AN INTRODUCTION

NATIONAL WELFARE AND HUMAN
 DEVELOPMENT ORGANIZATION.
ABOUT US


 NWHDO IS A NON-GOVERNMENTAL AND NOT-FOR-
 PROFIT ORGANIZATION.
 NWHDO FORMED IN 2009.
 NWHDO IS REGISTERED WITH CDD, MATIARI, SINDH.
 WE WORK FOR MAGINALIZED COMMUNITIES
 SPECIALLY IN RURAL AND SEMI-URBAN AREAS.
 IT IS GOVERNED BY EXECUTIVE COMMITTEE AND
 GENERAL BODY.
VISION


A SOCIETY FREE OF DE-HUMANIZING
    CONDITIONS, WITH BETTER
 EDUCATION, SOUND HEALTH, LESS
 POVERTY, HEALTHY ENVIRONMENT
AND ACCESS TO OTHER BASIC NEEDS.
MISSION.


TO DELIVER SERVICES FOR NATIONAL
WELFARE AND SUSTAINABLE HUMAN
 DEVELOPMENT TO LESS PRIVILEGED
 RURAL, SEMI-URBAN AND IGNORED
 AREAS UNDER THEMES OF NWHDO.
THEMES AND THEMATIC CLASSIFICATION



  Education, Health and Institutional Development

           Youth welfare through educational and Health
  initiatives, such as opening, adopting and strengthening
                           institutions.
                         Increase enrolment.
                     Increase teachers capacity.
                 Improve child and maternal health.
           Awareness for water borne diseases and cure.
            Providing Safe drinking water and sanitation.
THEMES AND THEMATIC CLASSIFICATION



  Community Development and Local Governance

     Community mobilization, awareness, empowerment
                  and capacity building.
       Coordination with local Governments for capacity
  building and encouraging. Public private partnership.
        Awareness and action regarding environmental
                     sustainability.
THEMES AND THEMATIC CLASSIFICATION



              Gender mainstreaming

           Adopting and encourage gender equality
 initiatives like, awareness empowerment, up-liftment,
                     and emancipation.
        Activate the role of women in decision making.

         Encouraging gender responsive budgeting
            system in local governments.
THEMES AND THEMATIC CLASSIFICATION



              Poverty Alleviation

    Coordination with Poverty Alleviation Programs
           of Public and private sector.
                Research on Poverty.
                     Micro Finance.
THEMES AND THEMATIC CLASSIFICATION



              Training and Research

        Arrange trainings, seminars, work shops for
 common masses, local Governments and other Govt.
                     functionaries.
        General research on any subject, self and in
  collaboration with other stake holders in public and
                    private sector.
THEMES AND THEMATIC CLASSIFICATION



  Project Planning Monitoring and Evaluation

      Survey, feasibility and planning of projects.
        Execution, Monitoring and Evaluation.
GROUPS TO ADDRESS.


 IGNORED COMMUNITIES OF RURAL
AND SEMI URBAN AREAS UNDER THE
       THEMES OF NWHDO
ACTIVITIES 2010


DISTRIBUTION OF RELIEF GOODS AMONGST MAROONED
PEOPLE OF DEVASTING FLOODS.
INSTALLATION OF STREET LIGHTS IN NASARPUR AND
SURROUNDINGS.
ANTI-MASQUITO CAMPAIGN.
ORGANIZED CAMP FOR BLOOD SCREENING, GROUPING
AND PROVIDING OF VACCINE FOR HEPATITIS “B” (PHASE
I).
ORGANIZED CAMP FOR BLOOD SCREENING, GROUPING
AND PROVIDING OF VACCINE FOR HEPATITIS “B” (PHASE
II).
ACTIVITIES DURING 2011.


PROVIDED OF STREET LIGHTS IN NASARPUR TOWN
AND SURROUNDINGS.
PROVIDED 10 HAND PUMPS TO NEEDY FAMILIES.
ORGANIZED TWO MEDICAL CAMPS.
DISTRIBUTED 300 FOOD KITS TO RAIN AFFACTEES.
FORMATION OF CBOs.
VISITS TO RAIN AFFECTED AREAS IN DISTRICT
MATIARI.
FUTURE PLAN AND PROGRAM.


 ESTABLISHING HEALTH UNIT AT NASARPUR TO
 CONTROL HEPATITIS.
 GIRLS COMPUTER CENTER
 CONDUCT OF SEMINARS ON:
   LOCAL GOVERNANCE.
   ROLE OF WOMEN IN HUMAN DEVELOPMENT.
   IMPACT OF POVERTY ON SOCIAL LIFE.
 PROVIDING SWEET DRINKING WATER TO RURAL
 COMMUNITIES IN DISTRICT MATIARI.
SPECIAL CONCERNTATIONS.


WE DESIRE TO IMPROVE AND DEVELOP DRAINAGE
SYSTEM AND SANITARY CONDITIONS IN MATIARI
DISTRICT INCLUDING TOWNS AND VILLAGES.
(THIS PROBLEM WAS EXPERIENCED DURING HEAVY
  RAINS 2011,
     AFTER ELAPSE OF 6 WEEKS IDPs HAVE NOT
          RETURNED TO THEIR HOMES)
THANK YOU

An introduction

  • 1.
    AN INTRODUCTION NATIONAL WELFAREAND HUMAN DEVELOPMENT ORGANIZATION.
  • 2.
    ABOUT US  NWHDOIS A NON-GOVERNMENTAL AND NOT-FOR- PROFIT ORGANIZATION.  NWHDO FORMED IN 2009.  NWHDO IS REGISTERED WITH CDD, MATIARI, SINDH.  WE WORK FOR MAGINALIZED COMMUNITIES SPECIALLY IN RURAL AND SEMI-URBAN AREAS.  IT IS GOVERNED BY EXECUTIVE COMMITTEE AND GENERAL BODY.
  • 3.
    VISION A SOCIETY FREEOF DE-HUMANIZING CONDITIONS, WITH BETTER EDUCATION, SOUND HEALTH, LESS POVERTY, HEALTHY ENVIRONMENT AND ACCESS TO OTHER BASIC NEEDS.
  • 4.
    MISSION. TO DELIVER SERVICESFOR NATIONAL WELFARE AND SUSTAINABLE HUMAN DEVELOPMENT TO LESS PRIVILEGED RURAL, SEMI-URBAN AND IGNORED AREAS UNDER THEMES OF NWHDO.
  • 5.
    THEMES AND THEMATICCLASSIFICATION Education, Health and Institutional Development Youth welfare through educational and Health initiatives, such as opening, adopting and strengthening institutions. Increase enrolment. Increase teachers capacity. Improve child and maternal health. Awareness for water borne diseases and cure. Providing Safe drinking water and sanitation.
  • 6.
    THEMES AND THEMATICCLASSIFICATION Community Development and Local Governance Community mobilization, awareness, empowerment and capacity building. Coordination with local Governments for capacity building and encouraging. Public private partnership. Awareness and action regarding environmental sustainability.
  • 7.
    THEMES AND THEMATICCLASSIFICATION Gender mainstreaming Adopting and encourage gender equality initiatives like, awareness empowerment, up-liftment, and emancipation. Activate the role of women in decision making. Encouraging gender responsive budgeting system in local governments.
  • 8.
    THEMES AND THEMATICCLASSIFICATION Poverty Alleviation Coordination with Poverty Alleviation Programs of Public and private sector. Research on Poverty. Micro Finance.
  • 9.
    THEMES AND THEMATICCLASSIFICATION Training and Research Arrange trainings, seminars, work shops for common masses, local Governments and other Govt. functionaries. General research on any subject, self and in collaboration with other stake holders in public and private sector.
  • 10.
    THEMES AND THEMATICCLASSIFICATION Project Planning Monitoring and Evaluation Survey, feasibility and planning of projects. Execution, Monitoring and Evaluation.
  • 11.
    GROUPS TO ADDRESS. IGNORED COMMUNITIES OF RURAL AND SEMI URBAN AREAS UNDER THE THEMES OF NWHDO
  • 12.
    ACTIVITIES 2010 DISTRIBUTION OFRELIEF GOODS AMONGST MAROONED PEOPLE OF DEVASTING FLOODS. INSTALLATION OF STREET LIGHTS IN NASARPUR AND SURROUNDINGS. ANTI-MASQUITO CAMPAIGN. ORGANIZED CAMP FOR BLOOD SCREENING, GROUPING AND PROVIDING OF VACCINE FOR HEPATITIS “B” (PHASE I). ORGANIZED CAMP FOR BLOOD SCREENING, GROUPING AND PROVIDING OF VACCINE FOR HEPATITIS “B” (PHASE II).
  • 13.
    ACTIVITIES DURING 2011. PROVIDEDOF STREET LIGHTS IN NASARPUR TOWN AND SURROUNDINGS. PROVIDED 10 HAND PUMPS TO NEEDY FAMILIES. ORGANIZED TWO MEDICAL CAMPS. DISTRIBUTED 300 FOOD KITS TO RAIN AFFACTEES. FORMATION OF CBOs. VISITS TO RAIN AFFECTED AREAS IN DISTRICT MATIARI.
  • 14.
    FUTURE PLAN ANDPROGRAM. ESTABLISHING HEALTH UNIT AT NASARPUR TO CONTROL HEPATITIS. GIRLS COMPUTER CENTER CONDUCT OF SEMINARS ON: LOCAL GOVERNANCE. ROLE OF WOMEN IN HUMAN DEVELOPMENT. IMPACT OF POVERTY ON SOCIAL LIFE. PROVIDING SWEET DRINKING WATER TO RURAL COMMUNITIES IN DISTRICT MATIARI.
  • 15.
    SPECIAL CONCERNTATIONS. WE DESIRETO IMPROVE AND DEVELOP DRAINAGE SYSTEM AND SANITARY CONDITIONS IN MATIARI DISTRICT INCLUDING TOWNS AND VILLAGES. (THIS PROBLEM WAS EXPERIENCED DURING HEAVY RAINS 2011, AFTER ELAPSE OF 6 WEEKS IDPs HAVE NOT RETURNED TO THEIR HOMES)
  • 16.