Fast, Agile, Resilient
for Emerging Workloads
X6: The sixth generation of EXA Technology
Alex Yost
Vice President, IBM PureSystems and System x
IBM Systems and Technology Group
Infrastructure Matters…
It drives virtually all business services

Agility
Speed
Efficiency

Infrastructure must:

• 
• 
• 
• 

Execute quickly and efficiently
Minimize costs and complexity
Foster innovation
Stay up and running

Economics
© 2014 IBM Corporation
IBM’s long history of x86 leadership

EXA
1st
VMware
development
partner

EXA2

1st
1st
x86 server with
100 #1
benchmarks

Intel co-innovation partner

© 2014 IBM Corporation

X3

X4

1st
hot-swap
memory

to surpass
1 million
tpmC

eX5
1st 	

scalable
memory

#1
market share

Largest
SAP HANA System

X6
Mission critical workloads are increasingly moving to x86
Enterprise
Resource Planning

Execute strategies and meet demand

Business
Analytics

Real-time trends and patterns	


Database

Access core information	


Virtualization

© 2014 IBM Corporation

IT optimization
Introducing the sixth generation of IBM Enterprise X-Architecture

FAST
AGILE
RESILIENT

Superior performance
43% lower solution cost
Up to 28% lower acquisition costs
Multiple generations of investment protection
3X the memory
More reliable

IBM System
x3950 X6

IBM System
x3850 X6

8-way rack

4-way rack

© 2014 IBM Corporation

IBM Flex System x880 X6
2- to 8-way compute node
FAST

Shift your business services into high gear

Scaling for new workloads
and business demands

3X more memory

Actionable information—
delivered faster

Scaling to support 8 CPUs

Higher solution performance
at 43% lower cost

New eXFlash memory-channel
storage

© 2014 IBM Corporation

FlashCache Storage Accelerator
FAST

Higher performance from Flash storage
directly on the memory bus

WriteNow • RAID • IBM FlashCache Storage Accelerator
DATA &
ANALYTICS

3X
LOWER
latency

CLOUD

2X
FLASH

© 2014 IBM Corporation

Better
awareness

FASTER
IT
optimization

Competitive
advantage

43% LOWER
solution cost
FAST

X6 Architecture + DB2 = Super Fast

DB2 optimized for high speed
analytics & transactions

99x faster analytics
using BLU Acceleration with X6
Architecture1

1. 
2. 

Leveraging X6 innovations
on memory, IO, and storage

2.3x increase for
transactional throughput
using eXFlash DIMM2	


Based on internal tests comparing DB2 10.1 on a whitebox with XIV storage vs. DB2 10.5 with BLU Acceleration and X6 Architecture
Based on internal tests comparing DB2 10.5 with SSD vs. with eXFlash DIMM.
© 2014 IBM Corporation
AGILE

Modular design reduces cost
and protects your investment

Simplify deployment
Maximize performance
Up to 28% lower
acquisition costs

Handles what you need today
and in the future
© 2014 IBM Corporation
AGILE

Multiple generations on one server

Upgrade technology using
the modular “book” design

Eliminate
“server rip
and replace”
© 2014 IBM Corporation
RESILIENT

Meet the demands of
enterprise workloads

Advanced Page Retire
Processor High Availability
Rolling Firmware Update Upward
Integration Module for Standard
Hypervisors
RAS Upward Integration Module
for Standard Hypervisors

© 2014 IBM Corporation

• 
• 
• 
• 

Maximize application availability
Reduce support costs
Simplify maintenance
Manage more with existing tools

3X the memory and 
still more reliable
X6: the ideal infrastructure for today’s enterprise applications

INFRASTRUCTURE SOLUTIONS
SAP
Business
Suite

SAP
HANA

© 2014 IBM Corporation

Microsoft
Hyper-V

VMware
vCloud
Suite

IBM
DB2 with BLU
Acceleration

Microsoft
SQL Data
Warehouse
SAP HANA and IBM momentum in big data and analytics
More than

2100 SAP
HANA
systems
shipped

Largest SAP
HANA system
in the world:

100TB

Investment
protection:
Add X6 to existing
eX5 clusters

Leadership 	


400TB

of IBM Systems in
SAP HANA
Enterprise Cloud

X6 is
optimized for
analytics:

I/O performance, memory
and core scalability	


© 2014 IBM Corporation

in SAP

HANA	


on EXA 
technology
Get expert integrated knowledge
baked right into your cloud

IBM Platform Resource
Scheduler

Dynamic resource management for OpenStack to
optimize infrastructure utilization while reducing cost

IBM Flex System for
SmartCloud Orchestrator

Quickly deploy clouds with open standards-driven
support across OpenStack, networking and storage

IBM PureFlex System for
VMware vCloud Suite

Provides simplicity, performance and speed of
deployment of our PureFlex System into
vCloud and vCenter environments

© 2014 IBM Corporation
Workload optimized for big data

Purpose-built for Big Data
Aggregate 
Analyze Data

IBM System x3650 M4 BD	

•  Industry’s highest total storage capacity of 3.5-inch drives for dual-socket x86 servers 	

•  Up to 56 TB of storage spanning 14 drives for big data and storage-rich applications	

•  High performance: Intel Xeon E5-2600 v2 processors (up to 12 cores per CPU)	

© 2014 IBM Corporation
can drive cloud and big data for your enterprise

Fast

Develop innovative products
and services

Achieve insight faster

Agile

Innovate products and
services

Multiple generations of
technology delivers up to
28% lower acquisition costs

Outperform your competitors

Resilient

More reliable with
3X the memory

© 2014 IBM Corporation

Cloud-enable mission critical
applications
The Next Generation
Database and X6
Sean Poulley
Vice President, Databases and Data Warehousing
IBM Software Group
What does the next generation of database look like?
ü  The most advanced in-memory technology on the
market today
ü  Hybrid columnar  row based
ü  Super fast for transactional and
analytic workloads
ü  Leading NOSQL and SQL capabilities
ü  Highly available, highly reliable, highly resilient, and
simplified with advanced workload capability

© 2014 IBM Corporation
DB2 with BLU Acceleration
Change the game for in-memory
§  In-memory columnar
processing
§  Dynamic memory
technology
§  Data skipping
§  Parallel vector processing

§  No need for indexes or
tuning
§  Create, load and go
§  Modular, flexible
system design

§  Clients reporting 10x
compression3
§  Compressed data
remains actionable
§  Very high compute and
storage density

§  Lowest TCA through
efficient
configurations
§  Lower license costs
with terabyte pricing
§  Upgrade with lower
cost, no overhead

© 2014 IBM Corporation
1Client-reported

testing results in DB2 10.5 early release program. Individual results will vary depending on individual workloads, configurations and conditions, including table size and content.
DB2 Performance
Change the game for Analytics and Super Fast Transactions
Super Fast Analytics

Super Fast Transactions

§  99x faster analytics using BLU Acceleration
on X6 Architecture1
§  In-memory columnar processing
§  POPS (Proof of Perf  Scalability) workload

§  IBM eXFlash DIMM technology
improves transaction throughput2
§  High-speed uncore I/O
§  Complex OLTP Workload

100
50

Throughput (tps)

150

Good

99x

200

2.3x

0
DB2 10.1 on w hitebox

1Based
2Based

DB2 10.5 w ith BLU Acceleleration w ith
X6 Architecture

on internal tests comparing DB2 10.1 on a whitebox with XIV storage vs. DB2 10.5 with BLU Acceleration on X6 Architecture
on internal tests comparing DB2 10.5 on X6 with SSD vs. with eXFlash DIMM
© 2014 IBM Corporation

Good

Elapsed time (min.)

250
Current System x clients are seeing remarkable results with BLU
Acceleration

“Our query process that used to take 7 minutes can now
be run in 20 seconds, an improvement of 21X. One of
the great benefits of BLU Acceleration is that this great
query performance came without any tuning!”
- Shohei Kato, Engineer
	
And…
OVER 1000 customers entitled to the power of BLU Acceleration !!!!!!!
© 2014 IBM Corporation
IBM NYSE event - 1-16 IBM's Alex Yost and Sean Poulley on IBM X6 Technology Breakthroughs

IBM NYSE event - 1-16 IBM's Alex Yost and Sean Poulley on IBM X6 Technology Breakthroughs

  • 1.
    Fast, Agile, Resilient forEmerging Workloads X6: The sixth generation of EXA Technology Alex Yost Vice President, IBM PureSystems and System x IBM Systems and Technology Group
  • 2.
    Infrastructure Matters… It drivesvirtually all business services Agility Speed Efficiency Infrastructure must: •  •  •  •  Execute quickly and efficiently Minimize costs and complexity Foster innovation Stay up and running Economics © 2014 IBM Corporation
  • 3.
    IBM’s long historyof x86 leadership EXA 1st VMware development partner EXA2 1st 1st x86 server with 100 #1 benchmarks Intel co-innovation partner © 2014 IBM Corporation X3 X4 1st hot-swap memory to surpass 1 million tpmC eX5 1st scalable memory #1 market share Largest SAP HANA System X6
  • 4.
    Mission critical workloadsare increasingly moving to x86 Enterprise Resource Planning Execute strategies and meet demand Business Analytics Real-time trends and patterns Database Access core information Virtualization © 2014 IBM Corporation IT optimization
  • 5.
    Introducing the sixthgeneration of IBM Enterprise X-Architecture FAST AGILE RESILIENT Superior performance 43% lower solution cost Up to 28% lower acquisition costs Multiple generations of investment protection 3X the memory More reliable IBM System x3950 X6 IBM System x3850 X6 8-way rack 4-way rack © 2014 IBM Corporation IBM Flex System x880 X6 2- to 8-way compute node
  • 6.
    FAST Shift your businessservices into high gear Scaling for new workloads and business demands 3X more memory Actionable information— delivered faster Scaling to support 8 CPUs Higher solution performance at 43% lower cost New eXFlash memory-channel storage © 2014 IBM Corporation FlashCache Storage Accelerator
  • 7.
    FAST Higher performance fromFlash storage directly on the memory bus WriteNow • RAID • IBM FlashCache Storage Accelerator DATA & ANALYTICS 3X LOWER latency CLOUD 2X FLASH © 2014 IBM Corporation Better awareness FASTER IT optimization Competitive advantage 43% LOWER solution cost
  • 8.
    FAST X6 Architecture +DB2 = Super Fast DB2 optimized for high speed analytics & transactions 99x faster analytics using BLU Acceleration with X6 Architecture1 1.  2.  Leveraging X6 innovations on memory, IO, and storage 2.3x increase for transactional throughput using eXFlash DIMM2 Based on internal tests comparing DB2 10.1 on a whitebox with XIV storage vs. DB2 10.5 with BLU Acceleration and X6 Architecture Based on internal tests comparing DB2 10.5 with SSD vs. with eXFlash DIMM. © 2014 IBM Corporation
  • 9.
    AGILE Modular design reducescost and protects your investment Simplify deployment Maximize performance Up to 28% lower acquisition costs Handles what you need today and in the future © 2014 IBM Corporation
  • 10.
    AGILE Multiple generations onone server Upgrade technology using the modular “book” design Eliminate “server rip and replace” © 2014 IBM Corporation
  • 11.
    RESILIENT Meet the demandsof enterprise workloads Advanced Page Retire Processor High Availability Rolling Firmware Update Upward Integration Module for Standard Hypervisors RAS Upward Integration Module for Standard Hypervisors © 2014 IBM Corporation •  •  •  •  Maximize application availability Reduce support costs Simplify maintenance Manage more with existing tools 3X the memory and still more reliable
  • 12.
    X6: the idealinfrastructure for today’s enterprise applications INFRASTRUCTURE SOLUTIONS SAP Business Suite SAP HANA © 2014 IBM Corporation Microsoft Hyper-V VMware vCloud Suite IBM DB2 with BLU Acceleration Microsoft SQL Data Warehouse
  • 13.
    SAP HANA andIBM momentum in big data and analytics More than 2100 SAP HANA systems shipped Largest SAP HANA system in the world: 100TB Investment protection: Add X6 to existing eX5 clusters Leadership 400TB of IBM Systems in SAP HANA Enterprise Cloud X6 is optimized for analytics: I/O performance, memory and core scalability © 2014 IBM Corporation in SAP HANA on EXA technology
  • 14.
    Get expert integratedknowledge baked right into your cloud IBM Platform Resource Scheduler Dynamic resource management for OpenStack to optimize infrastructure utilization while reducing cost IBM Flex System for SmartCloud Orchestrator Quickly deploy clouds with open standards-driven support across OpenStack, networking and storage IBM PureFlex System for VMware vCloud Suite Provides simplicity, performance and speed of deployment of our PureFlex System into vCloud and vCenter environments © 2014 IBM Corporation
  • 15.
    Workload optimized forbig data Purpose-built for Big Data Aggregate Analyze Data IBM System x3650 M4 BD •  Industry’s highest total storage capacity of 3.5-inch drives for dual-socket x86 servers •  Up to 56 TB of storage spanning 14 drives for big data and storage-rich applications •  High performance: Intel Xeon E5-2600 v2 processors (up to 12 cores per CPU) © 2014 IBM Corporation
  • 16.
    can drive cloudand big data for your enterprise Fast Develop innovative products and services Achieve insight faster Agile Innovate products and services Multiple generations of technology delivers up to 28% lower acquisition costs Outperform your competitors Resilient More reliable with 3X the memory © 2014 IBM Corporation Cloud-enable mission critical applications
  • 18.
    The Next Generation Databaseand X6 Sean Poulley Vice President, Databases and Data Warehousing IBM Software Group
  • 19.
    What does thenext generation of database look like? ü  The most advanced in-memory technology on the market today ü  Hybrid columnar row based ü  Super fast for transactional and analytic workloads ü  Leading NOSQL and SQL capabilities ü  Highly available, highly reliable, highly resilient, and simplified with advanced workload capability © 2014 IBM Corporation
  • 20.
    DB2 with BLUAcceleration Change the game for in-memory §  In-memory columnar processing §  Dynamic memory technology §  Data skipping §  Parallel vector processing §  No need for indexes or tuning §  Create, load and go §  Modular, flexible system design §  Clients reporting 10x compression3 §  Compressed data remains actionable §  Very high compute and storage density §  Lowest TCA through efficient configurations §  Lower license costs with terabyte pricing §  Upgrade with lower cost, no overhead © 2014 IBM Corporation 1Client-reported testing results in DB2 10.5 early release program. Individual results will vary depending on individual workloads, configurations and conditions, including table size and content.
  • 21.
    DB2 Performance Change thegame for Analytics and Super Fast Transactions Super Fast Analytics Super Fast Transactions §  99x faster analytics using BLU Acceleration on X6 Architecture1 §  In-memory columnar processing §  POPS (Proof of Perf Scalability) workload §  IBM eXFlash DIMM technology improves transaction throughput2 §  High-speed uncore I/O §  Complex OLTP Workload 100 50 Throughput (tps) 150 Good 99x 200 2.3x 0 DB2 10.1 on w hitebox 1Based 2Based DB2 10.5 w ith BLU Acceleleration w ith X6 Architecture on internal tests comparing DB2 10.1 on a whitebox with XIV storage vs. DB2 10.5 with BLU Acceleration on X6 Architecture on internal tests comparing DB2 10.5 on X6 with SSD vs. with eXFlash DIMM © 2014 IBM Corporation Good Elapsed time (min.) 250
  • 22.
    Current System xclients are seeing remarkable results with BLU Acceleration “Our query process that used to take 7 minutes can now be run in 20 seconds, an improvement of 21X. One of the great benefits of BLU Acceleration is that this great query performance came without any tuning!” - Shohei Kato, Engineer And… OVER 1000 customers entitled to the power of BLU Acceleration !!!!!!! © 2014 IBM Corporation