Task
To raise the productiveness of equipment
to observe dates and decrease rejection amount
Solution
✓ Machine pool has been integrated into a single information space.
✓ Machine energy consumption control has been set up.
✓ Emergency alert system has been set up.
✓ The process of control programs storage and transfer to machines has
been optimized.
Result
✓ 46.8% — ОЕЕ indicator achieved
✓ 1 hour — working time reserve per shift obtained due to automation
of program transfer to machines with CNC control blocks
✓ 500 Euro — are annual savings from one machine as a result of the
power consumption optimization.
36.1%
equipment load
increase
250 000 euro
savings on one
production site amounted
Machines connected: Equipment type:
Machines with CNC control blocks: Fanuc, Sinumerik, Mazatrol76