Summary
>7 years of Mechanical Experience on ship repairs, commissioning and testing of marine engines,
auxiliary machineries, propeller and rudder, pumps and pumping systems and other
equipment’s
> Sound knowledge of commissioning on steam boilers, purifiers, and wide variety of other
machineries
> poses extensive knowledge on
> Expertise on troubleshooting on main engines, aux engines, pumps and pumping systems,
firefighting systems, Air conditioning, compressors and condenser’s, boilers and centrifuges
> Commissioning and operation of all equipment on board after installation
 Familiar with calibrations on marine related equipment’s
 Ability to learn and adapt to new technologies, good team player in dynamic work group
environments.
 Self-motivated to work independently with excellent communication skills.
 Strong teamcollaboration skills. Work closely with team members to achieve engineering
goals.
 Ensuring application of safety and environment clauses while working on board
 Played a major role on engine room conversions on design and ethical aspects
 Responding efficiently and skillfully to any breakdown or corrective maintenance requirement
on the mechanical equipment.
Qualification Summary
B.TechMechanical engineering (pursuing thru correspondence) from (2014 – present) from IME
institute of mechanical engineer, Mumbai
Diploma in Marine engineering from (2006 - 2009), 80% from Mohamed sathak engineering college-
kelakarai
(10th & 12th) –from (2005 – 2006), 62% from Chidhambaram Matric.Higher Sec.Shool
,Ponnamaravathy
Certifications :
 Stcw 95
 Ms office automation / mid level/
 Basic welding practice /mid level/
 National service scheme (NSS)
 National cadet crops (NCC)
ABDULAZEEZ.ABDULLAH
PRESENT ADDRESS: NO.3322.INTER OCEAN SHIP REPAIR.LLC, DUBAI
MARITIME CITY, DUBAI.
Mobile : +971-565248677,E-mail : azeemeen@gmail.com a
Work Experience
Company: InterOcean Ship Repair LLC Dubai /Mar 2016 – present/
Designation: Ship Repair Engineer(Mechanical)
Role : > In charge of ship repairs and maintenance on ships main engine ,auxiliary engines,
turbochargers, pumps and pumping system ,coolers ,condenser’s ,boilers, sewage treatment
plants, fresh water treatment plants, fuel treatment plants, propeller, shafting, steering gear
system and rudder, crane, windlass and mooring winch.
 Had driven a team of 30 members to achieve the daily targetsefficiently and on time
 Attending meetings related to project planning and delivery, safety and priority
 Plan To identify the original scope and additional scope from clients
 Prepares schedule of mechanical works scope
 Commissioning and operation of all equipment on board after installation
 Possess extensive knowledge on Main Engines, generators engines and auxiliary machinery like
heat exchangers, compressed air, pumps, propeller, shaft, rudder, steering gear, bow thruster,
valves, hydraulic & pneumatic system testing and overhauling
 Keel coolers, oil coolers & heat ex-changer, tubes testing cleaning, headers, relief valves
adjustments, piping and fuel emergency stops. Sea chest and overboard valves testing/repair.
 Prime movers for auxiliary machinery oil purification plants testing and adjustments. Packing, oil
and seal inspection and replacement.
 Gear boxes condition monitoring, engines alignment checks using conventional and modern
equipment like laser checks.
Company : L&T SHIPBUILDING , KATTUPALLI, CHENNAI. /Jun 2015 – Mar 2016/
Designation : SeniorEngineer( Mechanical)
Role : > In charge of repairs and maintenance on ships main engine, pumps and pumping systems, air
conditioning, centrifuges, separators, etc. on INS jyoti (Indian naval vessel)
 Driven a team size of 20 members to achieve the day to day targets on time
 Reporting to Mechanical Manager & Project Manager
 Attending daily meetings related to project planning and delivery, safety and priority
 Prepares/ plan schedule of mechanical works scope.
 Ensuring application of safety and environment clauses while working on board
 Commissioning of HVAC systems , purifiers , pumps and pumping system , boilers on board oil
tankers
 Project planning and control
 Liaised with vendors on various machinery to complete the commissioning effectively as per
owners demand
 Posses extensive knowledge on main engine and turbocharger overhauling
 Organize cost effective production using skilled qualified manpower
Company: NAKILAT-KEPPEL OFFSHORE MARINE LTD, QATAR /Mar 2012 –Jun 2015/
Designation: Asst. Engineer(Mechanical)
Role : > in full charge of repairs and maintenance on oil tankers, LNG / LPG vessels, General cargo
vessels, Container vessels, Supply vessels, Tug boats and offshore oil rigs engine room
 Had driven a team of 40 members to achieve the daily targetsefficiently and on time
 Reporting to Mechanical Manager & Project Manager
 Attending meetings related to project planning and delivery, safety and priority
 Had proven achieving complicated projects with less man hours
 Assisted in fabrication of critical spares and tools
 Poses extensive knowledge on engineering drawings interpretation
 Played an smart and active team lead delivering projects to the owners scope
 Assisted vendors on steam turbine overhauling and maintenance
 Possess extensive knowledge on Main Engines, generators engines and auxiliary machinery like
compressed air, pumps, valves, hydraulic & pneumatic system testing and overhauling
 To implement planned maintenance management for the Yard equipment’s
 Ensuring application of safety and environment clauses while working on board
Company : SEAGULL MARINE SERVICES IN CHENNAI /May 2011 – Oct 2011/
Designation : Fifth Engineer
Role : > Assisted second engineers on watch keeping on main engines, aux engines , steam boilers on
board vessel sailing world wide
 Engine room watchkeeping assisting with second engineer or third engineer daily routine checks
 Entering parameters of diesel engine and main engine with respective log books
 Entering of oil record books, tank measurement book under the supervision of chief engineer
 Starting knowledge of emergency system such as emergency generator,Co2 system and
firefighting equipment’s
 Assisted with engineer to routine maintenance work
 Tracing of all pipe lines in the engine room from fuel lines to bilge lines
 Draining of air bottles
 Startup of pumps, blowers
 Dry washing of turbocharger
Company : STAURTS POWER HANDS CHENNAI /Mar 2012 – Jun 2015/
Designation : Mechanical Technician (juniorlevel)
Role : Assisted Engineers on repairs of boats, supply vessel including main engines, aux engines,
pumps , heat exchangers, purifiers ,compressors , boilers, valves and other related equipment’s
on board
 Had driven a team of 10 members to achieve the daily targetsefficiently and on time
 Reporting to Mechanical Manager & Project engineer
 Main Engines, generators engines and auxiliary machinery like HVAC system, compressed air,
pumps, propeller, shaft, rudder, steering gear, bow thruster, valves, hydraulic & pneumatic
system testing and overhauling
 Keel coolers, oil coolers & heat ex-changer, tubes testing cleaning, headers, relief valves
adjustments, piping and fuel emergency stops. Sea chest and overboard valves testing/repair.
 Ensuring application of safety and environment clauses while working on board
Personal profile :
Name : AbdulAzeez.A
Father’s Name : Abdullah.M
Sex : Male
Marital Status : Married
Nationality : Indian
LanguageKnown : English, Hindi & Tamil
Passport Number : G3273954
Date of Issue : 26.06.2007
Passport Validity : 25.07.2017
Permanent : Old.no.146/B,New.no.137,Kesarapatti
Address : Pudukkottai [Dt]-622 411.
Place:
Date: ABDULAZEEZ.A

ABDULAZEE1

  • 1.
    Summary >7 years ofMechanical Experience on ship repairs, commissioning and testing of marine engines, auxiliary machineries, propeller and rudder, pumps and pumping systems and other equipment’s > Sound knowledge of commissioning on steam boilers, purifiers, and wide variety of other machineries > poses extensive knowledge on > Expertise on troubleshooting on main engines, aux engines, pumps and pumping systems, firefighting systems, Air conditioning, compressors and condenser’s, boilers and centrifuges > Commissioning and operation of all equipment on board after installation  Familiar with calibrations on marine related equipment’s  Ability to learn and adapt to new technologies, good team player in dynamic work group environments.  Self-motivated to work independently with excellent communication skills.  Strong teamcollaboration skills. Work closely with team members to achieve engineering goals.  Ensuring application of safety and environment clauses while working on board  Played a major role on engine room conversions on design and ethical aspects  Responding efficiently and skillfully to any breakdown or corrective maintenance requirement on the mechanical equipment. Qualification Summary B.TechMechanical engineering (pursuing thru correspondence) from (2014 – present) from IME institute of mechanical engineer, Mumbai Diploma in Marine engineering from (2006 - 2009), 80% from Mohamed sathak engineering college- kelakarai (10th & 12th) –from (2005 – 2006), 62% from Chidhambaram Matric.Higher Sec.Shool ,Ponnamaravathy Certifications :  Stcw 95  Ms office automation / mid level/  Basic welding practice /mid level/  National service scheme (NSS)  National cadet crops (NCC) ABDULAZEEZ.ABDULLAH PRESENT ADDRESS: NO.3322.INTER OCEAN SHIP REPAIR.LLC, DUBAI MARITIME CITY, DUBAI. Mobile : +971-565248677,E-mail : azeemeen@gmail.com a
  • 2.
    Work Experience Company: InterOceanShip Repair LLC Dubai /Mar 2016 – present/ Designation: Ship Repair Engineer(Mechanical) Role : > In charge of ship repairs and maintenance on ships main engine ,auxiliary engines, turbochargers, pumps and pumping system ,coolers ,condenser’s ,boilers, sewage treatment plants, fresh water treatment plants, fuel treatment plants, propeller, shafting, steering gear system and rudder, crane, windlass and mooring winch.  Had driven a team of 30 members to achieve the daily targetsefficiently and on time  Attending meetings related to project planning and delivery, safety and priority  Plan To identify the original scope and additional scope from clients  Prepares schedule of mechanical works scope  Commissioning and operation of all equipment on board after installation  Possess extensive knowledge on Main Engines, generators engines and auxiliary machinery like heat exchangers, compressed air, pumps, propeller, shaft, rudder, steering gear, bow thruster, valves, hydraulic & pneumatic system testing and overhauling  Keel coolers, oil coolers & heat ex-changer, tubes testing cleaning, headers, relief valves adjustments, piping and fuel emergency stops. Sea chest and overboard valves testing/repair.  Prime movers for auxiliary machinery oil purification plants testing and adjustments. Packing, oil and seal inspection and replacement.  Gear boxes condition monitoring, engines alignment checks using conventional and modern equipment like laser checks. Company : L&T SHIPBUILDING , KATTUPALLI, CHENNAI. /Jun 2015 – Mar 2016/ Designation : SeniorEngineer( Mechanical) Role : > In charge of repairs and maintenance on ships main engine, pumps and pumping systems, air conditioning, centrifuges, separators, etc. on INS jyoti (Indian naval vessel)  Driven a team size of 20 members to achieve the day to day targets on time  Reporting to Mechanical Manager & Project Manager  Attending daily meetings related to project planning and delivery, safety and priority  Prepares/ plan schedule of mechanical works scope.  Ensuring application of safety and environment clauses while working on board  Commissioning of HVAC systems , purifiers , pumps and pumping system , boilers on board oil tankers  Project planning and control  Liaised with vendors on various machinery to complete the commissioning effectively as per owners demand  Posses extensive knowledge on main engine and turbocharger overhauling  Organize cost effective production using skilled qualified manpower
  • 3.
    Company: NAKILAT-KEPPEL OFFSHOREMARINE LTD, QATAR /Mar 2012 –Jun 2015/ Designation: Asst. Engineer(Mechanical) Role : > in full charge of repairs and maintenance on oil tankers, LNG / LPG vessels, General cargo vessels, Container vessels, Supply vessels, Tug boats and offshore oil rigs engine room  Had driven a team of 40 members to achieve the daily targetsefficiently and on time  Reporting to Mechanical Manager & Project Manager  Attending meetings related to project planning and delivery, safety and priority  Had proven achieving complicated projects with less man hours  Assisted in fabrication of critical spares and tools  Poses extensive knowledge on engineering drawings interpretation  Played an smart and active team lead delivering projects to the owners scope  Assisted vendors on steam turbine overhauling and maintenance  Possess extensive knowledge on Main Engines, generators engines and auxiliary machinery like compressed air, pumps, valves, hydraulic & pneumatic system testing and overhauling  To implement planned maintenance management for the Yard equipment’s  Ensuring application of safety and environment clauses while working on board Company : SEAGULL MARINE SERVICES IN CHENNAI /May 2011 – Oct 2011/ Designation : Fifth Engineer Role : > Assisted second engineers on watch keeping on main engines, aux engines , steam boilers on board vessel sailing world wide  Engine room watchkeeping assisting with second engineer or third engineer daily routine checks  Entering parameters of diesel engine and main engine with respective log books  Entering of oil record books, tank measurement book under the supervision of chief engineer  Starting knowledge of emergency system such as emergency generator,Co2 system and firefighting equipment’s  Assisted with engineer to routine maintenance work  Tracing of all pipe lines in the engine room from fuel lines to bilge lines  Draining of air bottles  Startup of pumps, blowers  Dry washing of turbocharger Company : STAURTS POWER HANDS CHENNAI /Mar 2012 – Jun 2015/ Designation : Mechanical Technician (juniorlevel) Role : Assisted Engineers on repairs of boats, supply vessel including main engines, aux engines, pumps , heat exchangers, purifiers ,compressors , boilers, valves and other related equipment’s on board  Had driven a team of 10 members to achieve the daily targetsefficiently and on time  Reporting to Mechanical Manager & Project engineer
  • 4.
     Main Engines,generators engines and auxiliary machinery like HVAC system, compressed air, pumps, propeller, shaft, rudder, steering gear, bow thruster, valves, hydraulic & pneumatic system testing and overhauling  Keel coolers, oil coolers & heat ex-changer, tubes testing cleaning, headers, relief valves adjustments, piping and fuel emergency stops. Sea chest and overboard valves testing/repair.  Ensuring application of safety and environment clauses while working on board Personal profile : Name : AbdulAzeez.A Father’s Name : Abdullah.M Sex : Male Marital Status : Married Nationality : Indian LanguageKnown : English, Hindi & Tamil Passport Number : G3273954 Date of Issue : 26.06.2007 Passport Validity : 25.07.2017 Permanent : Old.no.146/B,New.no.137,Kesarapatti Address : Pudukkottai [Dt]-622 411. Place: Date: ABDULAZEEZ.A