CHANDRESH GUPTA
Manager – Piping Design,
Tata Steel – Kolkata
E-mail: chandresh.g@gmail.com; Phone: +91-9038001445
Seeking assignments in Piping Layout & Material with a high
growth oriented organization of repute
Key SkillKey Skill
 Good experience (7+ years) in Equipment & Piping layout for EPC Projects.
 Design calculation of pipe wall thickness, RF pad, Miter bend, Steam out condition.
 Piping layout arrangement for process unit (Water treatment plant piping, vessel piping, Pump piping, tank piping)
 Knowledge of materials (Carbon steel. Stainless steel, alloy steel and LTCS) used in process piping.
 Preparation of Piping material specification and valve material specification
 Preparation of Technical Specification for various packages.
 Receive, review and answer technical clarifications at tendering stage.
 Study and analyze bids in technical aspects, obtain clarifications and optimize all factors to establish a recommendation for
the contracts.
 Preparation of techno commercial comparative and ratings among the vendors and coordinating the same with commercial
department for order placement.
 Complete design of piping general arrangement layout, Pipe stress analysis, piping isometrics, supports details, plot plans,
equipment layout.
 Required calculations for Pipe wall thickness, maximum allowable operating pressure (MAOP) and test pressure.
 Preparing MTO requirements, pump and valve data sheets, scope of work, pipeline routing, and various piping calculations
used for process piping and pipe lines.
 Preparing and checking of equipment orientation drawings for rotary and static equipments, considering equipments spacing,
accessibility, and operation & maintenance requirements.
 Reviewing vendor drawings for various Engineering packages.
 Experienced in using programs and software including AUTOCAD, CAESAR-II, ERP, MS-PROJECT.
 Working knowledge of National and International standards and codes like ASME, API, BS, ASTM, MSS-SP and IS.
 Review all vendor documentations to assure the compliance with the design and technical requirements.
 Support to project management/procurement/construction team.
 Involved in Inter departmental coordination & query resolution.
PPROFESSIONALROFESSIONAL EEXPERIENCEXPERIENCE
TATA STEEL – Design Cell since July 2012
Designation :- Manager – Piping Design
Project Specific Experience
TATA STEEL, KPO:- Design and Detail Engineering of Piping System for Blast Furnace.
Key Responsibilities
 Piping engineering of PA, service& process water, LP steam, Nitrogen, Compressed air, Blast Furnace and Coke oven Gas, Soft
water, Oxygen and Hydraulics piping.
 Preparation of route layout of Pipelines, taking clearance from other section.
 Pipe line sizing, pipe wall thickness calculation for interplant pipelines.
 Preparation of General Arrangement Layout defining location for pipe Support (Anchor and sliding), vent, drain, U-loop,
Expansion bellow, orifice plate, U-seal, isolation valve, control valve.
 Modification in the Layout based on the result obtained after doing stress analysis to pass the system layout.
 Checking P&ID, General Arrangement Layout, Supports Details, MTO, Equipment’s location plans, Plot plans, Orientation
drawings.
 Procurement activity- Preparation of Specification, Negotiation and Order placement.
MECON LIMITED (A Govt. of India Enterprise)
June 2008 – june 2012
Designation :- Design Engineer
Project Specific Experience
NINL, DUBURI :- Complete Design and Detail Engineering for Piping Layout System
Key Responsibilities
 Isometric & GAD Checking Material as well as layout point of view
 Prepared piping material specification & valve material specification.
 Responsible for Pump House Piping, Yard Piping, In shop Piping.
 Prepared exchanger and vessel piping and set the platform elevation to access the vessel nozzle and instruments.
 Preparation of Equipment Layout of water and waste water, DMP, SWP etc.
 Pipe wall thickness calculation, pipe line sizing.
 Checking P&ID, General Arrangement Layout, Supports Details, MTO, Equipments location plans, Plot plans, Orientation
drawings.
 Review of piping material specifications, Pump and Valve data sheets.
 Review all Vendor documentations to assure the compliance with the design and technical requirements.
 Checking of Equipments orientation drawing for all types of equipments, considering equipments spacing, accessibility,
operation and maintenance requirements.
 Responsible for pipe rack study.
 Coordination with other disciplines to expedite the job.
 Continuously updated project drawings and documents to final As-built status.
EEDUCATION &DUCATION & PPROFESSIONALROFESSIONAL CCREDENTIALSREDENTIALS
PG Diploma in Project Planning and ManagementPG Diploma in Project Planning and Management
DG-tech HR, Kolkata - pursuing
PG Diploma in Piping Engineering - 2011
MIT, Pune - Attained First Division
BACHELOR OF TECHNOLOGY IN MECHANICAL ENGINEERING - 2008
NATIONAL INSTITUTE OF TECHNOLOGY, DURGAPUR – Attained First Division
COMPUTER SKILLS:COMPUTER SKILLS: AutoCAD, ERP, CAESAR - II, MS Project
AADDITIONALDDITIONAL IINFORMATIONNFORMATION
Date of Birth:Date of Birth: 225
th
Janauary’1986;; Passport Number:Passport Number: G4184986G4184986; Reference:Reference: Available on request

Chandresh_Gupta_CV piping Design_layout & material

  • 1.
    CHANDRESH GUPTA Manager –Piping Design, Tata Steel – Kolkata E-mail: chandresh.g@gmail.com; Phone: +91-9038001445 Seeking assignments in Piping Layout & Material with a high growth oriented organization of repute Key SkillKey Skill  Good experience (7+ years) in Equipment & Piping layout for EPC Projects.  Design calculation of pipe wall thickness, RF pad, Miter bend, Steam out condition.  Piping layout arrangement for process unit (Water treatment plant piping, vessel piping, Pump piping, tank piping)  Knowledge of materials (Carbon steel. Stainless steel, alloy steel and LTCS) used in process piping.  Preparation of Piping material specification and valve material specification  Preparation of Technical Specification for various packages.  Receive, review and answer technical clarifications at tendering stage.  Study and analyze bids in technical aspects, obtain clarifications and optimize all factors to establish a recommendation for the contracts.  Preparation of techno commercial comparative and ratings among the vendors and coordinating the same with commercial department for order placement.  Complete design of piping general arrangement layout, Pipe stress analysis, piping isometrics, supports details, plot plans, equipment layout.  Required calculations for Pipe wall thickness, maximum allowable operating pressure (MAOP) and test pressure.  Preparing MTO requirements, pump and valve data sheets, scope of work, pipeline routing, and various piping calculations used for process piping and pipe lines.  Preparing and checking of equipment orientation drawings for rotary and static equipments, considering equipments spacing, accessibility, and operation & maintenance requirements.  Reviewing vendor drawings for various Engineering packages.  Experienced in using programs and software including AUTOCAD, CAESAR-II, ERP, MS-PROJECT.  Working knowledge of National and International standards and codes like ASME, API, BS, ASTM, MSS-SP and IS.  Review all vendor documentations to assure the compliance with the design and technical requirements.  Support to project management/procurement/construction team.  Involved in Inter departmental coordination & query resolution. PPROFESSIONALROFESSIONAL EEXPERIENCEXPERIENCE TATA STEEL – Design Cell since July 2012 Designation :- Manager – Piping Design Project Specific Experience TATA STEEL, KPO:- Design and Detail Engineering of Piping System for Blast Furnace.
  • 2.
    Key Responsibilities  Pipingengineering of PA, service& process water, LP steam, Nitrogen, Compressed air, Blast Furnace and Coke oven Gas, Soft water, Oxygen and Hydraulics piping.  Preparation of route layout of Pipelines, taking clearance from other section.  Pipe line sizing, pipe wall thickness calculation for interplant pipelines.  Preparation of General Arrangement Layout defining location for pipe Support (Anchor and sliding), vent, drain, U-loop, Expansion bellow, orifice plate, U-seal, isolation valve, control valve.  Modification in the Layout based on the result obtained after doing stress analysis to pass the system layout.  Checking P&ID, General Arrangement Layout, Supports Details, MTO, Equipment’s location plans, Plot plans, Orientation drawings.  Procurement activity- Preparation of Specification, Negotiation and Order placement. MECON LIMITED (A Govt. of India Enterprise) June 2008 – june 2012 Designation :- Design Engineer Project Specific Experience NINL, DUBURI :- Complete Design and Detail Engineering for Piping Layout System Key Responsibilities  Isometric & GAD Checking Material as well as layout point of view  Prepared piping material specification & valve material specification.  Responsible for Pump House Piping, Yard Piping, In shop Piping.  Prepared exchanger and vessel piping and set the platform elevation to access the vessel nozzle and instruments.  Preparation of Equipment Layout of water and waste water, DMP, SWP etc.  Pipe wall thickness calculation, pipe line sizing.  Checking P&ID, General Arrangement Layout, Supports Details, MTO, Equipments location plans, Plot plans, Orientation drawings.  Review of piping material specifications, Pump and Valve data sheets.  Review all Vendor documentations to assure the compliance with the design and technical requirements.  Checking of Equipments orientation drawing for all types of equipments, considering equipments spacing, accessibility, operation and maintenance requirements.  Responsible for pipe rack study.  Coordination with other disciplines to expedite the job.  Continuously updated project drawings and documents to final As-built status. EEDUCATION &DUCATION & PPROFESSIONALROFESSIONAL CCREDENTIALSREDENTIALS PG Diploma in Project Planning and ManagementPG Diploma in Project Planning and Management DG-tech HR, Kolkata - pursuing
  • 3.
    PG Diploma inPiping Engineering - 2011 MIT, Pune - Attained First Division BACHELOR OF TECHNOLOGY IN MECHANICAL ENGINEERING - 2008 NATIONAL INSTITUTE OF TECHNOLOGY, DURGAPUR – Attained First Division COMPUTER SKILLS:COMPUTER SKILLS: AutoCAD, ERP, CAESAR - II, MS Project AADDITIONALDDITIONAL IINFORMATIONNFORMATION Date of Birth:Date of Birth: 225 th Janauary’1986;; Passport Number:Passport Number: G4184986G4184986; Reference:Reference: Available on request