AKINLOYE OLANREWAJU AKINTOLA
Date of Birth: 23rd of September, 1981
Sex: Male
State of Origin: Oyo
Objective:
To develop and channel my energy in setting and meeting challenging targets
in compliance with quality, time and standard of my employer, and hence
delivering business results even in the face of obstacles.
Education:
 Federal University of Technology, Minna, Niger State 2002 - 2006
B. Tech Physics Electronics (Second Class Upper Division)
 The Polytechnic, Ibadan, Oyo State. 1998 – 2000
OND Electrical Electronics (Lower Credit)
 Lagos Baptist Academy, Obanikoro, Lagos State 1994 – 1996
Senior Secondary School Certificate
 Olivet Baptist High School, Oyo, Oyo state 1991 – 1993
Junior School Certificate
General Technical Knowledge
 Good knowledge of Datacentre from both Power and IT infrastructure
perspective
 Linux/Unix Administration knowledge.
 Oracle Database Management Knowledge
 Intel servers’ installations and fault troubleshooting
 Storage knowledge.
 knowledge of Virtualization on desktop and server
 Symantec Backup (Net Backup and Backup Exec) Knowledge
 Networking Knowledge
Address: 1, Omotayo-Disu Street
Off Salawe Avenue,
Ikosi-Ketu.
Lagos.
Email: olanrewajuakinloye@yahoo.com
akiloysys@gmail.com
Mobile: 08067715367
 Good knowledge of Datacentre from both Power and IT infrastructure
perspective
 Good knowledge of Industrial and Domestic wiring.
 Troubleshoot and repair of fault that has to do with Electrical Power
industrial panel.
 Hands on knowledge of electric motor maintenance
 Good practical experience on Electrical Panel maintenance that involve
electrical equipment like contactor, relay, limit switch, timer etc.
 Solar Installation
 Inverter/UPS Installation
 Power Audit and Analysis or Solar power capacity recommendation.
Training and Seminars Attended:
 COMPUTEX, Taipei Global ICT Forum Seminal
Taipei, 2016
 Hybrid Solar Energy (ONGRID & OFFGRID) Design, configuration and
Installation Training. (Kehua Training School in China-2015)
 Symantec Technical Training (Symantec Backup Exec 12)
Bitrax Training School, Lekki.
 Symantec Technical Training (NetBackup 6.5)
Expert Edge Training School, Victoria Island
 Huawei OCS O&M (Online Charging System)
 Huawei I2000 O&M
 Huawei USAU O&M
 Huawei URP O&M
 Ericsson CCN Operations (Charging Control Node)
 Ericsson CS5.0 System Admin
 Ericsson CS5.0 Advance System Admin
 OCA (Oracle Certified Associate)
Meridian Technology, Muri Okunola, V/I
 OCP (Oracle Certified Professional)
Meridian Technology, Muri Okunola, V/I
 CCNA Training
Certifications:
 Cisco Certified Network Associate (CCNA)
 Administration of Symantec Enterprise Vault 8.0
 Symantec Enterprise Vault 8.0 for Exchange Technical
 Symantec Technical Specialist in Net Backup
 Symantec Technical Specialist in Backup Exec System Recovery
 Symantec Sales expert in Backup Exec system recovery
 Symantec Technical Specialist in Backup Exec 12.5 for Windows Servers
 VMware Technical Sales professional
 Deploying and Maintaining Windows Vista Operating System and 2007
IBM System x BladeCenter v4
 ITIL V3 Foundation (EX0-101)
Work Experience:
Omatek Ventures Plc OCT 2015 TO DATE
Group Head, Technical & Power Co-ordinator;
 Managing the company Data Centre from the IT and Power Related Issues.
 Responds to Tender regards ICT product (Server, laptop & desktop) and Power
Product (Solar Inverter and UPS)
 Prepare Quotation and Negotiate to close with Client
 Prepare Technical Proposal (ICT and Power Products)
 Present technical presentation to client
 Draw Project Plan and Coordinates Projects from beginning to end.
 Interface with company vendors.
 Monitor fault log on Sage ERP
 Coordinate engineer’s activities and operations
 Ensure Good Customer Relationship
 Take business decisions on faults reported
 Ensure prompt Response and Fix times
 Follow up with engineers on outstanding jobs
 Submit Weekly, Monthly and Quarterly reports to CTO
 Relieve CTO while on leave
 Hold Weekly/Monthly meetings with Head, Service Centres
 Approve and sign all transactions documentations
 Coordinate Design, Installation, Troubleshooting and Maintenance of LAN & WAN
for In-house and Customers.
 Ensure Necessary Billing is made
Omatek Engineering Service Limited OCT 2013 - SEP 2015
Head, Service Centre;
General Job Description:
 Monitor fault log on Sage ERP
 Assign job to engineers
 Ensure Good Customer Relationship
 Take business decisions on faults reported
 Ensure prompt Response and Fix times
 Ensure necessary Billing is made
 Follow up with engineers on outstanding jobs
 Submit Weekly reports to Head, Technical by close of work on Friday
 Ensure returning spares are return in “like new” condition
 Monitor Buffer Stock Inventory Level
 Coordinate all activities in the Service Centres
 Approve and sign all transactions documentations
Omatek Computers Limited NOV 2012 - SEP 2013
Head; Quality, Research and Development;
 Responsible for the day to day quality management control of the company
 Ensuring Zero-% return of produced products
 Ensuring that the quality targets of the company is met
 Ensuring the sustenance of customer satisfaction on our products
 Ensure quality packaging of all Omatek products.
 Provide direction to the production team as well as ensuring that production
target is met
 Working with supply chain to establish parts required for production.
 Ensure that all parts used for production is of right quality and that the company
adheres strictly to the quality policy of the company.
 Ensure that the production quality policy of the company is complied with during
production.
 Ensuing full compliance with all the statutory laws of the country and making sure
that the company is a good corporate citizen.
 Carry out research and development to ensure that state of the act parts is used
for production by offering professional advice to relevant department/officer.
 Responsible for the maintenance of accurate records of Omatek products that
ever passed through the burning room and doing posting on the e-controller (SAGE
ERP)
 Manage subordinates to ensure proper assembly of the parts of the PC.
 Manage subordinates to ensure that the casing of the PC is well fixed.
 Manage subordinates to ensure that finished products are properly transferred
to the store
 Manage subordinates to ensure proper documentation of the day’s production
activity.
Globacom Limited Feb 2012 – Nov 2012
CORE Network Engineer. (Network Subsystem Department)
General Job Description:
 Integration and Interconnection of the Alcatel NGN (Next Generation
Networks) platform with MSCs (Mobile Services Switching Centre).
 Hardware and software acceptance of the Alcatel 5020 WGS (Wireless Call
Server) and 7570 MGW (Media Gateway).
 The integration and Configuration of new BSCs (Base Station Controllers) and
BTSs (Base Transceiver Stations) or cell sites into the MSC/VLRs (Visitor
Location Registers).
 Configuration and Expansion of the existing trunk groups in the MSCs with
respect to the work order or service level agreement (SLA) or whenever there
is a Request for Change (RFC)
 Subscriber administration (Subscription declaration, creation, upgrade and
modification in the AUC (Authentication Centre) and HLRs (Home Location
Registers).
 Subscriber Location and roaming administration using the VLRs.
 Termination and configuration of trunk of the E1s for BSC voice traffic, STMs
for inter-MSC and PLMN (Public Land Mobile Network) connections.
 Termination and configuration of PCMs (Pulse Code Modulation) for inter-MSC
trunks.
 Daily operations and Maintenance of Alcatel 7570 MGW (Media Gateway).
 Traffic management.
 Collection, analysis, interpretation of Alarms on the Network elements and the
escalation and resolution of the resulting issues.
 Signalling (SS7) and voice network analysis aimed at improving network quality
of service(QoS) and performance.
Globacom Nigeria October 2010 – January 2012
Intelligent Network Engineer
General Job Description:
 Operation, administration, and maintenance of the IN platforms (Huawei
Online Charging System, OCS V100R002 and Alcatel-Lucent Instant
Convergent Charging, ICC5.4 and Open Service Platform, OSP R2.3 & R2.4);
Ensured maximum service availability and minimum platform downtime.
 General operation and maintenance of the Centralized Voucher System
(Alcatel-Lucent CVS R2.3) and Short Message Service Centre (Acision
SMSC 5.2) services.
 Configuration, deployment, support and management of real time business
applications and end-users’ commercial offers – prepaid products design,
subscriber profiling, charging plans creation and development of other
services on the IN platforms.
 Implementing work orders/network modification requests on the IN
platforms using established change request and approval procedures.
 User Acceptance Testing and Integration of new core network elements on
the IN.
 Activity log management, routine health check, and network faults
management – fault tracking, reporting, analysis, escalation, administration
and automatic resolution to the extent possible.
 Daily and periodic (full) backup of the IN system (Oracle 9i and 10g)
databases and transaction
 Preparation, analysis, trending and distribution of performance
management reports on the utilization of the IN system.
 Management of IN related trouble tickets from Customer Care using
ALMA Vision Assurance Problem Management (AVAPM) software and
ensuring speedy resolution of same.
 Frequent monitoring uptime, Disk space, Temperature, Signalling, snap
delay, and CPU utilizations on IN servers vis script running
 Monitoring of IN service (Voice, sms, data) on all the IN servers
 Checking of SMSC buffer/ITP links
 Fault detection on IN servers regards Power Failure, Hardware Failure,
Connectivity Problems etc.
Dimension Data West Africa (Information Technology Consulting
Firm) 2007- 2010
Data Centre and Storage Solution Department
System Support Engineer
General Job Description:
 Responsible for deployment and support of Symantec Backup solution.
 Configuration of IBM Intel servers for customers using IBM
configuration Tools.
 Installing, configuring, networking and troubleshooting basic computer
systems
 Configuration, Installation, Managing and preventive maintenance of Intel
servers for in-house and offsite clients.
 Responsible for the maintenance and repair of all desktops and laptops of
in-house and offsite clients’ hardware and software installations.
 Preventive maintenance of servers (Intel), laptops and desktops for in-
house and offsite clients.
 LAN configuration for in-house staff.
 Printer configuration and maintenance for in-house.
 Managing the office Engineering store.
 Warranty replacements of faulty parts of several machines still under
warranty.
Duties and Projects Included:
 Implementation of Symantec Net Backup for Addax Petroleum
 Implementation of Symantec Backup Exec for Skye Bank, Visafone,
StanbicIbtc Bank, Total Nigeria, etc.
 Installing, configuring and maintaining IBM Servers for various
organisations like Union Banks, Stanbic IBTC Bank, IFA Insurance,
Fidelity Bank etc.
 Repair and maintenance of IBM IntelliStations for Chevron
 Hardware/OS troubleshooting & Installation
 IT Support for SNEPCO (Shell Nigeria Exploration and Petroleum
Company).
 IT and Preventive Maintenance Support for Central Bank of Nigeria,
Lagos
 NetApp Storage at Intercontinental Bank. Etc.
Clay Industry Nigeria Limited 2000 - 2002
Electrical Maintenance Engineer;
General Job Description:
 General industrial and domestic wiring.
 Troubleshoot and repair of fault that has to do with industrial
panel.
 Daily electric motor maintenance and connection
 Installation of Electrical component like limit switch, gear box,
contactor, relay, timer etc.
Communication / Interpersonal Skills:
 Developed excellent customer service skills.
 Outstanding verbal and written communication skills
 Ability to learn fast, work under pressure with minimum supervision and
maximum output.
 Ability to adapt and work in any suitable work environment as an individual
and as a team member.
Referees:
Mr. Muyiwa Ojo
Storage Presales Engineer
Redington Gulf
08023514107
Mr. Adekunle Fatokun
StanbicIbtc
Abuja.
08033445861
Pastor Timothy Adeyemo
Timothy Adeyemo Company
08023221247

Akinloye olanrewaju

  • 1.
    AKINLOYE OLANREWAJU AKINTOLA Dateof Birth: 23rd of September, 1981 Sex: Male State of Origin: Oyo Objective: To develop and channel my energy in setting and meeting challenging targets in compliance with quality, time and standard of my employer, and hence delivering business results even in the face of obstacles. Education:  Federal University of Technology, Minna, Niger State 2002 - 2006 B. Tech Physics Electronics (Second Class Upper Division)  The Polytechnic, Ibadan, Oyo State. 1998 – 2000 OND Electrical Electronics (Lower Credit)  Lagos Baptist Academy, Obanikoro, Lagos State 1994 – 1996 Senior Secondary School Certificate  Olivet Baptist High School, Oyo, Oyo state 1991 – 1993 Junior School Certificate General Technical Knowledge  Good knowledge of Datacentre from both Power and IT infrastructure perspective  Linux/Unix Administration knowledge.  Oracle Database Management Knowledge  Intel servers’ installations and fault troubleshooting  Storage knowledge.  knowledge of Virtualization on desktop and server  Symantec Backup (Net Backup and Backup Exec) Knowledge  Networking Knowledge Address: 1, Omotayo-Disu Street Off Salawe Avenue, Ikosi-Ketu. Lagos. Email: olanrewajuakinloye@yahoo.com akiloysys@gmail.com Mobile: 08067715367
  • 2.
     Good knowledgeof Datacentre from both Power and IT infrastructure perspective  Good knowledge of Industrial and Domestic wiring.  Troubleshoot and repair of fault that has to do with Electrical Power industrial panel.  Hands on knowledge of electric motor maintenance  Good practical experience on Electrical Panel maintenance that involve electrical equipment like contactor, relay, limit switch, timer etc.  Solar Installation  Inverter/UPS Installation  Power Audit and Analysis or Solar power capacity recommendation. Training and Seminars Attended:  COMPUTEX, Taipei Global ICT Forum Seminal Taipei, 2016  Hybrid Solar Energy (ONGRID & OFFGRID) Design, configuration and Installation Training. (Kehua Training School in China-2015)  Symantec Technical Training (Symantec Backup Exec 12) Bitrax Training School, Lekki.  Symantec Technical Training (NetBackup 6.5) Expert Edge Training School, Victoria Island  Huawei OCS O&M (Online Charging System)  Huawei I2000 O&M  Huawei USAU O&M  Huawei URP O&M  Ericsson CCN Operations (Charging Control Node)  Ericsson CS5.0 System Admin  Ericsson CS5.0 Advance System Admin  OCA (Oracle Certified Associate) Meridian Technology, Muri Okunola, V/I  OCP (Oracle Certified Professional) Meridian Technology, Muri Okunola, V/I  CCNA Training
  • 3.
    Certifications:  Cisco CertifiedNetwork Associate (CCNA)  Administration of Symantec Enterprise Vault 8.0  Symantec Enterprise Vault 8.0 for Exchange Technical  Symantec Technical Specialist in Net Backup  Symantec Technical Specialist in Backup Exec System Recovery  Symantec Sales expert in Backup Exec system recovery  Symantec Technical Specialist in Backup Exec 12.5 for Windows Servers  VMware Technical Sales professional  Deploying and Maintaining Windows Vista Operating System and 2007 IBM System x BladeCenter v4  ITIL V3 Foundation (EX0-101) Work Experience: Omatek Ventures Plc OCT 2015 TO DATE Group Head, Technical & Power Co-ordinator;  Managing the company Data Centre from the IT and Power Related Issues.  Responds to Tender regards ICT product (Server, laptop & desktop) and Power Product (Solar Inverter and UPS)  Prepare Quotation and Negotiate to close with Client  Prepare Technical Proposal (ICT and Power Products)  Present technical presentation to client  Draw Project Plan and Coordinates Projects from beginning to end.  Interface with company vendors.  Monitor fault log on Sage ERP  Coordinate engineer’s activities and operations  Ensure Good Customer Relationship  Take business decisions on faults reported  Ensure prompt Response and Fix times  Follow up with engineers on outstanding jobs  Submit Weekly, Monthly and Quarterly reports to CTO  Relieve CTO while on leave  Hold Weekly/Monthly meetings with Head, Service Centres  Approve and sign all transactions documentations  Coordinate Design, Installation, Troubleshooting and Maintenance of LAN & WAN for In-house and Customers.  Ensure Necessary Billing is made
  • 4.
    Omatek Engineering ServiceLimited OCT 2013 - SEP 2015 Head, Service Centre; General Job Description:  Monitor fault log on Sage ERP  Assign job to engineers  Ensure Good Customer Relationship  Take business decisions on faults reported  Ensure prompt Response and Fix times  Ensure necessary Billing is made  Follow up with engineers on outstanding jobs  Submit Weekly reports to Head, Technical by close of work on Friday  Ensure returning spares are return in “like new” condition  Monitor Buffer Stock Inventory Level  Coordinate all activities in the Service Centres  Approve and sign all transactions documentations Omatek Computers Limited NOV 2012 - SEP 2013 Head; Quality, Research and Development;  Responsible for the day to day quality management control of the company  Ensuring Zero-% return of produced products  Ensuring that the quality targets of the company is met  Ensuring the sustenance of customer satisfaction on our products  Ensure quality packaging of all Omatek products.  Provide direction to the production team as well as ensuring that production target is met  Working with supply chain to establish parts required for production.  Ensure that all parts used for production is of right quality and that the company adheres strictly to the quality policy of the company.  Ensure that the production quality policy of the company is complied with during production.  Ensuing full compliance with all the statutory laws of the country and making sure that the company is a good corporate citizen.  Carry out research and development to ensure that state of the act parts is used for production by offering professional advice to relevant department/officer.  Responsible for the maintenance of accurate records of Omatek products that ever passed through the burning room and doing posting on the e-controller (SAGE ERP)  Manage subordinates to ensure proper assembly of the parts of the PC.  Manage subordinates to ensure that the casing of the PC is well fixed.  Manage subordinates to ensure that finished products are properly transferred to the store  Manage subordinates to ensure proper documentation of the day’s production activity.
  • 5.
    Globacom Limited Feb2012 – Nov 2012 CORE Network Engineer. (Network Subsystem Department) General Job Description:  Integration and Interconnection of the Alcatel NGN (Next Generation Networks) platform with MSCs (Mobile Services Switching Centre).  Hardware and software acceptance of the Alcatel 5020 WGS (Wireless Call Server) and 7570 MGW (Media Gateway).  The integration and Configuration of new BSCs (Base Station Controllers) and BTSs (Base Transceiver Stations) or cell sites into the MSC/VLRs (Visitor Location Registers).  Configuration and Expansion of the existing trunk groups in the MSCs with respect to the work order or service level agreement (SLA) or whenever there is a Request for Change (RFC)  Subscriber administration (Subscription declaration, creation, upgrade and modification in the AUC (Authentication Centre) and HLRs (Home Location Registers).  Subscriber Location and roaming administration using the VLRs.  Termination and configuration of trunk of the E1s for BSC voice traffic, STMs for inter-MSC and PLMN (Public Land Mobile Network) connections.  Termination and configuration of PCMs (Pulse Code Modulation) for inter-MSC trunks.  Daily operations and Maintenance of Alcatel 7570 MGW (Media Gateway).  Traffic management.  Collection, analysis, interpretation of Alarms on the Network elements and the escalation and resolution of the resulting issues.  Signalling (SS7) and voice network analysis aimed at improving network quality of service(QoS) and performance. Globacom Nigeria October 2010 – January 2012 Intelligent Network Engineer General Job Description:  Operation, administration, and maintenance of the IN platforms (Huawei Online Charging System, OCS V100R002 and Alcatel-Lucent Instant Convergent Charging, ICC5.4 and Open Service Platform, OSP R2.3 & R2.4); Ensured maximum service availability and minimum platform downtime.  General operation and maintenance of the Centralized Voucher System (Alcatel-Lucent CVS R2.3) and Short Message Service Centre (Acision SMSC 5.2) services.  Configuration, deployment, support and management of real time business applications and end-users’ commercial offers – prepaid products design,
  • 6.
    subscriber profiling, chargingplans creation and development of other services on the IN platforms.  Implementing work orders/network modification requests on the IN platforms using established change request and approval procedures.  User Acceptance Testing and Integration of new core network elements on the IN.  Activity log management, routine health check, and network faults management – fault tracking, reporting, analysis, escalation, administration and automatic resolution to the extent possible.  Daily and periodic (full) backup of the IN system (Oracle 9i and 10g) databases and transaction  Preparation, analysis, trending and distribution of performance management reports on the utilization of the IN system.  Management of IN related trouble tickets from Customer Care using ALMA Vision Assurance Problem Management (AVAPM) software and ensuring speedy resolution of same.  Frequent monitoring uptime, Disk space, Temperature, Signalling, snap delay, and CPU utilizations on IN servers vis script running  Monitoring of IN service (Voice, sms, data) on all the IN servers  Checking of SMSC buffer/ITP links  Fault detection on IN servers regards Power Failure, Hardware Failure, Connectivity Problems etc. Dimension Data West Africa (Information Technology Consulting Firm) 2007- 2010 Data Centre and Storage Solution Department System Support Engineer General Job Description:  Responsible for deployment and support of Symantec Backup solution.  Configuration of IBM Intel servers for customers using IBM configuration Tools.  Installing, configuring, networking and troubleshooting basic computer systems  Configuration, Installation, Managing and preventive maintenance of Intel servers for in-house and offsite clients.  Responsible for the maintenance and repair of all desktops and laptops of in-house and offsite clients’ hardware and software installations.  Preventive maintenance of servers (Intel), laptops and desktops for in- house and offsite clients.
  • 7.
     LAN configurationfor in-house staff.  Printer configuration and maintenance for in-house.  Managing the office Engineering store.  Warranty replacements of faulty parts of several machines still under warranty. Duties and Projects Included:  Implementation of Symantec Net Backup for Addax Petroleum  Implementation of Symantec Backup Exec for Skye Bank, Visafone, StanbicIbtc Bank, Total Nigeria, etc.  Installing, configuring and maintaining IBM Servers for various organisations like Union Banks, Stanbic IBTC Bank, IFA Insurance, Fidelity Bank etc.  Repair and maintenance of IBM IntelliStations for Chevron  Hardware/OS troubleshooting & Installation  IT Support for SNEPCO (Shell Nigeria Exploration and Petroleum Company).  IT and Preventive Maintenance Support for Central Bank of Nigeria, Lagos  NetApp Storage at Intercontinental Bank. Etc. Clay Industry Nigeria Limited 2000 - 2002 Electrical Maintenance Engineer; General Job Description:  General industrial and domestic wiring.  Troubleshoot and repair of fault that has to do with industrial panel.  Daily electric motor maintenance and connection  Installation of Electrical component like limit switch, gear box, contactor, relay, timer etc.
  • 8.
    Communication / InterpersonalSkills:  Developed excellent customer service skills.  Outstanding verbal and written communication skills  Ability to learn fast, work under pressure with minimum supervision and maximum output.  Ability to adapt and work in any suitable work environment as an individual and as a team member. Referees: Mr. Muyiwa Ojo Storage Presales Engineer Redington Gulf 08023514107 Mr. Adekunle Fatokun StanbicIbtc Abuja. 08033445861 Pastor Timothy Adeyemo Timothy Adeyemo Company 08023221247