After Summit catch up 
Athens OpenStack User Group #OSATH 
11th Meetup, 12th November 2014 
Thanassis Parathyras 
aparathyras@stackmasters.eu, @parathyras
Paris, FRANCE , November 3-7 
First time in Europe 
Hosted 4700 guests nearly 50% EU-based
@parathyras #OpenStack is in #Paris. Full house at the Palais des 
Congres! Keynotes starting. #OpenStackSummit
“open source cloud architecture is popular because it speaks to the 
desire of IT shops and their customers”, 
Jonathan Bryce, executive director of the OpenStack Foundation 
“when you combine ubiquitous connectivity with the supercomputer 
in your pocket”, 
Mark Collier, COO of the OpenStack Foundation 
Choice 
Distributed 
power 
The blockbuster 
“open source is really eating the software world”, 
Jim Zemlin, executive director of the Linux Foundation
BMW i8 on OpenStack keynotes stage
BMW i8 on OpenStack keynotes stage
CERN user story
Breakouts overview 
Technical workshops ranging from introductory to deep dive 
• HA for OpenStack services and workloads 
• Cloud storage and performance 
• Networking, SDN, NFV developments 
• Operations management, CI/CD setups, Docker + Kubernetes 
• Security solutions over the whole stack 
• Sponsored sessions, Product presentations 
• Success stories, Lessons learned
Panels, Expo & Parties 
Discussion panels with leading members in the ecosystem 
• IT transformation 
• Telco strategies 
• Cloud investments 
• Community 
OpenStack Marketplace 
• Companies expo 
Sponsored evening events
Design & Ops Summit 
Design Summit 
• Project roadmap 
• Technical design 
• Next major release goals 
• Dev teams meetups 
Operators Summit 
• Docs, Infra teams sessions 
• Common practices sharing and discussion 
• Feedback to the dev teams
@parathyras@mist_io presenting their solution during the related 
OSS projects track #OpenStackSummit #Paris #OpenStack #OSATH
Greek presence 
• Thanassis Parathyras, CTO & co-founder 
• Dimitris Moraitis, CTO & co-founder 
• Chris Loukas, SRE & QA
Mist.io - talk and live demo 
“Beyond Horizon: Open Source Management On 
the Go for OpenStack and the Rest of Your 
Computing Infrastructure” 
http://youtu.be/poLkjOtxI2A 
OpenStack Summit 2014, Related OSS Projects Track
Continuing to focus on stability, operational 
improvements and performance
Release highlights 
• Data Processing Service 
– Big Data analytics, deploy Hadoop, Spark 
• Swift Storage Policies 
– Better Control over cost and performance 
• Networking enhancements 
– NFV use cases are work in progress since May 2014 
– IPv6 support, DVR, migrating from nova-network 
• Operations support 
– Numerous updated and fixes make easier stand up and maintain a deployment 
– Easier compute upgrades, enhanced metering and more efficient performance 
– Updated scheduler on host evacuation, instances rescue mode 
• Identity federation 
– User access multiple using same credentials 
– Multiple backends, easier LDAP integration 
• Orchestration engine improvement 
– Manage easier stacks, roll-back, cleanup
Official programs 
• Compute (Nova) 
• Object Storage (Swift) 
• Image Service (Glance) 
• Identity (Keystone) 
• Dashboard (Horizon) 
• Networking (Neutron) 
• Block Storage (Cinder) 
• Telemetry (Ceilometer) 
• Orchestration (Heat) 
• Database (Trove) 
• NEW! Data Processing (Sahara) 
Incubation 
• Shared file system (Manila) 
• Messaging (Zaqar) 
• DNS Service (Designate) 
• Key Management (Barbican) 
Supporting 
• Common libraries (Oslo) 
• Infrastructure 
• Documentation 
• QA (tempest) 
• Release cycle management 
• Devstack 
OpenStack Programs are reviewed by the Technical Committee to become 
official
Tokyo, JAPAN 
Fall 2015 
Next stops 
Vancouver, CANADA 
Spring 2015
Get involved 
• Documentation 
– http://docs.openstack.org 
• Join the community 
– http://www.openstack.org/community 
• Greek mailing list 
– http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-el 
• Contribute 
– code (development, blueprints, reviews, bugs) 
– docs writing, translations, infrastructure support
Thank you for being patient! 
Athens OpenStack User Group #OSATH 
http://www.meetup.com/Athens-OpenStack-User-Group 
Thanassis Parathyras 
aparathyras@stackmasters.eu, @parathyras

After summit catch up

  • 1.
    After Summit catchup Athens OpenStack User Group #OSATH 11th Meetup, 12th November 2014 Thanassis Parathyras aparathyras@stackmasters.eu, @parathyras
  • 2.
    Paris, FRANCE ,November 3-7 First time in Europe Hosted 4700 guests nearly 50% EU-based
  • 3.
    @parathyras #OpenStack isin #Paris. Full house at the Palais des Congres! Keynotes starting. #OpenStackSummit
  • 4.
    “open source cloudarchitecture is popular because it speaks to the desire of IT shops and their customers”, Jonathan Bryce, executive director of the OpenStack Foundation “when you combine ubiquitous connectivity with the supercomputer in your pocket”, Mark Collier, COO of the OpenStack Foundation Choice Distributed power The blockbuster “open source is really eating the software world”, Jim Zemlin, executive director of the Linux Foundation
  • 5.
    BMW i8 onOpenStack keynotes stage
  • 6.
    BMW i8 onOpenStack keynotes stage
  • 7.
  • 8.
    Breakouts overview Technicalworkshops ranging from introductory to deep dive • HA for OpenStack services and workloads • Cloud storage and performance • Networking, SDN, NFV developments • Operations management, CI/CD setups, Docker + Kubernetes • Security solutions over the whole stack • Sponsored sessions, Product presentations • Success stories, Lessons learned
  • 9.
    Panels, Expo &Parties Discussion panels with leading members in the ecosystem • IT transformation • Telco strategies • Cloud investments • Community OpenStack Marketplace • Companies expo Sponsored evening events
  • 10.
    Design & OpsSummit Design Summit • Project roadmap • Technical design • Next major release goals • Dev teams meetups Operators Summit • Docs, Infra teams sessions • Common practices sharing and discussion • Feedback to the dev teams
  • 11.
    @parathyras@mist_io presenting theirsolution during the related OSS projects track #OpenStackSummit #Paris #OpenStack #OSATH
  • 12.
    Greek presence •Thanassis Parathyras, CTO & co-founder • Dimitris Moraitis, CTO & co-founder • Chris Loukas, SRE & QA
  • 13.
    Mist.io - talkand live demo “Beyond Horizon: Open Source Management On the Go for OpenStack and the Rest of Your Computing Infrastructure” http://youtu.be/poLkjOtxI2A OpenStack Summit 2014, Related OSS Projects Track
  • 14.
    Continuing to focuson stability, operational improvements and performance
  • 15.
    Release highlights •Data Processing Service – Big Data analytics, deploy Hadoop, Spark • Swift Storage Policies – Better Control over cost and performance • Networking enhancements – NFV use cases are work in progress since May 2014 – IPv6 support, DVR, migrating from nova-network • Operations support – Numerous updated and fixes make easier stand up and maintain a deployment – Easier compute upgrades, enhanced metering and more efficient performance – Updated scheduler on host evacuation, instances rescue mode • Identity federation – User access multiple using same credentials – Multiple backends, easier LDAP integration • Orchestration engine improvement – Manage easier stacks, roll-back, cleanup
  • 16.
    Official programs •Compute (Nova) • Object Storage (Swift) • Image Service (Glance) • Identity (Keystone) • Dashboard (Horizon) • Networking (Neutron) • Block Storage (Cinder) • Telemetry (Ceilometer) • Orchestration (Heat) • Database (Trove) • NEW! Data Processing (Sahara) Incubation • Shared file system (Manila) • Messaging (Zaqar) • DNS Service (Designate) • Key Management (Barbican) Supporting • Common libraries (Oslo) • Infrastructure • Documentation • QA (tempest) • Release cycle management • Devstack OpenStack Programs are reviewed by the Technical Committee to become official
  • 17.
    Tokyo, JAPAN Fall2015 Next stops Vancouver, CANADA Spring 2015
  • 18.
    Get involved •Documentation – http://docs.openstack.org • Join the community – http://www.openstack.org/community • Greek mailing list – http://lists.openstack.org/cgi-bin/mailman/listinfo/openstack-el • Contribute – code (development, blueprints, reviews, bugs) – docs writing, translations, infrastructure support
  • 19.
    Thank you forbeing patient! Athens OpenStack User Group #OSATH http://www.meetup.com/Athens-OpenStack-User-Group Thanassis Parathyras aparathyras@stackmasters.eu, @parathyras