     1. Describe the purpose and organization of the
        engineering and maintenance department.
     2. Identify and describe the many elements and concerns
        of plant maintenance, including electrical, plumbing,
        HVAC, and refrigeration systems; vehicle and
        equipment maintenance; and working with contractors.
     3. Discuss the importance and objectives of preventive
        maintenance and explain the elements needed to
        implement a preventive maintenance program
        effectively.
© 2010, Educational Institute   (continued)                 2
Competencies for
              Heart-of-the-House Management II
                                (continued)

     1. Identify and describe the areas and issues that grounds
        maintenance and landscaping must address.
     2. Identify tools, procedures, programs, and systems that
        contribute to energy conservation and cost control.
     3. Describe the responsibilities, tools, and organization
        of a resort’s accounting department.
     4. Outline the critical role and responsibilities of a
        resort’s procurement department and the control
        procedures needed to protect purchased goods.
© 2010, Educational Institute                                     3
Engineering vs. Maintenance
          • Engineering deals with the planning, design,
            construction, and management of a resort’s
            physical structures and energy/mechanical systems
          • Maintenance keeps a resort’s engineering system
            in peak condition and its facilities in good repair



© 2010, Educational Institute                                     4
Physical Plant Organization
                   •     Electrical—heat, light, and power
                   •     Plumbing
                   •     Ventilation and air conditioning
                   •     Refrigeration
                   •     General repairs and maintenance
                   •     Grounds, roads, and pathways
                   •     Recreational facilities
                   •     Mechanical power, vehicles, and equipment
                   •     Construction and renovation
© 2010, Educational Institute                                        5
Tasks Commonly Assigned to
          Repair and Maintenance Personnel
          • Handling routine work orders from housekeeping
            and other units
          • Maintaining and cleaning buildings
          • Painting exteriors and interiors
          • Repairing and refinishing walls, ceilings, and floors
          • Refurbishing and repairing furniture and fixtures
          • Setting up exhibits for meetings and conventions
          • Handling minor interior/exterior construction
          • Repairing equipment
          • Installing furnishings
          • Maintaining grounds
© 2010, Educational Institute                                       6
Three Basic Objectives
                          of Preventive Maintenance
                                • Capital returns
                                • System reliability
                                • Operating efficiency




© 2010, Educational Institute                            7
Preventive Maintenance
                                    Recordkeeping
                                 •   Equipment inventory records
                                 •   Maintenance schedules
                                 •   Maintenance logs
                                 •   Departmental reports



© 2010, Educational Institute                                      8
Resort Areas Typically Covered
                      by a Resort’s Grounds
                      Maintenance Program
                           • Approach areas
                           • Vehicular and pedestrian traffic routes
                           • Service areas
                           • Outdoor recreational areas
                           • Natural scenic areas
                           • Artificial scenic attractions

© 2010, Educational Institute                                          9
Objectives of Resort Grounds
                             Maintenance
          1. To maintain the attractiveness of a green
             environment surrounding buildings and
             recreational facilities
          2. To ensure that the resort’s grounds remain safe,
             secure, and accessible to all users




© 2010, Educational Institute                                   10
Grounds Maintenance Functions
                • Maintaining trees, shrubs, flowers, lawns, etc.
                • Maintaining driveways and interior roadways
                • Maintaining ornamental water features
                • Maintaining outdoor activity areas
                • Upgrading irrigation systems and replacing
                  greenery when needed
                • Maintaining an on-premises nursery
                • Operating/overseeing pest control programs

© 2010, Educational Institute        (continued)                    11
Grounds Maintenance Functions
                                   (continued)

              • Maintaining recreational areas
              • Maintaining fountains and water displays
              • Organizing nature activities
              • Policing trails, beaches, scenic spots, and other
                outdoor areas near the resort
              • Participating in community environmental
                planning and programs
              • Monitoring grounds-related news
© 2010, Educational Institute                                       12
Factors to Consider When
                 Choosing Surface Materials for
                    Roads, Walkways, Etc.
                                •   Prevailing weather conditions
                                •   Level and patterns of traffic
                                •   Commercial vehicles
                                •   Maintenance
                                •   Widths of passageways


© 2010, Educational Institute                                       13
Approaches to
       Controlling/Reducing Energy Costs
             • Utility audits
             • Energy audits
             • Energy conservation/cost control management




© 2010, Educational Institute                                14
Energy Conservation/Cost Control
                  Program Activities
                                •   Data collection
                                •   Analysis
                                •   Training
                                •   Operational review
                                •   Monitoring
                                •   Management review
                                •   Capital analysis


© 2010, Educational Institute                            15
Green Energy Systems
                                •   Heat recovery systems
                                •   Cogeneration/trigeneration systems
                                •   Wind energy
                                •   Solar energy




© 2010, Educational Institute                                            16
Accounting Records
                                  •   Guest ledger
                                  •   City ledger
                                  •   Special journals
                                  •   General ledger
                                  •   Financial statements
                                  •   Information reports



© 2010, Educational Institute                                17
Computer Applications for Resort
                     Accounting
                    •     Payroll
                    •     Inventory
                    •     Accounts payable and exception reporting
                    •     General ledger




© 2010, Educational Institute                                        18
Internal Control Procedures
          • Separate purchasing activities from receiving
            activities
          • Keep inventories under lock with strict key control
          • Issue only upon receipt of authorized requisitions
          • Perform surprise audits of inventory and inventory
            records
          • Establish a code of ethics
          • Impose penalties for breach of purchasing code
          • Qualify employees and vendors involved with
            procurement
© 2010, Educational Institute     (continued)                     19
Internal Control Procedures
                                     (continued)

                 • Obtain competitive bids when possible
                 • Pay periodic visits to vendors to check
                   quality/price
                 • Require operating departments to evaluate
                   products in use and report products that don’t
                   conform to specifications/requirements


© 2010, Educational Institute                                       20

More Related Content

Viewers also liked

Chapter 11
Chapter 11Chapter 11
Chapter 11
jezratty
 
resort casestudy
resort casestudyresort casestudy
resort casestudy
Ar. Sahid Akhtar
 
Mis chapter 8
Mis chapter 8Mis chapter 8
Resorts (Travel Management Prelim Notes)
Resorts (Travel Management Prelim Notes)Resorts (Travel Management Prelim Notes)
Resorts (Travel Management Prelim Notes)Dairy Queen Philippines
 
Projects handled at Mistry Architects - Residence - Bungalow for Srinivasulu...
Projects handled at Mistry Architects  - Residence - Bungalow for Srinivasulu...Projects handled at Mistry Architects  - Residence - Bungalow for Srinivasulu...
Projects handled at Mistry Architects - Residence - Bungalow for Srinivasulu...Sathyanarayan C V
 
Resort
ResortResort
International and Domestic Planning, Packaging and Pricing week 1
International and Domestic Planning, Packaging and Pricing week 1International and Domestic Planning, Packaging and Pricing week 1
International and Domestic Planning, Packaging and Pricing week 1
jay
 
Projects handled at Mistry Architects -Resorts - Infinity Wildlife Resorts -02
Projects handled at Mistry Architects  -Resorts - Infinity Wildlife Resorts -02Projects handled at Mistry Architects  -Resorts - Infinity Wildlife Resorts -02
Projects handled at Mistry Architects -Resorts - Infinity Wildlife Resorts -02Sathyanarayan C V
 
Resort management
Resort managementResort management
Resort management
Nishya Nand Kaushik
 
World Class Benchmarking: Bloomberry Resorts Corp (BLOOM PM)
World Class Benchmarking: Bloomberry Resorts Corp (BLOOM PM)World Class Benchmarking: Bloomberry Resorts Corp (BLOOM PM)
World Class Benchmarking: Bloomberry Resorts Corp (BLOOM PM)
Andrew Stotz, PhD, CFA
 
Physical plant and development program
Physical plant and development  programPhysical plant and development  program
Physical plant and development programLovely Ann Azanza
 
Promotion Concept Doberai Raja Ampat Eco Resort
Promotion Concept Doberai Raja Ampat Eco ResortPromotion Concept Doberai Raja Ampat Eco Resort
Promotion Concept Doberai Raja Ampat Eco Resort
Fery Bawembang
 

Viewers also liked (15)

Chapter 11
Chapter 11Chapter 11
Chapter 11
 
resort casestudy
resort casestudyresort casestudy
resort casestudy
 
Happy Resorts - HumRes
Happy Resorts - HumResHappy Resorts - HumRes
Happy Resorts - HumRes
 
Mis chapter 8
Mis chapter 8Mis chapter 8
Mis chapter 8
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 
MIS Chapter 4
MIS Chapter 4MIS Chapter 4
MIS Chapter 4
 
Resorts (Travel Management Prelim Notes)
Resorts (Travel Management Prelim Notes)Resorts (Travel Management Prelim Notes)
Resorts (Travel Management Prelim Notes)
 
Projects handled at Mistry Architects - Residence - Bungalow for Srinivasulu...
Projects handled at Mistry Architects  - Residence - Bungalow for Srinivasulu...Projects handled at Mistry Architects  - Residence - Bungalow for Srinivasulu...
Projects handled at Mistry Architects - Residence - Bungalow for Srinivasulu...
 
Resort
ResortResort
Resort
 
International and Domestic Planning, Packaging and Pricing week 1
International and Domestic Planning, Packaging and Pricing week 1International and Domestic Planning, Packaging and Pricing week 1
International and Domestic Planning, Packaging and Pricing week 1
 
Projects handled at Mistry Architects -Resorts - Infinity Wildlife Resorts -02
Projects handled at Mistry Architects  -Resorts - Infinity Wildlife Resorts -02Projects handled at Mistry Architects  -Resorts - Infinity Wildlife Resorts -02
Projects handled at Mistry Architects -Resorts - Infinity Wildlife Resorts -02
 
Resort management
Resort managementResort management
Resort management
 
World Class Benchmarking: Bloomberry Resorts Corp (BLOOM PM)
World Class Benchmarking: Bloomberry Resorts Corp (BLOOM PM)World Class Benchmarking: Bloomberry Resorts Corp (BLOOM PM)
World Class Benchmarking: Bloomberry Resorts Corp (BLOOM PM)
 
Physical plant and development program
Physical plant and development  programPhysical plant and development  program
Physical plant and development program
 
Promotion Concept Doberai Raja Ampat Eco Resort
Promotion Concept Doberai Raja Ampat Eco ResortPromotion Concept Doberai Raja Ampat Eco Resort
Promotion Concept Doberai Raja Ampat Eco Resort
 

Similar to Chapter 10

Energy Solutions Brief Overview 2014
Energy Solutions Brief Overview 2014Energy Solutions Brief Overview 2014
Energy Solutions Brief Overview 2014
Michael Luffred
 
Imagine Austin Priority Program Teams
Imagine Austin Priority Program TeamsImagine Austin Priority Program Teams
Imagine Austin Priority Program Teams
ImagineAustin
 
Resume201512111001update
Resume201512111001updateResume201512111001update
Resume201512111001updateEric Daniels
 
Real Estate Sustainability
Real Estate SustainabilityReal Estate Sustainability
Real Estate Sustainability
International Energy Agency
 
Guide M - with Geoff Prudence
Guide M - with Geoff PrudenceGuide M - with Geoff Prudence
Guide M - with Geoff Prudence
CIBSE_Yorkshire
 
Research Data Management Roadmap@Edinburgh
Research Data Management Roadmap@EdinburghResearch Data Management Roadmap@Edinburgh
Research Data Management Roadmap@Edinburgh
EDINA, University of Edinburgh
 
Due Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_SabanovDue Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_SabanovSergei Sabanov
 
Green building & use
Green building & useGreen building & use
Green building & use
Mahendra meena
 
Introduction to the Course and EHSTraining Program Indus Enviro
Introduction to the Course and EHSTraining Program   Indus EnviroIntroduction to the Course and EHSTraining Program   Indus Enviro
Introduction to the Course and EHSTraining Program Indus EnviroAnuja Kaushal
 
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
marcus evans Network
 
McKinney ISD School Bond 2011
McKinney ISD School Bond 2011McKinney ISD School Bond 2011
McKinney ISD School Bond 2011mckinneyisd
 
2010 Sustainability Summit Presentation
2010 Sustainability Summit Presentation2010 Sustainability Summit Presentation
2010 Sustainability Summit Presentation
cliban
 
Sustainable Portolio Strategy
Sustainable Portolio StrategySustainable Portolio Strategy
Sustainable Portolio Strategy
Robert Lambe, CFM
 
Historic Preservation in the Houston Public Library System
Historic Preservation in the Houston Public Library SystemHistoric Preservation in the Houston Public Library System
Historic Preservation in the Houston Public Library Systemaiahouston
 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
sandeepprasad87
 

Similar to Chapter 10 (20)

Energy Solutions Brief Overview 2014
Energy Solutions Brief Overview 2014Energy Solutions Brief Overview 2014
Energy Solutions Brief Overview 2014
 
ConWet-Seminar-Ho-Final
ConWet-Seminar-Ho-FinalConWet-Seminar-Ho-Final
ConWet-Seminar-Ho-Final
 
Imagine Austin Priority Program Teams
Imagine Austin Priority Program TeamsImagine Austin Priority Program Teams
Imagine Austin Priority Program Teams
 
Resume201512111001update
Resume201512111001updateResume201512111001update
Resume201512111001update
 
Real Estate Sustainability
Real Estate SustainabilityReal Estate Sustainability
Real Estate Sustainability
 
Guide M - with Geoff Prudence
Guide M - with Geoff PrudenceGuide M - with Geoff Prudence
Guide M - with Geoff Prudence
 
Fro strategic plan march 2014
Fro strategic plan march 2014Fro strategic plan march 2014
Fro strategic plan march 2014
 
Fro strategic plan march 2014
Fro strategic plan march 2014Fro strategic plan march 2014
Fro strategic plan march 2014
 
Research Data Management Roadmap@Edinburgh
Research Data Management Roadmap@EdinburghResearch Data Management Roadmap@Edinburgh
Research Data Management Roadmap@Edinburgh
 
Due Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_SabanovDue Dilligence_Oil Shale_Colorado 2014_Sabanov
Due Dilligence_Oil Shale_Colorado 2014_Sabanov
 
Green building & use
Green building & useGreen building & use
Green building & use
 
QinetiQ
QinetiQQinetiQ
QinetiQ
 
Introduction to the Course and EHSTraining Program Indus Enviro
Introduction to the Course and EHSTraining Program   Indus EnviroIntroduction to the Course and EHSTraining Program   Indus Enviro
Introduction to the Course and EHSTraining Program Indus Enviro
 
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
Reliability Centered Maintenance II (RCM2) in Water and Wastewater Utilities ...
 
New alan kiff
New alan kiffNew alan kiff
New alan kiff
 
McKinney ISD School Bond 2011
McKinney ISD School Bond 2011McKinney ISD School Bond 2011
McKinney ISD School Bond 2011
 
2010 Sustainability Summit Presentation
2010 Sustainability Summit Presentation2010 Sustainability Summit Presentation
2010 Sustainability Summit Presentation
 
Sustainable Portolio Strategy
Sustainable Portolio StrategySustainable Portolio Strategy
Sustainable Portolio Strategy
 
Historic Preservation in the Houston Public Library System
Historic Preservation in the Houston Public Library SystemHistoric Preservation in the Houston Public Library System
Historic Preservation in the Houston Public Library System
 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
 

Recently uploaded

Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
sonjaschweigert1
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
Neo4j
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
Matthew Sinclair
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
Peter Spielvogel
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Nexer Digital
 

Recently uploaded (20)

Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
 

Chapter 10

  • 1. Chapter 10 Heart-of-the-House Management II: Plant, Grounds, Energy, Accounting, and Procurement World of Resorts: From Development to Management Third Edition (424TXT or 424CIN) © 2010, Educational Institute
  • 2. Competencies for Heart-of-the-House Management II 1. Describe the purpose and organization of the engineering and maintenance department. 2. Identify and describe the many elements and concerns of plant maintenance, including electrical, plumbing, HVAC, and refrigeration systems; vehicle and equipment maintenance; and working with contractors. 3. Discuss the importance and objectives of preventive maintenance and explain the elements needed to implement a preventive maintenance program effectively. © 2010, Educational Institute (continued) 2
  • 3. Competencies for Heart-of-the-House Management II (continued) 1. Identify and describe the areas and issues that grounds maintenance and landscaping must address. 2. Identify tools, procedures, programs, and systems that contribute to energy conservation and cost control. 3. Describe the responsibilities, tools, and organization of a resort’s accounting department. 4. Outline the critical role and responsibilities of a resort’s procurement department and the control procedures needed to protect purchased goods. © 2010, Educational Institute 3
  • 4. Engineering vs. Maintenance • Engineering deals with the planning, design, construction, and management of a resort’s physical structures and energy/mechanical systems • Maintenance keeps a resort’s engineering system in peak condition and its facilities in good repair © 2010, Educational Institute 4
  • 5. Physical Plant Organization • Electrical—heat, light, and power • Plumbing • Ventilation and air conditioning • Refrigeration • General repairs and maintenance • Grounds, roads, and pathways • Recreational facilities • Mechanical power, vehicles, and equipment • Construction and renovation © 2010, Educational Institute 5
  • 6. Tasks Commonly Assigned to Repair and Maintenance Personnel • Handling routine work orders from housekeeping and other units • Maintaining and cleaning buildings • Painting exteriors and interiors • Repairing and refinishing walls, ceilings, and floors • Refurbishing and repairing furniture and fixtures • Setting up exhibits for meetings and conventions • Handling minor interior/exterior construction • Repairing equipment • Installing furnishings • Maintaining grounds © 2010, Educational Institute 6
  • 7. Three Basic Objectives of Preventive Maintenance • Capital returns • System reliability • Operating efficiency © 2010, Educational Institute 7
  • 8. Preventive Maintenance Recordkeeping • Equipment inventory records • Maintenance schedules • Maintenance logs • Departmental reports © 2010, Educational Institute 8
  • 9. Resort Areas Typically Covered by a Resort’s Grounds Maintenance Program • Approach areas • Vehicular and pedestrian traffic routes • Service areas • Outdoor recreational areas • Natural scenic areas • Artificial scenic attractions © 2010, Educational Institute 9
  • 10. Objectives of Resort Grounds Maintenance 1. To maintain the attractiveness of a green environment surrounding buildings and recreational facilities 2. To ensure that the resort’s grounds remain safe, secure, and accessible to all users © 2010, Educational Institute 10
  • 11. Grounds Maintenance Functions • Maintaining trees, shrubs, flowers, lawns, etc. • Maintaining driveways and interior roadways • Maintaining ornamental water features • Maintaining outdoor activity areas • Upgrading irrigation systems and replacing greenery when needed • Maintaining an on-premises nursery • Operating/overseeing pest control programs © 2010, Educational Institute (continued) 11
  • 12. Grounds Maintenance Functions (continued) • Maintaining recreational areas • Maintaining fountains and water displays • Organizing nature activities • Policing trails, beaches, scenic spots, and other outdoor areas near the resort • Participating in community environmental planning and programs • Monitoring grounds-related news © 2010, Educational Institute 12
  • 13. Factors to Consider When Choosing Surface Materials for Roads, Walkways, Etc. • Prevailing weather conditions • Level and patterns of traffic • Commercial vehicles • Maintenance • Widths of passageways © 2010, Educational Institute 13
  • 14. Approaches to Controlling/Reducing Energy Costs • Utility audits • Energy audits • Energy conservation/cost control management © 2010, Educational Institute 14
  • 15. Energy Conservation/Cost Control Program Activities • Data collection • Analysis • Training • Operational review • Monitoring • Management review • Capital analysis © 2010, Educational Institute 15
  • 16. Green Energy Systems • Heat recovery systems • Cogeneration/trigeneration systems • Wind energy • Solar energy © 2010, Educational Institute 16
  • 17. Accounting Records • Guest ledger • City ledger • Special journals • General ledger • Financial statements • Information reports © 2010, Educational Institute 17
  • 18. Computer Applications for Resort Accounting • Payroll • Inventory • Accounts payable and exception reporting • General ledger © 2010, Educational Institute 18
  • 19. Internal Control Procedures • Separate purchasing activities from receiving activities • Keep inventories under lock with strict key control • Issue only upon receipt of authorized requisitions • Perform surprise audits of inventory and inventory records • Establish a code of ethics • Impose penalties for breach of purchasing code • Qualify employees and vendors involved with procurement © 2010, Educational Institute (continued) 19
  • 20. Internal Control Procedures (continued) • Obtain competitive bids when possible • Pay periodic visits to vendors to check quality/price • Require operating departments to evaluate products in use and report products that don’t conform to specifications/requirements © 2010, Educational Institute 20