List of Content
• 5S Cross Functional Team
• 5S Training of CFT
• 5S Objectives
• 5S Criteria for Benchmarking/Audit
• 5S Evaluation & Score Card
• 5S Execution Plan and Timelines
5S Cross Functional Team
Criteria
• A team of 6 to 8 representatives from departments will be preferred,
however, the size may vary depending on the situation.
• Individuals should have some engineering/management background with a
strong cognitive ability.
• Individuals must have strong interpersonal skills and enough experience in
the organization to reach hidden areas of departments.
• Individuals must be self motivated and have can do attitude.
• Individuals must be available on call during working hours and for CFT
meetings.
• Individuals should have intermediate level experience of MS Office
applications (Min. Word, Excel & PowerPoint), expertise in Visio,
Photoshop will be given preference.
5S Training of CFT
• CFT will be trained on 5S principles.
• They will be exposed to some Case Studies and Scenario based
learning.
• They will be provoked to apply 5S best practice and design a work
flow that can best leverage the plant practices.
• They will be educated so that they should be able to prepare criteria
for assessments during benchmarking and Audits.
• They will be trained to control and sustain the overall project.
5S Objectives
• Primary Objectives:
• Well-Organized and Standardized Work environment
• Improved Housekeeping and Appearance
• Secondary Objectives:
• Reduced Downtime
• Increased employee engagement
• Improved Safety
• Improved Quality
• Improved efficiency
• Increased Production Capacity
5S Criteria for Benchmarking/Audit
• Criteria for Benchmarking will be finalized based on the following
main principles.

More Related Content

Similar to 5S Execution Plan_Only for Upload.pptx

Resume Best Practices
Resume Best PracticesResume Best Practices
Resume Best Practices
SupportGCI
 
Human Resources: Using Competency Modeling to Centralize Your HR Functions
Human Resources:  Using Competency Modeling to Centralize Your HR Functions Human Resources:  Using Competency Modeling to Centralize Your HR Functions
Human Resources: Using Competency Modeling to Centralize Your HR Functions
Select_International
 
Execution - The Discipline of getting things done
Execution - The Discipline of getting things doneExecution - The Discipline of getting things done
Execution - The Discipline of getting things done
Sathish Kumar P
 
4. Need Assessment new.pptx
4. Need Assessment new.pptx4. Need Assessment new.pptx
4. Need Assessment new.pptx
Muhammadusman432680
 
Bryan_Chau_Resume_2016
Bryan_Chau_Resume_2016Bryan_Chau_Resume_2016
Bryan_Chau_Resume_2016Bryan Jung
 
Interview Preparation
Interview PreparationInterview Preparation
Interview Preparation
SupportGCI
 
How to Design Effective PMS Systems and KRA Sheets
How to Design Effective PMS Systems and KRA SheetsHow to Design Effective PMS Systems and KRA Sheets
How to Design Effective PMS Systems and KRA Sheets
Akash Deep Sharma
 
Learnings for the learning industry from 500 and 1000 notes decision
Learnings for the learning industry from 500 and 1000 notes decisionLearnings for the learning industry from 500 and 1000 notes decision
Learnings for the learning industry from 500 and 1000 notes decision
Enhance Systems Pvt. Ltd.
 
Strategic Mgmt - Internal and external 3.pptx
Strategic Mgmt - Internal and external 3.pptxStrategic Mgmt - Internal and external 3.pptx
Strategic Mgmt - Internal and external 3.pptx
alex133249
 
Resume Best Practices
Resume Best PracticesResume Best Practices
Resume Best Practices
SupportGCI
 
Training needs analysis, skills auditing and training roi presentation 31 aug...
Training needs analysis, skills auditing and training roi presentation 31 aug...Training needs analysis, skills auditing and training roi presentation 31 aug...
Training needs analysis, skills auditing and training roi presentation 31 aug...
Charles Cotter, PhD
 
Chapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success FactorChapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success FactorSanat Maharjan
 
Resume Best Practices
Resume Best PracticesResume Best Practices
Resume Best Practices
SupportGCI
 
10 Lessons of Salesforce Nonprofit implementations from a Customer and Integr...
10 Lessons of Salesforce Nonprofit implementations from a Customer and Integr...10 Lessons of Salesforce Nonprofit implementations from a Customer and Integr...
10 Lessons of Salesforce Nonprofit implementations from a Customer and Integr...
YeurDreamin'
 
Tricks and traps for effective IT resumes
Tricks and traps for effective IT resumesTricks and traps for effective IT resumes
Tricks and traps for effective IT resumes
Donna Shannon
 
Steve loos agile operationalizing your org
Steve loos   agile operationalizing your orgSteve loos   agile operationalizing your org
Steve loos agile operationalizing your org
Paul Ellarby
 
Talent Guard Overview
Talent Guard OverviewTalent Guard Overview
Talent Guard Overview
annmaynard
 

Similar to 5S Execution Plan_Only for Upload.pptx (20)

Resume Best Practices
Resume Best PracticesResume Best Practices
Resume Best Practices
 
Human Resources: Using Competency Modeling to Centralize Your HR Functions
Human Resources:  Using Competency Modeling to Centralize Your HR Functions Human Resources:  Using Competency Modeling to Centralize Your HR Functions
Human Resources: Using Competency Modeling to Centralize Your HR Functions
 
Execution - The Discipline of getting things done
Execution - The Discipline of getting things doneExecution - The Discipline of getting things done
Execution - The Discipline of getting things done
 
4. Need Assessment new.pptx
4. Need Assessment new.pptx4. Need Assessment new.pptx
4. Need Assessment new.pptx
 
IT Resume Writing
IT Resume WritingIT Resume Writing
IT Resume Writing
 
Bryan_Chau_Resume_2016
Bryan_Chau_Resume_2016Bryan_Chau_Resume_2016
Bryan_Chau_Resume_2016
 
Interview Preparation
Interview PreparationInterview Preparation
Interview Preparation
 
How to Design Effective PMS Systems and KRA Sheets
How to Design Effective PMS Systems and KRA SheetsHow to Design Effective PMS Systems and KRA Sheets
How to Design Effective PMS Systems and KRA Sheets
 
Learnings for the learning industry from 500 and 1000 notes decision
Learnings for the learning industry from 500 and 1000 notes decisionLearnings for the learning industry from 500 and 1000 notes decision
Learnings for the learning industry from 500 and 1000 notes decision
 
Resume_ La Tiffany Campbell
Resume_ La Tiffany CampbellResume_ La Tiffany Campbell
Resume_ La Tiffany Campbell
 
Strategic Mgmt - Internal and external 3.pptx
Strategic Mgmt - Internal and external 3.pptxStrategic Mgmt - Internal and external 3.pptx
Strategic Mgmt - Internal and external 3.pptx
 
Resume Best Practices
Resume Best PracticesResume Best Practices
Resume Best Practices
 
Training needs analysis, skills auditing and training roi presentation 31 aug...
Training needs analysis, skills auditing and training roi presentation 31 aug...Training needs analysis, skills auditing and training roi presentation 31 aug...
Training needs analysis, skills auditing and training roi presentation 31 aug...
 
Chapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success FactorChapter 6 Information System-Critical Success Factor
Chapter 6 Information System-Critical Success Factor
 
Resume Best Practices
Resume Best PracticesResume Best Practices
Resume Best Practices
 
10 Lessons of Salesforce Nonprofit implementations from a Customer and Integr...
10 Lessons of Salesforce Nonprofit implementations from a Customer and Integr...10 Lessons of Salesforce Nonprofit implementations from a Customer and Integr...
10 Lessons of Salesforce Nonprofit implementations from a Customer and Integr...
 
Tricks and traps for effective IT resumes
Tricks and traps for effective IT resumesTricks and traps for effective IT resumes
Tricks and traps for effective IT resumes
 
Steve loos agile operationalizing your org
Steve loos   agile operationalizing your orgSteve loos   agile operationalizing your org
Steve loos agile operationalizing your org
 
How to build a high performance company
How to build a high performance companyHow to build a high performance company
How to build a high performance company
 
Talent Guard Overview
Talent Guard OverviewTalent Guard Overview
Talent Guard Overview
 

Recently uploaded

Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
ssuser7dcef0
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 

Recently uploaded (20)

Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
NUMERICAL SIMULATIONS OF HEAT AND MASS TRANSFER IN CONDENSING HEAT EXCHANGERS...
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 

5S Execution Plan_Only for Upload.pptx

  • 2. List of Content • 5S Cross Functional Team • 5S Training of CFT • 5S Objectives • 5S Criteria for Benchmarking/Audit • 5S Evaluation & Score Card • 5S Execution Plan and Timelines
  • 3. 5S Cross Functional Team Criteria • A team of 6 to 8 representatives from departments will be preferred, however, the size may vary depending on the situation. • Individuals should have some engineering/management background with a strong cognitive ability. • Individuals must have strong interpersonal skills and enough experience in the organization to reach hidden areas of departments. • Individuals must be self motivated and have can do attitude. • Individuals must be available on call during working hours and for CFT meetings. • Individuals should have intermediate level experience of MS Office applications (Min. Word, Excel & PowerPoint), expertise in Visio, Photoshop will be given preference.
  • 4. 5S Training of CFT • CFT will be trained on 5S principles. • They will be exposed to some Case Studies and Scenario based learning. • They will be provoked to apply 5S best practice and design a work flow that can best leverage the plant practices. • They will be educated so that they should be able to prepare criteria for assessments during benchmarking and Audits. • They will be trained to control and sustain the overall project.
  • 5. 5S Objectives • Primary Objectives: • Well-Organized and Standardized Work environment • Improved Housekeeping and Appearance • Secondary Objectives: • Reduced Downtime • Increased employee engagement • Improved Safety • Improved Quality • Improved efficiency • Increased Production Capacity