SlideShare a Scribd company logo
Anirut Tiabchaiphan CV :V.20160328
1 of 15
 
CURRICULUM VITAE
 
Name      :  Mr. Anirut  Tiabchaiphan         
Birth date    :  24 March, 1976  
Age     :   40 Years Old 
Height     :  160 cm 
Weight     :  56 Kg 
Nationality     :   Thai  
MARITAL STATUS    :  Single 
Contract Number  :    +66 (0) 8 9754 1959 
Email address    :  anirut.tiabchaiphan@gmail.com 
 
EDUCATIONAL BACKGROUND 
1997‐2000               Bachelor Degree of Mahanakorn University of Technology, Thailand 
                                  Major Mechanical Engineer   
1994‐1996               Diploma of Rachamongkala Institute of Technology, North Bangkok  
                                  Campus, Thailand Major Metallurgy. 
1991‐1994               Vocational Certificate of Suphanburi Technical College, Thailand 
                                  Major Welding Technology                                                                                                             
 
TRAINING – SEMINAR – CERTIFICATES – OTHER CURICULAR ACTIVITIES 
LANGUAGE SKILLS: 
 Thai  Listen, Speak, Read and Write are fluent. 
 English  Listen, Speak, Read and Write are Very good.  
COMPUTER SKILLS:        
 Ms‐Word, Project, Power point, Access are good. 
 Excel advance level with spread sheet record and formula application. 
 AutoCAD advance level for 2D and 3D. 
 TeKla ‐Knowledge of Software application ‐ Training by Tekla REP Thailand. 
TRAINING COURSES 
 AWS D1.1 Basic of Structure Steel Fabrication Code. 
 Budged plan. 
 Success Through of People (STP). 
 Project Management. 
 
Availability  for :   Project Manager, Construction Manager, Engineering Manager, Engineering Coordinator 
                            , Sub Contract Engineer, Senior Inspector, Lifting Specialist.  
                        
 
CURENT STATUS 
 
AVAILABLE  
                
 
 
 
 
          
Anirut Tiabchaiphan CV :V.20160328
2 of 15
SUMMARY 
 
More than 15 Years experiences with Engineering, Fabrication and Construction for Civil, Structure, Piping 
and Mechanical works in Refinery, Petrochemical, Industry, Oil &Gas Off‐shore Facilities and On‐shore 
Modular.  
  
2014 to 2016 ‐  1.5 Years with JGC, KBR and Chiyoda Joint Venture for PNG On‐shore Facilities Pipe Rack and 
Process Modules Fabrication as Lead Project Engineer. 
2013 to 2014 ‐   8 Month with NKW Welder and Construction Co,.Ltd. for Refinery Expansion Project, as Project 
Manager.  
2012 to 2013 ‐   1.5 Years with John Holland and Leighton Joint Venture for Over‐sea Modules Fabrication as 
Package Manager. 
2010 to 2011 ‐   7 Months with Worleyparsons Thailand for Refinery Expansion Project and Shutdown Project 
as Lifting Specialist and Construction Supervisor.  
2006 to 2012 ‐   More than 5 Years with Clough Thailand with Fabrication and Construction Oil & Gas Off‐shore 
Facility and PNG LNG Modular as QAQC Engineer, Production Engineer, Construction 
Engineer, Project Engineer and Lead Engineer. 
2005 to 2006 –  1 Year with Clough Sino‐Thai Joint Venture for Modules Construction as SPM Inspector for 
Structure, Piping and Mechanical works.   
2002 to 2005 ‐   3 Years with Qualitech Engineering and Construction Co,.Ltd. for construction works in 
Refinery, Petrochemical and Industrial Plant as Production Engineer, QAQC Engineer and 
Project Engineer.  
2001 to 2002 –  2 Years in Civil Construction Works as Site Manager. 
                           
WORKING EXPERIENCES 
 
Period        May 2014‐Feb 2016. 
Company’s name    JKC (JGC, KBR and Chiyoda Joint Venture). 
        Supply under Brunel Technical Services ‐ Thailand Limited.   
Location                                          CUEL Ltd, Laem‐Chabung, Chonburi, Thailand. 
Project Details      Ichthys Onshore LNG Facilities Fabrication Project,  
Client INPEX Operations Australia Pty Ltd. 
3,500 Tons for 155 Modules fabrication to include Process Modules and 
Utility LNG Pipe Racks. 
 
 
 
 
 
 
     
Position                   Lead Project Engineer.  
Responsibilities  
 Lead  of  Project  Engineers,  to  deliver  multidiscipline  engineering  support  and  consulting  for  every 
engineering activities in Module Fabrication Yard. 
 Participate and investigate any project issues to find out solution, course of action, preventive course to 
address the project issue and prevent repeat problem.  
 Advise Technical Clarification/Instruction reply to Site Query. 
 Verify  all  engineering  design  changes  form  Yard  Discipline  Engineer  on  behalf  of  Yard  Engineering 
Manager to minimize impact to Construction activities and cost. 
 Prepare Site instruction issue to Module Fabricator to confirm instruction or course of action for any 
Engineering Design Change/Field changes. 
Anirut Tiabchaiphan CV :V.20160328
3 of 15
 Provide Cost Evaluation and Construction Man‐Hour Estimate for any Major Variation works support to 
JKC Contract Team. 
 Manage and maintain all relevant Engineering Reports/registers to include providing of engineering high 
level reports to Site Engineering Manager/ JKC Project Management Team. 
 Ship Loose Coordinator, Manage and control Project Ship Loose materials, Ship Loose Inspection, Lead 
of Ship Loose materials arrangement and delivery to Darwin Site. 
 Insulation Coordinator, Work closely with Darwin Insulation Team to deliver Module Fabricator/AGC 
Insulation  Subcontractor  with  technical  clarification  and  solution  for  any  Insulation  Issue  in  Module 
Fabrication Yard. 
 
Period        Sep 2013‐Apr 2014. 
Company’s name    NKW Welder & Construction Co,.Ltd.   
Location                                          Maptaput, Rayong, Thailand. 
Project Details      SACK Expansion Project. (Refinery Plant). 
        Supply Fabrication 80,000db Piping Fabrication including Piping installation. 
        Consulted by UHDE Shedden (Thailand) Co.,Ltd. 
 
 
 
 
 
 
 
  
Position                  Project Manager  
Responsibilities 
Taking over Project Manager Position to recover NKW performance. 
 Review and re‐arrange NKW organization chart. 
 Set up communication channel between company and NKW. 
 Review Document control Process and refresh IFC revision. 
 Attend weekly Progress Meeting UHDE and Taking UHDE Comments for further improvement. 
 Arrange Weekly Management walk down inspection to participate construction issue at the plant Site. 
 Provide Construction Schedule and 3 Week Look Ahead for UHDE approval. 
 Set up NKW Internal Meeting and clarify each Staffs with role of responsibility.  
 Review piping progress report and address omit error on the report for UHDE acceptable. 
 Tidy up NKW Quality Control department and close out any quality issue such as NDE Back Log and 
pending Inspection Reports. 
 Settle Pipe Support MTO and Progress Tracking Report which is not available in the beginning of project. 
 Settle Materials Stock and Inventory status reports. 
 Set up Site Query system to clarify any engineering issue/project as obstruct fabrication and erection 
activities. 
 Arrange necessary Letter in requesting UHDE release Construction Area for construction as per contract. 
 Place NKC progress claim which is omit missing by previous Project Manager to bring back NKW Cash 
Flow. 
 Request UHDE to arrange Contract Meeting to Clarify Scope of Works and Variation Works. 
 Management and Supervision NKC Construction Team to achieve the project as per agreed schedule.      
  
 
Anirut Tiabchaiphan CV :V.20160328
4 of 15
Period        Mar 2013‐Sep 2013 
Company’s name    John Holland ‐ Leighton (SEA) Joint Venture   
Location                                          ZPMC (Zhenhua Port Machinery Company), Shanghai, China. 
Project Details      Cap Lambert Port B Phase B Jetty Project, Australia. 
        350t Steel Structure Fabrication for Grout Containment Plates, Dolphin Access 
Platforms, Walkway Platform, Conveyor Supports, Wind Bows,  
Conveyor Guards and Misc Steel Structure.  
 
 
 
 
 
 
 
Position                   Package Manager  
Responsibilities 
Taking over Package Manager Role to address the project issue in order to deliver Fabricated Steel Structure 
Materials on time. 
 Participate All Project Issue and Report to John Holland Project Manager. 
 Set up progress tracking and reports to capture and expediting fabrication progress. 
 Perform inspection any fabricate items and advise ZPMC if any rework necessary. 
 Coordinate with John Holland Site for prioritize items to be shipped. 
 Follow up pending Site Query which is holding up fabrication activities.  
 Update fabrication details Schedule to align with John Holland construction required date. 
 Follow up Close out any quality documents overdue such as Welder Qualification Test Reports, NDE 
Technician register and certificate, Galvanize Procedure etc.. 
 Provide alternative option for John Holland (AUS) approval in order to minimize re‐works and schedule 
impact. 
 Attend each final Inspection with MOODY CHINA and release for materials delivery. 
 Assist Module Fabricator ZPMC to settle MDR documents. 
 Perform Safety Inspection weekly basis and advice to module fabricator if any necessary to be improved. 
 Work Closely with Client and ZPMC Project Manager to deliver materials on time. 
 
Period        April 2012‐Mar 2013  
Company’s name    John Holland ‐ Leighton (SEA) Joint Venture   
Location                                          SMV (Strategic Marine Vietnam), Vung Tau, Vietnam. 
Project Details      WICET Project (Wiggins Island Coal Export Terminal Pty Ltd), Australia. 
Supply FTA 530t Carbon Steel Surge Bin Fabrication and Module Assembly. 
 
 
 
 
 
 
 
 
Position                   Package Manager 
Responsibilities  
To manage and control 530t Surge Bin Module fabrication and assembly to include module transportation Free 
Trade Along Site (Vietnam Port).  
Anirut Tiabchaiphan CV :V.20160328
5 of 15
 Project Kick off Meeting at SMV Subcontractor. 
 Prepare Construction Sequence. 
 Constructability review with Module Fabricator. 
 Prepare construction details schedule and set up progress tracking spread sheet and S‐Curve.  
 Expedite and Consulting Module Fabricator to prepare project documents such as relevant Fabrication 
Procedure, Welding Procedure, Quality Procedure, ITP and Module Transport Procedure etc. 
 Witness WPS&PQR. 
 Welder Qualification. 
 Set up project materials status report to include Module Fabricator procure materials and Jonh Holland’s 
Free Issue Materials. 
 Verify Subcontractor’s relevant inspection reports. 
 Set up Technical Query system. 
 Verify Variation work and Module Fabricator claim. 
 Lead of Weekly Progress Meeting and MOM. 
 Work Closely with Module Fabricator and advise technical supports as necessary.   
 Perform Safety Inspection weekly basis and advice module fabricator if any necessary to be improved. 
 Verify Module Fabricator’s dimension reports and ensure each major dimension are under tolerance in 
accordance to design and AS standard code. 
 Review and verify heavy lift and heavy transport method statement to ensure that they are satisfied with 
project requirement and standard code as relate to company insurance. 
 Follow up Technical Query which is pending with Client and holding up fabrication activities. 
 Participate all project issue and close out on time. 
 Provide Weekly Progress report to John Holland Project Manager. 
 
Period        Jan 2011‐Mar 2012. 
Company’s name    Clough Thailand Company Limited. 
Location                                          Sattahip Yards, Thailand. 
Project  Details   
     
 PNG LNG Project Marine Jetty Topsides and Pipe Racks Fabrication, Client Chiyoda JGC Joint Venture. 
Supply, fabrication, coating, assembly and testing of all structural steel, 
cryogenic and utility piping, and installation of cable tray associated with the 
topsides and Pipe Rack modules for the PNG LNG Jetty Project in Papau New 
Guinea. 
 
 
 
 Gorgon Jansz Pipeline Heads Fabrication Project, Client Allseas. 
Fabrication of more than 80 components for the Gorgon Jansz Pipeline Project, 
located in the North West Shelf, offshore Western Australia. Scope of work 
includes fabrication of onshore and offshore pipe launchers, pig receivers and 
A&R heads, as well as all required project management and shop drawings, 
welding procedure specifications (WPS), nondestructive examinations (NDE), 
hydrostatic testing, surface preparation and coating, weighing and COG 
adjustments. Associated procurement includes the supply of pipe, fittings, 
bolts and gaskets. 
 
 
 
Anirut Tiabchaiphan CV :V.20160328
6 of 15
 Yolla Mid Life Expansion (MLE) Compression Modules Fabrication Project. Client Origin Energy. 
Procurement, fabrication and assembly of a 600MT gas 
compression and condensate pumping modules for the 
Yolla Platform Mid Life Expansion (MLE) Project, located 
in the Bass Strait, Victoria. The modules consisted of a 
single gas‐turbine driven centrifugal compressor train, 
electric condensate pumps, associated piping, fuel gas 
system, mechanical equipment, control systems and E&I. 
 
 PNG Dolphin Super Structure Project 300 tons, Client BAM Clough Australia. 
Engineering Shop detailing, Materials supply, Temporary Supports design, fabrication and Module assembly. 
 
 
 
 
 
 
 
 Cimeco HD4 Steel Structure Fabrication Project, Client Rio‐tinto Australia. 
Engineering shop detailing, Procurement, Stick Steel Fabrication, Packaging and delivery FTA Leam Cha‐bang 
Port. Chonburi, Thailand.  
 
Position                   Lead Engineer  
Responsibilities 
 Lead of Engineering College* on behalf of Engineering Manager to supporting Project Team and Yards 
Activities.   
*9  Project  Expat  &  TH,  5  Discipline  Engineer,  5  Production  Engineer,  23  Shop  detailing  officers,  5 
Document Controls, 2 Materials Control(Marian Engineer), 2 Engineering Admin.   
 Joining and supporting with system re boot for all management system SPF, SPMAT. 
 Participated Project Kick of Meeting. 
 Prepare and Conduct Constructability Review. 
 Prepare and Conduct Project Hazid Meeting. 
 Design review and technical clarify to Client. 
 Design fabrication and installation sequence. 
 Set up engineering structure shop drawing work flow using Tekla software‐ start from received native 
file micro station from Client – develop Tekla model – completed joint connection – generate shop 
drawings – nesting plan – Issued for construction. 
 Piping shop drawing by Spool gen Software – received native dxf from client – generate shop drawings 
 Advice Temporary steel works for Fabrication Jigs, Supports, Steel Structure Foundation for module 
building. 
 Consulting and monitoring project engineers on each projects. 
 Set up and scheduling shop detailing plan with shop detailing office Lead. 
 Control and Manage All design and details MTO supports to SPMAT for materials order or Engineering 
requisition ERQ. 
 Prepare all relevant SOW Scope of Work issued to Supply chain to searching materials and sub contract 
works.  
 Advice acceptance and prepare Technical Bid Evaluation to Project Manager and Supply Chain. 
 Provide multi‐disciplined engineering assistance to project and yard activities. 
 Provide facility plan and layout for Fabrication work shop and Yards. 
 Reply and clarify Subcontractor Technical Query. 
 Prepare relevant project procedures.  
 Review Module Sea fastening. 
Anirut Tiabchaiphan CV :V.20160328
7 of 15
 Prepare site move load out plan in the yards and arrange module transport plan to the Jetty and on Barge 
or under the hook of HLV heavy lift Vessel. 
 Review and Approve Heavy Lift Study. 
 Participate all safety programs. 
 Work closely with Project Management to monitor project issues, subcontract management, logistic, 
subcontract deliverables, and acting as general interface and source of project knowledge, alertness to 
all parties. 
 Provide multi‐disciplined engineering assistance for both project and yard ensuring the timely resolution 
of technical queries to support construction activities. 
 Participate in project planning and execution. 
 Provide construction engineering support for bidding activities. 
RIENCES 
Period        July 2010‐Jan 2011 
Company’s name    Worley Parson‐Thailand.  
Location                                          Thai Lube Base (Refinery Plant), Laem Cha‐Bang, Chonburi, Thailand.  
Project Details       
 Thai Lube Base Expansion Project.  
Structure and Piping erection. 
Static and Rotating Mechanical   Equipment 
installation approximate 230t this to include 
3x Process Columns. 
 Thai Lobe Base Shutdown Project. 
Replacement Air Pre‐heater and Furnace Burners to include structure supports reinforcement, Tie‐in piping, 
testing and commissioning works. 
 
 
 
 
 
 
Position                  Lifting Specialist & Construction Supervisor.    
Responsibilities 
 Constructability review all relevant equipment design drawings advice concern to Engineering Office for 
further design development.  
 Prepare  installation  procedure,  Lift  study,  JHA  for  3  off  process  columns  and  Other  Equipment  as 
necessary. 
 Review and approved Subcontractor lift study on behalf Thai Oil Specialist. 
 Site supervision and control field equipment installation on Thai Lube Base Expansion Project.  
 Lifting Study design for replacement Air Preheater Thai Lube Base Shutdown Project with using Screw 
Jack Lift Method. 
 Prepare method statement, temporary work design such as temporary lifting brackets, steel temporary 
support for replacement 120t Air Preheater equipment.  
 Site Supervision for steel temporary support, existing Air Preheater demerit, new Air Preheater install 
and reinforcement Structure Installation at Thai Lube Base Shutdown Project.  
 Management and control subcontractor for steel structure, piping and equipment installation in cluding 
Insulation works. 
 Attend walk down inspection and final punch list for steel structure, piping, equipment, painting and 
insulation works.  
 Expediting subcontractor for construct punch list close out.   
KING EXPERIENCES 
Anirut Tiabchaiphan CV :V.20160328
8 of 15
Period        June 2009‐June 2010. 
Company’s name    Clough (Thailand) Company Limited.  
Location                                          Sattahip Yard, Thailand.  
Project Details      Devil Creek Module Fabrication Project, Client Apache Energy Limited. 
        Onshore engineering, procurement, module fabrication and assembly for  
the Devil Creek Development Project, located in the north west of Western 
Australia.   
 
 
 
 
 
 
Position      Project Engineer    
Responsibilities 
 Provide multi‐disciplined engineering assistance to project and yard activities. 
 Work closely with Project Management to monitor project issues, subcontract managements, logistic, 
subcontract deliverables, and acting as general interface and source of project knowledge, alertness to 
all parties. 
 Provide multi‐disciplined engineering assistance for both project and yard ensuring the timely resolution 
of technical queries to support construction activities. 
 Participate in project planning and execution. 
 Provide construction engineer supports for bidding activities. 
 Prepare Site move load out plan in the yards and arrange module transport to the Jetty and under the 
hook of HLV heavy lift Vessel. 
 
Period        Feb 2009‐June 2009. 
Company’s name    NKW Welder and Construction Co.,Ltd.  
Location                                          Thai Jurong Engineering Limited’s Fabrication Yard Ban‐Bung, Chonburi. 
Project Details      Fujarah Piping Fabrication Project. Part of Alstom’s Electrical Power Plant in 
Fujarah, Dubai UAE. 
        Supply Fabrication for 70,000 Db Carbon Steel Piping and 12,000 Db Stainless 
Steel Piping. 
 
 
 
 
 
 
 
Position      Project Manager  
Responsibilities 
 Yards Facility Plan. 
 Production process settle including process inspection plan. 
 Equipment and Man Power Loading plan. 
 Progress tracking and progress control to ensuring the fabricate spool are delivered on time as per 
agreed schedule. 
 Provide daily and weekly progress report to Client. 
 Stock and Inventory control for all piping materials including expedite free issue materials shortage from 
client. 
Anirut Tiabchaiphan CV :V.20160328
9 of 15
 PWHT and NDE control. 
 Participate all Project Issues which holding product activity and immediately improved or report to Client 
if assist is required. 
 Provide  technical  support  to  production  team  and  raise  TQ  to  Client  if  any  technical  clarification  is 
necessary. 
 Progress Claim. 
 
Period        Oct 2008‐Jan 2009.  
Company’s name    Clough (Thailand) Company Limited.  
Location                                          Sattahip Yards, Chonburi, Thailand.   
Project Details      NuCoastal Songkhla Fabrication, Client NuCoastal (Thailand) Limited. 
        Engineering, shop detailing, procurement, fabrication, assembly, 
precommissioning, load out and sea‐fastening of one wellhead platform and 
production platform connected by a bridge link. 
 
 
 
 
 
Position      Lead Construction Engineer 
Responsibilities 
 All engineering activity in Module Fabrication Yard.  
 Lead  of  Production  engineer  to  provide  relevant  Procedure  and  Method  Statement  for  Modules 
construction. 
 Provide detail MTO for materials purchasing, stock and Inventory control.  
 Prepare Cutting Plan, Cutting List and materials reserve support to Construction Team. 
 Fabrication Work Packs preparation for Module Construction.  
 Provide Technical Support to Construction Crew and any technical review or recommendation required 
for procurement processing. 
 Provide multi‐disciplined engineering assistance for both project and yard ensuring the timely resolution 
of technical queries to support construction activities. 
 Review and approve sea‐fastening drawings, module temporary supports, temporary steel works, heavy 
lifting study, fabrication sequence and yard facility control. 
 Engineering Coordinate with Client, Subcontractor and other parties. 
 Prepare site move load out plan in the yards and arrange module transport to the Jetty and on Barge by 
SPMT ‐ Self‐Propelled Modular Transporter. 
 Ship Loose materials arrangement for Off‐shore Installation.  
 
Period        Feb 2008‐Jul 2008. 
Company’s name    Clough (Thailand) Company Limited. 
Location                                          Sattahip Fabrication Yard, Chonburi, Thailand.   
Project Details      Montara Topside Modules Fabrication Project.  
Client Coogee Resources Pty Ltd 
        Fabrication of the topsides for the Montara wellhead platform. The topsides  
        have an overall weight of approximately 700 tonnes. 
 
 
 
 
 
Position      Lead Construction Engineer.  
Responsibilities 
 All engineering activity in Module Fabrication Yard.  
Anirut Tiabchaiphan CV :V.20160328
10 of 15
 Control and manage engineering subcontractor ARV‐offshore to produce fabrication drawings. 
 Lead  of  Production  Engineer  to  provide  relevant  procedures  and  method  statements  for  module 
construction. 
 Provide detail MTO for materials purchasing, stock and inventory control.  
 Prepare Cutting Plan, Cutting List and materials reserve support to Construction Team. 
 Prepare Work Packs for Module Construction.  
 Provide technical support to Construction Crew and any technical review or recommendation required 
for procurement processing. 
 Provide multi‐disciplined engineering assistance for both project and yard ensuring the timely resolution 
of technical queries to support construction activities. 
 Review and approve sea‐fastening drawings, module temporary supports, temporary steel works, heavy 
lifting study, fabrication sequence and yard facility control. 
 Engineering coordinate with Client, Subcontractor and other parties. 
 Prepare site move load out plan in the yards and arrange module transport to the Jetty and on Barge by 
SPMT ‐ Self‐Propelled Modular Transporter. 
 Ship Loose materials arrangement for Off‐shore Installation. 
 
Period        Oct 2007‐Jan 2008.  
Company’s name    Clough (Thailand) Company Limited.  
Location                                          Sattahip Yard, Chonburi, Thailand.    
Project Details      GFI Bualuang Field Development BLWPA Wellhead Platform Fabrication 
Project, Client ARV Offshore. 
Wellhead Platform & Jacket Leg fabrication and assembly. 
Position      Lead Production Engineer  
Responsibilities 
 Constructability review All Fabrication Drawings. 
 Lead  of  Production  Engineer  to  provide  relevant  procedures  and  method  statements  for  modules 
construction. 
 Provide detail MTO for materials purchasing, stock and inventory control. 
 Providing technical support to construction crew and any technical review/recommendation required 
for procurement processing.  
 Prepare Cutting Plan, Cutting List and materials reserve support to Construction Team. 
 Prepare Work Packs for Module Construction.  
 Provide Lifting Procedure, Equipment Installation Method statement, Module Transportation Plan, and 
Yard Facility Control. 
 Participate  field  engineering  issue  at  site  and  Site  Query  raise  for  technical  clarification/alternative 
solution propose for Client approval. 
 
Period        Oct 2006‐Sep 2007. 
Company’s name    Clough (Thailand) Company Limited. 
Location                                          Sattahip Yard,Chonburi, Thailand.  
Project Details      Vetco Ettrick FPSO Modules Fabrication Project. Client Aibel Bluewater.  
Supply Fabrication of five topside process modules 
with a combined weight of about 1,800t tonnes for 
Aoka Mizu FPSO, at Nexen's Ettrick Field. 
 
 
 
 
 
Position      Production Engineer.  
Responsibilities 
 Provide detail MTO for Materials purchasing, stock and inventory control.  
Anirut Tiabchaiphan CV :V.20160328
11 of 15
 Providing technical support to construction crew and any technical review/recommendation required 
for procurement processing. 
 Prepare Cutting Plan, Cutting List and materials reserve support to Construction Team. 
 Prepare Work Packs for Module Construction. 
 Provide Lifting Procedure, Equipment Installation Method statement, Module Transportation Plan, and 
Yard Facility Control. 
 Participate  field  engineering  issue  at  site  and  Site  Query  raise  for  technical  clarification/alternative 
solution propose for Client approval. 
 
Period        Jul 2006‐Sep 2006 
Company’s name    Clough (Thailand) Company Limited.  
Location                                          Sattahip, Chonburi, Thailand.  
Project Details      Pluto LNG Jetty Catwalk Fabrication Project, Main Contractor AUS, 
Client Woodside Energy Limited. 
Supply 300 Meters Catwalks Fabrication and Assembly. 
 
 
 
 
 
Position      Production Engineer/QAQC Engineer. 
Responsibilities 
 Review and verify shop drawings, cutting plan and cutting list from ICS Shop Detailing Subcontractor. 
 Review and reply subcontractor Technical Query. 
 Monitoring and control steel structure fabrication at Shi‐asia’s Fabrication Shop and final assembly in 
Sattahip Yard. 
 Quality Control Coordinator. 
 Attend majority inspection such as witness 6GR PQR, 6GR Welder Qualification, materials inspection and 
final inspection etc. 
 Provide lifting procedure, land transport plan, and yard facility control. 
 Alertness and follow up Company comments/punch list close out. 
 Subcontract coordinator in Sattahip Fabrication Yard.  
 Coordinate and supporting Marine Engineer to complete Heavy Lift Vessel Lifting Study.   
 
Period        Sep 2005‐Jun 2006. 
Company’s name    Clough Sino‐Thai Company Limited. 
        Supply under Brunel Technical Services ‐ Thailand Limited.  
Location                                          Sattahip Yard, Chonburi, Thailand. 
Project Details      Alcan Gove G3 Expansion Project. Western Australia, Client Alcan Gove 
Development Pty Limited, 
        Clough with partner Sino‐Thai, undertook the fabrication of the Process Area 
Modules for the Alcan Gove Third Stage Expansion that included fabrication 
 and assembly of around 120 modular units with a total delivered weight from 
14 shipments of some 27,000 tonne. Work activities entailed all structural 
steel, process equipment, pipework, electrical and instrumentation systems 
and were pre‐commissioned prior to transport to site for final positioning, 
hook‐up and commissioning.  
Position      SPM Inspector (Structure, Piping and Mechanical Equipment Inspector). 
Responsibilities 
For 2x 3,500t Calciner Modules Fabrication. 
 Quality Control of structure, piping, ducting, refractory and mechanical work installation to meet with 
Construction Drawings and project specification.   
Anirut Tiabchaiphan CV :V.20160328
12 of 15
 Participate  all  quality  issue  during  module  construction  and  reports  to  Module  Superintendent  for 
further quality improvement.  
 Monitoring and verify dimension report before and after weld. 
 Perform welding inspection and control NDE as per project requirements. 
 Progressively documentation all inspection records/reports as required for project MDR. 
 
Period        Jul 2005‐Aug 2005. 
Company’s name    Qualitech Engineering & Construction Company Limited.  
Location                                          Maptaput, Rayong, Thailand. 
Project Details      Arometic (Thailand) Shutdown Project. (Petrochemical Plant) 
        Supply Fabrication 350db 4” new Line Piping including installation and Tie‐in. 
Position      Project Engineer 
Responsibilities 
 Materials take off and procure materials. 
 Site Survey and advice with temporary materials and construction equipment as necessary. 
 Provide work schedule, manpower & equipment loading plan. 
 Provide fabrication, Installation procedure and method statement for client review. 
 Control fabrication and site installation works. 
 Quality control, completed with project MDR. 
 
Period        Feb 2005‐Jun 2005 
Company’s name    Qualitech Engineering & Construction Company Limited 
Location                                          Fabrication Shop, Houypong, Rayong, Thailand. 
Project Details      CUEL Piping Fabrication Project. (Off‐Shore Piping, Oil & Gas)  
        Supply Fabrication Piping 15,000db for Off‐Shore Wellhead Platform Facilities.   
Position      Senior Production Engineer, QA/QC Engineer 
Responsibilities 
 Manage and control of piping fabrication and painting works. 
 Progress tracking and report including mouthy progress claim. 
 Manage and control painting subcontractor including painting inspection. 
 Lead of process inspection and NDE in according to ITP this to including blasting and painting inspection. 
 QAQC documentation settle and progressively filing for final MDR. 
 Tagging and Packing of piping spools and deliver to the CUEL fabrication yard complete with shipping 
documents. 
 
Period        Jul 2004‐Jan 2005 
Company’s name    Qualitech Engineering & Construction Company Limited 
Location                                          Fabrication Shop, Houypong, Rayong, Thailand. 
Project Details      Structure Steel Fabrication TTM Project GSP‐1 .(Gas Plant) 
        Supply Fabrication and delivers 
 250t Steel Structure Pipe Racks and Misc Steel Support for Slag Catcher 
to project GSP‐1, Cha‐na, Song‐Kla, South of Thailand,  
Client CBI Thailand. 
 300t Process Column Access Platforms to TTM Project GSP‐1, Cha‐na, 
Song‐Kla, South of Thailand. Client Samsung Engineering. 
 
 
 
 
 
Position      Senior Production Engineer, QA/QC Engineer. 
Responsibilities 
Anirut Tiabchaiphan CV :V.20160328
13 of 15
 Review and verify shop drawings from subcontractor.  
 Prepare cutting list and cutting plan. 
 Coordinate with the Client to close out any engineering Issue found during shop detailing and fabrication 
process. 
 Hold  management  since  client  has  totally  changed  Pipe  Rack  design  and  30%  of  steel  member  are 
impacted.   
 Progress tracking and report including mouthy progress Claim. 
 Manage and Control painting subcontractor including painting inspection. 
 Lead of process inspection and NDE in according to ITP this to including blasting and painting inspection. 
 QAQC documentation settle and progressively filing for final MDR. 
 Tagging and Packing Structure Steel Members deliver to the plant site complete with Ship documents.  
 
Period        Mar 2003‐May 2004 
Company’s name    Qualitech Engineering & Construction Company Limited 
Location                                    Maptaput, Rayong,Thailand. 
Project Details      NPCX Polyethylene Expansion Project, Main Contractor Samsung Engineering 
Company Limited, Client  (Chemical Plant) 
 85,000db Piping Fabrication and Installation. 
 1,200t Steel Structure Fabrication and Installation to include Steel 
Structure 
 950t Mechanical Equipment Installation to include Static and Rotating 
Equipment and Package Equipment as follow. 
 1x 91m Flare Stack, Cooling Tower. 
 Cooling Tower Unit. (Package Equipment). 
 Bagging Equipment. (Package Equipment). 
Position      Production Engineer, QA/QC Engineer. 
Responsibilities 
Fabrication Shop 
 Prepare WPS/PQR including Welder qualification.  
 Control steel structure and piping fabrication in Fabrication Work Shop. 
 Lead of process inspection and NDE in according to ITP this to including blasting and painting inspection. 
 QAQC documentation settle and progressively filing for final MDR.    
 Progress tracking and reports including monthly progress claim. 
 Prepare lifting study and method statement for 91m Flare Stack and 4x Storage Tanks installation. 
 Provide 3 weeks look ahead and Man Power loading for field painting works. 
 Supervise and control of 91m Flare Stack and 4x Storage Tank installation. 
 
Period        Dec 2002‐Feb 2003 
Company’s name    Qualitech Engineering & Construction Company Limited 
Location                                   Laem Chabang, Chonburi, Thailand.  
Project Details      Samsung Micro Wave Project. Client Thai Samsung Electronics Co,.Ltd. 
(Industrial Facility). 
Supply Fabrication 360t Steel Structure Roof Truss, 
Fire Protection Coating and Installation. 
 
 
 
 
 
Anirut Tiabchaiphan CV :V.20160328
14 of 15
Position      Production Engineer. 
Responsibilities 
 Design review and technical clarify to Client. 
 Shop Drawing preparation by 2d Auto‐cad. 
 Material take off and materials purchasing. 
 Control fabrication roof truss and accessories including fire protection coating. 
 Progress tracking and report including monthly progress claim. 
 Prepare construction sequence and installation plan. 
 Prepare lifting study for roof truss Installation. 
 Supervise and control site installation as per agreed construction schedule. 
 
Period        Jul 2002‐Nov 2002. 
Company’s name    Qualitech Engineering & Construction Company Limited. 
Location                                    Thai‐PET resin Project, Lopburi, Thailand. 
Project Details      Indorama idles Lopburi PET Polymer Plants/ Asia Pet (Thailand) 
1,000t Steel Structure Installation, 90,000db Piping Fabrication & Installation  
and Equipment installation to include  
 2x Stainless Storage Tank ∅9mx17m high. Fabrication &Install. 
 1x Stainless Extruder ∅9mx17m Silo. Fabrication &Install. 
 1x Stainless Steel Air receiver. Fabrication &Install. 
 1x Stainless Steel Demin Water Tank. Fabrication &Install.  
 
Position      Production Engineer, QA/QC Engineer. 
Responsibilities 
Fabrication Shop. 
 Control fabrication 2x Stainless Steel Storage Tanks roll and press Shell Plates, Cone Parts and Roof Tops. 
 Fabrication and assembly Stainless Steel Extruder Silo, Air receiver and Demin Water Tank. 
 Progress tracking and report to Project Control. 
 Perform inspection and NDE in according to project specification and standard code requirements. 
 Communicate with the Plant Site to ensuring delivery of fabricated items are meet with construction 
require date. 
Plant Site. 
 Completed 2x Stainless Steel Storage installation this to include access stairs and service platforms. 
 Install 2x Feed Silo supply from Simmer.  
 Conduct field inspection and NDE in accordance to ITP and project specification. 
 Completed MDR for the foregoing every items as above. 
 Subcontract  coordinator  and  supervision  for  piping  and  equipment  insulation  installation  including 
insulation inspection. 
 
Period        June 2001‐June 2002. 
Company’s name    Kosampatti Karnyotha Company Limited. 
Location                                    Surat Thani, Thailand. 
Project Title      Nursery School building Project. 
2 Floors/250,000sqm Concrete Building Works. 
Position      Site Manager.
Responsibilities 
 Construction management for Nursery School Concrete Building 2 Floors/250,000sqm.  
 Landscape layout and dimensional control with Theodorite and Total station. 
 Material take off and materials procure. 
Anirut Tiabchaiphan CV :V.20160328
15 of 15
 Formwork design and temporary materials evaluation. 
 Provide construction details schedule including heavy equipment and Man power loading plan. 
 Construction sequence. 
 Technical support and site supervision. 
 
Period        Feb 2000‐May 2001. 
Company’s name    Kosampatti Karnyotha Company Limited. 
Location                                    Surat Thani, Thailand. 
Project       JP Car Center Project. 
6 Floors Concrete Building Construction. 
Position      Site Manager. 
Responsibilities 
Construction management for 6 Floors Concrete Building Works. 
 Material Take off and Materials procure. 
 Formwork design and temporary materials evaluation. 
 Provide construction details schedule including heavy equipment and man power loading plan. 
 Construction sequence. 
 Landscape layout and dimensional control with Theodorite and Total station. 
 Technical support and site supervision. 
 
REFERENCES 
1. Mr. Russell White Position: Devil Creek Project Manager  
Mb: +66 (0) 8 7144 0287 email: Russell.white@clough.co.th 
 
2. Mr. Damien Trim Position: Engineering Manager 
Mb: +66 (0) 8 18012968 email: Damien.Trim@clough.co.th 
 
3. Mr. Panyapol  Maonampriy : Panyapol1971@gmail.com
Mb: +66 (0) 8 9607 8244, +66 (0) 8 9922 9568 
 
4. Mr. Tran Hong Viet, Operation Manager Asia:  hv.tran@leightonasia.com
Mb: +66 (0) 8 7106 0451 
 
5. Mr Yuji Fujita, Engineering Manager JKC CUEL Yard Thailand: fujita.yuji@jkc‐mf.com
Mb: +66 (0) 8 1295 2146 

More Related Content

What's hot

Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cv
mustafaghazy
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
Sajjad Khan Niazi
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
ahmad dodo
 
Resume-Mechanical Engineer
Resume-Mechanical EngineerResume-Mechanical Engineer
Resume-Mechanical Engineer
tiju thomas
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
Mehtab Zaidi
 
CV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection EngineerCV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection Engineer
Muhammed Salahuddeen
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
abdul shukoor
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
muhammad jamil
 
CV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem ShaikCV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem Shaik
Ahmed Kaleem Shaik
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
Mohammad Khan
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher
 
Senior HSE Engineer with 17 years experiences
Senior HSE Engineer with 17 years experiencesSenior HSE Engineer with 17 years experiences
Senior HSE Engineer with 17 years experiences
Mohammad Ansari
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
Mohamed Aboobakkar Sidiq
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
Omar Al-Naimi
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
Chandra Battu
 
M. Ajmal CV (Field Safety Engineer - 11 Years)
M. Ajmal CV (Field Safety Engineer - 11 Years)M. Ajmal CV (Field Safety Engineer - 11 Years)
M. Ajmal CV (Field Safety Engineer - 11 Years)
Muhammad Ajmal
 
MEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeMEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr Resume
Amr Sakr
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
Habeeb Omer
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
REHAN MUMTAZ
 
CV-Mechanical Engineer.
CV-Mechanical Engineer.CV-Mechanical Engineer.
CV-Mechanical Engineer.
AZHAR QAZI
 

What's hot (20)

Mechanical engineer cv
Mechanical engineer cvMechanical engineer cv
Mechanical engineer cv
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Resume-Mechanical Engineer
Resume-Mechanical EngineerResume-Mechanical Engineer
Resume-Mechanical Engineer
 
Planning engineer cv (mehtab)
Planning engineer cv (mehtab)Planning engineer cv (mehtab)
Planning engineer cv (mehtab)
 
CV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection EngineerCV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection Engineer
 
CIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoorCIVIL SUPERVISOR-CV-abdul shukoor
CIVIL SUPERVISOR-CV-abdul shukoor
 
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENTQA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
QA/AC SUPERVISOR ELECTRICAL & INSTRUMENT
 
CV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem ShaikCV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem Shaik
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
Senior HSE Engineer with 17 years experiences
Senior HSE Engineer with 17 years experiencesSenior HSE Engineer with 17 years experiences
Senior HSE Engineer with 17 years experiences
 
MEP Engineer Resume
MEP Engineer ResumeMEP Engineer Resume
MEP Engineer Resume
 
Piping Engineer CV
Piping Engineer CVPiping Engineer CV
Piping Engineer CV
 
Structural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDFStructural & Piping QC Inspector CV - PDF
Structural & Piping QC Inspector CV - PDF
 
M. Ajmal CV (Field Safety Engineer - 11 Years)
M. Ajmal CV (Field Safety Engineer - 11 Years)M. Ajmal CV (Field Safety Engineer - 11 Years)
M. Ajmal CV (Field Safety Engineer - 11 Years)
 
MEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr ResumeMEP Engineer Amr Sakr Resume
MEP Engineer Amr Sakr Resume
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 
MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007MECHANICAL SUPERVISOR 007
MECHANICAL SUPERVISOR 007
 
CV-Mechanical Engineer.
CV-Mechanical Engineer.CV-Mechanical Engineer.
CV-Mechanical Engineer.
 

Viewers also liked

Revista ;D
Revista ;DRevista ;D
Revista ;D
MalejaChavarro
 
Revista Sudestada 06
Revista Sudestada 06Revista Sudestada 06
Revista Sudestada 06
peronismo militante
 
Yet Another Scary Back to School Presentation
Yet Another Scary Back to School PresentationYet Another Scary Back to School Presentation
Yet Another Scary Back to School Presentation
Barbara Cohen
 
Amip
AmipAmip
Dirección de grupo 11 2016
Dirección de grupo 11 2016 Dirección de grupo 11 2016
Dirección de grupo 11 2016
IETI Rafael Navia Varón
 
Presentación GSB
Presentación GSBPresentación GSB
Presentación GSB
gsbworld
 
Pro menschenrechte contra vorurteile
Pro menschenrechte contra vorurteilePro menschenrechte contra vorurteile
Pro menschenrechte contra vorurteile
FESD GKr
 
Presentacion art hotel y suites
Presentacion art hotel y suitesPresentacion art hotel y suites
Presentacion art hotel y suites
lpachon
 
KEMP Technologies - Cultivating an Ecosystem of Success
KEMP Technologies - Cultivating an Ecosystem of SuccessKEMP Technologies - Cultivating an Ecosystem of Success
KEMP Technologies - Cultivating an Ecosystem of Success
Jeff Fisher
 
Gustarte a ti mismo
Gustarte a ti mismoGustarte a ti mismo
Gustarte a ti mismo
ivanr85
 
Edsger Dijkstra y algoritmo
Edsger Dijkstra y algoritmoEdsger Dijkstra y algoritmo
Edsger Dijkstra y algoritmo
jfct2012
 
Saber comunicar nuestra marca
Saber comunicar nuestra marcaSaber comunicar nuestra marca
Saber comunicar nuestra marca
Especialista en publicidad exterior #ooh #dooh
 
Awakening the voiceless, Capitalising on nineteen years of Swiss Cooperation ...
Awakening the voiceless, Capitalising on nineteen years of Swiss Cooperation ...Awakening the voiceless, Capitalising on nineteen years of Swiss Cooperation ...
Awakening the voiceless, Capitalising on nineteen years of Swiss Cooperation ...
regiosuisse
 
Cómo comer con palillos chinos
Cómo comer con palillos chinosCómo comer con palillos chinos
Cómo comer con palillos chinos
Departamento de Lengua IES Bovalar
 
Darlisr
DarlisrDarlisr
Darlisr
darlisramos
 
Week14mazon
Week14mazonWeek14mazon
Week14mazon
s1190087
 
Tipos de gráficos utilizados en power point
Tipos de gráficos utilizados en power pointTipos de gráficos utilizados en power point
Tipos de gráficos utilizados en power point
Brayanramosbamaca
 
Domotic Building
Domotic Building Domotic Building
Domotic Building
Christian Felipe
 
Automated Optimization with Smart Notifications by Jorrin Quest at MeasureCam...
Automated Optimization with Smart Notifications by Jorrin Quest at MeasureCam...Automated Optimization with Smart Notifications by Jorrin Quest at MeasureCam...
Automated Optimization with Smart Notifications by Jorrin Quest at MeasureCam...
Jorrin Quest
 
Cronograma de las actividades e.p.b
Cronograma de las actividades e.p.bCronograma de las actividades e.p.b
Cronograma de las actividades e.p.b
Jose Carrillo Moreno
 

Viewers also liked (20)

Revista ;D
Revista ;DRevista ;D
Revista ;D
 
Revista Sudestada 06
Revista Sudestada 06Revista Sudestada 06
Revista Sudestada 06
 
Yet Another Scary Back to School Presentation
Yet Another Scary Back to School PresentationYet Another Scary Back to School Presentation
Yet Another Scary Back to School Presentation
 
Amip
AmipAmip
Amip
 
Dirección de grupo 11 2016
Dirección de grupo 11 2016 Dirección de grupo 11 2016
Dirección de grupo 11 2016
 
Presentación GSB
Presentación GSBPresentación GSB
Presentación GSB
 
Pro menschenrechte contra vorurteile
Pro menschenrechte contra vorurteilePro menschenrechte contra vorurteile
Pro menschenrechte contra vorurteile
 
Presentacion art hotel y suites
Presentacion art hotel y suitesPresentacion art hotel y suites
Presentacion art hotel y suites
 
KEMP Technologies - Cultivating an Ecosystem of Success
KEMP Technologies - Cultivating an Ecosystem of SuccessKEMP Technologies - Cultivating an Ecosystem of Success
KEMP Technologies - Cultivating an Ecosystem of Success
 
Gustarte a ti mismo
Gustarte a ti mismoGustarte a ti mismo
Gustarte a ti mismo
 
Edsger Dijkstra y algoritmo
Edsger Dijkstra y algoritmoEdsger Dijkstra y algoritmo
Edsger Dijkstra y algoritmo
 
Saber comunicar nuestra marca
Saber comunicar nuestra marcaSaber comunicar nuestra marca
Saber comunicar nuestra marca
 
Awakening the voiceless, Capitalising on nineteen years of Swiss Cooperation ...
Awakening the voiceless, Capitalising on nineteen years of Swiss Cooperation ...Awakening the voiceless, Capitalising on nineteen years of Swiss Cooperation ...
Awakening the voiceless, Capitalising on nineteen years of Swiss Cooperation ...
 
Cómo comer con palillos chinos
Cómo comer con palillos chinosCómo comer con palillos chinos
Cómo comer con palillos chinos
 
Darlisr
DarlisrDarlisr
Darlisr
 
Week14mazon
Week14mazonWeek14mazon
Week14mazon
 
Tipos de gráficos utilizados en power point
Tipos de gráficos utilizados en power pointTipos de gráficos utilizados en power point
Tipos de gráficos utilizados en power point
 
Domotic Building
Domotic Building Domotic Building
Domotic Building
 
Automated Optimization with Smart Notifications by Jorrin Quest at MeasureCam...
Automated Optimization with Smart Notifications by Jorrin Quest at MeasureCam...Automated Optimization with Smart Notifications by Jorrin Quest at MeasureCam...
Automated Optimization with Smart Notifications by Jorrin Quest at MeasureCam...
 
Cronograma de las actividades e.p.b
Cronograma de las actividades e.p.bCronograma de las actividades e.p.b
Cronograma de las actividades e.p.b
 

Anirut_CV20160328

  • 1. Anirut Tiabchaiphan CV :V.20160328 1 of 15   CURRICULUM VITAE   Name      :  Mr. Anirut  Tiabchaiphan          Birth date    :  24 March, 1976   Age     :   40 Years Old  Height     :  160 cm  Weight     :  56 Kg  Nationality     :   Thai   MARITAL STATUS    :  Single  Contract Number  :    +66 (0) 8 9754 1959  Email address    :  anirut.tiabchaiphan@gmail.com    EDUCATIONAL BACKGROUND  1997‐2000               Bachelor Degree of Mahanakorn University of Technology, Thailand                                    Major Mechanical Engineer    1994‐1996               Diploma of Rachamongkala Institute of Technology, North Bangkok                                     Campus, Thailand Major Metallurgy.  1991‐1994               Vocational Certificate of Suphanburi Technical College, Thailand                                    Major Welding Technology                                                                                                                TRAINING – SEMINAR – CERTIFICATES – OTHER CURICULAR ACTIVITIES  LANGUAGE SKILLS:   Thai  Listen, Speak, Read and Write are fluent.   English  Listen, Speak, Read and Write are Very good.   COMPUTER SKILLS:          Ms‐Word, Project, Power point, Access are good.   Excel advance level with spread sheet record and formula application.   AutoCAD advance level for 2D and 3D.   TeKla ‐Knowledge of Software application ‐ Training by Tekla REP Thailand.  TRAINING COURSES   AWS D1.1 Basic of Structure Steel Fabrication Code.   Budged plan.   Success Through of People (STP).   Project Management.    Availability  for :   Project Manager, Construction Manager, Engineering Manager, Engineering Coordinator                              , Sub Contract Engineer, Senior Inspector, Lifting Specialist.                              CURENT STATUS    AVAILABLE                                      
  • 2. Anirut Tiabchaiphan CV :V.20160328 2 of 15 SUMMARY    More than 15 Years experiences with Engineering, Fabrication and Construction for Civil, Structure, Piping  and Mechanical works in Refinery, Petrochemical, Industry, Oil &Gas Off‐shore Facilities and On‐shore  Modular.      2014 to 2016 ‐  1.5 Years with JGC, KBR and Chiyoda Joint Venture for PNG On‐shore Facilities Pipe Rack and  Process Modules Fabrication as Lead Project Engineer.  2013 to 2014 ‐   8 Month with NKW Welder and Construction Co,.Ltd. for Refinery Expansion Project, as Project  Manager.   2012 to 2013 ‐   1.5 Years with John Holland and Leighton Joint Venture for Over‐sea Modules Fabrication as  Package Manager.  2010 to 2011 ‐   7 Months with Worleyparsons Thailand for Refinery Expansion Project and Shutdown Project  as Lifting Specialist and Construction Supervisor.   2006 to 2012 ‐   More than 5 Years with Clough Thailand with Fabrication and Construction Oil & Gas Off‐shore  Facility and PNG LNG Modular as QAQC Engineer, Production Engineer, Construction  Engineer, Project Engineer and Lead Engineer.  2005 to 2006 –  1 Year with Clough Sino‐Thai Joint Venture for Modules Construction as SPM Inspector for  Structure, Piping and Mechanical works.    2002 to 2005 ‐   3 Years with Qualitech Engineering and Construction Co,.Ltd. for construction works in  Refinery, Petrochemical and Industrial Plant as Production Engineer, QAQC Engineer and  Project Engineer.   2001 to 2002 –  2 Years in Civil Construction Works as Site Manager.                              WORKING EXPERIENCES    Period        May 2014‐Feb 2016.  Company’s name    JKC (JGC, KBR and Chiyoda Joint Venture).          Supply under Brunel Technical Services ‐ Thailand Limited.    Location                                          CUEL Ltd, Laem‐Chabung, Chonburi, Thailand.  Project Details      Ichthys Onshore LNG Facilities Fabrication Project,   Client INPEX Operations Australia Pty Ltd.  3,500 Tons for 155 Modules fabrication to include Process Modules and  Utility LNG Pipe Racks.                    Position                   Lead Project Engineer.   Responsibilities    Lead  of  Project  Engineers,  to  deliver  multidiscipline  engineering  support  and  consulting  for  every  engineering activities in Module Fabrication Yard.   Participate and investigate any project issues to find out solution, course of action, preventive course to  address the project issue and prevent repeat problem.    Advise Technical Clarification/Instruction reply to Site Query.   Verify  all  engineering  design  changes  form  Yard  Discipline  Engineer  on  behalf  of  Yard  Engineering  Manager to minimize impact to Construction activities and cost.   Prepare Site instruction issue to Module Fabricator to confirm instruction or course of action for any  Engineering Design Change/Field changes. 
  • 3. Anirut Tiabchaiphan CV :V.20160328 3 of 15  Provide Cost Evaluation and Construction Man‐Hour Estimate for any Major Variation works support to  JKC Contract Team.   Manage and maintain all relevant Engineering Reports/registers to include providing of engineering high  level reports to Site Engineering Manager/ JKC Project Management Team.   Ship Loose Coordinator, Manage and control Project Ship Loose materials, Ship Loose Inspection, Lead  of Ship Loose materials arrangement and delivery to Darwin Site.   Insulation Coordinator, Work closely with Darwin Insulation Team to deliver Module Fabricator/AGC  Insulation  Subcontractor  with  technical  clarification  and  solution  for  any  Insulation  Issue  in  Module  Fabrication Yard.    Period        Sep 2013‐Apr 2014.  Company’s name    NKW Welder & Construction Co,.Ltd.    Location                                          Maptaput, Rayong, Thailand.  Project Details      SACK Expansion Project. (Refinery Plant).          Supply Fabrication 80,000db Piping Fabrication including Piping installation.          Consulted by UHDE Shedden (Thailand) Co.,Ltd.                   Position                  Project Manager   Responsibilities  Taking over Project Manager Position to recover NKW performance.   Review and re‐arrange NKW organization chart.   Set up communication channel between company and NKW.   Review Document control Process and refresh IFC revision.   Attend weekly Progress Meeting UHDE and Taking UHDE Comments for further improvement.   Arrange Weekly Management walk down inspection to participate construction issue at the plant Site.   Provide Construction Schedule and 3 Week Look Ahead for UHDE approval.   Set up NKW Internal Meeting and clarify each Staffs with role of responsibility.    Review piping progress report and address omit error on the report for UHDE acceptable.   Tidy up NKW Quality Control department and close out any quality issue such as NDE Back Log and  pending Inspection Reports.   Settle Pipe Support MTO and Progress Tracking Report which is not available in the beginning of project.   Settle Materials Stock and Inventory status reports.   Set up Site Query system to clarify any engineering issue/project as obstruct fabrication and erection  activities.   Arrange necessary Letter in requesting UHDE release Construction Area for construction as per contract.   Place NKC progress claim which is omit missing by previous Project Manager to bring back NKW Cash  Flow.   Request UHDE to arrange Contract Meeting to Clarify Scope of Works and Variation Works.   Management and Supervision NKC Construction Team to achieve the project as per agreed schedule.           
  • 4. Anirut Tiabchaiphan CV :V.20160328 4 of 15 Period        Mar 2013‐Sep 2013  Company’s name    John Holland ‐ Leighton (SEA) Joint Venture    Location                                          ZPMC (Zhenhua Port Machinery Company), Shanghai, China.  Project Details      Cap Lambert Port B Phase B Jetty Project, Australia.          350t Steel Structure Fabrication for Grout Containment Plates, Dolphin Access  Platforms, Walkway Platform, Conveyor Supports, Wind Bows,   Conveyor Guards and Misc Steel Structure.                 Position                   Package Manager   Responsibilities  Taking over Package Manager Role to address the project issue in order to deliver Fabricated Steel Structure  Materials on time.   Participate All Project Issue and Report to John Holland Project Manager.   Set up progress tracking and reports to capture and expediting fabrication progress.   Perform inspection any fabricate items and advise ZPMC if any rework necessary.   Coordinate with John Holland Site for prioritize items to be shipped.   Follow up pending Site Query which is holding up fabrication activities.    Update fabrication details Schedule to align with John Holland construction required date.   Follow up Close out any quality documents overdue such as Welder Qualification Test Reports, NDE  Technician register and certificate, Galvanize Procedure etc..   Provide alternative option for John Holland (AUS) approval in order to minimize re‐works and schedule  impact.   Attend each final Inspection with MOODY CHINA and release for materials delivery.   Assist Module Fabricator ZPMC to settle MDR documents.   Perform Safety Inspection weekly basis and advice to module fabricator if any necessary to be improved.   Work Closely with Client and ZPMC Project Manager to deliver materials on time.    Period        April 2012‐Mar 2013   Company’s name    John Holland ‐ Leighton (SEA) Joint Venture    Location                                          SMV (Strategic Marine Vietnam), Vung Tau, Vietnam.  Project Details      WICET Project (Wiggins Island Coal Export Terminal Pty Ltd), Australia.  Supply FTA 530t Carbon Steel Surge Bin Fabrication and Module Assembly.                  Position                   Package Manager  Responsibilities   To manage and control 530t Surge Bin Module fabrication and assembly to include module transportation Free  Trade Along Site (Vietnam Port).  
  • 5. Anirut Tiabchaiphan CV :V.20160328 5 of 15  Project Kick off Meeting at SMV Subcontractor.   Prepare Construction Sequence.   Constructability review with Module Fabricator.   Prepare construction details schedule and set up progress tracking spread sheet and S‐Curve.    Expedite and Consulting Module Fabricator to prepare project documents such as relevant Fabrication  Procedure, Welding Procedure, Quality Procedure, ITP and Module Transport Procedure etc.   Witness WPS&PQR.   Welder Qualification.   Set up project materials status report to include Module Fabricator procure materials and Jonh Holland’s  Free Issue Materials.   Verify Subcontractor’s relevant inspection reports.   Set up Technical Query system.   Verify Variation work and Module Fabricator claim.   Lead of Weekly Progress Meeting and MOM.   Work Closely with Module Fabricator and advise technical supports as necessary.     Perform Safety Inspection weekly basis and advice module fabricator if any necessary to be improved.   Verify Module Fabricator’s dimension reports and ensure each major dimension are under tolerance in  accordance to design and AS standard code.   Review and verify heavy lift and heavy transport method statement to ensure that they are satisfied with  project requirement and standard code as relate to company insurance.   Follow up Technical Query which is pending with Client and holding up fabrication activities.   Participate all project issue and close out on time.   Provide Weekly Progress report to John Holland Project Manager.    Period        Jan 2011‐Mar 2012.  Company’s name    Clough Thailand Company Limited.  Location                                          Sattahip Yards, Thailand.  Project  Details           PNG LNG Project Marine Jetty Topsides and Pipe Racks Fabrication, Client Chiyoda JGC Joint Venture.  Supply, fabrication, coating, assembly and testing of all structural steel,  cryogenic and utility piping, and installation of cable tray associated with the  topsides and Pipe Rack modules for the PNG LNG Jetty Project in Papau New  Guinea.         Gorgon Jansz Pipeline Heads Fabrication Project, Client Allseas.  Fabrication of more than 80 components for the Gorgon Jansz Pipeline Project,  located in the North West Shelf, offshore Western Australia. Scope of work  includes fabrication of onshore and offshore pipe launchers, pig receivers and  A&R heads, as well as all required project management and shop drawings,  welding procedure specifications (WPS), nondestructive examinations (NDE),  hydrostatic testing, surface preparation and coating, weighing and COG  adjustments. Associated procurement includes the supply of pipe, fittings,  bolts and gaskets.       
  • 6. Anirut Tiabchaiphan CV :V.20160328 6 of 15  Yolla Mid Life Expansion (MLE) Compression Modules Fabrication Project. Client Origin Energy.  Procurement, fabrication and assembly of a 600MT gas  compression and condensate pumping modules for the  Yolla Platform Mid Life Expansion (MLE) Project, located  in the Bass Strait, Victoria. The modules consisted of a  single gas‐turbine driven centrifugal compressor train,  electric condensate pumps, associated piping, fuel gas  system, mechanical equipment, control systems and E&I.     PNG Dolphin Super Structure Project 300 tons, Client BAM Clough Australia.  Engineering Shop detailing, Materials supply, Temporary Supports design, fabrication and Module assembly.                 Cimeco HD4 Steel Structure Fabrication Project, Client Rio‐tinto Australia.  Engineering shop detailing, Procurement, Stick Steel Fabrication, Packaging and delivery FTA Leam Cha‐bang  Port. Chonburi, Thailand.     Position                   Lead Engineer   Responsibilities   Lead of Engineering College* on behalf of Engineering Manager to supporting Project Team and Yards  Activities.    *9  Project  Expat  &  TH,  5  Discipline  Engineer,  5  Production  Engineer,  23  Shop  detailing  officers,  5  Document Controls, 2 Materials Control(Marian Engineer), 2 Engineering Admin.     Joining and supporting with system re boot for all management system SPF, SPMAT.   Participated Project Kick of Meeting.   Prepare and Conduct Constructability Review.   Prepare and Conduct Project Hazid Meeting.   Design review and technical clarify to Client.   Design fabrication and installation sequence.   Set up engineering structure shop drawing work flow using Tekla software‐ start from received native  file micro station from Client – develop Tekla model – completed joint connection – generate shop  drawings – nesting plan – Issued for construction.   Piping shop drawing by Spool gen Software – received native dxf from client – generate shop drawings   Advice Temporary steel works for Fabrication Jigs, Supports, Steel Structure Foundation for module  building.   Consulting and monitoring project engineers on each projects.   Set up and scheduling shop detailing plan with shop detailing office Lead.   Control and Manage All design and details MTO supports to SPMAT for materials order or Engineering  requisition ERQ.   Prepare all relevant SOW Scope of Work issued to Supply chain to searching materials and sub contract  works.    Advice acceptance and prepare Technical Bid Evaluation to Project Manager and Supply Chain.   Provide multi‐disciplined engineering assistance to project and yard activities.   Provide facility plan and layout for Fabrication work shop and Yards.   Reply and clarify Subcontractor Technical Query.   Prepare relevant project procedures.    Review Module Sea fastening. 
  • 7. Anirut Tiabchaiphan CV :V.20160328 7 of 15  Prepare site move load out plan in the yards and arrange module transport plan to the Jetty and on Barge  or under the hook of HLV heavy lift Vessel.   Review and Approve Heavy Lift Study.   Participate all safety programs.   Work closely with Project Management to monitor project issues, subcontract management, logistic,  subcontract deliverables, and acting as general interface and source of project knowledge, alertness to  all parties.   Provide multi‐disciplined engineering assistance for both project and yard ensuring the timely resolution  of technical queries to support construction activities.   Participate in project planning and execution.   Provide construction engineering support for bidding activities.  RIENCES  Period        July 2010‐Jan 2011  Company’s name    Worley Parson‐Thailand.   Location                                          Thai Lube Base (Refinery Plant), Laem Cha‐Bang, Chonburi, Thailand.   Project Details         Thai Lube Base Expansion Project.   Structure and Piping erection.  Static and Rotating Mechanical   Equipment  installation approximate 230t this to include  3x Process Columns.   Thai Lobe Base Shutdown Project.  Replacement Air Pre‐heater and Furnace Burners to include structure supports reinforcement, Tie‐in piping,  testing and commissioning works.              Position                  Lifting Specialist & Construction Supervisor.     Responsibilities   Constructability review all relevant equipment design drawings advice concern to Engineering Office for  further design development.    Prepare  installation  procedure,  Lift  study,  JHA  for  3  off  process  columns  and  Other  Equipment  as  necessary.   Review and approved Subcontractor lift study on behalf Thai Oil Specialist.   Site supervision and control field equipment installation on Thai Lube Base Expansion Project.    Lifting Study design for replacement Air Preheater Thai Lube Base Shutdown Project with using Screw  Jack Lift Method.   Prepare method statement, temporary work design such as temporary lifting brackets, steel temporary  support for replacement 120t Air Preheater equipment.    Site Supervision for steel temporary support, existing Air Preheater demerit, new Air Preheater install  and reinforcement Structure Installation at Thai Lube Base Shutdown Project.    Management and control subcontractor for steel structure, piping and equipment installation in cluding  Insulation works.   Attend walk down inspection and final punch list for steel structure, piping, equipment, painting and  insulation works.    Expediting subcontractor for construct punch list close out.    KING EXPERIENCES 
  • 8. Anirut Tiabchaiphan CV :V.20160328 8 of 15 Period        June 2009‐June 2010.  Company’s name    Clough (Thailand) Company Limited.   Location                                          Sattahip Yard, Thailand.   Project Details      Devil Creek Module Fabrication Project, Client Apache Energy Limited.          Onshore engineering, procurement, module fabrication and assembly for   the Devil Creek Development Project, located in the north west of Western  Australia.                Position      Project Engineer     Responsibilities   Provide multi‐disciplined engineering assistance to project and yard activities.   Work closely with Project Management to monitor project issues, subcontract managements, logistic,  subcontract deliverables, and acting as general interface and source of project knowledge, alertness to  all parties.   Provide multi‐disciplined engineering assistance for both project and yard ensuring the timely resolution  of technical queries to support construction activities.   Participate in project planning and execution.   Provide construction engineer supports for bidding activities.   Prepare Site move load out plan in the yards and arrange module transport to the Jetty and under the  hook of HLV heavy lift Vessel.    Period        Feb 2009‐June 2009.  Company’s name    NKW Welder and Construction Co.,Ltd.   Location                                          Thai Jurong Engineering Limited’s Fabrication Yard Ban‐Bung, Chonburi.  Project Details      Fujarah Piping Fabrication Project. Part of Alstom’s Electrical Power Plant in  Fujarah, Dubai UAE.          Supply Fabrication for 70,000 Db Carbon Steel Piping and 12,000 Db Stainless  Steel Piping.                Position      Project Manager   Responsibilities   Yards Facility Plan.   Production process settle including process inspection plan.   Equipment and Man Power Loading plan.   Progress tracking and progress control to ensuring the fabricate spool are delivered on time as per  agreed schedule.   Provide daily and weekly progress report to Client.   Stock and Inventory control for all piping materials including expedite free issue materials shortage from  client. 
  • 9. Anirut Tiabchaiphan CV :V.20160328 9 of 15  PWHT and NDE control.   Participate all Project Issues which holding product activity and immediately improved or report to Client  if assist is required.   Provide  technical  support  to  production  team  and  raise  TQ  to  Client  if  any  technical  clarification  is  necessary.   Progress Claim.    Period        Oct 2008‐Jan 2009.   Company’s name    Clough (Thailand) Company Limited.   Location                                          Sattahip Yards, Chonburi, Thailand.    Project Details      NuCoastal Songkhla Fabrication, Client NuCoastal (Thailand) Limited.          Engineering, shop detailing, procurement, fabrication, assembly,  precommissioning, load out and sea‐fastening of one wellhead platform and  production platform connected by a bridge link.            Position      Lead Construction Engineer  Responsibilities   All engineering activity in Module Fabrication Yard.    Lead  of  Production  engineer  to  provide  relevant  Procedure  and  Method  Statement  for  Modules  construction.   Provide detail MTO for materials purchasing, stock and Inventory control.    Prepare Cutting Plan, Cutting List and materials reserve support to Construction Team.   Fabrication Work Packs preparation for Module Construction.    Provide Technical Support to Construction Crew and any technical review or recommendation required  for procurement processing.   Provide multi‐disciplined engineering assistance for both project and yard ensuring the timely resolution  of technical queries to support construction activities.   Review and approve sea‐fastening drawings, module temporary supports, temporary steel works, heavy  lifting study, fabrication sequence and yard facility control.   Engineering Coordinate with Client, Subcontractor and other parties.   Prepare site move load out plan in the yards and arrange module transport to the Jetty and on Barge by  SPMT ‐ Self‐Propelled Modular Transporter.   Ship Loose materials arrangement for Off‐shore Installation.     Period        Feb 2008‐Jul 2008.  Company’s name    Clough (Thailand) Company Limited.  Location                                          Sattahip Fabrication Yard, Chonburi, Thailand.    Project Details      Montara Topside Modules Fabrication Project.   Client Coogee Resources Pty Ltd          Fabrication of the topsides for the Montara wellhead platform. The topsides           have an overall weight of approximately 700 tonnes.            Position      Lead Construction Engineer.   Responsibilities   All engineering activity in Module Fabrication Yard.  
  • 10. Anirut Tiabchaiphan CV :V.20160328 10 of 15  Control and manage engineering subcontractor ARV‐offshore to produce fabrication drawings.   Lead  of  Production  Engineer  to  provide  relevant  procedures  and  method  statements  for  module  construction.   Provide detail MTO for materials purchasing, stock and inventory control.    Prepare Cutting Plan, Cutting List and materials reserve support to Construction Team.   Prepare Work Packs for Module Construction.    Provide technical support to Construction Crew and any technical review or recommendation required  for procurement processing.   Provide multi‐disciplined engineering assistance for both project and yard ensuring the timely resolution  of technical queries to support construction activities.   Review and approve sea‐fastening drawings, module temporary supports, temporary steel works, heavy  lifting study, fabrication sequence and yard facility control.   Engineering coordinate with Client, Subcontractor and other parties.   Prepare site move load out plan in the yards and arrange module transport to the Jetty and on Barge by  SPMT ‐ Self‐Propelled Modular Transporter.   Ship Loose materials arrangement for Off‐shore Installation.    Period        Oct 2007‐Jan 2008.   Company’s name    Clough (Thailand) Company Limited.   Location                                          Sattahip Yard, Chonburi, Thailand.     Project Details      GFI Bualuang Field Development BLWPA Wellhead Platform Fabrication  Project, Client ARV Offshore.  Wellhead Platform & Jacket Leg fabrication and assembly.  Position      Lead Production Engineer   Responsibilities   Constructability review All Fabrication Drawings.   Lead  of  Production  Engineer  to  provide  relevant  procedures  and  method  statements  for  modules  construction.   Provide detail MTO for materials purchasing, stock and inventory control.   Providing technical support to construction crew and any technical review/recommendation required  for procurement processing.    Prepare Cutting Plan, Cutting List and materials reserve support to Construction Team.   Prepare Work Packs for Module Construction.    Provide Lifting Procedure, Equipment Installation Method statement, Module Transportation Plan, and  Yard Facility Control.   Participate  field  engineering  issue  at  site  and  Site  Query  raise  for  technical  clarification/alternative  solution propose for Client approval.    Period        Oct 2006‐Sep 2007.  Company’s name    Clough (Thailand) Company Limited.  Location                                          Sattahip Yard,Chonburi, Thailand.   Project Details      Vetco Ettrick FPSO Modules Fabrication Project. Client Aibel Bluewater.   Supply Fabrication of five topside process modules  with a combined weight of about 1,800t tonnes for  Aoka Mizu FPSO, at Nexen's Ettrick Field.            Position      Production Engineer.   Responsibilities   Provide detail MTO for Materials purchasing, stock and inventory control.  
  • 11. Anirut Tiabchaiphan CV :V.20160328 11 of 15  Providing technical support to construction crew and any technical review/recommendation required  for procurement processing.   Prepare Cutting Plan, Cutting List and materials reserve support to Construction Team.   Prepare Work Packs for Module Construction.   Provide Lifting Procedure, Equipment Installation Method statement, Module Transportation Plan, and  Yard Facility Control.   Participate  field  engineering  issue  at  site  and  Site  Query  raise  for  technical  clarification/alternative  solution propose for Client approval.    Period        Jul 2006‐Sep 2006  Company’s name    Clough (Thailand) Company Limited.   Location                                          Sattahip, Chonburi, Thailand.   Project Details      Pluto LNG Jetty Catwalk Fabrication Project, Main Contractor AUS,  Client Woodside Energy Limited.  Supply 300 Meters Catwalks Fabrication and Assembly.            Position      Production Engineer/QAQC Engineer.  Responsibilities   Review and verify shop drawings, cutting plan and cutting list from ICS Shop Detailing Subcontractor.   Review and reply subcontractor Technical Query.   Monitoring and control steel structure fabrication at Shi‐asia’s Fabrication Shop and final assembly in  Sattahip Yard.   Quality Control Coordinator.   Attend majority inspection such as witness 6GR PQR, 6GR Welder Qualification, materials inspection and  final inspection etc.   Provide lifting procedure, land transport plan, and yard facility control.   Alertness and follow up Company comments/punch list close out.   Subcontract coordinator in Sattahip Fabrication Yard.    Coordinate and supporting Marine Engineer to complete Heavy Lift Vessel Lifting Study.      Period        Sep 2005‐Jun 2006.  Company’s name    Clough Sino‐Thai Company Limited.          Supply under Brunel Technical Services ‐ Thailand Limited.   Location                                          Sattahip Yard, Chonburi, Thailand.  Project Details      Alcan Gove G3 Expansion Project. Western Australia, Client Alcan Gove  Development Pty Limited,          Clough with partner Sino‐Thai, undertook the fabrication of the Process Area  Modules for the Alcan Gove Third Stage Expansion that included fabrication   and assembly of around 120 modular units with a total delivered weight from  14 shipments of some 27,000 tonne. Work activities entailed all structural  steel, process equipment, pipework, electrical and instrumentation systems  and were pre‐commissioned prior to transport to site for final positioning,  hook‐up and commissioning.   Position      SPM Inspector (Structure, Piping and Mechanical Equipment Inspector).  Responsibilities  For 2x 3,500t Calciner Modules Fabrication.   Quality Control of structure, piping, ducting, refractory and mechanical work installation to meet with  Construction Drawings and project specification.   
  • 12. Anirut Tiabchaiphan CV :V.20160328 12 of 15  Participate  all  quality  issue  during  module  construction  and  reports  to  Module  Superintendent  for  further quality improvement.    Monitoring and verify dimension report before and after weld.   Perform welding inspection and control NDE as per project requirements.   Progressively documentation all inspection records/reports as required for project MDR.    Period        Jul 2005‐Aug 2005.  Company’s name    Qualitech Engineering & Construction Company Limited.   Location                                          Maptaput, Rayong, Thailand.  Project Details      Arometic (Thailand) Shutdown Project. (Petrochemical Plant)          Supply Fabrication 350db 4” new Line Piping including installation and Tie‐in.  Position      Project Engineer  Responsibilities   Materials take off and procure materials.   Site Survey and advice with temporary materials and construction equipment as necessary.   Provide work schedule, manpower & equipment loading plan.   Provide fabrication, Installation procedure and method statement for client review.   Control fabrication and site installation works.   Quality control, completed with project MDR.    Period        Feb 2005‐Jun 2005  Company’s name    Qualitech Engineering & Construction Company Limited  Location                                          Fabrication Shop, Houypong, Rayong, Thailand.  Project Details      CUEL Piping Fabrication Project. (Off‐Shore Piping, Oil & Gas)           Supply Fabrication Piping 15,000db for Off‐Shore Wellhead Platform Facilities.    Position      Senior Production Engineer, QA/QC Engineer  Responsibilities   Manage and control of piping fabrication and painting works.   Progress tracking and report including mouthy progress claim.   Manage and control painting subcontractor including painting inspection.   Lead of process inspection and NDE in according to ITP this to including blasting and painting inspection.   QAQC documentation settle and progressively filing for final MDR.   Tagging and Packing of piping spools and deliver to the CUEL fabrication yard complete with shipping  documents.    Period        Jul 2004‐Jan 2005  Company’s name    Qualitech Engineering & Construction Company Limited  Location                                          Fabrication Shop, Houypong, Rayong, Thailand.  Project Details      Structure Steel Fabrication TTM Project GSP‐1 .(Gas Plant)          Supply Fabrication and delivers   250t Steel Structure Pipe Racks and Misc Steel Support for Slag Catcher  to project GSP‐1, Cha‐na, Song‐Kla, South of Thailand,   Client CBI Thailand.   300t Process Column Access Platforms to TTM Project GSP‐1, Cha‐na,  Song‐Kla, South of Thailand. Client Samsung Engineering.            Position      Senior Production Engineer, QA/QC Engineer.  Responsibilities 
  • 13. Anirut Tiabchaiphan CV :V.20160328 13 of 15  Review and verify shop drawings from subcontractor.    Prepare cutting list and cutting plan.   Coordinate with the Client to close out any engineering Issue found during shop detailing and fabrication  process.   Hold  management  since  client  has  totally  changed  Pipe  Rack  design  and  30%  of  steel  member  are  impacted.     Progress tracking and report including mouthy progress Claim.   Manage and Control painting subcontractor including painting inspection.   Lead of process inspection and NDE in according to ITP this to including blasting and painting inspection.   QAQC documentation settle and progressively filing for final MDR.   Tagging and Packing Structure Steel Members deliver to the plant site complete with Ship documents.     Period        Mar 2003‐May 2004  Company’s name    Qualitech Engineering & Construction Company Limited  Location                                    Maptaput, Rayong,Thailand.  Project Details      NPCX Polyethylene Expansion Project, Main Contractor Samsung Engineering  Company Limited, Client  (Chemical Plant)   85,000db Piping Fabrication and Installation.   1,200t Steel Structure Fabrication and Installation to include Steel  Structure   950t Mechanical Equipment Installation to include Static and Rotating  Equipment and Package Equipment as follow.   1x 91m Flare Stack, Cooling Tower.   Cooling Tower Unit. (Package Equipment).   Bagging Equipment. (Package Equipment).  Position      Production Engineer, QA/QC Engineer.  Responsibilities  Fabrication Shop   Prepare WPS/PQR including Welder qualification.    Control steel structure and piping fabrication in Fabrication Work Shop.   Lead of process inspection and NDE in according to ITP this to including blasting and painting inspection.   QAQC documentation settle and progressively filing for final MDR.      Progress tracking and reports including monthly progress claim.   Prepare lifting study and method statement for 91m Flare Stack and 4x Storage Tanks installation.   Provide 3 weeks look ahead and Man Power loading for field painting works.   Supervise and control of 91m Flare Stack and 4x Storage Tank installation.    Period        Dec 2002‐Feb 2003  Company’s name    Qualitech Engineering & Construction Company Limited  Location                                   Laem Chabang, Chonburi, Thailand.   Project Details      Samsung Micro Wave Project. Client Thai Samsung Electronics Co,.Ltd.  (Industrial Facility).  Supply Fabrication 360t Steel Structure Roof Truss,  Fire Protection Coating and Installation.           
  • 14. Anirut Tiabchaiphan CV :V.20160328 14 of 15 Position      Production Engineer.  Responsibilities   Design review and technical clarify to Client.   Shop Drawing preparation by 2d Auto‐cad.   Material take off and materials purchasing.   Control fabrication roof truss and accessories including fire protection coating.   Progress tracking and report including monthly progress claim.   Prepare construction sequence and installation plan.   Prepare lifting study for roof truss Installation.   Supervise and control site installation as per agreed construction schedule.    Period        Jul 2002‐Nov 2002.  Company’s name    Qualitech Engineering & Construction Company Limited.  Location                                    Thai‐PET resin Project, Lopburi, Thailand.  Project Details      Indorama idles Lopburi PET Polymer Plants/ Asia Pet (Thailand)  1,000t Steel Structure Installation, 90,000db Piping Fabrication & Installation   and Equipment installation to include    2x Stainless Storage Tank ∅9mx17m high. Fabrication &Install.   1x Stainless Extruder ∅9mx17m Silo. Fabrication &Install.   1x Stainless Steel Air receiver. Fabrication &Install.   1x Stainless Steel Demin Water Tank. Fabrication &Install.     Position      Production Engineer, QA/QC Engineer.  Responsibilities  Fabrication Shop.   Control fabrication 2x Stainless Steel Storage Tanks roll and press Shell Plates, Cone Parts and Roof Tops.   Fabrication and assembly Stainless Steel Extruder Silo, Air receiver and Demin Water Tank.   Progress tracking and report to Project Control.   Perform inspection and NDE in according to project specification and standard code requirements.   Communicate with the Plant Site to ensuring delivery of fabricated items are meet with construction  require date.  Plant Site.   Completed 2x Stainless Steel Storage installation this to include access stairs and service platforms.   Install 2x Feed Silo supply from Simmer.    Conduct field inspection and NDE in accordance to ITP and project specification.   Completed MDR for the foregoing every items as above.   Subcontract  coordinator  and  supervision  for  piping  and  equipment  insulation  installation  including  insulation inspection.    Period        June 2001‐June 2002.  Company’s name    Kosampatti Karnyotha Company Limited.  Location                                    Surat Thani, Thailand.  Project Title      Nursery School building Project.  2 Floors/250,000sqm Concrete Building Works.  Position      Site Manager. Responsibilities   Construction management for Nursery School Concrete Building 2 Floors/250,000sqm.    Landscape layout and dimensional control with Theodorite and Total station.   Material take off and materials procure. 
  • 15. Anirut Tiabchaiphan CV :V.20160328 15 of 15  Formwork design and temporary materials evaluation.   Provide construction details schedule including heavy equipment and Man power loading plan.   Construction sequence.   Technical support and site supervision.    Period        Feb 2000‐May 2001.  Company’s name    Kosampatti Karnyotha Company Limited.  Location                                    Surat Thani, Thailand.  Project       JP Car Center Project.  6 Floors Concrete Building Construction.  Position      Site Manager.  Responsibilities  Construction management for 6 Floors Concrete Building Works.   Material Take off and Materials procure.   Formwork design and temporary materials evaluation.   Provide construction details schedule including heavy equipment and man power loading plan.   Construction sequence.   Landscape layout and dimensional control with Theodorite and Total station.   Technical support and site supervision.    REFERENCES  1. Mr. Russell White Position: Devil Creek Project Manager   Mb: +66 (0) 8 7144 0287 email: Russell.white@clough.co.th    2. Mr. Damien Trim Position: Engineering Manager  Mb: +66 (0) 8 18012968 email: Damien.Trim@clough.co.th    3. Mr. Panyapol  Maonampriy : Panyapol1971@gmail.com Mb: +66 (0) 8 9607 8244, +66 (0) 8 9922 9568    4. Mr. Tran Hong Viet, Operation Manager Asia:  hv.tran@leightonasia.com Mb: +66 (0) 8 7106 0451    5. Mr Yuji Fujita, Engineering Manager JKC CUEL Yard Thailand: fujita.yuji@jkc‐mf.com Mb: +66 (0) 8 1295 2146