This hydro testing procedure document outlines the steps for safely pressure testing pipes, including pre-start meetings, checking equipment and barricades, filling the pipes with water and checking water quality, pressurizing the system while monitoring for pressure changes from temperature, maintaining the target pressure, depressurizing safely, and ensuring constant supervision to prevent incidents such as pipe collapse, rupture, or vacuum collapse within the exclusion zone.