Name: REYMOUS N.FABILLO
Qualification Electrical Installation and Maintenance NC II
Training Plan
Trainees’
Training
Requirement
Training
Activity/Task
Mode of
Training
Staff Facilities/Tools
and Equipment
Venue Assessment
Method
Date and
Time
• Look for
possible industry
partner
•Inquire about
the possibility of
deploying a
trainee to that
particular
industry
• Give proposal
Letters to explain
the nature of
the program
• Set
appointment for
presentation
• Presentation of
work-based
• Conduct site
visit for work-
based training
plan
• Finalize
Coordinato
r for
Academe-
Industry
Linkages
(Department
Head)
Department
Secretary
Industry
Supervisor
Pens/
Pencils
Papers
Printers
Computer
Unit
Internet
ALS
Community
Learning
Center
2.
training plan or
MOAor MOU
• Present the
training plan and
MOA or MOU for
approval
• Orientation and
deployment of
trainees in the
industry
CORE 1 PERFORM ROUGHING-IN ACTIVITIES, WIRING AND CABLING WORKS FOR SINGLE-PHASE DISTRIBUTION,
POWER, LIGHTING AND AUXILIARY SYSTEMS
LO 1
Install
electrical
metallic /non-
metallic (PVC
conduit)
1.1 Interpreted
correct drawings
based on job
requirements
1.2 Determined
correct quantities
of conduit,
fittings and
accessories as
per job
requirements
1.3 Selected tools
and equipment
as per job
requirements
1.4 Assembled
conduit ensuring
that fittings are
fully inserted and
tightened as per
job requirements
1.5 Bent conduit
with bends not
exceeding 90° as
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Rigid
Steel
Conduits
(RSC)
Intermedi
ate
Metallic
Conduit
(IMC)
Electrical
Metallic
Tubing
(EMT)
Polyvinyl
Chloride
Pipe (PVC)
Condulets
and
Reducers
lock nut
and
bushing
Entrance
Anteco
training
center
Observation
of
performance
Interview
Third party
report
3.
per job
requirements
1.6 Installed
conduit
couplingsand
elbows as per job
requirements
1.7 Threaded
conduit in line
with job
requirements
1.8 Followed
safety procedures
in line with
standard
operating
procedures
(SOPs.
cap
Nipple 2.5
Elbow
4.
LO 2
Install wire
waysand
cable tray
2.1 Interpreted
correct drawings to
determine job
requirements
2.2 Selected
correct quantities
of materials as per
job requirements
2.3 Selected tools
and equipment as
per job
requirements
2.4 Installed wire
ways and cable
trays as per job
requirements.
2.5 Foll0wed safety
procedures in line
with SOPs
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Boxes
Utility Box
Junction Box
Pull box/Splice
box
Conduit
supports
( e.g.
hangers )
Conduit
Strap
Connectors
(straight and
angle
Electrical
power tools
Wire ways
and cable
tray
Electrical
Metallic
conduit
Anteco
training
center
Observation
of
performance
Interview
Third party
report
LO 3
Install
auxiliary
terminal
cabinet and
distribution
panel
3. 1 Interpreted
correct drawings to
determine job
requirements
3.2 Selected
correct quantities
of materials as per
job requirements
3.3 Selected tools
and equipment as
per job
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Boxes
Utility Box
Junction Box
Pull box/Splice
box
Conduit
supports
( e.g.
hangers )
Conduit
Strap
Anteco
training
center
Observation
of
performance
Interview
Third party
report
5.
requirements
3.4 Installed
auxiliary terminal
cabinetas per job
requirements
3.5 Installed
auxiliary main
distribution frame
as per job
requirements
3.6 Followed safety
procedures in line
with SOPs
Connectors
(straight and
angle
Electrical
power tools
Wire ways
and cable
tray
Electrical
Metallic
conduit
6.
LO 4.
Prepare for
cablepulling
and
installation
4.1 Prepared
necessary tools,
equipment,
materials and
personal protective
equipment (PPE) in
line with job
requirements.
4.2 Identified cable
pulling &
installation
requirements and
constraints from
plan and site
inspections per job
requirements.
4.3 Set up cable
lay out &
installation
equipment in
accordance with
manufacturer's
and job
requirements.
4.4 Made site safe
and secure for
cable installation.
4.5 Selected
suitable protective
clothing and
required safety
devices are used
4.6 Assessed
support structure
as safe for normal
working
conditions.
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Spirit level,
hack saw,
pipe cutter,
plumb bob,
pipe reamer,
pipe
threader,
pipe bender,
bolt cutter,
electric drill
Electrical
power tools -
Power drills
- Portable
grinder
Electrical
Metallic
conduit
Wire ways
and cable
tray
Auxiliary
terminal
cabinet and
distribution
panel.
Anteco
training
center
Observation
of
performance
Interview
Third party
report
7.
LO 5
Perform
wiring and
cablinglay
out
5.1 Followed safety
procedures based
on safety
regulations PPE
are identified and
selected in line
with safety
requirements
5.2 Identified tools,
equipment, pulling
compound and
safety
requirements and
obtained for the lay
out and
installation.
5.3 Properly
Installed pulling
materials and
tensioned to
required
specifications
5.4 Secured cable
permanently to
support structure
in accordance with
standard
installation
procedures
5.5 Observed
bending radius
and loops
tolerance for cable
materials at all
times
5.6 Followed
schedule of wire
cutting lists based
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Boxes
Utility Box
Junction Box
Pull box/Splice
box
Conduit
supports
( e.g.
hangers )
Conduit
Strap
Connectors
(straight and
angle
Electrical
power tools
Spirit level,
hack saw,
pipe cutter,
plumb bob,
pipe reamer,
pipe
threader,
pipe bender,
bolt cutter,
electric drill
Electrical
power tools -
Power drills
- Portable
grinder
Electrical
Metallic
conduit
Wire ways
and cable
tray
Anteco
training
center
Observation
of
performance
Interview
Third party
report
8.
on estimates,
quantity andsizes
to avoid wastage.
5.7 Sought further
instructions if
unplanned events
or conditions occur
5.8 Checked
quality of work is
done in accordance
with instructions
and requirements.
Auxiliary
terminal
cabinet and
distribution
panel.
9.
LO 6
Notify
completion of
work
6.1Made final
checks to ensure
that work
conforms with
instructions and
job requirements
6.2 Notified
supervisor upon
completion of work
6.3 cleaned,
checked and
returned tools,
equipment and any
surplus resources
and materials to
storage in
accordance with
established
procedures
6.4 Cleaned up
work area and
made safe
according to OHSA
regulations
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Boxes
Utility Box
Junction Box
Pull box/Splice
box
Conduit
supports
( e.g.
hangers )
Conduit
Strap
Connectors
(straight and
angle
Electrical
power tools
Spirit level,
hack saw,
pipe cutter,
plumb bob,
pipe reamer,
pipe
threader,
pipe bender,
bolt cutter,
electric drill
Electrical
power tools -
Power drills
- Portable
grinder
Electrical
Metallic
conduit
Wire ways
and cable
tray
Anteco
training
center
Observation
of
performance
Interview
Third party
report
10.
CORE 2 INSTALLELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING
PROTECTION AND GROUNDING SYSTEMS
LO 1
Plan and
prepare work
1.1 Communicated
and confirmed
Instructions for the
preparation of the
work activity to
ensure clear
understanding
1.2 Identified tools,
equipment and
PPE needed to
install electrical
wiring and,
checked to ensure
they work correctly
as intended and
are safe to use in
accordance with
established
procedures
1.3 Obtained
materials needed
for work in
accordance with
established
procedures
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Pliers
Screwdrivers
Wrenches
Wire splicers
Electrician
knives
Electric drill
Ball hammer
Working
gloves
Safety shoes
Hard hat
Anteco
training
center
Observation
of
performance
Interview
Third party
report
LO 2
Install
electrical
protective
devices
2.1 Followed safety
procedures are
followed in line
with job
requirements
2.2 Performed
correct procedures
for installation of
electrical protective
devices in line with
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Philippine
Electrical
Code
Safety
standards
Safety
switch
Earth
Leakage
Circuit
Anteco
training
center
Observation
of
performance
Interview
Third party
report
11.
job requirements
and PEC.
2.3Followed
schedule of work to
ensure work is
completed in an
agreed time, to a
quality standard
and with a
minimum waste
2.4 Sought further
instructions from a
supervisor if
unplanned events
or conditions occur
2.5 Done on-going
checks of quality of
work in
accordance with
instructions and
requirements
Breaker
(ELCB)
Conventiona
l
atmospheric
lightning
protection
Grounding
system
LO3
Install
lighting
fixture and
auxiliary
outlet.
3.3 Followed
schedule of work to
ensure work is
completed in an
agreed time, to a
quality standard
and with a
minimum waste
3.4 Sought further
instructions from a
supervisor if
unplanned events
or conditions
occur.
3.5 Undertaken
on-going checks of
quality of work in
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Pliers
Screwdrivers
Wrenches
Wire splicers
Electrician
knives
Electric drill
Ball hammer
Working
gloves
Safety shoes
Hard hat
Lamps
Spotlights
Track lights
Perimeter
lighting
Anteco
training
center
Observation
of
performance
Interview
Third party
report
12.
accordance with
instructions and
requirements.
LO4
Notify
completion of
work.
4.1 Made final
checks to ensure
the work conforms
with instructions
and requirements
4.2 Notified
supervisor upon
completion of work
4.3 Cleaned,
checked and
returned tools,
equipment and any
surplus resources
and materials
where appropriate
to storage in
accordance with
established
procedures
4.4 Cleaned work
area and made
safe.4 Work area is
cleaned and safe
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Philippine
Electrical
Code
Safety
standards
Safety
switch
Earth
Leakage
Circuit
Breaker
(ELCB)
Conventiona
l
atmospheric
lightning
protection
Grounding
system
Anteco
training
center
Observation
of
performance
Interview
Third party
report
CORE 3 INSTALL WIRING DEVICES OF FLOOR AND WALL MOUNTED OUTLETS, LIGHTING FIXTURE/SWITCHES AND
AUXILLIARY OUTLETS
13.
LO1
Select wiring
devices
1.1 Readand
interpreted
Drawings to
determine job
requirements.
1.2 Identified
correct type and
quantity of wiring
devices and
consumable items
in line with job
requirements.
1.3 Selected tools
and equipment in
line with job
requirements
1.4 Identified and
selected correct
PPE in line with
safety
requirements
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Floor outlet
Ground fault
current
interrupting
device
Grounding
type
convenience
outlet
Light
switches
Wire nut
Electrical
tape
rubber tape
Pliers
Screwdrivers
Wire splicers
Electrician
knives
Working
gloves
Safety shoes
Hard hat
Anteco
training
center
Observation
of
performance
Interview
Third party
report
LO2
Install wiring
devices
2.1 Followed safety
procedures based
on safety
regulations
2.2 Performed
correct procedures
for installation of
wiring devices in
line with job
requirements
2.3 Followed
schedule of work
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Wire nut
Electrical
tape
rubber tape
Pliers
Screwdrivers
Wire splicers
Electrician
knives
Working
gloves
Safety shoes
Anteco
training
center
Observation
of
performance
Interview
Third party
report
14.
based on agreed
time,quality
standard and
minimum wastage
2.4 Sought further
instructions if
unplanned events
or conditions occur
2.5 Done on-going
checking of quality
of work in
accordance with
instructions and
requirements.
Hard hat
Philippine
Electrical
Code
Safety
standards
LO3
Install
lighting
fixture/
switches
3.1 Followed safety
procedures.
3.2 Performed
correct procedures
for installation of
lighting
fixtures/switches
in line with job
3.3 Followed
schedule of work to
ensure work is
completed in an
agreed time, to a
quality standard
and with a
minimum waste
3.4 Sought further
instructions from a
supervisor if
unplanned events
or conditions occur
3.5 Undertaken
on-going checks of
quality of work in
accordance with
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Wire nut
Electrical
tape
rubber tape
Pliers
Screwdrivers
Wire splicers
Electrician
knives
Working
gloves
Safety shoes
Hard hat
Lamps
Spotlights
Track Lights
Perimeter
Lighting
Anteco
training
center
Observation
of
performance
Interview
Third party
report
15.
instructions and
requirements
LO4
Notify
completion of
work
4.1Made final
checks to ensure
the work conforms
with instructions
and requirements
4.2 Notified
supervisor upon
completion of work
4.3 Cleaned,
checked and
returned tools,
equipment and any
surplus resources
and materials
where appropriate
to storage in
accordance with
established
procedures
4.4 Cleaned work
area and made
safe.
Dual
Training
System
Training
coordinator
Industry
linkage
officer
Instructor
Wire nut
Electrical
tape
rubber tape
Pliers
Screwdrivers
Wire splicers
Electrician
knives
Working
gloves
Safety shoes
Hard hat
Anteco
training
center
Observation
of
performance
Interview
Third party
report
Prepared by: REYMOUS N. FABILLO Reviewed and verified by:
Trainer