SMALL-MEDIUM CAPITAL PROJECTS
PROJECT SALE & INSTALLATION AT LARGEST SHEETFED PRINTER IN COUNTRY SCOPE OBJECTIVE Sell and install the first of a new product line; A Large Format Printing Press into the  largest sheet-fed printer in the world.  Doing so would thereby prove the advantages of  the equipment to the marketplace inspiring new sales. PROBLEM The Customer needed to reduced production costs by 13% or they would loose key  account.  Additionally, not cutting costs, Strine would not be able to afford expansion  toward the purchase of newer larger equipment that would open new markets for them;  A larger printed sheet as well as increasing production over a smaller machine by nearly  432% FACILITY PLAN Creating 3 Dimensional AutoCAD Geometry of the customer’s entire production  area.  I sat down with the CEO, Plant Manager, Service Manager and other production  personnel in conference.  Projected 3 Dimensional working drawing on screen  I gave them laser pointers.  Designated facility areas for use, then planned moving  certain production departments, equipment, creating work flow, production Aisles, and  lay down areas in one afternoon. TIMEFRAME 1 Year from Plan to Purchase, Installation and Startup COSTS $5+M = Estimated Total Facility Project Cost $4+M = Press Project Cost to Purchase, Manage, Engineer, Install & Equip. Startup ACCOMPLISHMENTS Incorporating Die Cutting & Folder Operations into the printing facility was successful  Customer accomplished targeted 13% reduction in production costs.  Savings afforded them the financial backing to purchase one of the largest Sheet-fed  Printing Presses in production today and also created new capabilities for them that  increased production abilities over their existing 40” machines by over 400%.
Newly Relocated Die Cutting & Folder Production Area New Sheet-Fed Printing Machine (top) Streamline Folder Packaging Area (reducing necessary manpower) New Equipment Installation (nearing completion)
FOUNDATION DRAWING
 
BUILDING SERVICES INTERFACE DRAWING
 
 
 
PROJECT Facility Re-Configuration and Custom Machine Installation SCOPE OBJECTIVE Sell and install UV/IR Process Print machine. PROBLEM Customer needed to expand their printing production.  Finding room to place a new  machine was difficult if not impossible.  New workflow and facility layout would need to  be generated.  Customer lacked expertise, time and resources to complete such a task.  But the purchase of a new machine was highly desired due to the new technology and  quality available. FACILITY PLAN & LOGISTICS Creating 3 Dimensional AutoCAD Geometry of the customer’s entire production  area.  I sat down with Plant Manager, Service Manager and other production  personnel in conference.  Projected 3 Dimensional working drawings on screen  I gave them laser pointers.  We designated facility areas for use and began moving  machines, Production Aisles, Work Flow & lay down areas in a 3D virtual environment  over several visits.  The trade-in, removal, and sale of existing equipment needed to be  part of the overall reconfiguration and plan with production to eliminate interruptions. I also offered and designed a coater pump system for their older existing equipment so  it would operate similar to the new equipment and provide similar performance. TIMEFRAME 1 Year from Purchase, Installation to Production Startup COSTS $4+M = Total Facility Project Cost $3+M = Press Project Cost to Purchase, Manage, Engineer, Install & Equip. Startup ACCOMPLISHMENT Machinery was installed in budget and on time, New and better facility workflow patterns  were established.  Production interruptions were kept to a minimum and a superior print  process was achieved. Coater pump modification were fabricated and delivered superior  performance over the old design allowing less downtime and easier cleanup.
 
 
PROJECT Smaller Printer in Northern New York SCOPE OBJECTIVE Sell, Remove and Re-Install small format used Sheet-fed Printing Press. PROBLEM Installation needed to be performed quickly while addressing serious foundation  concerns –  building sat near a high ravine (water/soil settlement).  Area chosen for  press needed to be prepared for Foundation, Overhead lights, HVAC, Exhaust, Under  floor piping,  workflow & customer presentation.  FACILITY PLAN & LOGISTICS Creating 3 Dimensional AutoCAD drawing of the candidate areas.  Selecting, then  issuing foundation, and services drawing as well as a schedule plan for completion in  shortened timeframe.  TIMEFRAME 2 Months from Purchase, Installation to Production Startup COSTS $$25K approx. = Total Facility Project Cost $700K approx. = Press Project - Purchase, Manage, Engineer, Install & Startup ACCOMPLISHMENT Machinery was installed in budget, on time. New Foundation, New Ceiling, Lights, HVAC, Newly Painted Floor & Underground  service piping.  Customer satisfaction was very high.  Customer was able to purchase a  used press that operated like new, and gained a facility installation which raised their  presentation profile with their customers.  Superb example of the ability to provide  Quality, Cost Effectiveness, and a fast installation. (see dates on following photos)
Project Managed Installation  BEFORE PLANNING AS PLANNED AS INSTALLED Before & After
THE END 3D Virtual Reality Videos may be seen at http://www.myspace.com/431549203 for additional information Contact: David Lukas Phone 732-742-7167 E-Mail lukas-david@hotmail.com

More Related Content

Viewers also liked (11)

Project handbook
Project handbookProject handbook
Project handbook
 
Miros Design Build Approach 2 26 10
Miros Design Build Approach 2 26 10Miros Design Build Approach 2 26 10
Miros Design Build Approach 2 26 10
 
Unilever_PM_Hndbk
Unilever_PM_HndbkUnilever_PM_Hndbk
Unilever_PM_Hndbk
 
Ch 2 project planning and control
Ch 2 project planning and controlCh 2 project planning and control
Ch 2 project planning and control
 
FTA Construction Management Handbook - 2012
FTA Construction Management Handbook - 2012FTA Construction Management Handbook - 2012
FTA Construction Management Handbook - 2012
 
Project LlifeCycle
Project LlifeCycleProject LlifeCycle
Project LlifeCycle
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project Life Cycle and Phases
Project Life Cycle and PhasesProject Life Cycle and Phases
Project Life Cycle and Phases
 
Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5Project Management Framework - PMBOK 5
Project Management Framework - PMBOK 5
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 
Project Planning
Project PlanningProject Planning
Project Planning
 

Similar to Portfolio Small Project Management

Reverse engineering & its application
Reverse engineering & its applicationReverse engineering & its application
Reverse engineering & its application
mapqrs
 
Wash D.C. Final
Wash D.C. FinalWash D.C. Final
Wash D.C. Final
jcleary
 
ravi reverseengineeringitsapplication01 121101044845-phpapp02
ravi reverseengineeringitsapplication01 121101044845-phpapp02ravi reverseengineeringitsapplication01 121101044845-phpapp02
ravi reverseengineeringitsapplication01 121101044845-phpapp02
Akash Maurya
 

Similar to Portfolio Small Project Management (20)

Portfolio Large Projects
Portfolio Large ProjectsPortfolio Large Projects
Portfolio Large Projects
 
Henry Suguna Raj.
Henry Suguna Raj.Henry Suguna Raj.
Henry Suguna Raj.
 
3 Opportunities to Increase Your Printing Operations Efficiency
3 Opportunities to Increase Your Printing Operations Efficiency3 Opportunities to Increase Your Printing Operations Efficiency
3 Opportunities to Increase Your Printing Operations Efficiency
 
3 Things You Probably Didn’t Knew About Rapid Prototyping
3 Things You Probably Didn’t Knew About Rapid Prototyping3 Things You Probably Didn’t Knew About Rapid Prototyping
3 Things You Probably Didn’t Knew About Rapid Prototyping
 
Facility layout
Facility layoutFacility layout
Facility layout
 
DESIGN & MFG AUTOMATION - GAIN PRODUCTIVITY
DESIGN & MFG AUTOMATION - GAIN PRODUCTIVITYDESIGN & MFG AUTOMATION - GAIN PRODUCTIVITY
DESIGN & MFG AUTOMATION - GAIN PRODUCTIVITY
 
Project Technical Solutions - NBD
Project Technical Solutions - NBDProject Technical Solutions - NBD
Project Technical Solutions - NBD
 
Using Metrology Software to Capture Data for Reverse Engineering
Using Metrology Software to Capture Data for Reverse EngineeringUsing Metrology Software to Capture Data for Reverse Engineering
Using Metrology Software to Capture Data for Reverse Engineering
 
Introduction to CAD-CAM.pptx
Introduction to CAD-CAM.pptxIntroduction to CAD-CAM.pptx
Introduction to CAD-CAM.pptx
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solution
 
Demolition project-management-solution
Demolition project-management-solutionDemolition project-management-solution
Demolition project-management-solution
 
Reverse engineering & its application
Reverse engineering & its applicationReverse engineering & its application
Reverse engineering & its application
 
Unit ii Process Planning
Unit ii Process PlanningUnit ii Process Planning
Unit ii Process Planning
 
Product Development & Design for Additive Manufacturing (DfAM)
Product Development & Design for Additive Manufacturing (DfAM)Product Development & Design for Additive Manufacturing (DfAM)
Product Development & Design for Additive Manufacturing (DfAM)
 
Project Planning Organising Tracking Construction
Project Planning Organising Tracking  ConstructionProject Planning Organising Tracking  Construction
Project Planning Organising Tracking Construction
 
Additive manufacturing ramesh r
Additive manufacturing ramesh rAdditive manufacturing ramesh r
Additive manufacturing ramesh r
 
Industrial report of Brother Printer Company
Industrial report of Brother Printer CompanyIndustrial report of Brother Printer Company
Industrial report of Brother Printer Company
 
Wash D.C. Final
Wash D.C. FinalWash D.C. Final
Wash D.C. Final
 
Wash D.C. Final
Wash D.C. FinalWash D.C. Final
Wash D.C. Final
 
ravi reverseengineeringitsapplication01 121101044845-phpapp02
ravi reverseengineeringitsapplication01 121101044845-phpapp02ravi reverseengineeringitsapplication01 121101044845-phpapp02
ravi reverseengineeringitsapplication01 121101044845-phpapp02
 

Recently uploaded

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
laloo_007
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 

Recently uploaded (20)

Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
!~+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUD...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 

Portfolio Small Project Management

  • 2. PROJECT SALE & INSTALLATION AT LARGEST SHEETFED PRINTER IN COUNTRY SCOPE OBJECTIVE Sell and install the first of a new product line; A Large Format Printing Press into the largest sheet-fed printer in the world. Doing so would thereby prove the advantages of the equipment to the marketplace inspiring new sales. PROBLEM The Customer needed to reduced production costs by 13% or they would loose key account. Additionally, not cutting costs, Strine would not be able to afford expansion toward the purchase of newer larger equipment that would open new markets for them; A larger printed sheet as well as increasing production over a smaller machine by nearly 432% FACILITY PLAN Creating 3 Dimensional AutoCAD Geometry of the customer’s entire production area. I sat down with the CEO, Plant Manager, Service Manager and other production personnel in conference. Projected 3 Dimensional working drawing on screen I gave them laser pointers. Designated facility areas for use, then planned moving certain production departments, equipment, creating work flow, production Aisles, and lay down areas in one afternoon. TIMEFRAME 1 Year from Plan to Purchase, Installation and Startup COSTS $5+M = Estimated Total Facility Project Cost $4+M = Press Project Cost to Purchase, Manage, Engineer, Install & Equip. Startup ACCOMPLISHMENTS Incorporating Die Cutting & Folder Operations into the printing facility was successful Customer accomplished targeted 13% reduction in production costs. Savings afforded them the financial backing to purchase one of the largest Sheet-fed Printing Presses in production today and also created new capabilities for them that increased production abilities over their existing 40” machines by over 400%.
  • 3. Newly Relocated Die Cutting & Folder Production Area New Sheet-Fed Printing Machine (top) Streamline Folder Packaging Area (reducing necessary manpower) New Equipment Installation (nearing completion)
  • 5.  
  • 7.  
  • 8.  
  • 9.  
  • 10. PROJECT Facility Re-Configuration and Custom Machine Installation SCOPE OBJECTIVE Sell and install UV/IR Process Print machine. PROBLEM Customer needed to expand their printing production. Finding room to place a new machine was difficult if not impossible. New workflow and facility layout would need to be generated. Customer lacked expertise, time and resources to complete such a task. But the purchase of a new machine was highly desired due to the new technology and quality available. FACILITY PLAN & LOGISTICS Creating 3 Dimensional AutoCAD Geometry of the customer’s entire production area. I sat down with Plant Manager, Service Manager and other production personnel in conference. Projected 3 Dimensional working drawings on screen I gave them laser pointers. We designated facility areas for use and began moving machines, Production Aisles, Work Flow & lay down areas in a 3D virtual environment over several visits. The trade-in, removal, and sale of existing equipment needed to be part of the overall reconfiguration and plan with production to eliminate interruptions. I also offered and designed a coater pump system for their older existing equipment so it would operate similar to the new equipment and provide similar performance. TIMEFRAME 1 Year from Purchase, Installation to Production Startup COSTS $4+M = Total Facility Project Cost $3+M = Press Project Cost to Purchase, Manage, Engineer, Install & Equip. Startup ACCOMPLISHMENT Machinery was installed in budget and on time, New and better facility workflow patterns were established. Production interruptions were kept to a minimum and a superior print process was achieved. Coater pump modification were fabricated and delivered superior performance over the old design allowing less downtime and easier cleanup.
  • 11.  
  • 12.  
  • 13. PROJECT Smaller Printer in Northern New York SCOPE OBJECTIVE Sell, Remove and Re-Install small format used Sheet-fed Printing Press. PROBLEM Installation needed to be performed quickly while addressing serious foundation concerns – building sat near a high ravine (water/soil settlement). Area chosen for press needed to be prepared for Foundation, Overhead lights, HVAC, Exhaust, Under floor piping, workflow & customer presentation. FACILITY PLAN & LOGISTICS Creating 3 Dimensional AutoCAD drawing of the candidate areas. Selecting, then issuing foundation, and services drawing as well as a schedule plan for completion in shortened timeframe. TIMEFRAME 2 Months from Purchase, Installation to Production Startup COSTS $$25K approx. = Total Facility Project Cost $700K approx. = Press Project - Purchase, Manage, Engineer, Install & Startup ACCOMPLISHMENT Machinery was installed in budget, on time. New Foundation, New Ceiling, Lights, HVAC, Newly Painted Floor & Underground service piping. Customer satisfaction was very high. Customer was able to purchase a used press that operated like new, and gained a facility installation which raised their presentation profile with their customers. Superb example of the ability to provide Quality, Cost Effectiveness, and a fast installation. (see dates on following photos)
  • 14. Project Managed Installation BEFORE PLANNING AS PLANNED AS INSTALLED Before & After
  • 15. THE END 3D Virtual Reality Videos may be seen at http://www.myspace.com/431549203 for additional information Contact: David Lukas Phone 732-742-7167 E-Mail lukas-david@hotmail.com