Org Change Management Project Management User Acceptance Test
  • 32.
    32 Final Preparation andcut-over - Who, What and Where? Secondary Responsibility Primary Responsibility Final review and Cut-over 20% Final cutover preparations 10% Go, No-go decision pack Post Go-Live support plan 10% Production support process Production cut-over plan Chng Mgmt Complia nce Steering Commte PMO FuncT eam Dev. Team Cut-over plan template Test scripts Training plan template Accelerators 30% End User Training 10% SAP Go Live Check preparation 30% Performance tests 20% User Acceptance Test Business Team Offshore- ability Tech. Team Work packages
  • 33.
    33 Phase 5: PostGo-Live Support Key Work Packages Post Go-Live Review Project Sign-off Production system Hand-over Org Change Management Project Management
  • 34.
    34 Post Go-Live Support- Who, What and Where? Secondary Responsibility Primary Responsibility Chng Mgmt Complia nce Steering Commte PMO FuncT eam Dev. Team KT approach, Support Transition plan Support process template Accelerators 30% Post Go-Live Review Project sign-off 30% Production system handover (*) Busines s Team Offshore- ability Tech. Team Work packages Notes: (*) If the production support team based out of offshore, more than 60% of this task can be handled from offshore
  • 35.
  • 36.
    36 Ajay Kaushik +919177848097 ajay.kaushik@cxi.net Thank you!