SlideShare a Scribd company logo
Profile & Objective:
I am a strong team player/builder and facilitator fosters atmosphere to complete the task in
challenging environment Proactive and result oriented with proven ability to manage multiple
assignments efficiently while meeting tight deadline schedules.
Work Field:
Electrical Construction Engineer, Technical office field, Instrumentation Engineer
Personal Information: Education:
Name Abu Alazaim Maghraby Genidy Bachelor of Engineer Helwan University, may, 2013
Address Egypt –Elwasta, Banisuif Department Electrical Power and Machines Department
Date of Birth 05 May 1991 Grade Good
Nationality Egyptian Graduation Project “Electrical distribution for (Health Care City)
Religion Muslim Graduation year Very good.
Military Service Done with excellent grade. Project Grade Excellent
Marital status Married. Language Skills:
Mobile 01277472466, 01091113532 Arabic Mother Tongue
E-Mail aboalazaimm@gmail.com English R & W Very Good
Driving license Egypt
Courses And Training
Electrical
Courses
And Training
1st
course, automatic control from Schneider electric.
From 29th
June to 3rd
July, 2012
2nd
course, plc control from Schneider electric.
From 5th
July to 9rd
July, 2012 (Zelio Soft, Unity Pro)
3rd
course, Scada from Schneider electric.
From 11St
July to 19th
July, 2012 (Citect soft)
4th
course, AutoCAD 2d from Cairo University's Faculty of Engineering.
5th
course, Power system distribution at the Engineers Syndicate.
From Sep. 2012 to May. 2013
• Electrical installation and design.
• Light current and telephone system.
• Shop drawing & AS built Drawing.
• Revit Software Distribution Systems.
• Firing systems installation and design.
• Sound system and paging system installation and design.
6th
Advanced H2S training from MAERSK at Jan. 2018.
7th
course, intel®learn program at July 2005
8th
course, ICDL at 22/03/2010 Word - Excel - Power Point- Access.
9th
Trained at Egyptian Iron & steel company, August 2011.
• Electrical power sector, Motors and generators, Welding and cutting sector,
Low voltage switches gear and circuit breaker maintenance.
AbuAlazaimMaghrabyGenidyRashid
Electrical Power Engineer
aboalazaimm@gmail.com , +201277472466, +201091113532
Work Experience
1th
Technical office Engineer at Five builders from April 2016 till October 2017
• Beni Suef combined cycle power plant 4800MW
a. Balance of plant scope, Gas station scope, Water treatment scope.
b. Module 10, two units gas turbine, two units HRSG, Unit steam turbine.
• Responsibilities
A. Race way
➢ Cable tray BOQ, controlled material, controlled progress in site, RFP, RFI
in main and secondary raceway, follow installed material in site.
B. Cables
➢ Cable pulling cards, controlled material, Controlled progress in site
➢Create drum schedule, follow Drums status, wiring diagram, SLD.
C. Electrical Equipment
➢Transformers, generators, electrical motors, Junction box, Panels and
SWGR Fixation and earthing.
D. Field Instruments
➢Study P&ID and hook up, piping isometric for all instruments.
E. Fire alarm
➢fittings and cables Pulling and termination, Water and CO2 systems.
F. INVOICES
➢Prepare invoices for each scope, Follow invoices until approval.
G. General responsibilities
➢Earthing system for all mentioned above works.
➢Material Submittals Offer martial compatible with project specs.
➢Send daily, weekly progress sheet.
➢As built and red line drawings.
2nd
Field Engineer at Carlo Gavazzi Egypt from October 2017 till April 2018
• ZOHR development field Project (Oil & Gas )
A. Substation 400 and its related area.
B. Substation 200 and its related area.
C. 33 KV, 6.6 KV Cable Pulling and Termination.
• Responsibilities
A. Electrical, Lighting, Fire& Gas, instrumentation, Earthing Systems
➢ Preparing all MIR related to all systems
➢ Cable tray-controlled material, progress main and sec. raceway.
➢ Design all secondary (as built) raceway drawing.
➢ Cable pulling, termination-controlled progress in site.
➢ Follow Installed equipment’s (junction box, luminaires, instruments, fire
& gas, panels, sockets …)
➢ Follow Earthing installed in site
➢ Follow all Vendor Skid drawing and martial package.
B. 33KV, 6.6KV Medium voltage cables
➢ Follow all activities (cable pulling, cable termination, splice joints,
megger and HIPOT tests)
➢ Follow all modification and doing as built for any additional activities.
BeniSuefcombinedcyclepowerplant
4800MW
Main contractor
Owner
Consultant
Main Contractor
3rd
Electrical Supervisor at TSK Electrónica Y Electricidad from May 2018 till now
• 4 Photovoltaic Power Plants Benban Solar Park (1.8GW), Aswan.
A. AEES1, ATEN, DELTA and HORUS Each 50MW Photovoltaic Power Plant.
• Responsibilities
A. Review all electrical drawings, BOQ to Ensure implementation with high quality
B. Plan and prepare work and equipment usage schedules.
C. Train and inform workers about new work procedures.
D. Follow All Subcontractors Activities in Site:
➢ Trenches Excavation, layers back filling.
➢ Cable pulling, DC, AC, FO, COM, Medium Voltage, Earthing Cables and Conduits.
➢ Cables termination.
➢ String connections, piercing connectors.
➢ Electrical Installation DC Switch boxes, MV Skids and inverters Unloading.
➢ Cables testing (continuity, megger, OTDR and VLF test).
➢ Equipment devices testing (controller, switch boxes, inverters and MVSWGR).
➢ CCTV system function test and configuration.
➢ Firefighting mechanical and electrical “installation, testing and commissioning”
E. Material control Installed or Remain in site actual and Daily sheets.
F. Follow daily and weekly progress sheet.
G. Follow commissioning team on cold and hot commissioning.
I hope that my C.V fulfills your requirements.
Eng: Abu Alazaim maghraby Genidy Rashid
Computer Skills:
Distribution
Systems
Design programs (dialux) ,
ETAP Software Distribution Systems,
Autodesk
Program's
Electrical AutoCAD 2D.
Revit Software
Navisworks Software
plc Plc with Zelio Soft and Unity Pro soft.
Scada Scada with Citect soft.
Programming Visual Basic, Mat lab.
Video Using adobe after effects and Corel video studio.
ICDL Office (Word - Excel - Power Point- Access), Searching Skills.
Windows Windows 10.

More Related Content

What's hot

Engr Adnan C.V
Engr Adnan C.VEngr Adnan C.V
Engr Adnan C.V
Engr Adnan Khan
 
cv umar
cv umarcv umar
cv umar
Shahid Umar
 
Elvis Resume 1
Elvis Resume 1Elvis Resume 1
Elvis Resume 1
Elvis Kibiwott
 
cv
cvcv
MES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationMES Case Study - Carlton Park Substation
MES Case Study - Carlton Park Substation
Steve Sadler
 
dharmapandian
dharmapandiandharmapandian
dharmapandian
dharmadurai pandian
 
SAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERALSAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERAL
darren sahlen
 
CEL CV
CEL CVCEL CV
CEL CV
Mazhar Iqbal
 
Hussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBERHussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBER
Hussein El Wakil
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
PETER MAIDENS
 
CV_Hamdy Ismail 2016 -9
CV_Hamdy Ismail 2016 -9CV_Hamdy Ismail 2016 -9
CV_Hamdy Ismail 2016 -9
Hamdy Ismail
 
Derek Smith CV. 02.09.16
Derek Smith CV. 02.09.16Derek Smith CV. 02.09.16
Derek Smith CV. 02.09.16
Derek Smith
 
TOSH
TOSHTOSH
Kazunda Simon CV1
Kazunda Simon CV1Kazunda Simon CV1
Kazunda Simon CV1
Simon Kazunda
 
CV JC
CV JCCV JC
Coenie curriculum vitae2
Coenie curriculum vitae2Coenie curriculum vitae2
Coenie curriculum vitae2
Coenie Bakkes
 
Anthony Hansungule Jempa ed
Anthony Hansungule Jempa edAnthony Hansungule Jempa ed
Anthony Hansungule Jempa ed
anthony hansungule jempa
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
Holland Kendall
 
anindya maity-cv
anindya maity-cvanindya maity-cv
anindya maity-cv
anindya maity
 
RESUME - Daryl Conn
RESUME - Daryl ConnRESUME - Daryl Conn
RESUME - Daryl Conn
Daryl Conn
 

What's hot (20)

Engr Adnan C.V
Engr Adnan C.VEngr Adnan C.V
Engr Adnan C.V
 
cv umar
cv umarcv umar
cv umar
 
Elvis Resume 1
Elvis Resume 1Elvis Resume 1
Elvis Resume 1
 
cv
cvcv
cv
 
MES Case Study - Carlton Park Substation
MES Case Study - Carlton Park SubstationMES Case Study - Carlton Park Substation
MES Case Study - Carlton Park Substation
 
dharmapandian
dharmapandiandharmapandian
dharmapandian
 
SAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERALSAHLEN, DARREN - ELECTRICAL GENERAL
SAHLEN, DARREN - ELECTRICAL GENERAL
 
CEL CV
CEL CVCEL CV
CEL CV
 
Hussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBERHussein CV 2016 OCTOBER
Hussein CV 2016 OCTOBER
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
CV_Hamdy Ismail 2016 -9
CV_Hamdy Ismail 2016 -9CV_Hamdy Ismail 2016 -9
CV_Hamdy Ismail 2016 -9
 
Derek Smith CV. 02.09.16
Derek Smith CV. 02.09.16Derek Smith CV. 02.09.16
Derek Smith CV. 02.09.16
 
TOSH
TOSHTOSH
TOSH
 
Kazunda Simon CV1
Kazunda Simon CV1Kazunda Simon CV1
Kazunda Simon CV1
 
CV JC
CV JCCV JC
CV JC
 
Coenie curriculum vitae2
Coenie curriculum vitae2Coenie curriculum vitae2
Coenie curriculum vitae2
 
Anthony Hansungule Jempa ed
Anthony Hansungule Jempa edAnthony Hansungule Jempa ed
Anthony Hansungule Jempa ed
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
 
anindya maity-cv
anindya maity-cvanindya maity-cv
anindya maity-cv
 
RESUME - Daryl Conn
RESUME - Daryl ConnRESUME - Daryl Conn
RESUME - Daryl Conn
 

Similar to Aboalazaim s cv f-2-1-2020

amr cv
amr cvamr cv
amr cv
Amro Zaky
 
Eng. Ahmed Maher - Electrical Engineer
Eng. Ahmed Maher - Electrical EngineerEng. Ahmed Maher - Electrical Engineer
Eng. Ahmed Maher - Electrical Engineer
Ahmed Maher
 
CURRICULUM__VITAE_NOEL27_08_15
CURRICULUM__VITAE_NOEL27_08_15CURRICULUM__VITAE_NOEL27_08_15
CURRICULUM__VITAE_NOEL27_08_15
Noel Owens
 
Basem CV new
Basem CV newBasem CV new
Basem CV new
basem mohsen
 
F Bryce CV
F Bryce CVF Bryce CV
F Bryce CV
Freddy Bryce
 
Mohammed Gad
Mohammed Gad Mohammed Gad
Mohammed Gad
Mohamed Gad
 
ansary-cv
ansary-cvansary-cv
ansary-cv
mohammed ansary
 
Peter a.a
Peter a.aPeter a.a
Peter a.a
Peter Andraws
 
RESUME ed3
RESUME ed3RESUME ed3
RESUME ed3
edeilo cordovez
 
RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)
roncan1
 
Eng Kamran zfp
Eng Kamran zfpEng Kamran zfp
Eng Kamran zfp
Kamran Ashraf
 
RATHEESH - CV - 19-08-2015
RATHEESH  - CV - 19-08-2015RATHEESH  - CV - 19-08-2015
RATHEESH - CV - 19-08-2015
RATHEESH VALLOLIMADAM
 
Asad Ali Shah cv
Asad Ali Shah cvAsad Ali Shah cv
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
sekar palani
 
Sadik_CV
Sadik_CVSadik_CV
Sadik_CV
Sadik Gour
 
ASIF RESUME 00
ASIF RESUME 00ASIF RESUME 00
ASIF RESUME 00
ASIF USMAN
 
Engr Qamar R
Engr Qamar REngr Qamar R
Engr Qamar R
Qamar Khan
 
Eng Hisham CV
Eng Hisham CVEng Hisham CV
Eng Hisham CV
Hesham Okasheh
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
jesegbue
 
Eng omar
Eng omarEng omar
Eng omar
Omar EL Safy
 

Similar to Aboalazaim s cv f-2-1-2020 (20)

amr cv
amr cvamr cv
amr cv
 
Eng. Ahmed Maher - Electrical Engineer
Eng. Ahmed Maher - Electrical EngineerEng. Ahmed Maher - Electrical Engineer
Eng. Ahmed Maher - Electrical Engineer
 
CURRICULUM__VITAE_NOEL27_08_15
CURRICULUM__VITAE_NOEL27_08_15CURRICULUM__VITAE_NOEL27_08_15
CURRICULUM__VITAE_NOEL27_08_15
 
Basem CV new
Basem CV newBasem CV new
Basem CV new
 
F Bryce CV
F Bryce CVF Bryce CV
F Bryce CV
 
Mohammed Gad
Mohammed Gad Mohammed Gad
Mohammed Gad
 
ansary-cv
ansary-cvansary-cv
ansary-cv
 
Peter a.a
Peter a.aPeter a.a
Peter a.a
 
RESUME ed3
RESUME ed3RESUME ed3
RESUME ed3
 
RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)RONCAN NEW CV FROM CURRENT TO OLD(1)
RONCAN NEW CV FROM CURRENT TO OLD(1)
 
Eng Kamran zfp
Eng Kamran zfpEng Kamran zfp
Eng Kamran zfp
 
RATHEESH - CV - 19-08-2015
RATHEESH  - CV - 19-08-2015RATHEESH  - CV - 19-08-2015
RATHEESH - CV - 19-08-2015
 
Asad Ali Shah cv
Asad Ali Shah cvAsad Ali Shah cv
Asad Ali Shah cv
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
Sadik_CV
Sadik_CVSadik_CV
Sadik_CV
 
ASIF RESUME 00
ASIF RESUME 00ASIF RESUME 00
ASIF RESUME 00
 
Engr Qamar R
Engr Qamar REngr Qamar R
Engr Qamar R
 
Eng Hisham CV
Eng Hisham CVEng Hisham CV
Eng Hisham CV
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
 
Eng omar
Eng omarEng omar
Eng omar
 

Recently uploaded

132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
enizeyimana36
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
abbyasa1014
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
Rahul
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 

Recently uploaded (20)

132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball playEric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
Eric Nizeyimana's document 2006 from gicumbi to ttc nyamata handball play
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Engineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdfEngineering Drawings Lecture Detail Drawings 2014.pdf
Engineering Drawings Lecture Detail Drawings 2014.pdf
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024ACEP Magazine edition 4th launched on 05.06.2024
ACEP Magazine edition 4th launched on 05.06.2024
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 

Aboalazaim s cv f-2-1-2020

  • 1. Profile & Objective: I am a strong team player/builder and facilitator fosters atmosphere to complete the task in challenging environment Proactive and result oriented with proven ability to manage multiple assignments efficiently while meeting tight deadline schedules. Work Field: Electrical Construction Engineer, Technical office field, Instrumentation Engineer Personal Information: Education: Name Abu Alazaim Maghraby Genidy Bachelor of Engineer Helwan University, may, 2013 Address Egypt –Elwasta, Banisuif Department Electrical Power and Machines Department Date of Birth 05 May 1991 Grade Good Nationality Egyptian Graduation Project “Electrical distribution for (Health Care City) Religion Muslim Graduation year Very good. Military Service Done with excellent grade. Project Grade Excellent Marital status Married. Language Skills: Mobile 01277472466, 01091113532 Arabic Mother Tongue E-Mail aboalazaimm@gmail.com English R & W Very Good Driving license Egypt Courses And Training Electrical Courses And Training 1st course, automatic control from Schneider electric. From 29th June to 3rd July, 2012 2nd course, plc control from Schneider electric. From 5th July to 9rd July, 2012 (Zelio Soft, Unity Pro) 3rd course, Scada from Schneider electric. From 11St July to 19th July, 2012 (Citect soft) 4th course, AutoCAD 2d from Cairo University's Faculty of Engineering. 5th course, Power system distribution at the Engineers Syndicate. From Sep. 2012 to May. 2013 • Electrical installation and design. • Light current and telephone system. • Shop drawing & AS built Drawing. • Revit Software Distribution Systems. • Firing systems installation and design. • Sound system and paging system installation and design. 6th Advanced H2S training from MAERSK at Jan. 2018. 7th course, intel®learn program at July 2005 8th course, ICDL at 22/03/2010 Word - Excel - Power Point- Access. 9th Trained at Egyptian Iron & steel company, August 2011. • Electrical power sector, Motors and generators, Welding and cutting sector, Low voltage switches gear and circuit breaker maintenance. AbuAlazaimMaghrabyGenidyRashid Electrical Power Engineer aboalazaimm@gmail.com , +201277472466, +201091113532
  • 2. Work Experience 1th Technical office Engineer at Five builders from April 2016 till October 2017 • Beni Suef combined cycle power plant 4800MW a. Balance of plant scope, Gas station scope, Water treatment scope. b. Module 10, two units gas turbine, two units HRSG, Unit steam turbine. • Responsibilities A. Race way ➢ Cable tray BOQ, controlled material, controlled progress in site, RFP, RFI in main and secondary raceway, follow installed material in site. B. Cables ➢ Cable pulling cards, controlled material, Controlled progress in site ➢Create drum schedule, follow Drums status, wiring diagram, SLD. C. Electrical Equipment ➢Transformers, generators, electrical motors, Junction box, Panels and SWGR Fixation and earthing. D. Field Instruments ➢Study P&ID and hook up, piping isometric for all instruments. E. Fire alarm ➢fittings and cables Pulling and termination, Water and CO2 systems. F. INVOICES ➢Prepare invoices for each scope, Follow invoices until approval. G. General responsibilities ➢Earthing system for all mentioned above works. ➢Material Submittals Offer martial compatible with project specs. ➢Send daily, weekly progress sheet. ➢As built and red line drawings. 2nd Field Engineer at Carlo Gavazzi Egypt from October 2017 till April 2018 • ZOHR development field Project (Oil & Gas ) A. Substation 400 and its related area. B. Substation 200 and its related area. C. 33 KV, 6.6 KV Cable Pulling and Termination. • Responsibilities A. Electrical, Lighting, Fire& Gas, instrumentation, Earthing Systems ➢ Preparing all MIR related to all systems ➢ Cable tray-controlled material, progress main and sec. raceway. ➢ Design all secondary (as built) raceway drawing. ➢ Cable pulling, termination-controlled progress in site. ➢ Follow Installed equipment’s (junction box, luminaires, instruments, fire & gas, panels, sockets …) ➢ Follow Earthing installed in site ➢ Follow all Vendor Skid drawing and martial package. B. 33KV, 6.6KV Medium voltage cables ➢ Follow all activities (cable pulling, cable termination, splice joints, megger and HIPOT tests) ➢ Follow all modification and doing as built for any additional activities. BeniSuefcombinedcyclepowerplant 4800MW Main contractor
  • 3. Owner Consultant Main Contractor 3rd Electrical Supervisor at TSK Electrónica Y Electricidad from May 2018 till now • 4 Photovoltaic Power Plants Benban Solar Park (1.8GW), Aswan. A. AEES1, ATEN, DELTA and HORUS Each 50MW Photovoltaic Power Plant. • Responsibilities A. Review all electrical drawings, BOQ to Ensure implementation with high quality B. Plan and prepare work and equipment usage schedules. C. Train and inform workers about new work procedures. D. Follow All Subcontractors Activities in Site: ➢ Trenches Excavation, layers back filling. ➢ Cable pulling, DC, AC, FO, COM, Medium Voltage, Earthing Cables and Conduits. ➢ Cables termination. ➢ String connections, piercing connectors. ➢ Electrical Installation DC Switch boxes, MV Skids and inverters Unloading. ➢ Cables testing (continuity, megger, OTDR and VLF test). ➢ Equipment devices testing (controller, switch boxes, inverters and MVSWGR). ➢ CCTV system function test and configuration. ➢ Firefighting mechanical and electrical “installation, testing and commissioning” E. Material control Installed or Remain in site actual and Daily sheets. F. Follow daily and weekly progress sheet. G. Follow commissioning team on cold and hot commissioning. I hope that my C.V fulfills your requirements. Eng: Abu Alazaim maghraby Genidy Rashid Computer Skills: Distribution Systems Design programs (dialux) , ETAP Software Distribution Systems, Autodesk Program's Electrical AutoCAD 2D. Revit Software Navisworks Software plc Plc with Zelio Soft and Unity Pro soft. Scada Scada with Citect soft. Programming Visual Basic, Mat lab. Video Using adobe after effects and Corel video studio. ICDL Office (Word - Excel - Power Point- Access), Searching Skills. Windows Windows 10.