AMIT KUMAR SINHA
A 1, 303, Unnathi Woods, Phase 1,
Village – Kavesar, Ghorbander Road,
Thane (W), 400 607, Maharashtra, INDIA,
Cell: +91-9819995759
E-mail: itsamitsinha@gmail.com / akssinha@hotmail.com
To Whom it May Concern,
I am a trained and tested engineer with the skills and leadership of a business owner. Time and time again my skills at
managing, staff, schedules and cost have resulted in increased profitability.
I have over 12 years experience in Project Controls; Resource, Cost, Schedule, Claims and Project Procedure &
Strategy covering Risk management. During my professional experience of over 12 years I happen to gain expertise in
Project Development, Project Planning, Execution & Control, Vendor Development, Site Management, Project
Feasibility Studies, Financial Analysis, Liaisoning with Govt. Authority, Team Management, Capex Estimation, Project
Audit in different capacities which has have to sharpened my character like never before and I’m sure my customer-
centric nature and a good consulting experience can definitely benefit in building organization and manage them
profitabily.
I have enclosed my resume for your review. Some of the strengths I can offer include:
 Through 12 years of Project experience; I developed exceptional managerial, interpersonal, and
communications skills
 In addition to my managerial skills I have the technical knowledge and experience running a team of
project engineers
 Tested experience in Infrastructure projects including, Cement, Mining & Highways.
 I am advanced in Microsoft Project & Primavera and beyond
 I have strong skills in Microsoft office
 Working knowledge of SAP & Cost systems
I would be a great addition to your team; not only do I have vast knowledge of project management but I have also
spent several years overseeing entire projects from bidding to closeout.
I would be pleased to review my qualifications in more details during my interview with you. In the meantime, if you
have any questions from my resume. Please don’t hesitate to ask. You may contact me directly at any time +91-
9819995759.
Thank you for your consideration.
Sincerely,
Amit Kumar Sinha
Enclosure: Resume
AMIT KUMAR SINHA
A 1, 303, Unnathi Woods, Phase 1,
Village – Kavesar, Ghorbander Road,
Thane (W), 400 607, Maharashtra, INDIA,
Contact: +919819995759
E-mail: itsamitsinha@gmail.com / akssinha@hotmail.com
JJOOBB OOBBJJEECCTTIIVVEE
To develop useful construction management practices including scheduling and cost accounting that fulfills the needs
of the project and save project development & construction time. A good schedule is not only a useful tool to stay on
time and budget but capable of forecasting: manpower, equipment needs, overlaps in scope as well as other things. I
have experience scheduling projects from as little as a few hundred activities to nearly 10,000 activities. My presence at
a project has proven time and again to save time and money both by efficient scheduling, tracking the progress and
accurate cost management.
I have a history of making projects more profitable through effective scheduling, Forecasting, and cost accounting.
KKEEYY QQUUAALLIIFFIICCAATTIIOONN && EEXXPPEERRTTIISSEE
I am qualified Graduate Mechanical Engineer with over 12 years of experience with various types of projects includes
Cement, Mining to Highways & infrastructure projects in India & Nepal. I am also perusing MBA from NMIMS,
Mumbai.
My skills include the management of various types of projects on planning, execution & contracts management. My
Past achievements was managing the delivery of multi-disciplinary engineering, procurement, construction &
commissioning project for civil & mechanical works. My professional experience also includes leading & managing
technical staff, geologists & planners. In my current assignment I am leading the planning, monitoring and controlling
the various Development Projects of Reliance Cement Co. Pvt. Ltd. This includes vision of 40 Mio Tons Per Annum
Cement capacities in next 5 years in various part of India & abroad. In my independent assignment as a Project
Manager I am leading the development activities of Cement Project of Nepal and Himachal Pradesh.
PPRROOFFEESSSSIIOONNAALL BBAACCKKGGRROOUUNNDD
PPrroojjeecctt CCoonnttrrooll MMaannaaggeerr
 Led and motivated teams of engineers managing Cost, Schedule, and Risk
 Submitting monthly reports detailing cost & schedule
 Integrated cost with accounting to better track expenses
 Prepares basic cost-to-completion, projections and assist team in making decisions accordingly.
 Facilitates team and vendors meetings effectively.
 Holds regular status meetings with project team & other stake holders.
 Keeps project team well informed of changes within the organization and general news related to the project.
 Resolves and/or escalates issues in a timely fashion.
 Assist team in field erection activities, spare planning, maintenance planning etc.
 Possesses a thorough understanding of Project technicalities.
 Maintains awareness of new and emerging technologies and the potential application on different infrastructure
projects.
 Instrumental in developing prioritization of projects under development in order to focus on project development
effort on the projects as per the prioritization exercise.
 Involved in strategizing the Logistics and Marketing plan for the project under development.
 Microsoft Project 2010
 Primavera P3, P6
 Strong Grasp of WBS
 Microsoft Excel
 Microsoft PowerPoint
 Cost Monitoring
 Financial Reporting
 Site Supervision
 Project Feasibility
 SAP – Project System
 Developing SOP’s
 Lieasoning Support
PPRROOFFEESSSSIIOONNAALL BBAACCKKGGRROOUUNNDD ((CCoonntt..))
MMaasstteerr PPllaannnniinngg//SScchheedduulliinngg
 Used Microsoft Project & Primavera Project Manager to:
o Track Cost
o Develop & Implement Work Breakdown Structure ensuring no trade overlap
o Manage resources and monitor availability
 Coordinated with contractors to generate 2 week look ahead schedules
 Produced weekly schedules with baselines to monitor progress vs. plan
CCoosstt EEnnggiinneeeerr
 Used SAP-PS for Cost monitoring.
 Responsible for cost accounting for entire projects
o Weekly reporting of all costs and cost allocation
o Estimates At Complete
o Monthly reports to corporate
 Monitored cost to ensure accurate reporting
EEssttiimmaattoorr
 Performed estimation of Pre Project activities and expenses for all the Development Projects of Cement Plant at
Reliance Cement.
 Managed teams of engineers, geologists, planners to facilitate the site activities
 Responsible for the entire budget planning, approval and upload to SAP.
 Successful in assisting preparing Business & Financial Analysis of Acquisition Proposal
EEMMPPLLOOYYMMEENNTT HHIISSTTOORRYY
Reliance Cement Company Limited
DGM – Projects
Feb 2011 to Present
ACC LTD.
Manager Project Planning & Monitoring
Dec 2009 – Feb 2011
ACC LTD
Asst. Manager Project Coordination – South West Region
Apr 2008 – Dec 2009
Aditya Cement Ltd. (A Unit of Ultratech Cement)
Sr. Mechanical Engineer
Apr 2007 – Mar 2008
Jaiprakash Associates Limited (Cement Division)
Field Mechanical Engineer
Feb 2006 – Mar 2007
Hindustan Construction Co. Ltd. (HCC Ltd.)
Mechanical Engineer
Jun 2002 – Jan 2006
EEDDUUCCAATTIIOONNAALL && PPRROOFFEESSSSIIOONNAALL CCRREEDDEENNTTIIAALLSS
B.E Mechanical Engineering, 2002 (65%)
Rajiv Ghandi Engineering College of Engineering & Research Tech., Chandrapur
Trainings:
 Seminar on PERT & CPM
 Four week training on Project Management & Claim Management.
 Training for user end at SAP-PS Module.
Computer Proficiency:
Application Packages: MS-Office, MS-Project, Primavera, Auto CAD.
OS Platforms: Windows 95/98/2000/XP.
 Expertise in SAP, Project System Module, M S Project, Primavera, Working on it in the ongoing project.
 Diploma in Software Development from CEDTI, Aurangabad
 Certificate of participation from registered education provider from “Project Management Institute (PMI)” in
“Effective use of MS-Project in Project Management”
Date of Birth: 5th April 1981
Language Proficiency: English, Hindi
NNOOTTEEWWOORRTTHHYY AACCCCOOMMPPLLIISSHHMMEENNTT
SSyynnooppssiiss:: Engineering graduate with vast project experience from concept development to commissioning offering
over 12 years of insightful experience including 3 years in Business Development at Reliance Cement for green and
brown field projects.
 Aspiring, Sincere, Hard working & focused Engineering Graduate with a vast experience of over 12 years in
Project Feasibility, Planning, Execution & Control, Costing etc in Infrastructure Projects.
 Currently working with Business Development team as a Deputy General Manager – Projects with Reliance
Cement Company Limited (ADAG Group Company), Navi Mumbai for all the new upcoming Greenfield cement
projects.
 Established professional credibility in the areas of Project Planning, Project Monitoring, Project Control, and Site
Supervision & Execution of projects with safety.
 Showcased Exceptional Leadership Quality in execution of Major Project activities in 3 Green Field Project (2 in
ACC Limited & 1 in Reliance Cement) & 3 Brown Field Projects (1 in Jaypee Associates, 1 in Aditya Birla Group &
1 in ACC Limited).
 Handling additional responsibility as Project Leader for Proposed Cement Projects in Nepal and Himachal
Pradesh.
 Well versed with MS Project, SAP-PS, Primavera P6, Spreadsheet usage, and MS PowerPoint.
 Adept in swiftly ramping up projects in close co-ordination with Contract cell, Materials, Consultants &
Contractors and ensuring on time deliverables.
 Expertise in monitoring contractor plan with regular updating the schedules and progress figures, control and
analyze contractor construction progress.
 Deft at establishing and maintaining project baselines, critical path analysis and mitigation action planning.
 Excellent communication & interpersonal skills with strong analytical, team building, problem solving and
organizational abilities.
PPRROOFFEESSSSIIOONNAALL EEXXPPEERRIIEENNCCEE
RELIANCE CEMENT COMPANY LIMITED
DGM – Projects (Feb 2011 – Till date)
 Monitoring of overall plan of Project Development department.
 Planning, Directing, and Managing designated projects in coordination with the project managers.
 Ensured that objectives were accomplished in accordance with outlined priorities.
 Coordinating with Project Managers for successful simultaneous development of several projects.
 Involved in negotiation of contracts that ensured quality and safety.
 Prepared weekly & monthly project status reports for Head – Project Development.
 Build credibility, establish rapport, and maintain communication with stakeholders at multiple levels, including
those external to the organization.
 Ensure for proper usage of best practice in project management and project planning, monitoring & control.
 Working in tandem with the Project Managers to manage cost, schedule, and performance of projects, while
working to ensure the ultimate success.
 Preparing the financial and technical feasibility of the proposed new projects.
 Involved in Capex Estimation for all the upcoming new projects.
 Doing the budgeting for department and cash flow accordingly for the month.
 Keeping of the track of the same in SAP-PS.
 Assisting team in Business & Financial Analysis of Acquisition Proposal.
 Played a key role in analysis and auction of coal block and won a Coal Block for Reliance Cement.
ACC LTD
Manager Project Planning & Monitoring (Dec 2009 – Feb 2011)
 Headed a section for Planning, Erection & Commissioning of Vertical Roller Mill & Material Handling section
at Green Field Grinding Unit Project.
 Headed Pyro Section for Planning, Erection & Commissioning for a plant of 10,000 TPD Cement Plant.
 Involved in preparing the Feasibility Reports for New Projects and presented the same to management for there
approval and sanction.
 Involved in doing the costing for the projects and coordinated with finance team for financial feasibility of the
same.
 Coordinated with the local statutory authority for necessary approvals related to project.
 Track the progress of individual Capex and reporting the same to top management.
 Done the survey for land and other necessary amenities for new upcoming projects in east region.
 Worked on SAP-PS project as Assistant Project Manager for addition of new functionalities.
 Done work on Vendor Development for making the project execution team more competitive in terms of
delivering the result on time.
 Played instrumental role in finding the possibilities for Outsourcing the Project Jobs and suggesting the necessary
changes in design which helps the erection & logistic team performing better in less time.
 Involved in Safety Audits and proper submission of safety reports from all the team members from project team
members.
ACC LTD
Asst. Manager Project Coordination – South West Region (Apr 2008 – Dec 2009)
 Overall monitoring of the Project Progress of all the Cement Project of South West Region.
 Played a role of Interface between CEO-South West Region and Project Team.
 Provided all necessary support for getting the project completed in scheduled time period.
 Monitored the inception of project approved budget through proper planning.
 Controlled the project progress through one to one interaction and assisting the execution team from getting the
necessary statutory clearances in time from government authority.
 Ensured safe working environment through Regular Site Visit and Safety Audit.
 Ensured in time delivery of all the equipment and follow with the supplier for the same.
 Have carried out various Tender Evaluations for different project activities.
 Working on SAP Project System module as a end user for monitoring progress, budget inception, Equipment
orders etc.
 Have a short exposure of Catia V5 and Pro-E software’s and also carried some assembly projects in these
software’s.
 Involved in erection and commissioning of ACC Bellary & Kolar Green Field Cement projects.
 Involved in erection and commissioning of ACC Chanda Project for Pyro Section.
 Regular visit to vendors for there progress of equipments for ACC ongoing projects.
ADITYA CEMENT LTD. (A UNIT OF ADITYA BIRLA GROUP)
Sr. Mechanical Engineer (Apr 2007 – Mar 2008)
 Involved in Designing modification & Erection of VRM, World Largest Coal Mill, i.e. Four Roller Vertical Mill
Make:- LOESCHE at Aditya Cement, a unit of Aditya Birla Group.
 Responsible for proper planning using of erection activities involved in Coal Mill from Raw Coal Feeding to Fine
Coal firing.
 Well versed with SAP for making PR and project related activity.
 Involved in doing planning as per the available front and its progress monitoring through M S Project &
Primavera.
JAIPRAKASH ASSOCIATES LIMITED
Mechanical Engineer (Feb 2006 – Mar 2007)
 Involved in Up gradation of Complete Plant, Purchased by M/s Jaypee Associates Ltd. from U P Government i.e.
Dalla Cement plant, It include Raw Mill, Kiln feed System, ESP, Bag Filter, Cooler Grates, Coal Mill, Multi Cyclone
system etc.
 Have carried out too many modifications in much equipment as per the requirement of the up gradation of plant
with the available specification and the AutoCAD software. Upgraded equipment involves complete Raw meal
transport like Air Slide, Bucket Elevators, Screw Conveyors, Belt Conveyors, etc and Clinker Transport i.e. DPC,
DBC, Kiln, Coal Mill & Coal Mill Transport etc.
 Improving availability of Equipments involved in Clinker Production by reducing Downtime.
 Documentation as per ISO System and OHSAS Systems.
 Using Computer Aided Maintenance Management (CAMM) software, for keeping the records of all the
maintenance work done at Centre Line.
 Motivating workers for safety and environment friendly working systems
 Using Oracle based Shift Management Systems Software for Shift activity record and also well versed with ERP
software for Material Management system.
HINDUSTAN CONSTRUCTION CO. LTD.
Mechanical Engineer (Jun 2002 – Jan 2006)
 Solved the entire design problem with assistance of Consultant M/s M N Dastur & Co. Ltd.
 Involved in Designing, Fabrication, Erection and Commissioning of Crushing Plant Steel Str. And it’s Equipment.
 Maintenance Plan of all the Crushers which includes Jaw and Cone Crushers and Material Handling Systems used
for Conveying of Aggregates.
 Documentation as per ISO System and OHSAS Systems.
 Looking for Preventive, Predictive And Breakdown Maintenance of All the Crushers, Vibrating Screens, Feeders,
Screw Conveyors, and Conveyor Belts etc.
 Have carried out overhaul of different machineries at Plant workshop premises.
 Spare parts planning for Different machineries categorizing in Fast Moving and Stand by stocks.
 Carrying Failure analysis & Troubleshooting of different Crushing Plant Equipments.
 Have Designed Dust Suppuration system for fighting with rock dust at Crushing Plant Premises.
 Have given Record Availability of 83% against Budgeted Availability of 70%.
 Job Allocation for all the Mechanics and Fitter for works at Plant Premises.
 Training and Motivating Workers for Safety and Environment friendly Working System.
References:
Available on request.

Amit_Kumar_Sinha_Updated_15.04

  • 1.
    AMIT KUMAR SINHA A1, 303, Unnathi Woods, Phase 1, Village – Kavesar, Ghorbander Road, Thane (W), 400 607, Maharashtra, INDIA, Cell: +91-9819995759 E-mail: itsamitsinha@gmail.com / akssinha@hotmail.com To Whom it May Concern, I am a trained and tested engineer with the skills and leadership of a business owner. Time and time again my skills at managing, staff, schedules and cost have resulted in increased profitability. I have over 12 years experience in Project Controls; Resource, Cost, Schedule, Claims and Project Procedure & Strategy covering Risk management. During my professional experience of over 12 years I happen to gain expertise in Project Development, Project Planning, Execution & Control, Vendor Development, Site Management, Project Feasibility Studies, Financial Analysis, Liaisoning with Govt. Authority, Team Management, Capex Estimation, Project Audit in different capacities which has have to sharpened my character like never before and I’m sure my customer- centric nature and a good consulting experience can definitely benefit in building organization and manage them profitabily. I have enclosed my resume for your review. Some of the strengths I can offer include:  Through 12 years of Project experience; I developed exceptional managerial, interpersonal, and communications skills  In addition to my managerial skills I have the technical knowledge and experience running a team of project engineers  Tested experience in Infrastructure projects including, Cement, Mining & Highways.  I am advanced in Microsoft Project & Primavera and beyond  I have strong skills in Microsoft office  Working knowledge of SAP & Cost systems I would be a great addition to your team; not only do I have vast knowledge of project management but I have also spent several years overseeing entire projects from bidding to closeout. I would be pleased to review my qualifications in more details during my interview with you. In the meantime, if you have any questions from my resume. Please don’t hesitate to ask. You may contact me directly at any time +91- 9819995759. Thank you for your consideration. Sincerely, Amit Kumar Sinha Enclosure: Resume
  • 2.
    AMIT KUMAR SINHA A1, 303, Unnathi Woods, Phase 1, Village – Kavesar, Ghorbander Road, Thane (W), 400 607, Maharashtra, INDIA, Contact: +919819995759 E-mail: itsamitsinha@gmail.com / akssinha@hotmail.com JJOOBB OOBBJJEECCTTIIVVEE To develop useful construction management practices including scheduling and cost accounting that fulfills the needs of the project and save project development & construction time. A good schedule is not only a useful tool to stay on time and budget but capable of forecasting: manpower, equipment needs, overlaps in scope as well as other things. I have experience scheduling projects from as little as a few hundred activities to nearly 10,000 activities. My presence at a project has proven time and again to save time and money both by efficient scheduling, tracking the progress and accurate cost management. I have a history of making projects more profitable through effective scheduling, Forecasting, and cost accounting. KKEEYY QQUUAALLIIFFIICCAATTIIOONN && EEXXPPEERRTTIISSEE I am qualified Graduate Mechanical Engineer with over 12 years of experience with various types of projects includes Cement, Mining to Highways & infrastructure projects in India & Nepal. I am also perusing MBA from NMIMS, Mumbai. My skills include the management of various types of projects on planning, execution & contracts management. My Past achievements was managing the delivery of multi-disciplinary engineering, procurement, construction & commissioning project for civil & mechanical works. My professional experience also includes leading & managing technical staff, geologists & planners. In my current assignment I am leading the planning, monitoring and controlling the various Development Projects of Reliance Cement Co. Pvt. Ltd. This includes vision of 40 Mio Tons Per Annum Cement capacities in next 5 years in various part of India & abroad. In my independent assignment as a Project Manager I am leading the development activities of Cement Project of Nepal and Himachal Pradesh. PPRROOFFEESSSSIIOONNAALL BBAACCKKGGRROOUUNNDD PPrroojjeecctt CCoonnttrrooll MMaannaaggeerr  Led and motivated teams of engineers managing Cost, Schedule, and Risk  Submitting monthly reports detailing cost & schedule  Integrated cost with accounting to better track expenses  Prepares basic cost-to-completion, projections and assist team in making decisions accordingly.  Facilitates team and vendors meetings effectively.  Holds regular status meetings with project team & other stake holders.  Keeps project team well informed of changes within the organization and general news related to the project.  Resolves and/or escalates issues in a timely fashion.  Assist team in field erection activities, spare planning, maintenance planning etc.  Possesses a thorough understanding of Project technicalities.  Maintains awareness of new and emerging technologies and the potential application on different infrastructure projects.  Instrumental in developing prioritization of projects under development in order to focus on project development effort on the projects as per the prioritization exercise.  Involved in strategizing the Logistics and Marketing plan for the project under development.  Microsoft Project 2010  Primavera P3, P6  Strong Grasp of WBS  Microsoft Excel  Microsoft PowerPoint  Cost Monitoring  Financial Reporting  Site Supervision  Project Feasibility  SAP – Project System  Developing SOP’s  Lieasoning Support
  • 3.
    PPRROOFFEESSSSIIOONNAALL BBAACCKKGGRROOUUNNDD ((CCoonntt..)) MMaasstteerrPPllaannnniinngg//SScchheedduulliinngg  Used Microsoft Project & Primavera Project Manager to: o Track Cost o Develop & Implement Work Breakdown Structure ensuring no trade overlap o Manage resources and monitor availability  Coordinated with contractors to generate 2 week look ahead schedules  Produced weekly schedules with baselines to monitor progress vs. plan CCoosstt EEnnggiinneeeerr  Used SAP-PS for Cost monitoring.  Responsible for cost accounting for entire projects o Weekly reporting of all costs and cost allocation o Estimates At Complete o Monthly reports to corporate  Monitored cost to ensure accurate reporting EEssttiimmaattoorr  Performed estimation of Pre Project activities and expenses for all the Development Projects of Cement Plant at Reliance Cement.  Managed teams of engineers, geologists, planners to facilitate the site activities  Responsible for the entire budget planning, approval and upload to SAP.  Successful in assisting preparing Business & Financial Analysis of Acquisition Proposal EEMMPPLLOOYYMMEENNTT HHIISSTTOORRYY Reliance Cement Company Limited DGM – Projects Feb 2011 to Present ACC LTD. Manager Project Planning & Monitoring Dec 2009 – Feb 2011 ACC LTD Asst. Manager Project Coordination – South West Region Apr 2008 – Dec 2009 Aditya Cement Ltd. (A Unit of Ultratech Cement) Sr. Mechanical Engineer Apr 2007 – Mar 2008 Jaiprakash Associates Limited (Cement Division) Field Mechanical Engineer Feb 2006 – Mar 2007 Hindustan Construction Co. Ltd. (HCC Ltd.) Mechanical Engineer Jun 2002 – Jan 2006 EEDDUUCCAATTIIOONNAALL && PPRROOFFEESSSSIIOONNAALL CCRREEDDEENNTTIIAALLSS B.E Mechanical Engineering, 2002 (65%) Rajiv Ghandi Engineering College of Engineering & Research Tech., Chandrapur Trainings:  Seminar on PERT & CPM  Four week training on Project Management & Claim Management.  Training for user end at SAP-PS Module. Computer Proficiency: Application Packages: MS-Office, MS-Project, Primavera, Auto CAD. OS Platforms: Windows 95/98/2000/XP.
  • 4.
     Expertise inSAP, Project System Module, M S Project, Primavera, Working on it in the ongoing project.  Diploma in Software Development from CEDTI, Aurangabad  Certificate of participation from registered education provider from “Project Management Institute (PMI)” in “Effective use of MS-Project in Project Management” Date of Birth: 5th April 1981 Language Proficiency: English, Hindi
  • 5.
    NNOOTTEEWWOORRTTHHYY AACCCCOOMMPPLLIISSHHMMEENNTT SSyynnooppssiiss:: Engineeringgraduate with vast project experience from concept development to commissioning offering over 12 years of insightful experience including 3 years in Business Development at Reliance Cement for green and brown field projects.  Aspiring, Sincere, Hard working & focused Engineering Graduate with a vast experience of over 12 years in Project Feasibility, Planning, Execution & Control, Costing etc in Infrastructure Projects.  Currently working with Business Development team as a Deputy General Manager – Projects with Reliance Cement Company Limited (ADAG Group Company), Navi Mumbai for all the new upcoming Greenfield cement projects.  Established professional credibility in the areas of Project Planning, Project Monitoring, Project Control, and Site Supervision & Execution of projects with safety.  Showcased Exceptional Leadership Quality in execution of Major Project activities in 3 Green Field Project (2 in ACC Limited & 1 in Reliance Cement) & 3 Brown Field Projects (1 in Jaypee Associates, 1 in Aditya Birla Group & 1 in ACC Limited).  Handling additional responsibility as Project Leader for Proposed Cement Projects in Nepal and Himachal Pradesh.  Well versed with MS Project, SAP-PS, Primavera P6, Spreadsheet usage, and MS PowerPoint.  Adept in swiftly ramping up projects in close co-ordination with Contract cell, Materials, Consultants & Contractors and ensuring on time deliverables.  Expertise in monitoring contractor plan with regular updating the schedules and progress figures, control and analyze contractor construction progress.  Deft at establishing and maintaining project baselines, critical path analysis and mitigation action planning.  Excellent communication & interpersonal skills with strong analytical, team building, problem solving and organizational abilities. PPRROOFFEESSSSIIOONNAALL EEXXPPEERRIIEENNCCEE RELIANCE CEMENT COMPANY LIMITED DGM – Projects (Feb 2011 – Till date)  Monitoring of overall plan of Project Development department.  Planning, Directing, and Managing designated projects in coordination with the project managers.  Ensured that objectives were accomplished in accordance with outlined priorities.  Coordinating with Project Managers for successful simultaneous development of several projects.  Involved in negotiation of contracts that ensured quality and safety.  Prepared weekly & monthly project status reports for Head – Project Development.  Build credibility, establish rapport, and maintain communication with stakeholders at multiple levels, including those external to the organization.  Ensure for proper usage of best practice in project management and project planning, monitoring & control.  Working in tandem with the Project Managers to manage cost, schedule, and performance of projects, while working to ensure the ultimate success.  Preparing the financial and technical feasibility of the proposed new projects.  Involved in Capex Estimation for all the upcoming new projects.  Doing the budgeting for department and cash flow accordingly for the month.  Keeping of the track of the same in SAP-PS.  Assisting team in Business & Financial Analysis of Acquisition Proposal.  Played a key role in analysis and auction of coal block and won a Coal Block for Reliance Cement. ACC LTD Manager Project Planning & Monitoring (Dec 2009 – Feb 2011)  Headed a section for Planning, Erection & Commissioning of Vertical Roller Mill & Material Handling section at Green Field Grinding Unit Project.  Headed Pyro Section for Planning, Erection & Commissioning for a plant of 10,000 TPD Cement Plant.
  • 6.
     Involved inpreparing the Feasibility Reports for New Projects and presented the same to management for there approval and sanction.  Involved in doing the costing for the projects and coordinated with finance team for financial feasibility of the same.  Coordinated with the local statutory authority for necessary approvals related to project.  Track the progress of individual Capex and reporting the same to top management.  Done the survey for land and other necessary amenities for new upcoming projects in east region.  Worked on SAP-PS project as Assistant Project Manager for addition of new functionalities.  Done work on Vendor Development for making the project execution team more competitive in terms of delivering the result on time.  Played instrumental role in finding the possibilities for Outsourcing the Project Jobs and suggesting the necessary changes in design which helps the erection & logistic team performing better in less time.  Involved in Safety Audits and proper submission of safety reports from all the team members from project team members. ACC LTD Asst. Manager Project Coordination – South West Region (Apr 2008 – Dec 2009)  Overall monitoring of the Project Progress of all the Cement Project of South West Region.  Played a role of Interface between CEO-South West Region and Project Team.  Provided all necessary support for getting the project completed in scheduled time period.  Monitored the inception of project approved budget through proper planning.  Controlled the project progress through one to one interaction and assisting the execution team from getting the necessary statutory clearances in time from government authority.  Ensured safe working environment through Regular Site Visit and Safety Audit.  Ensured in time delivery of all the equipment and follow with the supplier for the same.  Have carried out various Tender Evaluations for different project activities.  Working on SAP Project System module as a end user for monitoring progress, budget inception, Equipment orders etc.  Have a short exposure of Catia V5 and Pro-E software’s and also carried some assembly projects in these software’s.  Involved in erection and commissioning of ACC Bellary & Kolar Green Field Cement projects.  Involved in erection and commissioning of ACC Chanda Project for Pyro Section.  Regular visit to vendors for there progress of equipments for ACC ongoing projects. ADITYA CEMENT LTD. (A UNIT OF ADITYA BIRLA GROUP) Sr. Mechanical Engineer (Apr 2007 – Mar 2008)  Involved in Designing modification & Erection of VRM, World Largest Coal Mill, i.e. Four Roller Vertical Mill Make:- LOESCHE at Aditya Cement, a unit of Aditya Birla Group.  Responsible for proper planning using of erection activities involved in Coal Mill from Raw Coal Feeding to Fine Coal firing.  Well versed with SAP for making PR and project related activity.  Involved in doing planning as per the available front and its progress monitoring through M S Project & Primavera. JAIPRAKASH ASSOCIATES LIMITED Mechanical Engineer (Feb 2006 – Mar 2007)  Involved in Up gradation of Complete Plant, Purchased by M/s Jaypee Associates Ltd. from U P Government i.e. Dalla Cement plant, It include Raw Mill, Kiln feed System, ESP, Bag Filter, Cooler Grates, Coal Mill, Multi Cyclone system etc.  Have carried out too many modifications in much equipment as per the requirement of the up gradation of plant with the available specification and the AutoCAD software. Upgraded equipment involves complete Raw meal transport like Air Slide, Bucket Elevators, Screw Conveyors, Belt Conveyors, etc and Clinker Transport i.e. DPC, DBC, Kiln, Coal Mill & Coal Mill Transport etc.  Improving availability of Equipments involved in Clinker Production by reducing Downtime.  Documentation as per ISO System and OHSAS Systems.  Using Computer Aided Maintenance Management (CAMM) software, for keeping the records of all the maintenance work done at Centre Line.
  • 7.
     Motivating workersfor safety and environment friendly working systems  Using Oracle based Shift Management Systems Software for Shift activity record and also well versed with ERP software for Material Management system. HINDUSTAN CONSTRUCTION CO. LTD. Mechanical Engineer (Jun 2002 – Jan 2006)  Solved the entire design problem with assistance of Consultant M/s M N Dastur & Co. Ltd.  Involved in Designing, Fabrication, Erection and Commissioning of Crushing Plant Steel Str. And it’s Equipment.  Maintenance Plan of all the Crushers which includes Jaw and Cone Crushers and Material Handling Systems used for Conveying of Aggregates.  Documentation as per ISO System and OHSAS Systems.  Looking for Preventive, Predictive And Breakdown Maintenance of All the Crushers, Vibrating Screens, Feeders, Screw Conveyors, and Conveyor Belts etc.  Have carried out overhaul of different machineries at Plant workshop premises.  Spare parts planning for Different machineries categorizing in Fast Moving and Stand by stocks.  Carrying Failure analysis & Troubleshooting of different Crushing Plant Equipments.  Have Designed Dust Suppuration system for fighting with rock dust at Crushing Plant Premises.  Have given Record Availability of 83% against Budgeted Availability of 70%.  Job Allocation for all the Mechanics and Fitter for works at Plant Premises.  Training and Motivating Workers for Safety and Environment friendly Working System. References: Available on request.