The document provides step-by-step instructions for installing a Seametrics AG2000 center pivot irrigation flow meter. The instructions include measuring the vertical riser pipe, cutting out sections of pipe to ensure straight sections before and after the meter, welding flanges to the pipe ends, installing the meter and ensuring proper orientation, installing equalization wires for grounding, securing the output cable to prevent water intrusion, installing a protective cap, routing the cable, making electrical connections, and referring to additional documentation for operation.