SlideShare a Scribd company logo
Work Samples - Peng Wang
Zayed Center, Lahore
High-rise Mixed-
               -use Complex



  Company: HOK Group, DC Office
  Role:       Designer
  Supervisor: Duncan Lyons, Design Principal
Bird’s Eye View Rendering
Area Summary


      •   Total:      4,802,800 SF.
      •   Office:     1,368,000 SF.
      •   Hotel:       530,000 SF.
      •   Apartments: 2,170,400 SF.
      •   Retail:      696,200SF.
      •   Cineplex:    38,200 SF.
      •   Car Parking: 2,800 Cars
Harbour Station, Woodbridge, VA
High-rise Service Apartment Complex
     rise




    Company: HOK Group, DC Office
    Role:       Designer
    Supervisor: Duncan Lyons, Design Principal
Shanghai Jin Hongqiao Center
  High-rise Office + Low
       rise          Low-rise Retail




  Company: John Portman & Associates
  Role:       Design Architect
  Supervisor: Kinka Wong, Project Director
Bird’s Eye View Rendering
Design Concept – City Gate Shanghai
                      Gate,
         Bird’s Eye View Rendering
Ground Floor Plan & North Elevation
Typical Low-RiseTower Plan & South Elevation
            RiseTower
Hilton Bayfront Hotel & Convention Center
              San Diego, CA
       High-rise Hotel + Convention Center
            rise




       Company: John Portman & Associates
       Role:       Design Architect
       Supervisor: Kinka Wong, Project Director
Bird’s Eye View Rendering
Project Data




        l   Hilton Bayfront Hotel

        l   1190 room convention center hotel

        l   92,900 sq. meters
        l   Two Large ballrooms (3160 sq. meters
            and 2230 sq. meters)

        l   15,330 sq. meters total meeting space
        l   Three restaurants
Design Experience
•The site was prone to eartquakes, requiring       •The site had been a ship building yard
special structure throughout the building          previously, so there was a necessity to
                                                   remediate the soil
•Our assignment during this project was to
work with the developer to design and address
voluminous project conditions.

•The site location adjacent to the bay had salt-
laden air, complicating details which had metal
exposed to the air
Ground Floor Plan, Views of Spa & Bar
Vertical Transportation

•   From early design development to
    substantial completion took 3.5
    years.
•   Vertical transportation including
    elevator core/lobby and escalator
    lobby were part of my responsibility
    from design concept through
    construction document phase.
Guestrooms

•   From early design development to
    substantial completion took 3.5 years.
•   Trying to get more guestrooms to enjoy
    the bay view.

More Related Content

Similar to Recent Work Samples of Peng Wang

zk resume
zk resumezk resume
zk resume
zafrulla khan
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
RICHBUTKUS
 
Appendices
AppendicesAppendices
InterContinental Double Bay
InterContinental Double Bay InterContinental Double Bay
InterContinental Double Bay
Od Solutions
 
John Nelson CV 29 Oct 2015
John Nelson CV 29 Oct 2015John Nelson CV 29 Oct 2015
John Nelson CV 29 Oct 2015
John Nelson FRICS, FHKIS, FCIOB.
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
RICHBUTKUS
 
AF2018 Day 2 Platkowski
AF2018 Day 2 PlatkowskiAF2018 Day 2 Platkowski
AF2018 Day 2 Platkowski
Architecture of the Future
 
Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2
David Seaward
 
Key Projects Summary
Key Projects SummaryKey Projects Summary
Key Projects Summary
Brian Lorenc
 
Resume.Sherif
Resume.SherifResume.Sherif
Resume.Sherif
sherif63
 
Portfolio
PortfolioPortfolio
Portfolio
Ashwani Bhalla
 
Luca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdfLuca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdf
Luca Tentellini
 
Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resume
Renee Thomas
 
R PROFILE 0216
R PROFILE 0216R PROFILE 0216
R PROFILE 0216
rashad alami
 
Potomac Place Shopping Center
Potomac Place Shopping CenterPotomac Place Shopping Center
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
Roman Rozek
 
CV-Ian Traill Jan 2016
 CV-Ian Traill Jan 2016 CV-Ian Traill Jan 2016
CV-Ian Traill Jan 2016
Ian Traill
 
Las-Olas - Revised 050716
Las-Olas - Revised 050716Las-Olas - Revised 050716
Las-Olas - Revised 050716
David Peterson
 
John R. Scanlon AIA
John R. Scanlon AIAJohn R. Scanlon AIA
John R. Scanlon AIA
jrscanlon
 
Adonis designs project portfolio
Adonis designs project portfolioAdonis designs project portfolio
Adonis designs project portfolio
Amit Koli
 

Similar to Recent Work Samples of Peng Wang (20)

zk resume
zk resumezk resume
zk resume
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
 
Appendices
AppendicesAppendices
Appendices
 
InterContinental Double Bay
InterContinental Double Bay InterContinental Double Bay
InterContinental Double Bay
 
John Nelson CV 29 Oct 2015
John Nelson CV 29 Oct 2015John Nelson CV 29 Oct 2015
John Nelson CV 29 Oct 2015
 
Jll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser ScanningJll Presentation Cpa And Bohler Arch And Laser Scanning
Jll Presentation Cpa And Bohler Arch And Laser Scanning
 
AF2018 Day 2 Platkowski
AF2018 Day 2 PlatkowskiAF2018 Day 2 Platkowski
AF2018 Day 2 Platkowski
 
Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2Resume Oct 2015 Revision 2
Resume Oct 2015 Revision 2
 
Key Projects Summary
Key Projects SummaryKey Projects Summary
Key Projects Summary
 
Resume.Sherif
Resume.SherifResume.Sherif
Resume.Sherif
 
Portfolio
PortfolioPortfolio
Portfolio
 
Luca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdfLuca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdf
 
Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resume
 
R PROFILE 0216
R PROFILE 0216R PROFILE 0216
R PROFILE 0216
 
Potomac Place Shopping Center
Potomac Place Shopping CenterPotomac Place Shopping Center
Potomac Place Shopping Center
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
CV-Ian Traill Jan 2016
 CV-Ian Traill Jan 2016 CV-Ian Traill Jan 2016
CV-Ian Traill Jan 2016
 
Las-Olas - Revised 050716
Las-Olas - Revised 050716Las-Olas - Revised 050716
Las-Olas - Revised 050716
 
John R. Scanlon AIA
John R. Scanlon AIAJohn R. Scanlon AIA
John R. Scanlon AIA
 
Adonis designs project portfolio
Adonis designs project portfolioAdonis designs project portfolio
Adonis designs project portfolio
 

Recently uploaded

按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
kuapy
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NishantRathi18
 
UXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdfUXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdf
anthonylin333
 
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Designforuminternational
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
lhtvqoag
 
定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样
qo1as76n
 
Getting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by NeontribeGetting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by Neontribe
Harry Harrold
 
一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样
tobbk6s8
 
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
k7nm6tk
 
Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)
bagmai
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
881evgn0
 
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
hw2xf1m
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
Jaime Brown
 
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdfAHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
talaatahm
 
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
9lq7ultg
 
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
21uul8se
 
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
ijk38lw
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
qo1as76n
 
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
3vgr39kx
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
Knight Moves
 

Recently uploaded (20)

按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
 
UXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdfUXpert_Report (UALR Mapping Renewal 2022).pdf
UXpert_Report (UALR Mapping Renewal 2022).pdf
 
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
 
定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样
 
Getting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by NeontribeGetting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by Neontribe
 
一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样一比一原版肯特大学毕业证UKC成绩单一模一样
一比一原版肯特大学毕业证UKC成绩单一模一样
 
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
一比一原版(LSBU毕业证书)伦敦南岸大学毕业证如何办理
 
Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)Manual ISH (International Society of Hypertension)
Manual ISH (International Society of Hypertension)
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
 
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
原版制作(MDIS毕业证书)新加坡管理发展学院毕业证学位证一模一样
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
 
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdfAHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
AHMED TALAAT ARCHITECTURE PORTFOLIO .pdf
 
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
 
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
一比一原版亚利桑那大学毕业证(UA毕业证书)如何办理
 
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
 
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
一比一原版南安普顿索伦特大学毕业证Southampton成绩单一模一样
 
ARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdfARENA - Young adults in the workplace (Knight Moves).pdf
ARENA - Young adults in the workplace (Knight Moves).pdf
 

Recent Work Samples of Peng Wang

  • 1. Work Samples - Peng Wang
  • 2. Zayed Center, Lahore High-rise Mixed- -use Complex Company: HOK Group, DC Office Role: Designer Supervisor: Duncan Lyons, Design Principal
  • 3. Bird’s Eye View Rendering
  • 4. Area Summary • Total: 4,802,800 SF. • Office: 1,368,000 SF. • Hotel: 530,000 SF. • Apartments: 2,170,400 SF. • Retail: 696,200SF. • Cineplex: 38,200 SF. • Car Parking: 2,800 Cars
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16. Harbour Station, Woodbridge, VA High-rise Service Apartment Complex rise Company: HOK Group, DC Office Role: Designer Supervisor: Duncan Lyons, Design Principal
  • 17.
  • 18.
  • 19.
  • 20.
  • 21. Shanghai Jin Hongqiao Center High-rise Office + Low rise Low-rise Retail Company: John Portman & Associates Role: Design Architect Supervisor: Kinka Wong, Project Director
  • 22. Bird’s Eye View Rendering
  • 23. Design Concept – City Gate Shanghai Gate, Bird’s Eye View Rendering
  • 24. Ground Floor Plan & North Elevation
  • 25.
  • 26. Typical Low-RiseTower Plan & South Elevation RiseTower
  • 27.
  • 28.
  • 29.
  • 30. Hilton Bayfront Hotel & Convention Center San Diego, CA High-rise Hotel + Convention Center rise Company: John Portman & Associates Role: Design Architect Supervisor: Kinka Wong, Project Director
  • 31. Bird’s Eye View Rendering
  • 32. Project Data l Hilton Bayfront Hotel l 1190 room convention center hotel l 92,900 sq. meters l Two Large ballrooms (3160 sq. meters and 2230 sq. meters) l 15,330 sq. meters total meeting space l Three restaurants
  • 33. Design Experience •The site was prone to eartquakes, requiring •The site had been a ship building yard special structure throughout the building previously, so there was a necessity to remediate the soil •Our assignment during this project was to work with the developer to design and address voluminous project conditions. •The site location adjacent to the bay had salt- laden air, complicating details which had metal exposed to the air
  • 34. Ground Floor Plan, Views of Spa & Bar
  • 35. Vertical Transportation • From early design development to substantial completion took 3.5 years. • Vertical transportation including elevator core/lobby and escalator lobby were part of my responsibility from design concept through construction document phase.
  • 36. Guestrooms • From early design development to substantial completion took 3.5 years. • Trying to get more guestrooms to enjoy the bay view.