SlideShare a Scribd company logo
MR.ADNAN ERDOGAN
Place of Date: 13.07.1974
Place of Birth: Samsun-Turkey
Academic: Master in Public Management
University of Anatolian, Eskisehir-TURKEY
Duration: October 1994-July 2000
Joining Date: 1 Months
Advance Railway Management Master Program
Railway Staff College-Vadodara-India
Duration: Sept-Oct 2005
Computer Skills:
MS Office, Windows, MAC Apple, Sap/R3 (User of Real Time Systems Analysis and Program
Development), Hardware, Network
Work Experience:
SIEMENS AG- Ankara Branch Office
Project of Ankara Light Rail Transit System
Designation: Technical Support.
Duration: July 1993- November 1995-Ankara
Worked at installation and commissioning at team
Civil Works: [Station Rough and Fine Works; Bored, Cut & Cover Tunnels; At-Grade and Depressed
Open & Closed Structures; Construction Works; Rail and Sleeper Laying; Escalators; Travelators;
Elevators; Drainage Structures; Pump Equipment, etc.]
Track Works: [Points; Rails; Point Heating Systems; Rail Welding Equipment; Rail Grinding
Vehicle; Rail-Road Vehicle; Derailing Equipment; Ballast and Sleepers Laying Equipment, etc.]
Workshop: [Under-floor wheel lathe; Body and Paint Shop Equipment; Washing Plant; Drainage
Equipment; Vehicle Lifting Plant; Emergency Ventilation; Cranes, Welding Equipment; Lathes,
Drilling, Grinding, Pressing, Milling Machines, etc.]
Power Supply: [Third Rail, Over-head Line; Traction Power Supply System; Pantograph; UPS
Systems; Rectifier Transformers and Rectifiers; Circuit Breakers; Disconnectors; DC and AC
Switchboards; Safety Systems; Grounding Systems; Battery System; Interlocking System; Potential
Monitoring Device etc.]
Ankara Light Rail &Metro Transit System
Designation:
Technical Support Officer 1995-2001
Worked workshop, stations equipments maintenance works
Sr. Maintenance Chief 2001-2016 present
Report to Maintenance Director, Head Director
Maintenance Team: 20 Technicians, subcontractor companies (Otis Kone, Valter and local companies)
My closest duty Maintenance Director
Responsible for maintenance & repair, to the following systems and equipment:
Workshop: [Under-floor wheel lathe; Body and Paint Shop Equipment; Washing Plant; Drainage
Equipment; Vehicle Lifting Plant; Emergency Ventilation, Cranes, Welding Equipment; Lathes,
Drilling, Grinding, Pressing, Milling Machines, Train Works, Heating and Cooling System
Training ,Air Conditions, Central Heating and Cooling Systems etc.]
Civil & Mechanical & Electronic, Station Equipment Works:
Escalators; Travelators; Elevators; Drainage Structures; Pump Equipment,Tunnel Izolations and
Chemical Injections WorksTunnel and Station Construction, Scada, CCTV, Fire Alarm Systems,
Escalators; Travelators; Elevators,Roller Shutter, Sanitary and Fire equipment.
Train Works& Rolling Stock: Rolling Stock etc.
Track Yard Works: [Points; Rails; Point Heating Systems; Rail Welding Equipment; Rail Grinding
Vehicle; Rail-Road Vehicle; Derailing Equipment; Ballast and Sleepers Laying Equipment, etc.]
Signaling and Communication Works, Depot 3.rd Power Supply, Rail Switches, Rail tracks, Drainage
Systems
Other Works: Material Management, Procurement, Management, Maintenance Management,
Project Management, Preparation of bid document, Public Transport Organizational Development,
Workforce Planning, Vendor Management, Team Building, Rolling Stock Management, Infrastructure
Management
Language: English (B2+), German (Beginner), Turkish (Native), Hindi (Beginner)
Driving License: B -1994 Turkey
Courses:
Rites Ltd. –Gurgaon-India
Management Training September 2005
Ankaray Consortium
Training November 1995-Agust 1996
Advanced Railway Tech. Training
Otis, Schindler and Krupp-Thyysen, Kone
Escalator, Elevator Training
Fire Extinguisher Systems, Aerosol Fire Extinguisher Systems (Rome-Italy)
Address: Home: Gop. Mah. Unsal. Sok. 2/8, Sincan-Ankara-Turkey
Phone: + 90 312 2734208 (Home)
Mobile : + 90 542 4217548
Office: +90 312 224 1170-71 ext.1265-1226
E-mail: adnanmtb@hotmail.com
Reference:
ALGAN SAYGI
STFA Construction Group
Project Controls + Technical Office Manager
STFA Construction Group - FERNAS - KALYON JV,
STFA Construction Group
E-mail: algansaygi@windowslive.com
ILGAZ CANDEMİR
Railway / Urban Rail / Director de Projet -ALGERIA
YUKSEL PROJE INTERNATIONAL A.S.
E-mail: ilgazcandemir@hotmail.com

More Related Content

What's hot

Cantonment metro station a case study1 rajkumar
Cantonment metro station   a case study1  rajkumarCantonment metro station   a case study1  rajkumar
Cantonment metro station a case study1 rajkumar
Sanjeev Dyamannavar
 
metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)
A.U Architecture Alumni Association
 
Job Description of a Locomotive Engineer
Job Description of a Locomotive EngineerJob Description of a Locomotive Engineer
Job Description of a Locomotive EngineerVincent P. Mulray
 
15.01.18 JGARCIA CV (Personal Version)
15.01.18 JGARCIA CV (Personal Version)15.01.18 JGARCIA CV (Personal Version)
15.01.18 JGARCIA CV (Personal Version)Justin Michael Garcia
 
SP+Transportation
SP+TransportationSP+Transportation
SP+TransportationDon Jordan
 
C.V. Omar Sherif[1]
C.V. Omar Sherif[1]C.V. Omar Sherif[1]
C.V. Omar Sherif[1]Omar ead
 
Eng.osama ali (cv)
Eng.osama ali (cv)Eng.osama ali (cv)
Eng.osama ali (cv)
Osama Ali
 

What's hot (9)

Metro project
Metro projectMetro project
Metro project
 
Cantonment metro station a case study1 rajkumar
Cantonment metro station   a case study1  rajkumarCantonment metro station   a case study1  rajkumar
Cantonment metro station a case study1 rajkumar
 
metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)metro station planning ar.ravi sankar alumni(auce architecture)
metro station planning ar.ravi sankar alumni(auce architecture)
 
Hossam elmawardy
Hossam elmawardyHossam elmawardy
Hossam elmawardy
 
Job Description of a Locomotive Engineer
Job Description of a Locomotive EngineerJob Description of a Locomotive Engineer
Job Description of a Locomotive Engineer
 
15.01.18 JGARCIA CV (Personal Version)
15.01.18 JGARCIA CV (Personal Version)15.01.18 JGARCIA CV (Personal Version)
15.01.18 JGARCIA CV (Personal Version)
 
SP+Transportation
SP+TransportationSP+Transportation
SP+Transportation
 
C.V. Omar Sherif[1]
C.V. Omar Sherif[1]C.V. Omar Sherif[1]
C.V. Omar Sherif[1]
 
Eng.osama ali (cv)
Eng.osama ali (cv)Eng.osama ali (cv)
Eng.osama ali (cv)
 

Similar to Adnan ERDOGAN CV

Procurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern CapeProcurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern Cape
Transnet Port Terminals
 
CV udayan
CV  udayan CV  udayan
Global Rail _interactive_(c) Arup
Global Rail _interactive_(c) ArupGlobal Rail _interactive_(c) Arup
Global Rail _interactive_(c) ArupHeather Ceney
 
Imran-Kazmi-Purchase- sourc CV- 16
Imran-Kazmi-Purchase- sourc CV-  16Imran-Kazmi-Purchase- sourc CV-  16
Imran-Kazmi-Purchase- sourc CV- 16Imran Haider
 
ozcan ozturk CV 12may15
ozcan ozturk CV 12may15ozcan ozturk CV 12may15
ozcan ozturk CV 12may15cant1
 
consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11Ali Elamin
 
CV-Mohamed Shafi Younus
CV-Mohamed Shafi YounusCV-Mohamed Shafi Younus
CV-Mohamed Shafi YounusYounus Mohamed
 
IBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - CopyIBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - Copyibrahim ramadan
 
resume Kogan D 20151028
resume Kogan D 20151028resume Kogan D 20151028
resume Kogan D 20151028Dmitry Kogan
 

Similar to Adnan ERDOGAN CV (20)

Procurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern CapeProcurement Opportunities 2016 Imbizo held at Eastern Cape
Procurement Opportunities 2016 Imbizo held at Eastern Cape
 
31-5-2015
31-5-201531-5-2015
31-5-2015
 
CV udayan
CV  udayan CV  udayan
CV udayan
 
Global Rail _interactive_(c) Arup
Global Rail _interactive_(c) ArupGlobal Rail _interactive_(c) Arup
Global Rail _interactive_(c) Arup
 
RESUME .ENGLISH 2525
RESUME .ENGLISH 2525RESUME .ENGLISH 2525
RESUME .ENGLISH 2525
 
CV -Update 1-12
CV -Update 1-12CV -Update 1-12
CV -Update 1-12
 
Imran-Kazmi-Purchase- sourc CV- 16
Imran-Kazmi-Purchase- sourc CV-  16Imran-Kazmi-Purchase- sourc CV-  16
Imran-Kazmi-Purchase- sourc CV- 16
 
ozcan ozturk CV 12may15
ozcan ozturk CV 12may15ozcan ozturk CV 12may15
ozcan ozturk CV 12may15
 
Sreekumar_bms
Sreekumar_bmsSreekumar_bms
Sreekumar_bms
 
Hem-Singh-Rajodiya-Vtech
Hem-Singh-Rajodiya-VtechHem-Singh-Rajodiya-Vtech
Hem-Singh-Rajodiya-Vtech
 
consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11consultant eng Ali sman CV A 11
consultant eng Ali sman CV A 11
 
CV-Mohamed Shafi Younus
CV-Mohamed Shafi YounusCV-Mohamed Shafi Younus
CV-Mohamed Shafi Younus
 
IBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - CopyIBRAHIM RAMADAN CV - Copy
IBRAHIM RAMADAN CV - Copy
 
resume Kogan D 20151028
resume Kogan D 20151028resume Kogan D 20151028
resume Kogan D 20151028
 
arvind_resume_new (1)
arvind_resume_new (1)arvind_resume_new (1)
arvind_resume_new (1)
 
ThammarakCV-29Aug2015
ThammarakCV-29Aug2015ThammarakCV-29Aug2015
ThammarakCV-29Aug2015
 
NIlAVARI- CV
NIlAVARI- CVNIlAVARI- CV
NIlAVARI- CV
 
My new cv
My new cvMy new cv
My new cv
 
cv_eng2014
cv_eng2014cv_eng2014
cv_eng2014
 
CV_Magesh
CV_MageshCV_Magesh
CV_Magesh
 

Adnan ERDOGAN CV

  • 1. MR.ADNAN ERDOGAN Place of Date: 13.07.1974 Place of Birth: Samsun-Turkey Academic: Master in Public Management University of Anatolian, Eskisehir-TURKEY Duration: October 1994-July 2000 Joining Date: 1 Months Advance Railway Management Master Program Railway Staff College-Vadodara-India Duration: Sept-Oct 2005 Computer Skills: MS Office, Windows, MAC Apple, Sap/R3 (User of Real Time Systems Analysis and Program Development), Hardware, Network Work Experience: SIEMENS AG- Ankara Branch Office Project of Ankara Light Rail Transit System Designation: Technical Support. Duration: July 1993- November 1995-Ankara Worked at installation and commissioning at team Civil Works: [Station Rough and Fine Works; Bored, Cut & Cover Tunnels; At-Grade and Depressed Open & Closed Structures; Construction Works; Rail and Sleeper Laying; Escalators; Travelators; Elevators; Drainage Structures; Pump Equipment, etc.] Track Works: [Points; Rails; Point Heating Systems; Rail Welding Equipment; Rail Grinding Vehicle; Rail-Road Vehicle; Derailing Equipment; Ballast and Sleepers Laying Equipment, etc.] Workshop: [Under-floor wheel lathe; Body and Paint Shop Equipment; Washing Plant; Drainage Equipment; Vehicle Lifting Plant; Emergency Ventilation; Cranes, Welding Equipment; Lathes, Drilling, Grinding, Pressing, Milling Machines, etc.] Power Supply: [Third Rail, Over-head Line; Traction Power Supply System; Pantograph; UPS Systems; Rectifier Transformers and Rectifiers; Circuit Breakers; Disconnectors; DC and AC Switchboards; Safety Systems; Grounding Systems; Battery System; Interlocking System; Potential Monitoring Device etc.] Ankara Light Rail &Metro Transit System Designation: Technical Support Officer 1995-2001 Worked workshop, stations equipments maintenance works Sr. Maintenance Chief 2001-2016 present Report to Maintenance Director, Head Director Maintenance Team: 20 Technicians, subcontractor companies (Otis Kone, Valter and local companies) My closest duty Maintenance Director
  • 2. Responsible for maintenance & repair, to the following systems and equipment: Workshop: [Under-floor wheel lathe; Body and Paint Shop Equipment; Washing Plant; Drainage Equipment; Vehicle Lifting Plant; Emergency Ventilation, Cranes, Welding Equipment; Lathes, Drilling, Grinding, Pressing, Milling Machines, Train Works, Heating and Cooling System Training ,Air Conditions, Central Heating and Cooling Systems etc.] Civil & Mechanical & Electronic, Station Equipment Works: Escalators; Travelators; Elevators; Drainage Structures; Pump Equipment,Tunnel Izolations and Chemical Injections WorksTunnel and Station Construction, Scada, CCTV, Fire Alarm Systems, Escalators; Travelators; Elevators,Roller Shutter, Sanitary and Fire equipment. Train Works& Rolling Stock: Rolling Stock etc. Track Yard Works: [Points; Rails; Point Heating Systems; Rail Welding Equipment; Rail Grinding Vehicle; Rail-Road Vehicle; Derailing Equipment; Ballast and Sleepers Laying Equipment, etc.] Signaling and Communication Works, Depot 3.rd Power Supply, Rail Switches, Rail tracks, Drainage Systems Other Works: Material Management, Procurement, Management, Maintenance Management, Project Management, Preparation of bid document, Public Transport Organizational Development, Workforce Planning, Vendor Management, Team Building, Rolling Stock Management, Infrastructure Management Language: English (B2+), German (Beginner), Turkish (Native), Hindi (Beginner) Driving License: B -1994 Turkey Courses: Rites Ltd. –Gurgaon-India Management Training September 2005 Ankaray Consortium Training November 1995-Agust 1996 Advanced Railway Tech. Training Otis, Schindler and Krupp-Thyysen, Kone Escalator, Elevator Training Fire Extinguisher Systems, Aerosol Fire Extinguisher Systems (Rome-Italy) Address: Home: Gop. Mah. Unsal. Sok. 2/8, Sincan-Ankara-Turkey Phone: + 90 312 2734208 (Home) Mobile : + 90 542 4217548 Office: +90 312 224 1170-71 ext.1265-1226 E-mail: adnanmtb@hotmail.com Reference: ALGAN SAYGI STFA Construction Group Project Controls + Technical Office Manager STFA Construction Group - FERNAS - KALYON JV, STFA Construction Group E-mail: algansaygi@windowslive.com ILGAZ CANDEMİR Railway / Urban Rail / Director de Projet -ALGERIA YUKSEL PROJE INTERNATIONAL A.S. E-mail: ilgazcandemir@hotmail.com