SlideShare a Scribd company logo
CURRICULUM VATIE
Ali Hassan
Cell #:0342-5280890
0304-5101004
alimalik984@gmail.com
Village and Post Office Saigolabad District and Tehsil Chakwal
OBJECTIVE
Seeking a challenging and progressive career with an esteemed organization offering
good future prospects and a professional working environment, where I can contribute
best of my skills towards the growth of the organization. To obtain a meaningful and
challenging position that enables me to learn the specific field, Allows for advancement
which will require me to utilize my skills and abilities in the field to ensure the
company’s & as well as my success.
PERSONAL BIO DATA:
Father’s Name: Malik Qamar Tanveer Awan (LATE)
Date of Birth: 10-08-1992
Nationality: Pakistani
N.I.C No: 37201-5371183-7
Passport No: FH6801831
Domicile: Chakwal
Marital Status: Single
Religion: Islam
Languages: English, Urdu, Punjabi, Sindhi
QUALIFICATION:
 DAE (Mechanical)
.
Technology Year of Passing Result Institute
Mechanical 2012 66%
F.I.T Institute of
Technology
 Metric
.
Subject Year of passing Result Institute
Science 2009 58%
GOVT Higher
Secondary
School,
Saigolabad
COMPUTER SKILLS:
• MS Office 2003&2007
• All kind of windows, Internet, Browsing & E-mail etc.
• Internet Surfing
Application For: SR MATERIAL CONTROLLER
TOTAL EXPERIENCE
3-Years & 09-Months in OIL & Gas Field Development
From 07-Aug-2012 to Till Now.
JOB EXPERIENCE
Position: Material Controller
Employer: Pipelink Construction Ltd.
Project: KPD TAY PC-1 Kunnar Development Project
Client: Oil and Gas Development Company Limited.
(OGDCL)
Position: Material Coordinator
Employer: Pipelink Construction Ltd.
Project: Sawan North Horizontal (Well Head) Project
Client: O.M.V
Position: Material Coordinator
Employer: Pipelink Construction Ltd.
Project: Naimat West Development Project
Client: U.E.P (United Energy Pakistan)
Position: Material Coordinator
Employer: Pipelink Construction Ltd.
Project: Dismantling of Amine and Glycol Plant from Turk Gas facility
to Naimat West Development Plant.
Client: U.E.P (United Energy Pakistan)
Position: Material Coordinator
Employer: Pipelink Construction Ltd.
Project: Flow lines & Plant Modification Work
Client: U.E.P (United Energy Pakistan)
Projects:
• NAKA (Naimat Kausar) Trunk Line Project.
• Ghongro 8” Flow Line Project.
• 6” Flow line 1.2 Km (Korai-1 to suhrat-1)
• 2” Gas Lift line 2.4 Km(Lodano Remote to lodano
deep-1&lodano-3).
• Bozdar South Deep-8 (Flex Steel) Flow Line.
• 8” Flowline 6.3 Km Karim 01 flow line Project
• 4” Flow line 3.0 Km (Tajedi-2 to North Akri only
Hydrotesting job)
• Modification Works at Badin For Scrubbers at Tap
Flow Line Jabo-9 to Jabo-6”
• Amdani 1 Flow Line Project.
• Advance Fabrication Of Wellhead
• Duphri 8 Well head Project.
• Duphri Surface Piping Project.
• Equipment Relocation For Shekhano-1 Compression
Project
• Mechanical Works For Shekhano Deep-1 Wellhead
and 2 Leg Manifold Construction at Shekhano Remote
• Mechanical Work Sheikhano-1 Compressor Project.
• Lying Of Shekhano-2 Shekhano Remote 4”x 0.5km
and 6” Wellhead Installation.
Position: MATERIL COORDINATOR
Employer: Al-Tariq Constructor (Pvt.) Limited 10-Aug-2012
To, 27-Dec-2012
MAJOR RESPONSIBILITIES IN ALL ORANIZATION:
• All Activities related to the Project material and store.
• Unload material from trucks by hand or with hand operated Or
motorized equipment
• Inspect items, as to quality and quantity, against freight
document.
• Unpack incoming goods and wraps and packs outgoing goods.
• Preparation of MIR (material inspection report).
• Receiving & issuance of client material supply as per drawing
list.
• Posting of SIR (Store Issue Requisition).
• Preparation Weekly, Monthly Annual stock statement.
• Generating stock ledger reports.
• Generating pending PO reports.
• Updating of material receiving report.
• Maintain stock to control material at sight.
• Maintain Logs of different activities.
• Attend weekly staff meeting to going progress reports.
• Correspondence with foreign clients gives on via Internet &
Telephone.
• Supervise other staff in all operations.
• Gain useful knowledge about Hardware & Software
• All accountabilities of Client and tool store/consumable store.
• Perform all Material receiving and issuance responsibilities.
• Daily reporting Material related details to the Project
Management.
• Liaison with client and home department for materials.
• Take full responsibility for material issuance from client ware
house to job site.
• Reconciliation of Material at the end of project.
PERSONAL ATTRIBUTES:
• Excellent verbal and written communication skills.
• Unquestionably honest, punctual and reliable.
• Positive, patient and objective in situations involving conflict
and negotiation.
• Motivated, passionate, optimist and job-focused.
• Committed to quality and the highest standards of excellence.
• Lifetime learner with adaptability to grasp new and relevant
knowledge.
INTERNSHIP:
• One week Internship with INFINITY Engineering Lahore.
EXTRA CURRICULAR ACTIVITIES:
• Play Badminton
• Books and news paper reading
• Internet suffering
REFERENCE:
Will be furnished as may requested

More Related Content

What's hot

About Planet Tool & Engineering
About Planet Tool & EngineeringAbout Planet Tool & Engineering
About Planet Tool & EngineeringDan Grassmuck
 
Priyank Engineering, Ahmedabad, Textile Machinery Parts
Priyank Engineering, Ahmedabad, Textile Machinery PartsPriyank Engineering, Ahmedabad, Textile Machinery Parts
Priyank Engineering, Ahmedabad, Textile Machinery Parts
IndiaMART InterMESH Limited
 
PERSONAL DATA John Fabian
PERSONAL DATA John FabianPERSONAL DATA John Fabian
PERSONAL DATA John FabianJohn Fabian
 
Material Controller
Material Controller Material Controller
Material Controller Mohamed Hamed
 
AO Daily Volley - Day Three
AO Daily Volley - Day ThreeAO Daily Volley - Day Three
AO Daily Volley - Day ThreeSimon Marafioti
 
Strategy 2011
Strategy 2011Strategy 2011
Strategy 2011
David Prasojo
 
Rey Punla CV Material Controller June
Rey Punla CV Material Controller JuneRey Punla CV Material Controller June
Rey Punla CV Material Controller JuneRey Punla
 
Suneel - Material Coordinator
Suneel - Material CoordinatorSuneel - Material Coordinator
Suneel - Material CoordinatorSuneel Kumar
 
Dennis Cagle Resume Builder
Dennis Cagle Resume BuilderDennis Cagle Resume Builder
Dennis Cagle Resume BuilderDennis Cagle
 
MICHAEL ERIC SEEBOLD RESUME
MICHAEL ERIC SEEBOLD RESUMEMICHAEL ERIC SEEBOLD RESUME
MICHAEL ERIC SEEBOLD RESUMEMichael Seebold
 

What's hot (18)

Resume2
Resume2Resume2
Resume2
 
khalil
khalilkhalil
khalil
 
About Planet Tool & Engineering
About Planet Tool & EngineeringAbout Planet Tool & Engineering
About Planet Tool & Engineering
 
Resume
ResumeResume
Resume
 
Priyank Engineering, Ahmedabad, Textile Machinery Parts
Priyank Engineering, Ahmedabad, Textile Machinery PartsPriyank Engineering, Ahmedabad, Textile Machinery Parts
Priyank Engineering, Ahmedabad, Textile Machinery Parts
 
gg (1)
gg (1)gg (1)
gg (1)
 
PERSONAL DATA John Fabian
PERSONAL DATA John FabianPERSONAL DATA John Fabian
PERSONAL DATA John Fabian
 
Material Controller
Material Controller Material Controller
Material Controller
 
RESUME FIKRI 2014 WELDER (1) (1)
RESUME FIKRI 2014 WELDER (1) (1)RESUME FIKRI 2014 WELDER (1) (1)
RESUME FIKRI 2014 WELDER (1) (1)
 
AO Daily Volley - Day Three
AO Daily Volley - Day ThreeAO Daily Volley - Day Three
AO Daily Volley - Day Three
 
123
123123
123
 
Winjum Resume
Winjum ResumeWinjum Resume
Winjum Resume
 
Strategy 2011
Strategy 2011Strategy 2011
Strategy 2011
 
ACE Certificate
ACE CertificateACE Certificate
ACE Certificate
 
Rey Punla CV Material Controller June
Rey Punla CV Material Controller JuneRey Punla CV Material Controller June
Rey Punla CV Material Controller June
 
Suneel - Material Coordinator
Suneel - Material CoordinatorSuneel - Material Coordinator
Suneel - Material Coordinator
 
Dennis Cagle Resume Builder
Dennis Cagle Resume BuilderDennis Cagle Resume Builder
Dennis Cagle Resume Builder
 
MICHAEL ERIC SEEBOLD RESUME
MICHAEL ERIC SEEBOLD RESUMEMICHAEL ERIC SEEBOLD RESUME
MICHAEL ERIC SEEBOLD RESUME
 

Viewers also liked

01 Power Plus Commercial Projects Pictures (reduced size)
01 Power Plus Commercial Projects Pictures (reduced size)01 Power Plus Commercial Projects Pictures (reduced size)
01 Power Plus Commercial Projects Pictures (reduced size)W. Mark Kehrer
 
FedEx Custom Critical Earth Day
FedEx Custom Critical Earth DayFedEx Custom Critical Earth Day
FedEx Custom Critical Earth Day
Dave Hill
 
UNIVERSITY OF DAR ES SALAAM
UNIVERSITY OF DAR ES SALAAMUNIVERSITY OF DAR ES SALAAM
UNIVERSITY OF DAR ES SALAAMLitimba Said
 
Prism powerpoint
Prism powerpointPrism powerpoint
Prism powerpoint
danni bridge
 
Methods of computing depreciation
Methods of computing depreciationMethods of computing depreciation
Methods of computing depreciation
Sarah Ahmed
 
Evolution of the Political Parties
Evolution of the Political PartiesEvolution of the Political Parties
Evolution of the Political Parties
Antyal Tennyson
 
LaFactoria_Tools&Apps_2015
LaFactoria_Tools&Apps_2015LaFactoria_Tools&Apps_2015
LaFactoria_Tools&Apps_2015Bernat Casanovas
 
Strategic management assignment on berger paints
Strategic management assignment on berger paintsStrategic management assignment on berger paints
Strategic management assignment on berger paints
Usman Afridi
 
Type of EOT Crane
Type of EOT Crane Type of EOT Crane
Type of EOT Crane
SHREE KRISHNA ENGINEERING CO
 
JENNIFERNICOLENEERESUME
JENNIFERNICOLENEERESUMEJENNIFERNICOLENEERESUME
JENNIFERNICOLENEERESUMEJennifer Nee
 

Viewers also liked (13)

PROJEKT
PROJEKTPROJEKT
PROJEKT
 
01 Power Plus Commercial Projects Pictures (reduced size)
01 Power Plus Commercial Projects Pictures (reduced size)01 Power Plus Commercial Projects Pictures (reduced size)
01 Power Plus Commercial Projects Pictures (reduced size)
 
FedEx Custom Critical Earth Day
FedEx Custom Critical Earth DayFedEx Custom Critical Earth Day
FedEx Custom Critical Earth Day
 
UNIVERSITY OF DAR ES SALAAM
UNIVERSITY OF DAR ES SALAAMUNIVERSITY OF DAR ES SALAAM
UNIVERSITY OF DAR ES SALAAM
 
PFM_MakerPF
PFM_MakerPFPFM_MakerPF
PFM_MakerPF
 
Prism powerpoint
Prism powerpointPrism powerpoint
Prism powerpoint
 
RESUME-ANKUR GUPTA (1)
RESUME-ANKUR GUPTA (1)RESUME-ANKUR GUPTA (1)
RESUME-ANKUR GUPTA (1)
 
Methods of computing depreciation
Methods of computing depreciationMethods of computing depreciation
Methods of computing depreciation
 
Evolution of the Political Parties
Evolution of the Political PartiesEvolution of the Political Parties
Evolution of the Political Parties
 
LaFactoria_Tools&Apps_2015
LaFactoria_Tools&Apps_2015LaFactoria_Tools&Apps_2015
LaFactoria_Tools&Apps_2015
 
Strategic management assignment on berger paints
Strategic management assignment on berger paintsStrategic management assignment on berger paints
Strategic management assignment on berger paints
 
Type of EOT Crane
Type of EOT Crane Type of EOT Crane
Type of EOT Crane
 
JENNIFERNICOLENEERESUME
JENNIFERNICOLENEERESUMEJENNIFERNICOLENEERESUME
JENNIFERNICOLENEERESUME
 

Similar to Ali hassan CV

Velpandi CV
Velpandi CV Velpandi CV
Velpandi CV Vel Pandi
 
Zain Naveed (Mechanical Engineer)CV
Zain Naveed (Mechanical Engineer)CVZain Naveed (Mechanical Engineer)CV
Zain Naveed (Mechanical Engineer)CVZain Naveed
 
Mohd Hamid CV 10-12-2016
Mohd Hamid CV 10-12-2016Mohd Hamid CV 10-12-2016
Mohd Hamid CV 10-12-2016mohd hamid
 
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)anish sidharthan
 
Chemical engineer
Chemical engineerChemical engineer
Chemical engineer
Khawar Nazeer Bhutta
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-Shyamal Sahu
 
Application letter and CV
Application letter and CVApplication letter and CV
Application letter and CVAldry Harvindra
 
Inspection Engineer Taufeeque cv
Inspection Engineer Taufeeque cvInspection Engineer Taufeeque cv
Inspection Engineer Taufeeque cvTAUFEEQUE AHMAD
 
Purushothaman K 3+ years exp. In QMS
Purushothaman K 3+ years exp. In QMSPurushothaman K 3+ years exp. In QMS
Purushothaman K 3+ years exp. In QMS
purushothaman kathaperumal
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
Sarim Mujtaba
 

Similar to Ali hassan CV (20)

Velpandi CV
Velpandi CV Velpandi CV
Velpandi CV
 
Zain Naveed (Mechanical Engineer)CV
Zain Naveed (Mechanical Engineer)CVZain Naveed (Mechanical Engineer)CV
Zain Naveed (Mechanical Engineer)CV
 
Mohd Hamid CV 10-12-2016
Mohd Hamid CV 10-12-2016Mohd Hamid CV 10-12-2016
Mohd Hamid CV 10-12-2016
 
CV FAISAL
CV FAISALCV FAISAL
CV FAISAL
 
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
Aneesh sidharthan QC Inspector civil with 9-years exp.. (1) (1)
 
Mohd Khazzarul Khazreen_Resume
Mohd Khazzarul Khazreen_ResumeMohd Khazzarul Khazreen_Resume
Mohd Khazzarul Khazreen_Resume
 
Chemical engineer
Chemical engineerChemical engineer
Chemical engineer
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 
A.Manigandan -CV 24-06-15
A.Manigandan -CV 24-06-15A.Manigandan -CV 24-06-15
A.Manigandan -CV 24-06-15
 
Application letter and CV
Application letter and CVApplication letter and CV
Application letter and CV
 
CV@RAHUL
CV@RAHULCV@RAHUL
CV@RAHUL
 
Abubacker Maheen
Abubacker MaheenAbubacker Maheen
Abubacker Maheen
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
Resume
ResumeResume
Resume
 
SHAKEEB UDDIN C.V
SHAKEEB UDDIN C.VSHAKEEB UDDIN C.V
SHAKEEB UDDIN C.V
 
Mohan-PPC
Mohan-PPCMohan-PPC
Mohan-PPC
 
Inspection Engineer Taufeeque cv
Inspection Engineer Taufeeque cvInspection Engineer Taufeeque cv
Inspection Engineer Taufeeque cv
 
Purushothaman K 3+ years exp. In QMS
Purushothaman K 3+ years exp. In QMSPurushothaman K 3+ years exp. In QMS
Purushothaman K 3+ years exp. In QMS
 
Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)Resume Expediting & Inspection Engineer (Oil & Gas)
Resume Expediting & Inspection Engineer (Oil & Gas)
 

Ali hassan CV

  • 1. CURRICULUM VATIE Ali Hassan Cell #:0342-5280890 0304-5101004 alimalik984@gmail.com Village and Post Office Saigolabad District and Tehsil Chakwal OBJECTIVE Seeking a challenging and progressive career with an esteemed organization offering good future prospects and a professional working environment, where I can contribute best of my skills towards the growth of the organization. To obtain a meaningful and challenging position that enables me to learn the specific field, Allows for advancement which will require me to utilize my skills and abilities in the field to ensure the company’s & as well as my success. PERSONAL BIO DATA: Father’s Name: Malik Qamar Tanveer Awan (LATE) Date of Birth: 10-08-1992 Nationality: Pakistani N.I.C No: 37201-5371183-7 Passport No: FH6801831 Domicile: Chakwal Marital Status: Single Religion: Islam Languages: English, Urdu, Punjabi, Sindhi QUALIFICATION:  DAE (Mechanical) . Technology Year of Passing Result Institute Mechanical 2012 66% F.I.T Institute of Technology  Metric . Subject Year of passing Result Institute Science 2009 58% GOVT Higher Secondary School, Saigolabad
  • 2. COMPUTER SKILLS: • MS Office 2003&2007 • All kind of windows, Internet, Browsing & E-mail etc. • Internet Surfing Application For: SR MATERIAL CONTROLLER TOTAL EXPERIENCE 3-Years & 09-Months in OIL & Gas Field Development From 07-Aug-2012 to Till Now. JOB EXPERIENCE Position: Material Controller Employer: Pipelink Construction Ltd. Project: KPD TAY PC-1 Kunnar Development Project Client: Oil and Gas Development Company Limited. (OGDCL) Position: Material Coordinator Employer: Pipelink Construction Ltd. Project: Sawan North Horizontal (Well Head) Project Client: O.M.V Position: Material Coordinator Employer: Pipelink Construction Ltd. Project: Naimat West Development Project Client: U.E.P (United Energy Pakistan) Position: Material Coordinator Employer: Pipelink Construction Ltd. Project: Dismantling of Amine and Glycol Plant from Turk Gas facility to Naimat West Development Plant. Client: U.E.P (United Energy Pakistan) Position: Material Coordinator Employer: Pipelink Construction Ltd. Project: Flow lines & Plant Modification Work Client: U.E.P (United Energy Pakistan) Projects: • NAKA (Naimat Kausar) Trunk Line Project.
  • 3. • Ghongro 8” Flow Line Project. • 6” Flow line 1.2 Km (Korai-1 to suhrat-1) • 2” Gas Lift line 2.4 Km(Lodano Remote to lodano deep-1&lodano-3). • Bozdar South Deep-8 (Flex Steel) Flow Line. • 8” Flowline 6.3 Km Karim 01 flow line Project • 4” Flow line 3.0 Km (Tajedi-2 to North Akri only Hydrotesting job) • Modification Works at Badin For Scrubbers at Tap Flow Line Jabo-9 to Jabo-6” • Amdani 1 Flow Line Project. • Advance Fabrication Of Wellhead • Duphri 8 Well head Project. • Duphri Surface Piping Project. • Equipment Relocation For Shekhano-1 Compression Project • Mechanical Works For Shekhano Deep-1 Wellhead and 2 Leg Manifold Construction at Shekhano Remote • Mechanical Work Sheikhano-1 Compressor Project. • Lying Of Shekhano-2 Shekhano Remote 4”x 0.5km and 6” Wellhead Installation. Position: MATERIL COORDINATOR Employer: Al-Tariq Constructor (Pvt.) Limited 10-Aug-2012 To, 27-Dec-2012 MAJOR RESPONSIBILITIES IN ALL ORANIZATION: • All Activities related to the Project material and store. • Unload material from trucks by hand or with hand operated Or motorized equipment • Inspect items, as to quality and quantity, against freight document. • Unpack incoming goods and wraps and packs outgoing goods. • Preparation of MIR (material inspection report). • Receiving & issuance of client material supply as per drawing list. • Posting of SIR (Store Issue Requisition). • Preparation Weekly, Monthly Annual stock statement. • Generating stock ledger reports. • Generating pending PO reports.
  • 4. • Updating of material receiving report. • Maintain stock to control material at sight. • Maintain Logs of different activities. • Attend weekly staff meeting to going progress reports. • Correspondence with foreign clients gives on via Internet & Telephone. • Supervise other staff in all operations. • Gain useful knowledge about Hardware & Software • All accountabilities of Client and tool store/consumable store. • Perform all Material receiving and issuance responsibilities. • Daily reporting Material related details to the Project Management. • Liaison with client and home department for materials. • Take full responsibility for material issuance from client ware house to job site. • Reconciliation of Material at the end of project. PERSONAL ATTRIBUTES: • Excellent verbal and written communication skills. • Unquestionably honest, punctual and reliable. • Positive, patient and objective in situations involving conflict and negotiation. • Motivated, passionate, optimist and job-focused. • Committed to quality and the highest standards of excellence. • Lifetime learner with adaptability to grasp new and relevant knowledge. INTERNSHIP: • One week Internship with INFINITY Engineering Lahore. EXTRA CURRICULAR ACTIVITIES: • Play Badminton • Books and news paper reading • Internet suffering REFERENCE: Will be furnished as may requested