Ali Hassan is seeking a challenging career in an esteemed organization where he can utilize his 3 years and 9 months of experience as a material controller and coordinator on various oil and gas field development projects. He has a DAE in Mechanical Technology and has worked on projects for companies including OGDCL, OMV, and UEP, where his responsibilities included receiving and issuing materials, maintaining stock records and reports, and supervising other staff. He aims to obtain a meaningful position to further his skills and contribute to an organization's growth.
Depreciation can be charged based on different methods which are found suitable in different circumstances relevant to nature of assets and business. Further, it is not necessary that an enterprise employ single method for all classes of its depreciable assets.
Three diagrams that chart the Evolution of the Political Parties.
First party system (1792–1820) Source
http://www.learnnc.org/lp/pages/5123
Antebellum Political parties (1820–1860) Source
http://www.learnnc.org/lp/multimedia/12357
Early 20th Century Political parties (1896–1929) Source
http://www.learnnc.org/lp/multimedia/13939
The third chart (1896-1929) was edited to include additional labels. Textual data was lost in the edit. See source link for original pdf file with textual data intact.
Presentation give detailed information pertaining to the EOT Crane generally known as electric overhead travelling crane . Information is inclusive with photos , type of EOT Crane and individual type of crane 's feature and description.
SHREE KRISHNA ENGINEERING CO based in Ahmedabad, India is No 1 manufacture & Supplier of EOT Crane,SINGLE GIRDER EOT CRANE,DOUBLE GIRDER EOT CRANE,EOT TROLLEY ,JIB CRANE,CRAB WINCH,LIFTING MAGNET,Hoisting Equipments,WIRE ROPE HOIST.
Further information is accessible at http://www.eotcranes.in/
To pursue a challenging career in an internationally reputed engineering organization where I can do some value added work for the company’s benefit, customer Satisfaction and my professional growth. Seeking a supervisory position in a world class company, that will give me an opportunity to expand and explore the technologies and skills while realizing the vision of the company.
Electrical Engineer with 7 years of Experience in Expediting of Refinery Expansion Projects & Inspection of Electrical and Instrumentation Equipment’s, working with the objectives and Targets aimed at the achievements of the Company’s short and long term.
1. CURRICULUM VATIE
Ali Hassan
Cell #:0342-5280890
0304-5101004
alimalik984@gmail.com
Village and Post Office Saigolabad District and Tehsil Chakwal
OBJECTIVE
Seeking a challenging and progressive career with an esteemed organization offering
good future prospects and a professional working environment, where I can contribute
best of my skills towards the growth of the organization. To obtain a meaningful and
challenging position that enables me to learn the specific field, Allows for advancement
which will require me to utilize my skills and abilities in the field to ensure the
company’s & as well as my success.
PERSONAL BIO DATA:
Father’s Name: Malik Qamar Tanveer Awan (LATE)
Date of Birth: 10-08-1992
Nationality: Pakistani
N.I.C No: 37201-5371183-7
Passport No: FH6801831
Domicile: Chakwal
Marital Status: Single
Religion: Islam
Languages: English, Urdu, Punjabi, Sindhi
QUALIFICATION:
DAE (Mechanical)
.
Technology Year of Passing Result Institute
Mechanical 2012 66%
F.I.T Institute of
Technology
Metric
.
Subject Year of passing Result Institute
Science 2009 58%
GOVT Higher
Secondary
School,
Saigolabad
2. COMPUTER SKILLS:
• MS Office 2003&2007
• All kind of windows, Internet, Browsing & E-mail etc.
• Internet Surfing
Application For: SR MATERIAL CONTROLLER
TOTAL EXPERIENCE
3-Years & 09-Months in OIL & Gas Field Development
From 07-Aug-2012 to Till Now.
JOB EXPERIENCE
Position: Material Controller
Employer: Pipelink Construction Ltd.
Project: KPD TAY PC-1 Kunnar Development Project
Client: Oil and Gas Development Company Limited.
(OGDCL)
Position: Material Coordinator
Employer: Pipelink Construction Ltd.
Project: Sawan North Horizontal (Well Head) Project
Client: O.M.V
Position: Material Coordinator
Employer: Pipelink Construction Ltd.
Project: Naimat West Development Project
Client: U.E.P (United Energy Pakistan)
Position: Material Coordinator
Employer: Pipelink Construction Ltd.
Project: Dismantling of Amine and Glycol Plant from Turk Gas facility
to Naimat West Development Plant.
Client: U.E.P (United Energy Pakistan)
Position: Material Coordinator
Employer: Pipelink Construction Ltd.
Project: Flow lines & Plant Modification Work
Client: U.E.P (United Energy Pakistan)
Projects:
• NAKA (Naimat Kausar) Trunk Line Project.
3. • Ghongro 8” Flow Line Project.
• 6” Flow line 1.2 Km (Korai-1 to suhrat-1)
• 2” Gas Lift line 2.4 Km(Lodano Remote to lodano
deep-1&lodano-3).
• Bozdar South Deep-8 (Flex Steel) Flow Line.
• 8” Flowline 6.3 Km Karim 01 flow line Project
• 4” Flow line 3.0 Km (Tajedi-2 to North Akri only
Hydrotesting job)
• Modification Works at Badin For Scrubbers at Tap
Flow Line Jabo-9 to Jabo-6”
• Amdani 1 Flow Line Project.
• Advance Fabrication Of Wellhead
• Duphri 8 Well head Project.
• Duphri Surface Piping Project.
• Equipment Relocation For Shekhano-1 Compression
Project
• Mechanical Works For Shekhano Deep-1 Wellhead
and 2 Leg Manifold Construction at Shekhano Remote
• Mechanical Work Sheikhano-1 Compressor Project.
• Lying Of Shekhano-2 Shekhano Remote 4”x 0.5km
and 6” Wellhead Installation.
Position: MATERIL COORDINATOR
Employer: Al-Tariq Constructor (Pvt.) Limited 10-Aug-2012
To, 27-Dec-2012
MAJOR RESPONSIBILITIES IN ALL ORANIZATION:
• All Activities related to the Project material and store.
• Unload material from trucks by hand or with hand operated Or
motorized equipment
• Inspect items, as to quality and quantity, against freight
document.
• Unpack incoming goods and wraps and packs outgoing goods.
• Preparation of MIR (material inspection report).
• Receiving & issuance of client material supply as per drawing
list.
• Posting of SIR (Store Issue Requisition).
• Preparation Weekly, Monthly Annual stock statement.
• Generating stock ledger reports.
• Generating pending PO reports.
4. • Updating of material receiving report.
• Maintain stock to control material at sight.
• Maintain Logs of different activities.
• Attend weekly staff meeting to going progress reports.
• Correspondence with foreign clients gives on via Internet &
Telephone.
• Supervise other staff in all operations.
• Gain useful knowledge about Hardware & Software
• All accountabilities of Client and tool store/consumable store.
• Perform all Material receiving and issuance responsibilities.
• Daily reporting Material related details to the Project
Management.
• Liaison with client and home department for materials.
• Take full responsibility for material issuance from client ware
house to job site.
• Reconciliation of Material at the end of project.
PERSONAL ATTRIBUTES:
• Excellent verbal and written communication skills.
• Unquestionably honest, punctual and reliable.
• Positive, patient and objective in situations involving conflict
and negotiation.
• Motivated, passionate, optimist and job-focused.
• Committed to quality and the highest standards of excellence.
• Lifetime learner with adaptability to grasp new and relevant
knowledge.
INTERNSHIP:
• One week Internship with INFINITY Engineering Lahore.
EXTRA CURRICULAR ACTIVITIES:
• Play Badminton
• Books and news paper reading
• Internet suffering
REFERENCE:
Will be furnished as may requested