1. | 1
21%
equipment load
increase
183 800 Euro
per year
economic effect
Task
To increase machine time fraction and
arrange end-to-end production control
Solution
✓ Machine pool has been integrated into single information space.
✓ Monitoring Terminals TVV-10 for downtime cause determination
have been installed.
✓ Control programs transfer and execution monitoring have been
automated.
✓ Monitoring system integration with SIMCENTER complex
(CAD/CAM/CAE/MES + PDM + ERP).
Result
✓ 21% — increase in machine time average fraction.
✓ 183 800 euro — annual economic effect from monitoring
system introduction.
✓ KPIs for shop managers and production have been developed
and are controlled.
Effectivization of High-Tech Aviation
Products Manufacturing
Machines connected:
Machines with CNC Fanuc, Mazak, Okuma, Siemens86
Equipment type: