"The name on the door can't produce one set of plans, it's the professionals inside that make the difference in every project."
Reynolds-Clark Development, Inc. Founded in 2004 6 Employees 3 Licensed P.E.’s Licensed in VA & NC Location - Main Street Gretna Over 100 Clients Over 500 Specific Projects Completed  WBE & Small Business
Reynolds-Clark Development, Inc. Municipal Engineering Water / Sewer / Gas Line Design Trail Design Solid Waste Facility Design Project Management In-House Project Management Construction Project Management Subdivision Management Land Development Industrial Park Design Road Design Site Plans Subdivision Layout Environmental Wetland Delineation Stream Assessments Joint Permit Applications Mitigation Plans On-Site Sewer Design
LAND DEVELOPMENT Waterfront Development  Residential Subdivisions  Roadway Design  Stormwater Management  Erosion and Sediment Control  Commercial / Industrial Site Design Preliminary Engineering Studies  Cost Planning  Construction Management  Conventional and Alternative Drainfield Design  Marketing Assistance Falcon Ridge Heron Pointe
 
RESIDENTIAL SUBDIVISION DESIGN
MUNICIPAL ENGINEERING Waterline Design  Sanitary Sewer Design  Sanitary Sewer Pump Station Design  Sanitary Sewer Flow Monitoring  Preliminary Engineering Studies  Master Planning  Cost Estimating  Construction Management
ECONOMIC DEVELOPMENT Industrial Park Planning and Design  Adaptive Re-use of Industrial Parks  Shell Building / Virtual Building Design / Right Now Site Certifications  Site Specific / Prospect Specific Layout Exhibits  On-Site / On-Call Prospect Consultation  Construction Cost Estimating  Master Planning and Preliminary Engineering Studies  Grant Application Assistance  Comprehensive Facilities Assessments  Marketing Assistance - Multi Media Presentations, 3-D Exhibits, Web Based Marketing  Site Selections Studies Tel Vista Call Center Danville, VA
 
ENVIRONMENTAL PLANNING Wetland Delineation / Permitting  VPDES Permitting  Phase I Environmental Assessments Nationwide & Regional Permits  State Program General Permits  Individual Permits VA Water Protection General & Individual Permits
Degraded Stream Channel Wetland Delineation Map
CONSTRUCTION MANAGEMENT Competitive Bid Management  Construction Inspection  Construction Management / Pay Request Management  Erosion Control Inspections  Construction Specification Preparation
National College of Business and Technology Danville, VA
PROJECT MANAGEMENT Status Reports Scheduling/ Gantt charts Milestones Inspections On-site Management Closeout  Paving and Site Improvements: Mt. Cross Solid Waste Collection Center
Call Reynolds-Clark Development Inc. For all your civil engineering, environmental permitting, project management, and land development needs.

Reynolds Clark Development

  • 1.
  • 2.
    "The name onthe door can't produce one set of plans, it's the professionals inside that make the difference in every project."
  • 3.
    Reynolds-Clark Development, Inc.Founded in 2004 6 Employees 3 Licensed P.E.’s Licensed in VA & NC Location - Main Street Gretna Over 100 Clients Over 500 Specific Projects Completed WBE & Small Business
  • 4.
    Reynolds-Clark Development, Inc.Municipal Engineering Water / Sewer / Gas Line Design Trail Design Solid Waste Facility Design Project Management In-House Project Management Construction Project Management Subdivision Management Land Development Industrial Park Design Road Design Site Plans Subdivision Layout Environmental Wetland Delineation Stream Assessments Joint Permit Applications Mitigation Plans On-Site Sewer Design
  • 5.
    LAND DEVELOPMENT WaterfrontDevelopment Residential Subdivisions Roadway Design Stormwater Management Erosion and Sediment Control Commercial / Industrial Site Design Preliminary Engineering Studies Cost Planning Construction Management Conventional and Alternative Drainfield Design Marketing Assistance Falcon Ridge Heron Pointe
  • 6.
  • 7.
  • 8.
    MUNICIPAL ENGINEERING WaterlineDesign Sanitary Sewer Design Sanitary Sewer Pump Station Design Sanitary Sewer Flow Monitoring Preliminary Engineering Studies Master Planning Cost Estimating Construction Management
  • 9.
    ECONOMIC DEVELOPMENT IndustrialPark Planning and Design Adaptive Re-use of Industrial Parks Shell Building / Virtual Building Design / Right Now Site Certifications Site Specific / Prospect Specific Layout Exhibits On-Site / On-Call Prospect Consultation Construction Cost Estimating Master Planning and Preliminary Engineering Studies Grant Application Assistance Comprehensive Facilities Assessments Marketing Assistance - Multi Media Presentations, 3-D Exhibits, Web Based Marketing Site Selections Studies Tel Vista Call Center Danville, VA
  • 10.
  • 11.
    ENVIRONMENTAL PLANNING WetlandDelineation / Permitting VPDES Permitting Phase I Environmental Assessments Nationwide & Regional Permits State Program General Permits Individual Permits VA Water Protection General & Individual Permits
  • 12.
    Degraded Stream ChannelWetland Delineation Map
  • 13.
    CONSTRUCTION MANAGEMENT CompetitiveBid Management Construction Inspection Construction Management / Pay Request Management Erosion Control Inspections Construction Specification Preparation
  • 14.
    National College ofBusiness and Technology Danville, VA
  • 15.
    PROJECT MANAGEMENT StatusReports Scheduling/ Gantt charts Milestones Inspections On-site Management Closeout Paving and Site Improvements: Mt. Cross Solid Waste Collection Center
  • 16.
    Call Reynolds-Clark DevelopmentInc. For all your civil engineering, environmental permitting, project management, and land development needs.