Challenge
Demonstrate an implementable product that provides
multiple capabilities to producing assets that will:
Enhance Safety for Field personnel
Monitor emissions for Safety notification and Regulatory requirements
Provide archived performance and compliance metrics
Integrate into the Control System and Control System Philosophy
Shut down critical equipment with crisis emission event encountered
Operate to – 45oF
Solution
ALERT PLUS, LLC
Matt Murdock, Chief Operating Officer
Pinedale, WY 82941
(307) 749-0615
info@alert-plus.com
Alert Plus Aegis 400 Remote
Emission Monitoring Station
AGENDA
Agenda Coverage
Aegis 400 Remote Monitoring emissions station
Production Resource Coverage ; Production Supply Chain
Production problem the Aegis solves
Method alignment with existing compliance methods
Existing Regulatory Compliance and trends
Existing Oil and Gas Methods that Aegis attains
Safety and operations benefits
ROI categories for Aegis implementation
Work Process Summary of Aegis; implementation and
operations
Aegis shutdown technology
Summary
UPSTREAMTODOWNSTREAM
Up and Down the Supply and Production Stream
Where does the Aegis 400 provide benefit ?
THEPROBLEM&THEALERTPLUSSOLUTION
Problem: Monitor and manage fugitive emissions that mitigate
operation, production loss, and safety risk.
Solution:
Aegis 400 detects excessive emission events, logs it, and
activates alarms to stakeholders
Site assets shut down if factored in alarm/operation
philosophy.
SOP is preserved with data log and data analytics access
Cost effective. Fund it with Control System budget
Demonstrable as risk monitoring and assessment resource for
Rule 49 related operations
ASUMMARYOFREGULATORYINFLUENCES
The Regulatory Management Challenge:
What are existing and evolving requirements and how
to factor into Operations implementation
THEPROBLEM&THEALERTPLUSSOLUTION
Methane and VOC Emission Sensing
Both Wyoming and Colorado lead to set regulatory and
performance requirements
LDAR at compressor stations and production facilities
Method set to identify high emission assets and develop a
program to mitigate it
Succinct process to assess emission leaks and resolve them
Storage Tank Emission Management (STEM) with remote
emission monitoring
Leak repair response and recordkeeping
Producers have a good knowledge base of where high emitters
are in the system
Emphasis on risk assessment and management
*Some content from Mike Silverstein, Colorado Department of Public Health and Environment
THEPROBLEM&THEALERTPLUSSOLUTION
Methane and VOC Emissions - Trends
Other states are establishing emission performance rules: OH,
WY, CA
Colorado methods are akin to a Best Practice
EPA has just released NSPS0000a. Ratification is geared
towards 2016
CTG is released for ozone attainment initiatives
The impetus for emission management is risk assessment and
the risk mitigation plans to protect.
Site based solutions that provide continuous monitoring, alert,
mobile accessibility, and archival knowledge base harmonize
well with evolving and present regulations
*Some content from Mike Silverstein, Colorado Department of Public Health and Environment
EXISTINGOPERATIONSMETHODS
Integrity Management. Aegis is a tool to fulfill
Title 49 CFR Part 192 (Gas operations)
Established management method for operational risk assessment set
by DOT/PHMSA for Midstream.
The Risk assessment philosophy can be applied to Production
operations
Apply the existing precedent for risk based methods to Safety and
Emissions management criteria
Lifecycle management drives the need for operational risk review.
Regular risk review and mitigation (yearly)
Objectives
• To perform integrity assessments of pipelines in locations where a pipeline
failure could have significant adverse consequences (referred to as High
Consequence Areas or HCAs).
• To improve operator management, analytical, and operational processes to
manage pipeline integrity.
• To increase government’s role in the oversight of operator integrity
management programs and activities.
• To improve public confidence in pipeline safety.
http://primis.phmsa.dot.gov/comm/IM.htm?nocache=8834
EXISTINGOPERATIONSMETHODS
Integrity Management. Aegis is a tool to fulfill
Title 49 CFR Part 192 (Gas operations) (Taken directly from the Rule)
This is Where the Risk Analysis Program Element Comes In
Comprehensive and systematic risk analysis is a valuable tool to help
operators identify and determine the significance of previously
unrecognized threats. Through rigorous analysis of all available data,
pipeline operators are required to identify and evaluate all potential
precursors to pipeline failure and the risks that they pose. Operators
must also identify and implement additional preventive or mitigative
measures to address the most significant threats identified by the risk
analysis. These measures would be dependent on the nature of the
threat and the specifics of the operator’s pipeline system and its
operation. Some examples include: enhancing damage prevention
programs; improving corrosion control monitoring; enhancing control
center operator training; improving leak detection system capability;
conducting emergency drills with local emergency responders; and
installing remotely operated valves to expedite the isolation of a leak or
failure when one is discovered.
http://primis.phmsa.dot.gov/comm/IM.htm?nocache=8834
THEPROBLEM&THEALERTPLUSSOLUTION
Integrity Management. Aegis 400 as an Alarm Alert
ANSI/ISA 18.2 Alarm Management Life-cycle
Emissions Remote Monitoring extends Alarm Management to
production assets to extend integrity management.
Operations unify Control and Situation assessment
Additional Stake holders provide for comprehensive situation
assessment
THEPROBLEM&THEALERTPLUSSOLUTION
Problem: Field emission events create safety threats for
Field Personnel and communities
Solution:
Emission events alert Control Operations and Management
Response team is able to be alerted remotely
Service Team can check emission levels before entering site
All response actions are able to be logged, linked to the event,
and recorded in data archive
GAINDATAFORSTAKEHOLDERS
Remote Emission and Safety Triage
System level Alert that drives SOP response
Remote access to incident data to drive priority and resource
decisions
Field personnel access emission levels to determine
accessibility to site for service
Crisis
Management,
Operations
Improvement,
Emergency
Response Team
Operations
Management
Field
Operations
Emissions
Or
Safety Alert
GAINADDITIONALBENEFITSWITHAEGIS
Proactive Safety Management for Field Emission risks
Demonstrate this to any and all stakeholders as risk mitigation.
Gain visibility to Community and Compliance efforts with the
investment
Evidence of strong company commitment for stewardship
Emission
and safety
incident
avoidance
Production
Operations
Stewardship
to community
and lands
Demonstrable
archive of
performance
THEPROBLEM&THEALERTPLUSSOLUTION
Problem: How is the Aegis 400 an incremental asset
monitoring resource to present resources ?
Solution:
Aegis 400 is a networked, fixed emission monitoring system
Instantaneous alarm alert notification to stake holders and
control operations
Aegis product philosophy is compatible with Control
Philosophy (alarm and event driven action SOP)
Data log provides an operations work response archive
HOWTOPAYFORAEGIS400
Return on Investment Opportunities for the Aegis 400
Economically Priced
Efficient implementation
Integrate-able with existing assets and
control systems
Work Process improvement
Loss recovery
Safety incident avoidance
Regulatory issue avoidance
Demonstrable as good faith investment
for Community and BLM
IMPLEMENTATIONOFAEGIS400
Implementation Work Process with the Aegis 400
Identify site emission
coverage requirements
Power
availability plan
for site coverage
Estimate 2 Hours
completion time
for installation
Identify locational and resource elements and installation is
completed quickly
Determine if a stand alone monitoring station or connection to
Control Network
Quarterly calibration cycle – to integrate with other site based
service requirements
Sensors to be replaced at 2 – 5 year increments depending on
sensor types
EFFICIENCIESGAINEDWITHAEGISALERTS
Work Process – Assessment and Incident Handling
Emission or
Safety Alert
• Remote notification; alert through control network or broadcast
• Stake holders notification
• Trigger SOP (standard operating procedure)
Assess,
Deploy
• Does SOP match the alert scope details ?
• Modify the response team to match the threat and incident scope
• Respond accordingly to the threat level alerted
Resolve,
Document
• Team deployed matches the scope of the threat . Cost management
• Responsiveness matches the SOP outlined as is documented as such
• Archived alert, response, and closure. Lessons learned can be applied
This is a repeatable Integrity Management process
Process and response discipline is maintained
Potential ROI with dispatch of resources to match the data
analysis of the threat alert
THEPROBLEM&THEALERTPLUSSOLUTION
Problem: Cold temperature operations are a challenge
for monitoring conditions and operations
Solution:
Aegis 400 is a networked, fixed emission monitoring system
Operating temperature range is -45oF to 150oF
Alert Plus continues to characterize for even lower operating
temperatures
Much of NG
production exists
in cold weather
regions
THEPROBLEM&THEALERTPLUSSOLUTION
Problem: There are other data collection resources and
devices at site locations. How to consolidate ?
Solution:
Aegis 400 is a networked, fixed emission monitoring system
Multiple channels enable integration of multiple data
collection
The Aegis 400 is a PLC
Probe data is able to be integrated into channel data collection
on the Aegis 400
AUTOMATICSHUTDOWN
Shut down operations remotely or automatically
Proprietary valve provides “control & command”
functionality in one package in extreme conditions.
SUMMARY
Alert Plus Aegis 400
Remote Emission Monitoring Station
Cold Weather Operation to – 40oF
Automatic asset shut down triggered by
alarmed emission event
Operation philosophy integrates with
CRM and control operation philosophy
Can be integrated into Control system
as a PLC
Utilize as continuous improvement
compliance resource
Proactive solution to evolving emissions
management standards
Practical implementation and
investment cost
SUMMARY
-45oC
Aegis 400 Operation Philosophy
PO Box 268; Pinedale, WY 82941
Tel. (844) ALERTPLUS
Matt Murdock, Chief Operating Officer
Cell: (307) 749-0615
www.alert-plus.com
info@alert-plus.com

More Related Content

What's hot

Nfpa Process Safety Management and osha 6 8 2013
Nfpa Process Safety Management and osha 6 8 2013Nfpa Process Safety Management and osha 6 8 2013
Nfpa Process Safety Management and osha 6 8 2013John Newquist
 
Elements of Process Safety Management
Elements of Process Safety ManagementElements of Process Safety Management
Elements of Process Safety ManagementShirazeh arghami
 
_Process_Safety_Management
_Process_Safety_Management_Process_Safety_Management
_Process_Safety_ManagementEssam Osmaan
 
How to ensure peak performance in my Gas Chromatograph
How to ensure peak performance in my Gas ChromatographHow to ensure peak performance in my Gas Chromatograph
How to ensure peak performance in my Gas ChromatographYokogawa1
 
Process Safety
Process SafetyProcess Safety
Process SafetyConsultivo
 
3 psm process_hazard_analysis2
3 psm process_hazard_analysis23 psm process_hazard_analysis2
3 psm process_hazard_analysis2Syyeda Misbah
 
The business case for process safety final ppt
The business case for process safety final pptThe business case for process safety final ppt
The business case for process safety final pptorosghe
 
Hsse policy group 5 final
Hsse policy group 5 finalHsse policy group 5 final
Hsse policy group 5 finalSamarth Mewada
 
BlueScape California Industrial Storm Water Compliance Webinar 090816
BlueScape California Industrial Storm Water Compliance Webinar 090816BlueScape California Industrial Storm Water Compliance Webinar 090816
BlueScape California Industrial Storm Water Compliance Webinar 090816BlueScape
 
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...Nimonik
 
Application of Combustion Analyzers in Safety Instrumented Systems
Application of Combustion Analyzers in Safety Instrumented SystemsApplication of Combustion Analyzers in Safety Instrumented Systems
Application of Combustion Analyzers in Safety Instrumented SystemsBelilove Company-Engineers
 
The 4 key types of regulations and how to comply (3)
The 4 key types of regulations and how to comply (3)The 4 key types of regulations and how to comply (3)
The 4 key types of regulations and how to comply (3)Nimonik
 
Compliance Reporting with SiteFM (CMMS)
Compliance Reporting with SiteFM (CMMS)Compliance Reporting with SiteFM (CMMS)
Compliance Reporting with SiteFM (CMMS)Michele Thompson
 
20110204 alarm management seminar ureason v1 3
20110204 alarm management seminar ureason v1 320110204 alarm management seminar ureason v1 3
20110204 alarm management seminar ureason v1 3UReasonChannel
 
Performance standard
Performance standardPerformance standard
Performance standardWarren Kang
 

What's hot (20)

Tiêu chuẩn GLP - OECD trong quản lý hệ thống vi tính
Tiêu chuẩn GLP - OECD trong quản lý hệ thống vi tínhTiêu chuẩn GLP - OECD trong quản lý hệ thống vi tính
Tiêu chuẩn GLP - OECD trong quản lý hệ thống vi tính
 
Nfpa Process Safety Management and osha 6 8 2013
Nfpa Process Safety Management and osha 6 8 2013Nfpa Process Safety Management and osha 6 8 2013
Nfpa Process Safety Management and osha 6 8 2013
 
PSM RM - Learn from experience
PSM RM - Learn from experiencePSM RM - Learn from experience
PSM RM - Learn from experience
 
Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)Control focused inspection tools (Mark Smith)
Control focused inspection tools (Mark Smith)
 
Elements of Process Safety Management
Elements of Process Safety ManagementElements of Process Safety Management
Elements of Process Safety Management
 
_Process_Safety_Management
_Process_Safety_Management_Process_Safety_Management
_Process_Safety_Management
 
How to ensure peak performance in my Gas Chromatograph
How to ensure peak performance in my Gas ChromatographHow to ensure peak performance in my Gas Chromatograph
How to ensure peak performance in my Gas Chromatograph
 
Process Safety
Process SafetyProcess Safety
Process Safety
 
3 psm process_hazard_analysis2
3 psm process_hazard_analysis23 psm process_hazard_analysis2
3 psm process_hazard_analysis2
 
Streamlining Waste Management in Healthcare
Streamlining Waste Management in HealthcareStreamlining Waste Management in Healthcare
Streamlining Waste Management in Healthcare
 
The business case for process safety final ppt
The business case for process safety final pptThe business case for process safety final ppt
The business case for process safety final ppt
 
Hsse policy group 5 final
Hsse policy group 5 finalHsse policy group 5 final
Hsse policy group 5 final
 
BlueScape California Industrial Storm Water Compliance Webinar 090816
BlueScape California Industrial Storm Water Compliance Webinar 090816BlueScape California Industrial Storm Water Compliance Webinar 090816
BlueScape California Industrial Storm Water Compliance Webinar 090816
 
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
Comprehensive Compliance for Environmental, Safety, Quality Requirements in C...
 
Application of Combustion Analyzers in Safety Instrumented Systems
Application of Combustion Analyzers in Safety Instrumented SystemsApplication of Combustion Analyzers in Safety Instrumented Systems
Application of Combustion Analyzers in Safety Instrumented Systems
 
The 4 key types of regulations and how to comply (3)
The 4 key types of regulations and how to comply (3)The 4 key types of regulations and how to comply (3)
The 4 key types of regulations and how to comply (3)
 
Compliance Reporting with SiteFM (CMMS)
Compliance Reporting with SiteFM (CMMS)Compliance Reporting with SiteFM (CMMS)
Compliance Reporting with SiteFM (CMMS)
 
20110204 alarm management seminar ureason v1 3
20110204 alarm management seminar ureason v1 320110204 alarm management seminar ureason v1 3
20110204 alarm management seminar ureason v1 3
 
Performance standard
Performance standardPerformance standard
Performance standard
 
05 reviewing your SMS
05 reviewing your SMS05 reviewing your SMS
05 reviewing your SMS
 

Viewers also liked

Why You Should Attend the 20th Annual AOBA
Why You Should Attend the 20th Annual AOBAWhy You Should Attend the 20th Annual AOBA
Why You Should Attend the 20th Annual AOBABank Director
 
учитель року – 2016
учитель року – 2016учитель року – 2016
учитель року – 2016ggolinovska
 
Bardinasunera bidean!!!
Bardinasunera bidean!!!Bardinasunera bidean!!!
Bardinasunera bidean!!!Betiemakume
 
MEP’s Engineering In Your Future
MEP’s Engineering In Your FutureMEP’s Engineering In Your Future
MEP’s Engineering In Your FutureCharlie Cerezo
 
food 6 th grade
food 6 th gradefood 6 th grade
food 6 th gradefaisal515
 
SEAMANSHIP WEEKEND
SEAMANSHIP WEEKENDSEAMANSHIP WEEKEND
SEAMANSHIP WEEKENDJuan corradi
 
Mahjong Titans Scoring & Tile Values - How To Get High Scores
Mahjong Titans Scoring & Tile Values - How To Get High ScoresMahjong Titans Scoring & Tile Values - How To Get High Scores
Mahjong Titans Scoring & Tile Values - How To Get High ScoresDouglas Hale
 
How to communicate your enterprise gamification project
How to communicate your enterprise gamification projectHow to communicate your enterprise gamification project
How to communicate your enterprise gamification projectCentrical
 
кафедра начального образования
кафедра начального образованиякафедра начального образования
кафедра начального образованияTalyzina Alla
 
презентація до уроку
презентація до урокупрезентація до уроку
презентація до урокуivmamon2
 
Wind turbine (bhaw nath jha)
Wind turbine (bhaw nath jha)Wind turbine (bhaw nath jha)
Wind turbine (bhaw nath jha)Bhawnath Jha
 
A tanulási – tanítási folyamat tervezése, az oktatás tartalma
A tanulási – tanítási folyamat tervezése, az oktatás tartalmaA tanulási – tanítási folyamat tervezése, az oktatás tartalma
A tanulási – tanítási folyamat tervezése, az oktatás tartalmaDr. Ollé János
 
Airborne Wind Turbines - A report
Airborne Wind Turbines - A reportAirborne Wind Turbines - A report
Airborne Wind Turbines - A reportParag Deshpande
 
Seminar airborne wind turbines
Seminar   airborne wind turbinesSeminar   airborne wind turbines
Seminar airborne wind turbinesParag Deshpande
 

Viewers also liked (18)

Why You Should Attend the 20th Annual AOBA
Why You Should Attend the 20th Annual AOBAWhy You Should Attend the 20th Annual AOBA
Why You Should Attend the 20th Annual AOBA
 
учитель року – 2016
учитель року – 2016учитель року – 2016
учитель року – 2016
 
Bardinasunera bidean!!!
Bardinasunera bidean!!!Bardinasunera bidean!!!
Bardinasunera bidean!!!
 
ЗОШ
ЗОШЗОШ
ЗОШ
 
MEP’s Engineering In Your Future
MEP’s Engineering In Your FutureMEP’s Engineering In Your Future
MEP’s Engineering In Your Future
 
food 6 th grade
food 6 th gradefood 6 th grade
food 6 th grade
 
SEAMANSHIP WEEKEND
SEAMANSHIP WEEKENDSEAMANSHIP WEEKEND
SEAMANSHIP WEEKEND
 
Metody zabezpieczenia umów
Metody zabezpieczenia umówMetody zabezpieczenia umów
Metody zabezpieczenia umów
 
Mahjong Titans Scoring & Tile Values - How To Get High Scores
Mahjong Titans Scoring & Tile Values - How To Get High ScoresMahjong Titans Scoring & Tile Values - How To Get High Scores
Mahjong Titans Scoring & Tile Values - How To Get High Scores
 
How to communicate your enterprise gamification project
How to communicate your enterprise gamification projectHow to communicate your enterprise gamification project
How to communicate your enterprise gamification project
 
кафедра начального образования
кафедра начального образованиякафедра начального образования
кафедра начального образования
 
презентація до уроку
презентація до урокупрезентація до уроку
презентація до уроку
 
Ccd application
Ccd applicationCcd application
Ccd application
 
Wind turbine (bhaw nath jha)
Wind turbine (bhaw nath jha)Wind turbine (bhaw nath jha)
Wind turbine (bhaw nath jha)
 
Tanulási környezet
Tanulási környezetTanulási környezet
Tanulási környezet
 
A tanulási – tanítási folyamat tervezése, az oktatás tartalma
A tanulási – tanítási folyamat tervezése, az oktatás tartalmaA tanulási – tanítási folyamat tervezése, az oktatás tartalma
A tanulási – tanítási folyamat tervezése, az oktatás tartalma
 
Airborne Wind Turbines - A report
Airborne Wind Turbines - A reportAirborne Wind Turbines - A report
Airborne Wind Turbines - A report
 
Seminar airborne wind turbines
Seminar   airborne wind turbinesSeminar   airborne wind turbines
Seminar airborne wind turbines
 

Similar to Alert Plus PIOGA Presentation - oct'15

Risk Based Design & SCE
Risk Based Design & SCERisk Based Design & SCE
Risk Based Design & SCEadepp
 
ADEPP Monitor & Risk Based Design
ADEPP Monitor & Risk Based DesignADEPP Monitor & Risk Based Design
ADEPP Monitor & Risk Based DesignFabienne Salimi
 
IBM Maximo HSE Solution Presentation.pdf
IBM Maximo HSE Solution Presentation.pdfIBM Maximo HSE Solution Presentation.pdf
IBM Maximo HSE Solution Presentation.pdfPhanThnh52
 
ADEPP & Configuration Management
ADEPP & Configuration ManagementADEPP & Configuration Management
ADEPP & Configuration ManagementFabienne Salimi
 
Integrating IT with HSE
Integrating IT with HSEIntegrating IT with HSE
Integrating IT with HSEMuzahid Khan
 
Learn how to use Maximo HSE to Add a Layer of Control on Top of your Work Pro...
Learn how to use Maximo HSE to Add a Layer of Control on Top of your Work Pro...Learn how to use Maximo HSE to Add a Layer of Control on Top of your Work Pro...
Learn how to use Maximo HSE to Add a Layer of Control on Top of your Work Pro...FMMUG
 
Management of Change 22.4.15
Management of Change 22.4.15Management of Change 22.4.15
Management of Change 22.4.15SANJIV SONI
 
Klir: powerful regulatory compliance management for water utilities
Klir: powerful regulatory compliance management for water utilitiesKlir: powerful regulatory compliance management for water utilities
Klir: powerful regulatory compliance management for water utilitiesKlir
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
Alarm information sheet
Alarm information sheet   Alarm information sheet
Alarm information sheet Anand Mishra
 
Safety System Modularity
Safety System ModularitySafety System Modularity
Safety System ModularityFasiul Alam
 
ARC's Wil Chin Remote Operations Management Presentation @ ARC Industry Forum...
ARC's Wil Chin Remote Operations Management Presentation @ ARC Industry Forum...ARC's Wil Chin Remote Operations Management Presentation @ ARC Industry Forum...
ARC's Wil Chin Remote Operations Management Presentation @ ARC Industry Forum...ARC Advisory Group
 
Riskmitigationwhitepaperweb 1
Riskmitigationwhitepaperweb 1Riskmitigationwhitepaperweb 1
Riskmitigationwhitepaperweb 1Yasmin AbdelAziz
 
[Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management [Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management Schneider Electric
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Cairn India Limited
 
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreo
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreoMejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreo
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreogafch
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityStork
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow controlhqdan
 

Similar to Alert Plus PIOGA Presentation - oct'15 (20)

Psm by Ronak
Psm by RonakPsm by Ronak
Psm by Ronak
 
Risk Based Design & SCE
Risk Based Design & SCERisk Based Design & SCE
Risk Based Design & SCE
 
ADEPP Monitor & Risk Based Design
ADEPP Monitor & Risk Based DesignADEPP Monitor & Risk Based Design
ADEPP Monitor & Risk Based Design
 
IBM Maximo HSE Solution Presentation.pdf
IBM Maximo HSE Solution Presentation.pdfIBM Maximo HSE Solution Presentation.pdf
IBM Maximo HSE Solution Presentation.pdf
 
ADEPP & Configuration Management
ADEPP & Configuration ManagementADEPP & Configuration Management
ADEPP & Configuration Management
 
Integrating IT with HSE
Integrating IT with HSEIntegrating IT with HSE
Integrating IT with HSE
 
Learn how to use Maximo HSE to Add a Layer of Control on Top of your Work Pro...
Learn how to use Maximo HSE to Add a Layer of Control on Top of your Work Pro...Learn how to use Maximo HSE to Add a Layer of Control on Top of your Work Pro...
Learn how to use Maximo HSE to Add a Layer of Control on Top of your Work Pro...
 
Management of Change 22.4.15
Management of Change 22.4.15Management of Change 22.4.15
Management of Change 22.4.15
 
Klir: powerful regulatory compliance management for water utilities
Klir: powerful regulatory compliance management for water utilitiesKlir: powerful regulatory compliance management for water utilities
Klir: powerful regulatory compliance management for water utilities
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
Alarm information sheet
Alarm information sheet   Alarm information sheet
Alarm information sheet
 
Safety System Modularity
Safety System ModularitySafety System Modularity
Safety System Modularity
 
ARC's Wil Chin Remote Operations Management Presentation @ ARC Industry Forum...
ARC's Wil Chin Remote Operations Management Presentation @ ARC Industry Forum...ARC's Wil Chin Remote Operations Management Presentation @ ARC Industry Forum...
ARC's Wil Chin Remote Operations Management Presentation @ ARC Industry Forum...
 
Riskmitigationwhitepaperweb 1
Riskmitigationwhitepaperweb 1Riskmitigationwhitepaperweb 1
Riskmitigationwhitepaperweb 1
 
[Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management [Oil & Gas White Paper] Control Room Management - Alarm Management
[Oil & Gas White Paper] Control Room Management - Alarm Management
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
 
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreo
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreoMejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreo
Mejoras en-programas-de-manejo-de-fatiga-con-tecnologias de-monitoreo
 
iWIT-A4-Brochure
iWIT-A4-BrochureiWIT-A4-Brochure
iWIT-A4-Brochure
 
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical IntegrityWebinar | GE & Stork | APM Best Practices - Mechanical Integrity
Webinar | GE & Stork | APM Best Practices - Mechanical Integrity
 
Capability initial flow control
Capability   initial flow controlCapability   initial flow control
Capability initial flow control
 

Alert Plus PIOGA Presentation - oct'15

  • 1. Challenge Demonstrate an implementable product that provides multiple capabilities to producing assets that will: Enhance Safety for Field personnel Monitor emissions for Safety notification and Regulatory requirements Provide archived performance and compliance metrics Integrate into the Control System and Control System Philosophy Shut down critical equipment with crisis emission event encountered Operate to – 45oF Solution
  • 2. ALERT PLUS, LLC Matt Murdock, Chief Operating Officer Pinedale, WY 82941 (307) 749-0615 info@alert-plus.com Alert Plus Aegis 400 Remote Emission Monitoring Station
  • 3. AGENDA Agenda Coverage Aegis 400 Remote Monitoring emissions station Production Resource Coverage ; Production Supply Chain Production problem the Aegis solves Method alignment with existing compliance methods Existing Regulatory Compliance and trends Existing Oil and Gas Methods that Aegis attains Safety and operations benefits ROI categories for Aegis implementation Work Process Summary of Aegis; implementation and operations Aegis shutdown technology Summary
  • 4. UPSTREAMTODOWNSTREAM Up and Down the Supply and Production Stream Where does the Aegis 400 provide benefit ?
  • 5. THEPROBLEM&THEALERTPLUSSOLUTION Problem: Monitor and manage fugitive emissions that mitigate operation, production loss, and safety risk. Solution: Aegis 400 detects excessive emission events, logs it, and activates alarms to stakeholders Site assets shut down if factored in alarm/operation philosophy. SOP is preserved with data log and data analytics access Cost effective. Fund it with Control System budget Demonstrable as risk monitoring and assessment resource for Rule 49 related operations
  • 6. ASUMMARYOFREGULATORYINFLUENCES The Regulatory Management Challenge: What are existing and evolving requirements and how to factor into Operations implementation
  • 7. THEPROBLEM&THEALERTPLUSSOLUTION Methane and VOC Emission Sensing Both Wyoming and Colorado lead to set regulatory and performance requirements LDAR at compressor stations and production facilities Method set to identify high emission assets and develop a program to mitigate it Succinct process to assess emission leaks and resolve them Storage Tank Emission Management (STEM) with remote emission monitoring Leak repair response and recordkeeping Producers have a good knowledge base of where high emitters are in the system Emphasis on risk assessment and management *Some content from Mike Silverstein, Colorado Department of Public Health and Environment
  • 8. THEPROBLEM&THEALERTPLUSSOLUTION Methane and VOC Emissions - Trends Other states are establishing emission performance rules: OH, WY, CA Colorado methods are akin to a Best Practice EPA has just released NSPS0000a. Ratification is geared towards 2016 CTG is released for ozone attainment initiatives The impetus for emission management is risk assessment and the risk mitigation plans to protect. Site based solutions that provide continuous monitoring, alert, mobile accessibility, and archival knowledge base harmonize well with evolving and present regulations *Some content from Mike Silverstein, Colorado Department of Public Health and Environment
  • 9. EXISTINGOPERATIONSMETHODS Integrity Management. Aegis is a tool to fulfill Title 49 CFR Part 192 (Gas operations) Established management method for operational risk assessment set by DOT/PHMSA for Midstream. The Risk assessment philosophy can be applied to Production operations Apply the existing precedent for risk based methods to Safety and Emissions management criteria Lifecycle management drives the need for operational risk review. Regular risk review and mitigation (yearly) Objectives • To perform integrity assessments of pipelines in locations where a pipeline failure could have significant adverse consequences (referred to as High Consequence Areas or HCAs). • To improve operator management, analytical, and operational processes to manage pipeline integrity. • To increase government’s role in the oversight of operator integrity management programs and activities. • To improve public confidence in pipeline safety. http://primis.phmsa.dot.gov/comm/IM.htm?nocache=8834
  • 10. EXISTINGOPERATIONSMETHODS Integrity Management. Aegis is a tool to fulfill Title 49 CFR Part 192 (Gas operations) (Taken directly from the Rule) This is Where the Risk Analysis Program Element Comes In Comprehensive and systematic risk analysis is a valuable tool to help operators identify and determine the significance of previously unrecognized threats. Through rigorous analysis of all available data, pipeline operators are required to identify and evaluate all potential precursors to pipeline failure and the risks that they pose. Operators must also identify and implement additional preventive or mitigative measures to address the most significant threats identified by the risk analysis. These measures would be dependent on the nature of the threat and the specifics of the operator’s pipeline system and its operation. Some examples include: enhancing damage prevention programs; improving corrosion control monitoring; enhancing control center operator training; improving leak detection system capability; conducting emergency drills with local emergency responders; and installing remotely operated valves to expedite the isolation of a leak or failure when one is discovered. http://primis.phmsa.dot.gov/comm/IM.htm?nocache=8834
  • 11. THEPROBLEM&THEALERTPLUSSOLUTION Integrity Management. Aegis 400 as an Alarm Alert ANSI/ISA 18.2 Alarm Management Life-cycle Emissions Remote Monitoring extends Alarm Management to production assets to extend integrity management. Operations unify Control and Situation assessment Additional Stake holders provide for comprehensive situation assessment
  • 12. THEPROBLEM&THEALERTPLUSSOLUTION Problem: Field emission events create safety threats for Field Personnel and communities Solution: Emission events alert Control Operations and Management Response team is able to be alerted remotely Service Team can check emission levels before entering site All response actions are able to be logged, linked to the event, and recorded in data archive
  • 13. GAINDATAFORSTAKEHOLDERS Remote Emission and Safety Triage System level Alert that drives SOP response Remote access to incident data to drive priority and resource decisions Field personnel access emission levels to determine accessibility to site for service Crisis Management, Operations Improvement, Emergency Response Team Operations Management Field Operations Emissions Or Safety Alert
  • 14. GAINADDITIONALBENEFITSWITHAEGIS Proactive Safety Management for Field Emission risks Demonstrate this to any and all stakeholders as risk mitigation. Gain visibility to Community and Compliance efforts with the investment Evidence of strong company commitment for stewardship Emission and safety incident avoidance Production Operations Stewardship to community and lands Demonstrable archive of performance
  • 15. THEPROBLEM&THEALERTPLUSSOLUTION Problem: How is the Aegis 400 an incremental asset monitoring resource to present resources ? Solution: Aegis 400 is a networked, fixed emission monitoring system Instantaneous alarm alert notification to stake holders and control operations Aegis product philosophy is compatible with Control Philosophy (alarm and event driven action SOP) Data log provides an operations work response archive
  • 16. HOWTOPAYFORAEGIS400 Return on Investment Opportunities for the Aegis 400 Economically Priced Efficient implementation Integrate-able with existing assets and control systems Work Process improvement Loss recovery Safety incident avoidance Regulatory issue avoidance Demonstrable as good faith investment for Community and BLM
  • 17. IMPLEMENTATIONOFAEGIS400 Implementation Work Process with the Aegis 400 Identify site emission coverage requirements Power availability plan for site coverage Estimate 2 Hours completion time for installation Identify locational and resource elements and installation is completed quickly Determine if a stand alone monitoring station or connection to Control Network Quarterly calibration cycle – to integrate with other site based service requirements Sensors to be replaced at 2 – 5 year increments depending on sensor types
  • 18. EFFICIENCIESGAINEDWITHAEGISALERTS Work Process – Assessment and Incident Handling Emission or Safety Alert • Remote notification; alert through control network or broadcast • Stake holders notification • Trigger SOP (standard operating procedure) Assess, Deploy • Does SOP match the alert scope details ? • Modify the response team to match the threat and incident scope • Respond accordingly to the threat level alerted Resolve, Document • Team deployed matches the scope of the threat . Cost management • Responsiveness matches the SOP outlined as is documented as such • Archived alert, response, and closure. Lessons learned can be applied This is a repeatable Integrity Management process Process and response discipline is maintained Potential ROI with dispatch of resources to match the data analysis of the threat alert
  • 19. THEPROBLEM&THEALERTPLUSSOLUTION Problem: Cold temperature operations are a challenge for monitoring conditions and operations Solution: Aegis 400 is a networked, fixed emission monitoring system Operating temperature range is -45oF to 150oF Alert Plus continues to characterize for even lower operating temperatures Much of NG production exists in cold weather regions
  • 20. THEPROBLEM&THEALERTPLUSSOLUTION Problem: There are other data collection resources and devices at site locations. How to consolidate ? Solution: Aegis 400 is a networked, fixed emission monitoring system Multiple channels enable integration of multiple data collection The Aegis 400 is a PLC Probe data is able to be integrated into channel data collection on the Aegis 400
  • 21. AUTOMATICSHUTDOWN Shut down operations remotely or automatically Proprietary valve provides “control & command” functionality in one package in extreme conditions.
  • 22. SUMMARY Alert Plus Aegis 400 Remote Emission Monitoring Station Cold Weather Operation to – 40oF Automatic asset shut down triggered by alarmed emission event Operation philosophy integrates with CRM and control operation philosophy Can be integrated into Control system as a PLC Utilize as continuous improvement compliance resource Proactive solution to evolving emissions management standards Practical implementation and investment cost
  • 24. PO Box 268; Pinedale, WY 82941 Tel. (844) ALERTPLUS Matt Murdock, Chief Operating Officer Cell: (307) 749-0615 www.alert-plus.com info@alert-plus.com