Training Plan
Trainees’
Training
Requirement
Training
Activity/Task
Mode of
Training
Staff Facilities/Tools
and Equipment
Venue Assessment
Method
Date and
Time
• Look for
possible industry
partner
•Inquire about
the possibility of
deploying a
trainee to that
particular
industry
• Give proposal
Letters to explain
the nature of
the program
• Set
appointment for
presentation
• Presentation of
work-based
• Conduct site
visit for work-
based training
plan
• Finalize
Coordinato
r for
Academe-
Industry
Linkages
(Department
Head)
Department
Secretary
Industry
Supervisor
 Pens/
Pencils
 Papers
 Printers
 Computer
Unit
 Internet
ALS
Community
Learning
Center
training plan or
MOA or MOU
• Present the
training plan and
MOA or MOU for
approval
• Orientation and
deployment of
trainees in the
industry
CORE 1 PERFORM ROUGHING-IN ACTIVITIES, WIRING AND CABLING WORKS FOR SINGLE-PHASE DISTRIBUTION,
POWER, LIGHTING AND AUXILIARY SYSTEMS
LO 1
Install
electrical
metallic /non-
metallic (PVC
conduit)
1.1 Interpreted
correct drawings
based on job
requirements
1.2 Determined
correct quantities
of conduit,
fittings and
accessories as
per job
requirements
1.3 Selected tools
and equipment
as per job
requirements
1.4 Assembled
conduit ensuring
that fittings are
fully inserted and
tightened as per
job requirements
1.5 Bent conduit
with bends not
exceeding 90° as
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Rigid
Steel
Conduits
(RSC)
 Intermedi
ate
Metallic
Conduit
(IMC)
 Electrical
Metallic
Tubing
(EMT)
 Polyvinyl
Chloride
Pipe (PVC)

Condulets
and
Reducers
lock nut
and
bushing
 Entrance
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
per job
requirements
1.6 Installed
conduit
couplings and
elbows as per job
requirements
1.7 Threaded
conduit in line
with job
requirements
1.8 Followed
safety procedures
in line with
standard
operating
procedures
(SOPs.
cap
 Nipple 2.5
Elbow
LO 2
Install wire
ways and
cable tray
2.1 Interpreted
correct drawings to
determine job
requirements
2.2 Selected
correct quantities
of materials as per
job requirements
2.3 Selected tools
and equipment as
per job
requirements
2.4 Installed wire
ways and cable
trays as per job
requirements.
2.5 Foll0wed safety
procedures in line
with SOPs
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Boxes
 Utility Box
 Junction Box
 Pull box/Splice
box
 Conduit
supports
( e.g.
hangers )
 Conduit
Strap
 Connectors
(straight and
angle
 Electrical
power tools
 Wire ways
and cable
tray
 Electrical
Metallic
conduit
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
LO 3
Install
auxiliary
terminal
cabinet and
distribution
panel
3. 1 Interpreted
correct drawings to
determine job
requirements
3.2 Selected
correct quantities
of materials as per
job requirements
3.3 Selected tools
and equipment as
per job
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Boxes
 Utility Box
 Junction Box
 Pull box/Splice
box
 Conduit
supports
( e.g.
hangers )
 Conduit
Strap
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
requirements
3.4 Installed
auxiliary terminal
cabinet as per job
requirements
3.5 Installed
auxiliary main
distribution frame
as per job
requirements
3.6 Followed safety
procedures in line
with SOPs
 Connectors
(straight and
angle
 Electrical
power tools
 Wire ways
and cable
tray
 Electrical
Metallic
conduit
LO 4.
Prepare for
cable pulling
and
installation
4.1 Prepared
necessary tools,
equipment,
materials and
personal protective
equipment (PPE) in
line with job
requirements.
4.2 Identified cable
pulling &
installation
requirements and
constraints from
plan and site
inspections per job
requirements.
4.3 Set up cable
lay out &
installation
equipment in
accordance with
manufacturer's
and job
requirements.
4.4 Made site safe
and secure for
cable installation.
4.5 Selected
suitable protective
clothing and
required safety
devices are used
4.6 Assessed
support structure
as safe for normal
working
conditions.
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Spirit level,
hack saw,
pipe cutter,
plumb bob,
pipe reamer,
pipe
threader,
pipe bender,
bolt cutter,
electric drill
 Electrical
power tools -
Power drills
- Portable
grinder
 Electrical
Metallic
conduit
 Wire ways
and cable
tray
 Auxiliary
terminal
cabinet and
distribution
panel.
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
LO 5
Perform
wiring and
cabling lay
out
5.1 Followed safety
procedures based
on safety
regulations PPE
are identified and
selected in line
with safety
requirements
5.2 Identified tools,
equipment, pulling
compound and
safety
requirements and
obtained for the lay
out and
installation.
5.3 Properly
Installed pulling
materials and
tensioned to
required
specifications
5.4 Secured cable
permanently to
support structure
in accordance with
standard
installation
procedures
5.5 Observed
bending radius
and loops
tolerance for cable
materials at all
times
5.6 Followed
schedule of wire
cutting lists based
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Boxes
 Utility Box
 Junction Box
 Pull box/Splice
box
 Conduit
supports
( e.g.
hangers )
 Conduit
Strap
 Connectors
(straight and
angle
 Electrical
power tools

 Spirit level,
hack saw,
pipe cutter,
plumb bob,
pipe reamer,
pipe
threader,
pipe bender,
bolt cutter,
electric drill
 Electrical
power tools -
Power drills
- Portable
grinder
 Electrical
Metallic
conduit
 Wire ways
and cable
tray
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
on estimates,
quantity and sizes
to avoid wastage.
5.7 Sought further
instructions if
unplanned events
or conditions occur
5.8 Checked
quality of work is
done in accordance
with instructions
and requirements.
Auxiliary
terminal
cabinet and
distribution
panel.
LO 6
Notify
completion of
work
6.1 Made final
checks to ensure
that work
conforms with
instructions and
job requirements
6.2 Notified
supervisor upon
completion of work
6.3 cleaned,
checked and
returned tools,
equipment and any
surplus resources
and materials to
storage in
accordance with
established
procedures
6.4 Cleaned up
work area and
made safe
according to OHSA
regulations
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Boxes
 Utility Box
 Junction Box
 Pull box/Splice
box
 Conduit
supports
( e.g.
hangers )
 Conduit
Strap
 Connectors
(straight and
angle
 Electrical
power tools

 Spirit level,
hack saw,
pipe cutter,
plumb bob,
pipe reamer,
pipe
threader,
pipe bender,
bolt cutter,
electric drill
 Electrical
power tools -
Power drills
- Portable
grinder
 Electrical
Metallic
conduit
 Wire ways
and cable
tray
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
CORE 2 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING
PROTECTION AND GROUNDING SYSTEMS
LO 1
Plan and
prepare work
1.1 Communicated
and confirmed
Instructions for the
preparation of the
work activity to
ensure clear
understanding
1.2 Identified tools,
equipment and
PPE needed to
install electrical
wiring and,
checked to ensure
they work correctly
as intended and
are safe to use in
accordance with
established
procedures
1.3 Obtained
materials needed
for work in
accordance with
established
procedures
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Pliers
 Screwdrivers
 Wrenches
 Wire splicers
 Electrician
knives
 Electric drill
 Ball hammer
 Working
gloves
 Safety shoes
 Hard hat
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
LO 2
Install
electrical
protective
devices
2.1 Followed safety
procedures are
followed in line
with job
requirements
2.2 Performed
correct procedures
for installation of
electrical protective
devices in line with
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Philippine
Electrical
Code
 Safety
standards
 Safety
switch
 Earth
Leakage
Circuit
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
job requirements
and PEC.
2.3 Followed
schedule of work to
ensure work is
completed in an
agreed time, to a
quality standard
and with a
minimum waste
2.4 Sought further
instructions from a
supervisor if
unplanned events
or conditions occur
2.5 Done on-going
checks of quality of
work in
accordance with
instructions and
requirements
Breaker
(ELCB)
 Conventiona
l
atmospheric
lightning
protection
 Grounding
system
LO3
Install
lighting
fixture and
auxiliary
outlet.
3.3 Followed
schedule of work to
ensure work is
completed in an
agreed time, to a
quality standard
and with a
minimum waste
3.4 Sought further
instructions from a
supervisor if
unplanned events
or conditions
occur.
3.5 Undertaken
on-going checks of
quality of work in
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Pliers
 Screwdrivers
 Wrenches
 Wire splicers
 Electrician
knives
 Electric drill
 Ball hammer
 Working
gloves
 Safety shoes
 Hard hat
 Lamps
 Spotlights
 Track lights
 Perimeter
lighting
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
accordance with
instructions and
requirements.
LO 4
Notify
completion of
work.
4.1 Made final
checks to ensure
the work conforms
with instructions
and requirements
4.2 Notified
supervisor upon
completion of work
4.3 Cleaned,
checked and
returned tools,
equipment and any
surplus resources
and materials
where appropriate
to storage in
accordance with
established
procedures
4.4 Cleaned work
area and made
safe.4 Work area is
cleaned and safe
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Philippine
Electrical
Code
 Safety
standards
 Safety
switch
 Earth
Leakage
Circuit
Breaker
(ELCB)
 Conventiona
l
atmospheric
lightning
protection
 Grounding
system
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
CORE 3 INSTALL WIRING DEVICES OF FLOOR AND WALL MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES AND
AUXILLIARY OUTLETS
LO1
Select wiring
devices
1.1 Read and
interpreted
Drawings to
determine job
requirements.
1.2 Identified
correct type and
quantity of wiring
devices and
consumable items
in line with job
requirements.
1.3 Selected tools
and equipment in
line with job
requirements
1.4 Identified and
selected correct
PPE in line with
safety
requirements
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Floor outlet
 Ground fault
current
interrupting
device
 Grounding
type
convenience
outlet
 Light
switches
 Wire nut
 Electrical
tape
 rubber tape
 Pliers
 Screwdrivers
 Wire splicers
 Electrician
knives
 Working
gloves
 Safety shoes
 Hard hat
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
LO2
Install wiring
devices
2.1 Followed safety
procedures based
on safety
regulations
2.2 Performed
correct procedures
for installation of
wiring devices in
line with job
requirements
2.3 Followed
schedule of work
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Wire nut
 Electrical
tape
 rubber tape
 Pliers
 Screwdrivers
 Wire splicers
 Electrician
knives
 Working
gloves
 Safety shoes
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
based on agreed
time, quality
standard and
minimum wastage
2.4 Sought further
instructions if
unplanned events
or conditions occur
2.5 Done on-going
checking of quality
of work in
accordance with
instructions and
requirements.
 Hard hat
 Philippine
Electrical
Code
 Safety
standards
LO3
Install
lighting
fixture/
switches
3.1 Followed safety
procedures.
3.2 Performed
correct procedures
for installation of
lighting
fixtures/switches
in line with job
3.3 Followed
schedule of work to
ensure work is
completed in an
agreed time, to a
quality standard
and with a
minimum waste
3.4 Sought further
instructions from a
supervisor if
unplanned events
or conditions occur
3.5 Undertaken
on-going checks of
quality of work in
accordance with
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Wire nut
 Electrical
tape
 rubber tape
 Pliers
 Screwdrivers
 Wire splicers
 Electrician
knives
 Working
gloves
 Safety shoes
 Hard hat
 Lamps
 Spotlights
 Track Lights
 Perimeter
Lighting
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
instructions and
requirements
LO4
Notify
completion of
work
4.1 Made final
checks to ensure
the work conforms
with instructions
and requirements
4.2 Notified
supervisor upon
completion of work
4.3 Cleaned,
checked and
returned tools,
equipment and any
surplus resources
and materials
where appropriate
to storage in
accordance with
established
procedures
4.4 Cleaned work
area and made
safe.
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
 Wire nut
 Electrical
tape
 rubber tape
 Pliers
 Screwdrivers
 Wire splicers
 Electrician
knives
 Working
gloves
 Safety shoes
 Hard hat
Anteco
training
center
 Observation
of
performance
 Interview
 Third party
report
Prepared by: REYMOUS N. FABILLO Reviewed and verified by:
Trainer
Approved by: Approved by:

#8 REYMOUS Training-plan.docx TRAINING PLAN EIM

  • 1.
    Name: REYMOUS N.FABILLO Qualification Electrical Installation and Maintenance NC II Training Plan Trainees’ Training Requirement Training Activity/Task Mode of Training Staff Facilities/Tools and Equipment Venue Assessment Method Date and Time • Look for possible industry partner •Inquire about the possibility of deploying a trainee to that particular industry • Give proposal Letters to explain the nature of the program • Set appointment for presentation • Presentation of work-based • Conduct site visit for work- based training plan • Finalize Coordinato r for Academe- Industry Linkages (Department Head) Department Secretary Industry Supervisor  Pens/ Pencils  Papers  Printers  Computer Unit  Internet ALS Community Learning Center
  • 2.
    training plan or MOAor MOU • Present the training plan and MOA or MOU for approval • Orientation and deployment of trainees in the industry CORE 1 PERFORM ROUGHING-IN ACTIVITIES, WIRING AND CABLING WORKS FOR SINGLE-PHASE DISTRIBUTION, POWER, LIGHTING AND AUXILIARY SYSTEMS LO 1 Install electrical metallic /non- metallic (PVC conduit) 1.1 Interpreted correct drawings based on job requirements 1.2 Determined correct quantities of conduit, fittings and accessories as per job requirements 1.3 Selected tools and equipment as per job requirements 1.4 Assembled conduit ensuring that fittings are fully inserted and tightened as per job requirements 1.5 Bent conduit with bends not exceeding 90° as Dual Training System Training coordinator Industry linkage officer Instructor  Rigid Steel Conduits (RSC)  Intermedi ate Metallic Conduit (IMC)  Electrical Metallic Tubing (EMT)  Polyvinyl Chloride Pipe (PVC)  Condulets and Reducers lock nut and bushing  Entrance Anteco training center  Observation of performance  Interview  Third party report
  • 3.
    per job requirements 1.6 Installed conduit couplingsand elbows as per job requirements 1.7 Threaded conduit in line with job requirements 1.8 Followed safety procedures in line with standard operating procedures (SOPs. cap  Nipple 2.5 Elbow
  • 4.
    LO 2 Install wire waysand cable tray 2.1 Interpreted correct drawings to determine job requirements 2.2 Selected correct quantities of materials as per job requirements 2.3 Selected tools and equipment as per job requirements 2.4 Installed wire ways and cable trays as per job requirements. 2.5 Foll0wed safety procedures in line with SOPs Dual Training System Training coordinator Industry linkage officer Instructor  Boxes  Utility Box  Junction Box  Pull box/Splice box  Conduit supports ( e.g. hangers )  Conduit Strap  Connectors (straight and angle  Electrical power tools  Wire ways and cable tray  Electrical Metallic conduit Anteco training center  Observation of performance  Interview  Third party report LO 3 Install auxiliary terminal cabinet and distribution panel 3. 1 Interpreted correct drawings to determine job requirements 3.2 Selected correct quantities of materials as per job requirements 3.3 Selected tools and equipment as per job Dual Training System Training coordinator Industry linkage officer Instructor  Boxes  Utility Box  Junction Box  Pull box/Splice box  Conduit supports ( e.g. hangers )  Conduit Strap Anteco training center  Observation of performance  Interview  Third party report
  • 5.
    requirements 3.4 Installed auxiliary terminal cabinetas per job requirements 3.5 Installed auxiliary main distribution frame as per job requirements 3.6 Followed safety procedures in line with SOPs  Connectors (straight and angle  Electrical power tools  Wire ways and cable tray  Electrical Metallic conduit
  • 6.
    LO 4. Prepare for cablepulling and installation 4.1 Prepared necessary tools, equipment, materials and personal protective equipment (PPE) in line with job requirements. 4.2 Identified cable pulling & installation requirements and constraints from plan and site inspections per job requirements. 4.3 Set up cable lay out & installation equipment in accordance with manufacturer's and job requirements. 4.4 Made site safe and secure for cable installation. 4.5 Selected suitable protective clothing and required safety devices are used 4.6 Assessed support structure as safe for normal working conditions. Dual Training System Training coordinator Industry linkage officer Instructor  Spirit level, hack saw, pipe cutter, plumb bob, pipe reamer, pipe threader, pipe bender, bolt cutter, electric drill  Electrical power tools - Power drills - Portable grinder  Electrical Metallic conduit  Wire ways and cable tray  Auxiliary terminal cabinet and distribution panel. Anteco training center  Observation of performance  Interview  Third party report
  • 7.
    LO 5 Perform wiring and cablinglay out 5.1 Followed safety procedures based on safety regulations PPE are identified and selected in line with safety requirements 5.2 Identified tools, equipment, pulling compound and safety requirements and obtained for the lay out and installation. 5.3 Properly Installed pulling materials and tensioned to required specifications 5.4 Secured cable permanently to support structure in accordance with standard installation procedures 5.5 Observed bending radius and loops tolerance for cable materials at all times 5.6 Followed schedule of wire cutting lists based Dual Training System Training coordinator Industry linkage officer Instructor  Boxes  Utility Box  Junction Box  Pull box/Splice box  Conduit supports ( e.g. hangers )  Conduit Strap  Connectors (straight and angle  Electrical power tools   Spirit level, hack saw, pipe cutter, plumb bob, pipe reamer, pipe threader, pipe bender, bolt cutter, electric drill  Electrical power tools - Power drills - Portable grinder  Electrical Metallic conduit  Wire ways and cable tray Anteco training center  Observation of performance  Interview  Third party report
  • 8.
    on estimates, quantity andsizes to avoid wastage. 5.7 Sought further instructions if unplanned events or conditions occur 5.8 Checked quality of work is done in accordance with instructions and requirements. Auxiliary terminal cabinet and distribution panel.
  • 9.
    LO 6 Notify completion of work 6.1Made final checks to ensure that work conforms with instructions and job requirements 6.2 Notified supervisor upon completion of work 6.3 cleaned, checked and returned tools, equipment and any surplus resources and materials to storage in accordance with established procedures 6.4 Cleaned up work area and made safe according to OHSA regulations Dual Training System Training coordinator Industry linkage officer Instructor  Boxes  Utility Box  Junction Box  Pull box/Splice box  Conduit supports ( e.g. hangers )  Conduit Strap  Connectors (straight and angle  Electrical power tools   Spirit level, hack saw, pipe cutter, plumb bob, pipe reamer, pipe threader, pipe bender, bolt cutter, electric drill  Electrical power tools - Power drills - Portable grinder  Electrical Metallic conduit  Wire ways and cable tray Anteco training center  Observation of performance  Interview  Third party report
  • 10.
    CORE 2 INSTALLELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION AND GROUNDING SYSTEMS LO 1 Plan and prepare work 1.1 Communicated and confirmed Instructions for the preparation of the work activity to ensure clear understanding 1.2 Identified tools, equipment and PPE needed to install electrical wiring and, checked to ensure they work correctly as intended and are safe to use in accordance with established procedures 1.3 Obtained materials needed for work in accordance with established procedures Dual Training System Training coordinator Industry linkage officer Instructor  Pliers  Screwdrivers  Wrenches  Wire splicers  Electrician knives  Electric drill  Ball hammer  Working gloves  Safety shoes  Hard hat Anteco training center  Observation of performance  Interview  Third party report LO 2 Install electrical protective devices 2.1 Followed safety procedures are followed in line with job requirements 2.2 Performed correct procedures for installation of electrical protective devices in line with Dual Training System Training coordinator Industry linkage officer Instructor  Philippine Electrical Code  Safety standards  Safety switch  Earth Leakage Circuit Anteco training center  Observation of performance  Interview  Third party report
  • 11.
    job requirements and PEC. 2.3Followed schedule of work to ensure work is completed in an agreed time, to a quality standard and with a minimum waste 2.4 Sought further instructions from a supervisor if unplanned events or conditions occur 2.5 Done on-going checks of quality of work in accordance with instructions and requirements Breaker (ELCB)  Conventiona l atmospheric lightning protection  Grounding system LO3 Install lighting fixture and auxiliary outlet. 3.3 Followed schedule of work to ensure work is completed in an agreed time, to a quality standard and with a minimum waste 3.4 Sought further instructions from a supervisor if unplanned events or conditions occur. 3.5 Undertaken on-going checks of quality of work in Dual Training System Training coordinator Industry linkage officer Instructor  Pliers  Screwdrivers  Wrenches  Wire splicers  Electrician knives  Electric drill  Ball hammer  Working gloves  Safety shoes  Hard hat  Lamps  Spotlights  Track lights  Perimeter lighting Anteco training center  Observation of performance  Interview  Third party report
  • 12.
    accordance with instructions and requirements. LO4 Notify completion of work. 4.1 Made final checks to ensure the work conforms with instructions and requirements 4.2 Notified supervisor upon completion of work 4.3 Cleaned, checked and returned tools, equipment and any surplus resources and materials where appropriate to storage in accordance with established procedures 4.4 Cleaned work area and made safe.4 Work area is cleaned and safe Dual Training System Training coordinator Industry linkage officer Instructor  Philippine Electrical Code  Safety standards  Safety switch  Earth Leakage Circuit Breaker (ELCB)  Conventiona l atmospheric lightning protection  Grounding system Anteco training center  Observation of performance  Interview  Third party report CORE 3 INSTALL WIRING DEVICES OF FLOOR AND WALL MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES AND AUXILLIARY OUTLETS
  • 13.
    LO1 Select wiring devices 1.1 Readand interpreted Drawings to determine job requirements. 1.2 Identified correct type and quantity of wiring devices and consumable items in line with job requirements. 1.3 Selected tools and equipment in line with job requirements 1.4 Identified and selected correct PPE in line with safety requirements Dual Training System Training coordinator Industry linkage officer Instructor  Floor outlet  Ground fault current interrupting device  Grounding type convenience outlet  Light switches  Wire nut  Electrical tape  rubber tape  Pliers  Screwdrivers  Wire splicers  Electrician knives  Working gloves  Safety shoes  Hard hat Anteco training center  Observation of performance  Interview  Third party report LO2 Install wiring devices 2.1 Followed safety procedures based on safety regulations 2.2 Performed correct procedures for installation of wiring devices in line with job requirements 2.3 Followed schedule of work Dual Training System Training coordinator Industry linkage officer Instructor  Wire nut  Electrical tape  rubber tape  Pliers  Screwdrivers  Wire splicers  Electrician knives  Working gloves  Safety shoes Anteco training center  Observation of performance  Interview  Third party report
  • 14.
    based on agreed time,quality standard and minimum wastage 2.4 Sought further instructions if unplanned events or conditions occur 2.5 Done on-going checking of quality of work in accordance with instructions and requirements.  Hard hat  Philippine Electrical Code  Safety standards LO3 Install lighting fixture/ switches 3.1 Followed safety procedures. 3.2 Performed correct procedures for installation of lighting fixtures/switches in line with job 3.3 Followed schedule of work to ensure work is completed in an agreed time, to a quality standard and with a minimum waste 3.4 Sought further instructions from a supervisor if unplanned events or conditions occur 3.5 Undertaken on-going checks of quality of work in accordance with Dual Training System Training coordinator Industry linkage officer Instructor  Wire nut  Electrical tape  rubber tape  Pliers  Screwdrivers  Wire splicers  Electrician knives  Working gloves  Safety shoes  Hard hat  Lamps  Spotlights  Track Lights  Perimeter Lighting Anteco training center  Observation of performance  Interview  Third party report
  • 15.
    instructions and requirements LO4 Notify completion of work 4.1Made final checks to ensure the work conforms with instructions and requirements 4.2 Notified supervisor upon completion of work 4.3 Cleaned, checked and returned tools, equipment and any surplus resources and materials where appropriate to storage in accordance with established procedures 4.4 Cleaned work area and made safe. Dual Training System Training coordinator Industry linkage officer Instructor  Wire nut  Electrical tape  rubber tape  Pliers  Screwdrivers  Wire splicers  Electrician knives  Working gloves  Safety shoes  Hard hat Anteco training center  Observation of performance  Interview  Third party report Prepared by: REYMOUS N. FABILLO Reviewed and verified by: Trainer
  • 16.