- The Monte Group was founded in 1980 by Manuel and Alípio do Monte and has since expanded internationally. It is now present in 10 countries across Europe, Africa, and South America.
- The Group engages in engineering and construction, aggregates and industry, environmental services, real estate, concessions, and capital investments. It has over 2,600 employees worldwide.
- Key business units include road concessions, water infrastructure projects, wastewater treatment plants, quarries and concrete production, and environmental services. The Group aims to strengthen its presence in existing markets and core business areas.
The document describes a proposed industrial park project in Colombia called Polígonos Industriales de Colombia (PIC), which would develop 396 hectares of land into industrial blocks with roads, utilities, and environmental protections to attract businesses. The PIC aims to stimulate the local economy by providing ideal conditions for efficient industrial operations and productivity in a comfortable environment. It outlines the project details, location advantages, construction stages, technical specifications, environmental protections, and tax benefits to promote investment in the development.
The document outlines several tourism development projects along Haiti's Caribbean coast, including in the regions of Jacmel, Côtes-de-Fer, and Île-à-Vache. The government aims to invest over $100 million in new hotels, airports, roads, and other infrastructure to attract private investment and create over 3,500 new hotel rooms. Specific projects proposed include renovating historic sites in Jacmel, developing a large integrated tourism zone in Côtes-de-Fer along 26km of beaches, and upgrading the island of Île-à-Vache into an eco-tourism destination.
The document outlines the master plan for the Côtes de Fer integrated ecotourism development area in Haiti. It includes sections on transportation and location accessibility, a proposed three-phase master plan, photographs of beaches in the area, and target images. The multi-phase master plan would include hotels, residential areas, commercial spaces, and restoration of natural areas, with an estimated total investment of $65 million for the first phase.
ZAL Port is a logistics platform established in Barcelona in 1992 as part of infrastructure development for the 1992 Olympics. It has become a highly successful model that is recognized internationally. In 2015, ZAL Port achieved its best economic performance with over €41.8 million in revenue and a 97% occupancy rate in warehouses. ZAL Port prioritizes sustainable practices such as solar panels, LED lighting, and obtaining environmental certifications.
The document describes a logistic terminal for lease located in Bogota, Colombia. It provides details on the total area of the terminal, including warehouses, offices, and commercial space. It then gives the location and driving distances from Bogota and nearby cities. Further sections provide descriptions of the layout, features of the warehouses such as loading docks and mezzanines, commercial areas, and contact information.
VIVERS CENTRE VERD, S.A.U was established in 1997 and has grown to provide a wide range of gardening and landscaping services including the production and sale of ornamental plants, maintenance of green spaces, gardening and landscaping works, studies and projects, and sports field construction. The company has diversified its operations and employs qualified personnel and resources to complete all stages of projects to the highest standards of quality for its clients.
- The Monte Group was founded in 1980 by Manuel and Alípio do Monte and has since expanded internationally. It is now present in 10 countries across Europe, Africa, and South America.
- The Group engages in engineering and construction, aggregates and industry, environmental services, real estate, concessions, and capital investments. It has over 2,600 employees worldwide.
- Key business units include road concessions totaling 847 km, water treatment plants and infrastructure projects, and 8 aggregates plants in Portugal and 7 in Angola. The Group is continuously expanding into new markets and business areas.
The document describes a proposed industrial park project in Colombia called Polígonos Industriales de Colombia (PIC), which would develop 396 hectares of land into industrial blocks with roads, utilities, and environmental protections to attract businesses. The PIC aims to stimulate the local economy by providing ideal conditions for efficient industrial operations and productivity in a comfortable environment. It outlines the project details, location advantages, construction stages, technical specifications, environmental protections, and tax benefits to promote investment in the development.
The document outlines several tourism development projects along Haiti's Caribbean coast, including in the regions of Jacmel, Côtes-de-Fer, and Île-à-Vache. The government aims to invest over $100 million in new hotels, airports, roads, and other infrastructure to attract private investment and create over 3,500 new hotel rooms. Specific projects proposed include renovating historic sites in Jacmel, developing a large integrated tourism zone in Côtes-de-Fer along 26km of beaches, and upgrading the island of Île-à-Vache into an eco-tourism destination.
The document outlines the master plan for the Côtes de Fer integrated ecotourism development area in Haiti. It includes sections on transportation and location accessibility, a proposed three-phase master plan, photographs of beaches in the area, and target images. The multi-phase master plan would include hotels, residential areas, commercial spaces, and restoration of natural areas, with an estimated total investment of $65 million for the first phase.
ZAL Port is a logistics platform established in Barcelona in 1992 as part of infrastructure development for the 1992 Olympics. It has become a highly successful model that is recognized internationally. In 2015, ZAL Port achieved its best economic performance with over €41.8 million in revenue and a 97% occupancy rate in warehouses. ZAL Port prioritizes sustainable practices such as solar panels, LED lighting, and obtaining environmental certifications.
The document describes a logistic terminal for lease located in Bogota, Colombia. It provides details on the total area of the terminal, including warehouses, offices, and commercial space. It then gives the location and driving distances from Bogota and nearby cities. Further sections provide descriptions of the layout, features of the warehouses such as loading docks and mezzanines, commercial areas, and contact information.
VIVERS CENTRE VERD, S.A.U was established in 1997 and has grown to provide a wide range of gardening and landscaping services including the production and sale of ornamental plants, maintenance of green spaces, gardening and landscaping works, studies and projects, and sports field construction. The company has diversified its operations and employs qualified personnel and resources to complete all stages of projects to the highest standards of quality for its clients.
- The Monte Group was founded in 1980 by Manuel and Alípio do Monte and has since expanded internationally. It is now present in 10 countries across Europe, Africa, and South America.
- The Group engages in engineering and construction, aggregates and industry, environmental services, real estate, concessions, and capital investments. It has over 2,600 employees worldwide.
- Key business units include road concessions totaling 847 km, water treatment plants and infrastructure projects, and 8 aggregates plants in Portugal and 7 in Angola. The Group is continuously expanding into new markets and business areas.
Este documento discute a importância da otimização dos processos de extração e transformação de rochas, começando pela perfuração. A perfuração é a primeira etapa e afeta a eficiência de todas as etapas subsequentes. Os palestrantes da MonteAdriano apresentaram um estudo sobre como otimizar a perfuração de maciços rochosos fracturados para reduzir custos e aumentar a produtividade. O documento também discute a importância do zoneamento geotécnico de pedreiras para apoiar a gestão dos recursos geológic
The document provides a history of Monte Group from 1940 to present day. It traces the founding and growth of the company under Avelino Gomes do Monte and later his nephews Manuel and Alípio do Monte. It details the company's expansion internationally beginning in 1996 and various acquisitions and business lines added through the 2000s. The organization chart and information is also presented on the group's various business units including Engineering & Construction, Aggregates & Industry, Environment & Energy, Capital & Services, and Real Estate & Tourism.
The document discusses each of the seven deadly sins - pride, envy, gluttony, greed, wrath, lust, and sloth. For each sin, it poses reflective questions to help the reader consider if and how that sin manifests in their own life. It encourages introspection on one's relationship with and expression of each sin.
The document provides an overview of content and optimization strategies for startups. It discusses inbound marketing, how people search for information online, the importance of good web design for conversions, and technical SEO factors like keywords, URLs, and page speed. The document emphasizes testing design changes through A/B testing and using free analytics tools to optimize the site.
This document provides instructions for submitting a story using an online system. It outlines the 4 stories available within a 12 month period and notes that each submission will be deducted. Users are advised to seek tips and resources before starting. The instructions then guide users through logging in, providing story details, uploading optional photos, editing and submitting the story for review within 24 hours. Users can then approve or request changes to the finalized story before it is distributed to media outlets. Contact details are provided for support.
1. The document discusses various cell types and organelles. It provides examples of unicellular organisms like bacteria and describes organelles that would be visible under an electron microscope like mitochondria and ribosomes.
2. Questions are asked about how different cell types are suited to their functions. For example, cheek epithelial cells are flat and irregularly shaped to form a protective layer in the mouth.
3. The roles of cell structures like rough endoplasmic reticulum, smooth endoplasmic reticulum and mitochondria are defined. Xylem tissue and its role in water transport and support is also discussed.
Outlines a recent collaborrative marketing campaign between Free People clothing and Olapic, a social image sharing startup. The end result was innovative functionality that allowed Free People customers the ability to have images they uploaded to Twitter, Instagram, and Facebook appear on product detail pages at Freepeople.com. This deck chronicles the idea from inception through reception of what was ultimately a successful campaign to support the relaunch of Free People's denim line.
Este documento analiza las diferentes ediciones del Informe Horizonte de 2014 a 2016. El Informe Horizonte identifica tecnologías emergentes que podrían tener un impacto en la educación en los próximos 1 a 2 años, 2 a 3 años, y 4 a 5 años. El documento compara las tecnologías identificadas en cada período y ofrece ejemplos de cómo algunas tecnologías podrían usarse en Panamá.
Biometrics is the science of measuring and analyzing human body characteristics for authentication purposes. Major biometrics include face, fingerprints, and irises. Fingerprints are uniquely persistent and can be used for positive identification through analysis of ridge and minutiae patterns, such as bifurcations and ridge endings. Fingerprint images are typically stored and classified according to international standards that define format, resolution, and quality parameters.
This document provides an overview of the Antamina mining operation in Peru as follows:
1) Antamina is a large copper mine located in Peru that began operations in 2001. It is one of the largest and lowest cost copper mines globally.
2) The mine produces copper, zinc, silver and other metals. Production has increased over time with expansions. In 2016 it produced 431kt of copper.
3) The mine is owned by major mining companies and has extensive infrastructure including a pipeline and port facilities to transport its concentrates.
ACCIONA is unveiling the ACCIONA 100% EcoPowered, the first fully electric vehicle to participate in the Dakar Rally, powered solely by clean energy with zero emissions; this pioneering project faces the challenges of competing in the toughest motorsport event in the world with an electric car's limited range and need for battery recharging during stages; ACCIONA hopes to prove electric vehicles can compete at the highest level and lead the way for others by demonstrating an alternative that does not generate emissions.
Waste & Water SARL is an environmental services and consulting company founded in France with offices in France and Greece. The company provides a range of water and wastewater treatment services including design, construction, operation, and maintenance of municipal and industrial wastewater treatment plants and water supply networks. It has 50 employees and experience with over 100 projects in Greece, France, and other European countries.
COMSA Corporación is a Spanish infrastructure and engineering group founded in 1891. In 2017, it had a turnover of €1.08 billion and over 7,700 employees. It operates internationally in 24 countries across five continents. COMSA provides comprehensive infrastructure, industrial engineering, environmental, and technology services, with a focus on railways, civil works, buildings, and maintenance. The company has over 120 years of history in infrastructure development and international recognition for its expertise and innovation.
Some highlighted articles of ACCIONA Reports 70 talk about sustainable mobility in cities, the first renewable energy facility in Easter Island and other amazing stories.
El hierro island. local economy, sustainability and mobility. pécsjmorales001
Experiences on sustainability of El Hierro island and other parts of the world based on renewable energy, organic food, sustainable mobility and Blue Economy
The Breton delegation will be happy to welcome you at booth AE22
AMO-EOLHYD
BREIZH’EMR
BRETAGNE POLE NAVAL
IN VIVO
ORANGE MARINE
PORT BREST BRETAGNE
QUIET-OCEANS
RTSYS
BLUE WATER SHIPPING
The document provides an overview of Italcementi Group, which is the world's fifth largest cement producer with a presence in 22 countries. Some key details:
- It has over 18,000 employees and an annual production capacity of approximately 61 million tons.
- The group has a 150-year history and is currently owned and operated by the founding family's fifth generation.
- Italcementi Group has a worldwide presence with 46 cement plants, 12 grinding centers, 98 quarries, and 417 concrete plants. It generates over 4.1 billion Euros in annual sales.
- In addition to cement, concrete, and aggregates, the group operates businesses in related areas like trading, energy production
The document summarizes information about a proposed public-private partnership (PPP) project to restore degraded ecosystems along the Canal del Dique in Colombia.
Key details include:
1) The project would involve constructing 39 works along the 114km Canal del Dique to restore wetlands and improve navigability.
2) The estimated cost is $1.95 billion with a 15-year concession period. Revenue sources would include navigation fees.
3) The project aims to control sedimentation, regulate water flows, adapt to climate change, and restore ecosystems among other objectives.
4) A prequalification process for bidders is currently underway and requires legal capacity, investment experience, and financial capability.
Este documento discute a importância da otimização dos processos de extração e transformação de rochas, começando pela perfuração. A perfuração é a primeira etapa e afeta a eficiência de todas as etapas subsequentes. Os palestrantes da MonteAdriano apresentaram um estudo sobre como otimizar a perfuração de maciços rochosos fracturados para reduzir custos e aumentar a produtividade. O documento também discute a importância do zoneamento geotécnico de pedreiras para apoiar a gestão dos recursos geológic
The document provides a history of Monte Group from 1940 to present day. It traces the founding and growth of the company under Avelino Gomes do Monte and later his nephews Manuel and Alípio do Monte. It details the company's expansion internationally beginning in 1996 and various acquisitions and business lines added through the 2000s. The organization chart and information is also presented on the group's various business units including Engineering & Construction, Aggregates & Industry, Environment & Energy, Capital & Services, and Real Estate & Tourism.
The document discusses each of the seven deadly sins - pride, envy, gluttony, greed, wrath, lust, and sloth. For each sin, it poses reflective questions to help the reader consider if and how that sin manifests in their own life. It encourages introspection on one's relationship with and expression of each sin.
The document provides an overview of content and optimization strategies for startups. It discusses inbound marketing, how people search for information online, the importance of good web design for conversions, and technical SEO factors like keywords, URLs, and page speed. The document emphasizes testing design changes through A/B testing and using free analytics tools to optimize the site.
This document provides instructions for submitting a story using an online system. It outlines the 4 stories available within a 12 month period and notes that each submission will be deducted. Users are advised to seek tips and resources before starting. The instructions then guide users through logging in, providing story details, uploading optional photos, editing and submitting the story for review within 24 hours. Users can then approve or request changes to the finalized story before it is distributed to media outlets. Contact details are provided for support.
1. The document discusses various cell types and organelles. It provides examples of unicellular organisms like bacteria and describes organelles that would be visible under an electron microscope like mitochondria and ribosomes.
2. Questions are asked about how different cell types are suited to their functions. For example, cheek epithelial cells are flat and irregularly shaped to form a protective layer in the mouth.
3. The roles of cell structures like rough endoplasmic reticulum, smooth endoplasmic reticulum and mitochondria are defined. Xylem tissue and its role in water transport and support is also discussed.
Outlines a recent collaborrative marketing campaign between Free People clothing and Olapic, a social image sharing startup. The end result was innovative functionality that allowed Free People customers the ability to have images they uploaded to Twitter, Instagram, and Facebook appear on product detail pages at Freepeople.com. This deck chronicles the idea from inception through reception of what was ultimately a successful campaign to support the relaunch of Free People's denim line.
Este documento analiza las diferentes ediciones del Informe Horizonte de 2014 a 2016. El Informe Horizonte identifica tecnologías emergentes que podrían tener un impacto en la educación en los próximos 1 a 2 años, 2 a 3 años, y 4 a 5 años. El documento compara las tecnologías identificadas en cada período y ofrece ejemplos de cómo algunas tecnologías podrían usarse en Panamá.
Biometrics is the science of measuring and analyzing human body characteristics for authentication purposes. Major biometrics include face, fingerprints, and irises. Fingerprints are uniquely persistent and can be used for positive identification through analysis of ridge and minutiae patterns, such as bifurcations and ridge endings. Fingerprint images are typically stored and classified according to international standards that define format, resolution, and quality parameters.
This document provides an overview of the Antamina mining operation in Peru as follows:
1) Antamina is a large copper mine located in Peru that began operations in 2001. It is one of the largest and lowest cost copper mines globally.
2) The mine produces copper, zinc, silver and other metals. Production has increased over time with expansions. In 2016 it produced 431kt of copper.
3) The mine is owned by major mining companies and has extensive infrastructure including a pipeline and port facilities to transport its concentrates.
ACCIONA is unveiling the ACCIONA 100% EcoPowered, the first fully electric vehicle to participate in the Dakar Rally, powered solely by clean energy with zero emissions; this pioneering project faces the challenges of competing in the toughest motorsport event in the world with an electric car's limited range and need for battery recharging during stages; ACCIONA hopes to prove electric vehicles can compete at the highest level and lead the way for others by demonstrating an alternative that does not generate emissions.
Waste & Water SARL is an environmental services and consulting company founded in France with offices in France and Greece. The company provides a range of water and wastewater treatment services including design, construction, operation, and maintenance of municipal and industrial wastewater treatment plants and water supply networks. It has 50 employees and experience with over 100 projects in Greece, France, and other European countries.
COMSA Corporación is a Spanish infrastructure and engineering group founded in 1891. In 2017, it had a turnover of €1.08 billion and over 7,700 employees. It operates internationally in 24 countries across five continents. COMSA provides comprehensive infrastructure, industrial engineering, environmental, and technology services, with a focus on railways, civil works, buildings, and maintenance. The company has over 120 years of history in infrastructure development and international recognition for its expertise and innovation.
Some highlighted articles of ACCIONA Reports 70 talk about sustainable mobility in cities, the first renewable energy facility in Easter Island and other amazing stories.
El hierro island. local economy, sustainability and mobility. pécsjmorales001
Experiences on sustainability of El Hierro island and other parts of the world based on renewable energy, organic food, sustainable mobility and Blue Economy
The Breton delegation will be happy to welcome you at booth AE22
AMO-EOLHYD
BREIZH’EMR
BRETAGNE POLE NAVAL
IN VIVO
ORANGE MARINE
PORT BREST BRETAGNE
QUIET-OCEANS
RTSYS
BLUE WATER SHIPPING
The document provides an overview of Italcementi Group, which is the world's fifth largest cement producer with a presence in 22 countries. Some key details:
- It has over 18,000 employees and an annual production capacity of approximately 61 million tons.
- The group has a 150-year history and is currently owned and operated by the founding family's fifth generation.
- Italcementi Group has a worldwide presence with 46 cement plants, 12 grinding centers, 98 quarries, and 417 concrete plants. It generates over 4.1 billion Euros in annual sales.
- In addition to cement, concrete, and aggregates, the group operates businesses in related areas like trading, energy production
The document summarizes information about a proposed public-private partnership (PPP) project to restore degraded ecosystems along the Canal del Dique in Colombia.
Key details include:
1) The project would involve constructing 39 works along the 114km Canal del Dique to restore wetlands and improve navigability.
2) The estimated cost is $1.95 billion with a 15-year concession period. Revenue sources would include navigation fees.
3) The project aims to control sedimentation, regulate water flows, adapt to climate change, and restore ecosystems among other objectives.
4) A prequalification process for bidders is currently underway and requires legal capacity, investment experience, and financial capability.
This document summarizes Total's decades of experience and technological advances in deep offshore oil and gas exploration and production. It highlights several industry firsts and innovations by Total that have enabled production from ever deeper offshore fields, including the development of subsea separation and processing technologies, multiphase pumping, electric heating of pipelines, and autonomous underwater vehicles for inspection. The document also profiles several major deep offshore projects by Total, such as Pazflor, GirRi, and Moho Nord, that demonstrate the company's continued leadership in the technical and economic development of deep offshore resources.
Saint-Gobain PAM is a leading European manufacturer of pipe systems that has over 150 years of experience. It operates factories across Europe and has over 4,500 employees. The company focuses on innovation through its research center and has registered over 1,500 patents. Choosing Saint-Gobain PAM offers customers a reliable and high-quality solution that is sustainable as products are manufactured locally in Europe.
Eptisa is an engineering firm that provides services in transportation, water/environment, industry/energy/buildings, and information technology. In 2016, Eptisa's key figures included €100 million in income, presence in over 45 countries, 1,800 professionals, and a backlog of €195 million in projects. In Spain, Eptisa worked on numerous transportation projects including road infrastructure studies and designs, quality control services, and railway feasibility studies. Eptisa also conducted research on pavement management technologies.
Sainsbury's plans to redevelop its regional distribution depot in Basingstoke to provide a modern, more efficient facility. The existing 300,000 sq ft depot built in 1964 is outdated and at full capacity. The proposed redevelopment will increase distribution efficiency, secure Sainsbury's long-term future in Basingstoke, and safeguard existing jobs. Construction of the new 15-hectare site will begin in November 2011 if planning approval is granted.
The document discusses potential technical solutions for offshore wind farms in Spain. It considers locations off the coasts of Canarias and the Spanish peninsula and the technologies available for developing offshore wind projects in areas with varying distances from shore and of different sizes between 250-1500 MW. The solutions proposed would depend on factors like the location, available wind speeds, distance to grid connection points, and turbine and cable technologies. Conventional HVAC collection and export systems are assumed for the nearer term, though larger multi-GW projects farther offshore may utilize HVDC transmission in the future.
ACCIONA Magazine 76: the Global Challenge of Access to Wateracciona
The planet is already thirsty. What is going to happen when population grows and climate crisis worsens? Sustainable
Development Goal 6, a basic human right, can be achieved through engineering, legislation and investment.
Sociedad Minera El Brocal’s activities and achievements
are prime examples of what makes Peru such an exciting
and important epic center for mining in South America
The document provides information on best practices in Segovia, Spain. It discusses the historic Aqueduct of Segovia, the Gothic Cathedral, and the Alcazar palace. It then covers transportation options like high-speed trains and buses. The document also discusses Spain's leadership in renewable energy, obtaining over a third of its electricity from sources like wind, hydroelectric, and solar power in 2015. It concludes with an overview of Spain's waste management program focused on prevention, reuse, recycling, and elimination.
Similar to Apresentacao Ingles Infra Agosto10 (20)
2. HISTORY 1940 - Mr Avelino Gomes do Monte started his activity in public work 1980 – Mr Manuel and Mr Alípio do Monte carried on Mr Avelino Gomes do Monte’s legacy 1980 – The 2 Monte brothers found the company Monte & Monte – nowadays Monte Group 1996– Internationalisation in CAPE VERDE 1999 - LaunchoftheGroup'sparticipationinroadconcessionsby AENOR. Weattendthefollowing holdings with Auto-Estrada da Costa de Prata, SA, Lusoscut - Auto-Estradas do Grande Porto, SA, Lusoscut - Auto-Estrada das Beiras Litoral e Alta SA, LusoLisboa - Auto-Estrada da Grande Lisboa, SA Douro e AENOR - Auto-Estradas do Douro Interior, S. A. Webuildthefuture 2
3. 3 HISTORY 2002 – The first steps for Monte & Monte internationalisation in ANGOLA 2004 – MonteAdriano Group develops Water utilities businesses through INDAQUA 2005 – MonteAdriano Group registers its branch in ROMANIA becoming an autonomous company in the country 2007 - The family Monte acquires 100% of the MonteAdriano Group 2008 – MonteAdriano Group inaugurates 169 km of road in HUAMBO – ANGOLA Webuildthefuture
4. 4 HISTORY 2008 - MonteAdriano Group registers its branch business in MOROCCO, giving autonomy to business in the country; MAEC first company in the field of engineering and construction to obtain international certification 2009 - Creation of companies MonteAdriano BRAZIL and MonteAdrianoOMAN. 2010 – Creation of companies MonteAdrianoMozambique and MonteAdrianoSão Tomé e Príncipe. Webuildthefuture
5. ORGANISATION CHART MONTE, SGPS, SA MONTEADRIANO SGPS, SA ENVIRONMENT & ENERGY REAL ESTATE & TOURISM CAPITAL CONCESSIONS ENGINEERING & CONSTRUCTION AGGREGATES & INDUSTRY Webuildthefuture 5
54. MozambiqueThe Group is studying other markets, where it may develop its activity. However, strategically, it wants to strengthen its position in the above-mentioned markets. We build the future 7
55. MAIN CONSOLIDATED INDICATORS More than 353 million EUR of consolidated invoicing in 2009 GeographicalDistributionsRH’s More than 2600 Employees, in 7 geographical areas We build the future 8
56. ENGINEERING & CONSTRUCTION 2008 - 308 million EUR TURNOVER: 2009 - 336 million EUR Firstcompanyintheareawithinternationalcertification We build the future 9
62. MonteAdriano Eng. & Const. – the Operation - Infrastructure Works We build the future 12 Eg. PretaroucaDam Thisnewinfrastructureintegrates Balsemão Systemand serves thetownsof Lamego, Tarouca, Resende, easternpartof Cinfães, Castro D'Aireand Vila Nova de Paiva, a total populationof 118 146 inhabitants. BeyondthePretaroucaDam, the Balsemão SystemconsistsofDrinkingWaterTreatmentPlantwitha treatmentcapacityof 19,872 m3/day, 3 PumpingStations, a Pipeline Systemabout 145 km long, and 3 reservoirs.
63. MonteAdriano Eng. & Const. – the Operation - Infrastructure Works Eg. OdeloucaDam The Odelouca Dam stores water from a basin of 393 km2, a reservoir with approximately 7.8 km2. The water is then transported by 8.15 km tunnel Odelouca- Funcho until it intersects the adductorAlcantarilha, 200 m downstream of the dam's Funcho. After over 11.5 kilometers, the water reservoir reaches Odelouca Water Treatment Plant of Alcantarilha, where is treated and distributed to municipalities. Webuildthefuture 13
64. MonteAdriano Eng. & Const. – theOperation - Infrastructure Works Eg. SambadeDamEg. WaterTreatmentStationSambade The Sambade system serves a population of 5440 inhabitants, including the municipal Alfandega da Fé and Vila Flor, and beyond the dam Sambade, there is a Water Treatment Plant with a treatment capacity of 2793 m3/day, 2 Pumping Stations, a Pipeline System with about 20 km long and 2 tanks. Webuildthefuture 14
65. MonteAdriano Eng. & Const. – the Operation - Infrastructure Works Eg. WastewaterTreatmentStationSerzedelo Webuildthefuture 15
66. MonteAdriano Eng. & Const. – the Operation - Infrastructure Works Eg. WastewaterTreatmentStation Ave This Wastewater Treatment will serve the Ave municipalities in Povoa de Varzim and Vila do Conde, covering a population of about 258.000 inhabitants in the high season, and 184.000 in the low season. Webuildthefuture 16
67. MonteAdriano Eng. & Const. – the Operation - Infrastructure Works Eg. RabagãoWaterTreatmentPlant Eg. S. Jorge WaterTreatmentPlant Webuildthefuture 17
68. MonteAdriano Eng. & Const. – the Operation - Infrastructure Works Eg. Detailofreservoirpipes– EDIA - Alqueva Webuildthefuture 18
69. MonteAdriano Eng. & Const. – the Operation - Infrastructure Works Eg. Water supply, collection, treatment and disposal of wastewater - INDAQUA Webuildthefuture 19
70. MonteAdriano Eng. & Const. – the Operation - Infrastructure Works Eg. Landfillof Alto Tamega Webuildthefuture 20
71. MonteAdriano Eng. & Const. – the Operation - Infrastructure Works Eg. Valorlis Webuildthefuture 21
72. MonteAdriano Eng. & Const. – the Operation - Infrastructure Works Eg. Suldouro Webuildthefuture 22
73. MonteAdriano Eng. & Const. – the Operation - Infrastructure Works Eg. AquicultureUnit – Pescanova The largest unit of world aquiculture production of turbot. Webuildthefuture 23
74. 24 SUBCONCESSÃO DO DOURO INTERIOR MonteAdriano Eng. & Const. – the Operation > The six road concessions total 847 km of roads, highways and complementary, involving a total investment of 5041 million EUR. It is the Group's aim to expand this business, so we are committed to the development and implementation of new projects that may also pass through diversification. Webuildthefuture
75. 25 MonteAdriano Eng. & Const. – the Operation > Aenor - HighwayNorth, SA - extension: 175 km > Lusoscut - MotorwaysoftheSilverCoast, SA - extension: 110 km > Lusoscut - Motorwaysof Porto, SA - extension: 56 Km> Lusoscut - Highway Beiras Litoral e Alta SA - extension: 173 km > LusoLisboa - Motorwaysofthe Grande Lisboa, SA - extension: 25 + 66 km > Aenor Douro - Motorwaysofthe Douro Interior, SA - extension: 242 km Webuildthefuture
76. AGGREGATES & INDUSTRY 2008 - 37 million EUR TURNOVER: 2009 – 31,6 million EUR Webuildthefuture 26
77.
78. Internationally, in the market of Angola, the Group has 7 production plants, namely Pedreira do Tombo, do Libongos, da Cuca and in Benguela. A Concrete and Bituminous Plant in Huambo, a Concrete Plant in Benguela and a Bituminous Plant in Viana. We build the future 27
79. ENVIRONMENT & ENERGY A recent area, plenty of growth potential, either in Portugal or abroad, namely in Angola. 2008 – 8,5 million EUR TURNOVER: 2009 – 10,3 million EUR Webuildthefuture 28
85. AMBYSIS, SA It works as a complement to the services performed by Ecovisão, namely in Environmental Bio/Technology area (waste and liquid effluent treatment,reusing or not the energy). 32 Webuildthefuture
91. INDAQUA is present in Angola, in partnership with BPA. through Vista WaterWe build the future 34
92. CAPITAL & SERVICES 2008 – 4,7 million EUR TURNOVER: 2009 – 10,9 million EUR A business area that takes advantage of new investment opportunities and/or works as company incubator. We build the future 35 Panidoce
93. REAL ESTATE & TOURISM 2008 – 9,7 million EUR TURNOVER: 2009 – 8 million EUR EP CONSTRUÇÕES EDIFÍCIO DA ILHA ETONA EDIFÍCIO S. PAULO EDIFÍCIO TPA We build the future 36
94.
95. It is strongly based on the international field, in which 77% of the foreseen investment comes from abroad, specially from Angola.
96. Real estate investments include strategic partnerships for various regions. At this moment, MonteAdriano Group has 4 partnership groups in the scope of its real estate activity.We build the future 37