Connecting global & regional finance to projects - Finance for #SDGs High Level Meeting – #financeforSDGs – Christoph Waldersee – Bellagio – 25-27 February 2015
The estimated contribution of urban area to India’s GDP is approximately 70-75%. Despite the enormous economic contribution, the current state of urban infrastructure is in poor condition. It is estimated that by 2030, an additional $1.2 trillion would be required to provide basic urban services. In this presentation, an attempt has been made to find out the ways to mobilize such a huge financial requirement. The target audience of this presentation includes inter alia urban development and finance professionals, city managers and the general public.
The updated document used for the second Stormwater Information Session held Weds, March 11 at the Franklin TV studio. Some slides were added and or revised to better tell the story based upon feedback from the first session.
Need for Smart Cities, Introduction to Smart Cities, India Smart City Initiative Details, Financing Mechanisms to support implementation & Global Examples
Connecting global & regional finance to projects - Finance for #SDGs High Level Meeting – #financeforSDGs – Christoph Waldersee – Bellagio – 25-27 February 2015
The estimated contribution of urban area to India’s GDP is approximately 70-75%. Despite the enormous economic contribution, the current state of urban infrastructure is in poor condition. It is estimated that by 2030, an additional $1.2 trillion would be required to provide basic urban services. In this presentation, an attempt has been made to find out the ways to mobilize such a huge financial requirement. The target audience of this presentation includes inter alia urban development and finance professionals, city managers and the general public.
The updated document used for the second Stormwater Information Session held Weds, March 11 at the Franklin TV studio. Some slides were added and or revised to better tell the story based upon feedback from the first session.
Need for Smart Cities, Introduction to Smart Cities, India Smart City Initiative Details, Financing Mechanisms to support implementation & Global Examples
The estimated contribution of urban area to India’s GDP is approximately 70-75%. Despite the enormous economic contribution, the current state of urban infrastructure is in poor condition. It is estimated that by 2030, an additional $1.2 trillion would be required to provide basic urban services. In this presentation, an attempt has been made to find out the ways to mobilize such a goliath financial requirement. The target audience of this presentation are inter alia urban development and finance professionals, city managers and general public.
Market report Waste and Circular Economy South Africa 2023MetaSus
Results of a market assessment waste management / circular economy in Durban, Cape Town and Johannesburg/Pretoria by Mr. Bert Keesman of MetaSus and Mr. Hans Breukelman of BreAd BV, carried out 24-28 July 2023. Key support was provided by Messrs. Don and Troy Govender of the Lindon Corp, Mr. Chris Whyte of the African Circular Economy Network (ACEN) and the team at the Royal Netherlands Embassy in Pretoria and the Consulate in Cape Town.
H765, An Act to Reduce Solid Waste and Provide Universal Recycling AccessMassRecycle .
Claire Sullivan, Executive Director of the South Shore Recycling Cooperative presents her universal recycling bill, H765 An Act to Reduce Solid Waste and Provide Universal Recycling Access
Waste Management propoal that I presented for Elected Officials and City Management of High Point, NC. This contract was competed out. I lost; but came very close to obtaining contract.
Tax Increment Financing Presentation from Rochester, NH - the Granite Ridge Development District takes off with a development plan for 915 acres and 2 million square feet of development. Call now for space!
Rochester NH plans to utilize RSA 162:K to finance public infrastructure as a catalyst to development. 2 million square feet of retail, hospitality and commercial development is at stake.
MSW in Indian Cities is still crawling in its infancy. In Spite every day it is going from Bad to worst we are yet to set a priority in this part od Urban management.
Miramar, Fl was faced with the strategic planning decision whether or not to join the Broward Solid Waste Disposal District. This presentation provides a detailed analysis of the proposed district and contractual arrangements conducted by Value Added Consulting.
when will pi network coin be available on crypto exchange.DOT TECH
There is no set date for when Pi coins will enter the market.
However, the developers are working hard to get them released as soon as possible.
Once they are available, users will be able to exchange other cryptocurrencies for Pi coins on designated exchanges.
But for now the only way to sell your pi coins is through verified pi vendor.
Here is the telegram contact of my personal pi vendor
@Pi_vendor_247
The estimated contribution of urban area to India’s GDP is approximately 70-75%. Despite the enormous economic contribution, the current state of urban infrastructure is in poor condition. It is estimated that by 2030, an additional $1.2 trillion would be required to provide basic urban services. In this presentation, an attempt has been made to find out the ways to mobilize such a goliath financial requirement. The target audience of this presentation are inter alia urban development and finance professionals, city managers and general public.
Market report Waste and Circular Economy South Africa 2023MetaSus
Results of a market assessment waste management / circular economy in Durban, Cape Town and Johannesburg/Pretoria by Mr. Bert Keesman of MetaSus and Mr. Hans Breukelman of BreAd BV, carried out 24-28 July 2023. Key support was provided by Messrs. Don and Troy Govender of the Lindon Corp, Mr. Chris Whyte of the African Circular Economy Network (ACEN) and the team at the Royal Netherlands Embassy in Pretoria and the Consulate in Cape Town.
H765, An Act to Reduce Solid Waste and Provide Universal Recycling AccessMassRecycle .
Claire Sullivan, Executive Director of the South Shore Recycling Cooperative presents her universal recycling bill, H765 An Act to Reduce Solid Waste and Provide Universal Recycling Access
Waste Management propoal that I presented for Elected Officials and City Management of High Point, NC. This contract was competed out. I lost; but came very close to obtaining contract.
Tax Increment Financing Presentation from Rochester, NH - the Granite Ridge Development District takes off with a development plan for 915 acres and 2 million square feet of development. Call now for space!
Rochester NH plans to utilize RSA 162:K to finance public infrastructure as a catalyst to development. 2 million square feet of retail, hospitality and commercial development is at stake.
MSW in Indian Cities is still crawling in its infancy. In Spite every day it is going from Bad to worst we are yet to set a priority in this part od Urban management.
Miramar, Fl was faced with the strategic planning decision whether or not to join the Broward Solid Waste Disposal District. This presentation provides a detailed analysis of the proposed district and contractual arrangements conducted by Value Added Consulting.
when will pi network coin be available on crypto exchange.DOT TECH
There is no set date for when Pi coins will enter the market.
However, the developers are working hard to get them released as soon as possible.
Once they are available, users will be able to exchange other cryptocurrencies for Pi coins on designated exchanges.
But for now the only way to sell your pi coins is through verified pi vendor.
Here is the telegram contact of my personal pi vendor
@Pi_vendor_247
If you are looking for a pi coin investor. Then look no further because I have the right one he is a pi vendor (he buy and resell to whales in China). I met him on a crypto conference and ever since I and my friends have sold more than 10k pi coins to him And he bought all and still want more. I will drop his telegram handle below just send him a message.
@Pi_vendor_247
what is the future of Pi Network currency.DOT TECH
The future of the Pi cryptocurrency is uncertain, and its success will depend on several factors. Pi is a relatively new cryptocurrency that aims to be user-friendly and accessible to a wide audience. Here are a few key considerations for its future:
Message: @Pi_vendor_247 on telegram if u want to sell PI COINS.
1. Mainnet Launch: As of my last knowledge update in January 2022, Pi was still in the testnet phase. Its success will depend on a successful transition to a mainnet, where actual transactions can take place.
2. User Adoption: Pi's success will be closely tied to user adoption. The more users who join the network and actively participate, the stronger the ecosystem can become.
3. Utility and Use Cases: For a cryptocurrency to thrive, it must offer utility and practical use cases. The Pi team has talked about various applications, including peer-to-peer transactions, smart contracts, and more. The development and implementation of these features will be essential.
4. Regulatory Environment: The regulatory environment for cryptocurrencies is evolving globally. How Pi navigates and complies with regulations in various jurisdictions will significantly impact its future.
5. Technology Development: The Pi network must continue to develop and improve its technology, security, and scalability to compete with established cryptocurrencies.
6. Community Engagement: The Pi community plays a critical role in its future. Engaged users can help build trust and grow the network.
7. Monetization and Sustainability: The Pi team's monetization strategy, such as fees, partnerships, or other revenue sources, will affect its long-term sustainability.
It's essential to approach Pi or any new cryptocurrency with caution and conduct due diligence. Cryptocurrency investments involve risks, and potential rewards can be uncertain. The success and future of Pi will depend on the collective efforts of its team, community, and the broader cryptocurrency market dynamics. It's advisable to stay updated on Pi's development and follow any updates from the official Pi Network website or announcements from the team.
Falcon stands out as a top-tier P2P Invoice Discounting platform in India, bridging esteemed blue-chip companies and eager investors. Our goal is to transform the investment landscape in India by establishing a comprehensive destination for borrowers and investors with diverse profiles and needs, all while minimizing risk. What sets Falcon apart is the elimination of intermediaries such as commercial banks and depository institutions, allowing investors to enjoy higher yields.
Introduction to Indian Financial System ()Avanish Goel
The financial system of a country is an important tool for economic development of the country, as it helps in creation of wealth by linking savings with investments.
It facilitates the flow of funds form the households (savers) to business firms (investors) to aid in wealth creation and development of both the parties
how can i use my minded pi coins I need some funds.DOT TECH
If you are interested in selling your pi coins, i have a verified pi merchant, who buys pi coins and resell them to exchanges looking forward to hold till mainnet launch.
Because the core team has announced that pi network will not be doing any pre-sale. The only way exchanges like huobi, bitmart and hotbit can get pi is by buying from miners.
Now a merchant stands in between these exchanges and the miners. As a link to make transactions smooth. Because right now in the enclosed mainnet you can't sell pi coins your self. You need the help of a merchant,
i will leave the telegram contact of my personal pi merchant below. 👇 I and my friends has traded more than 3000pi coins with him successfully.
@Pi_vendor_247
NO1 Uk Black Magic Specialist Expert In Sahiwal, Okara, Hafizabad, Mandi Bah...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
how to swap pi coins to foreign currency withdrawable.DOT TECH
As of my last update, Pi is still in the testing phase and is not tradable on any exchanges.
However, Pi Network has announced plans to launch its Testnet and Mainnet in the future, which may include listing Pi on exchanges.
The current method for selling pi coins involves exchanging them with a pi vendor who purchases pi coins for investment reasons.
If you want to sell your pi coins, reach out to a pi vendor and sell them to anyone looking to sell pi coins from any country around the globe.
Below is the contact information for my personal pi vendor.
Telegram: @Pi_vendor_247
Empowering the Unbanked: The Vital Role of NBFCs in Promoting Financial Inclu...Vighnesh Shashtri
In India, financial inclusion remains a critical challenge, with a significant portion of the population still unbanked. Non-Banking Financial Companies (NBFCs) have emerged as key players in bridging this gap by providing financial services to those often overlooked by traditional banking institutions. This article delves into how NBFCs are fostering financial inclusion and empowering the unbanked.
Even tho Pi network is not listed on any exchange yet.
Buying/Selling or investing in pi network coins is highly possible through the help of vendors. You can buy from vendors[ buy directly from the pi network miners and resell it]. I will leave the telegram contact of my personal vendor.
@Pi_vendor_247
NO1 Uk Divorce problem uk all amil baba in karachi,lahore,pakistan talaq ka m...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
2. 2
• A growing number of municipal & regional governments
are implementing PPPs to recycle municipal solid wastes
• Focus on:
• Cardboard & paper materials
• Plastics
• Glass
• Compostable organic materials
• Common PPP structures are:
• Concession: City grants exclusive license (ie
“concession”) to private developer to collect &
process municipal solid wastes & then sell the
recycled products
2
PPPs in Waste Recycling & Processing
3. 3
3
Waste Recycling & Processing PPPs
Private Owner
/Investor
Banks &
Lenders
$
Gotham City
Government
Citizens &
Households
Waste Recycling
Concession (Exclusive)
PPP Contract
Loans
Repayment
Equity
PPP Private Partner
(Special Purpose
Vehicle – SPV)
Collection of
Solid Wastes
Local Businesses
& Institutions
Bulk
Purchasers of
Recycled
Products
LANDFILL
Sale of Bulk
Recycled
Products
Disposal of
Residual Wastes
4. 4
• Cost-Recovery: Often the revenues from sell bulk recycled materials
does not cover the entire costs of waste collection, separation,
processing, and disposal of residual non-recyclable materials. In this
case, the City may need to pay the private partner for collection, etc.
• Municipal Benefits: Often the benefit to the municipality is not
additional revenue-generation (ie revenue-sharing with the private
partner). Instead it is avoiding having pay the current costs of waste
collection & disposal.
• Waste-Stream Quality: Municipal Solid Waste can be very
heterogeneous. The percent of recyclable materials in the waste
stream can vary greatly over time, and differ from what a PPP
feasibility study & or PPP tender documents state. Municipalities are
often required to guarantee minimum quantities & qualities of wastes
for the private partner.
• Managing Stakeholder Impacts: Often small-scale, low-income,
informal, recyclers already depend heavily on existing waste
collection systems (ie no formal recycling) for their livelihoods. A new
PPP could completely remove their economic livelihood.
4
Waste Recycling PPPs: Key Challenges
5. 5
5
PPP Financial Model Case Example:
Background on KERFLOKISTAN
• Kerflokistan: An Emerging Market Economy
• GDP per Capita per Year: $4,000
• Population 40 million
• Current crisis in infrastructure & public services due to
decades of lack of public investment under previous single-
party regime.
• New economic reform policies of liberalization, competition,
and private sector-led growth expected to increase economic
growth from 1% to 4% over next 5 years.
• Inflation projected at 7% for next 5+ years
• New Government has launched a new Municipal PPP Unit
(MP3 Unit) to identify and accelerate local Government PPP
transactions in infrastructure
7. 7
• Gotham City, a medium-sized city in Kerflokistan: population
300,000
• Gotham City currently spends $1,000,000 per year on
municipal waste collection & disposal
• However, waste collection service is not reliable, due to
inadequate maintenance of trucks. Illegal dumping of wastes
along road-side and on vacant plots of land is common.
• City has no official recycling program. However, recycling by
low-income “informal recyclers” is reportedly common. No
official data exists on the current levels of recycling by these
informal recyclers.
• National Policy is to encourage recycling and reduce waste
generation, but there is no official plan yet, with clear targets
or any clear financial incentives or supports for municipal
government recycling investments
• Gotham City lacks the funds to construct and operate a solid
waste management recycling program to address the problem
7
Gotham City, KERFLOKISTAN
8. 8
Group Assignment #1
1. Identify all of the key stakeholders who
would need to be included in this project as
a PPP
2. Identify the most important risks facing each
key stakeholder group
3. Propose how the risks should be allocated
(or shared) between the stakeholder
groups:
Government (Gotham City)
Interested Private Developers
8
9. 9
9
PPP Financial Model
3-CAPITAL INVEST.:
-Construction
- Depreciation
5-PROFIT & LOSS STATEMENT:
+Revenues(10 yrs.)
- O & M Costs
-Interest expenses
-Depreciation Exp.
-Taxes
-= Net Income
2-DEMAND: Vehicle Pop.
-Projected Pop. over 20 yrs.
= Required Capacity
6-CASH FLOW STATEMENT
Net Income
+ Depreciation
- Debt Principal Paymnts.
= Cash Flow
DSCR
IRR
4-FINANCING:
-Debt (term, %, DSCR)
-Equity (Gearing & RoE)
- Loan Repayment Sched
A.TARIFFS
Bulk-Purchasers/
City Support?
B. DSCR
Lenders
C. IRR
Investors
1-INPUTS & RESULTS
10. 10
• Municipal Solid Waste Stream Analysis:
10
Gotham City Recycling Project Feasibility
Study:Technical & Cost Estimations
Gotham City Regional Population (2016) # of People 300,000
Gotham City Regional Population Growth Rate % 1.5%
Total Municipal Solid Waste Volume (2016) tonnes/Year 100,000
Annual Growth Rate in Municipal Solid Waste Volume % 2.5%
Percent of Recycleable Paper & Cardboard % 17%
Percent of Recycleable Plastics % 12%
Percent of Recycleable Glass % 3%
Percent of Recycleable Metal % 1%
Total Percent of Recycleable Materials % 33%
Recovery Rate (% of Recycleable Materials Recovered) % 30%
Annual Growth Rate in Recovery of Recycled Materials (Years 1 - 5) % 5%
Annual Growth Rate in Recovery of Recycled Materials (Years 6 -10) % 0%
11. 11
11
Capital Investments
3 - CAPITAL EXPENDITURE Assumptions Units
Civil Works & Site Preparation $ $50,000
Recycling Facility Construction $ $500,000
Waste Sorting & Packaging Equipment $ $250,000
Number of Trucks # 6
Cost per Truck $ $70,000
Number of Recycling Bins # 500
Cost per Recycling Bin $ $500
Start-up Working Capital ( = 3 months x Total O&M Costs) $ $50,000
Total Capital Investment $ $1,520,000
Annual Depeciation Rate on Assets % 10%
12. 12
12
Projected Revenues
Revenues:
Sale Price per tonne of Recycled Paper & Cardboard $/tonne $125
Sale Price per tonne of Recycled Plastic $/tonne $45
Sale Price per tonne of Recycled Glass $/tonne $50
Sale Price per tonne of Recycled Metals $/tonne $400
Annual Growth Rate in Recycled Materials Sales Prices % 1%
Annual Subsidy Payment from Gotham City $200,000
Total Revenues (Year 1) $1,164,500
13. 13
13
Financial Model Results
RESULTS
Internal Rate of Return (IRR) on Equity % 35.1%
Reinvestment Rate % 10.0%
Modified Internal Rate of Return (MIRR) on Equity % 23.6%
Minimum Debt Service Coverage Ratio (DSCR) Ratio 1.48
15. 15
• What if the percent of recyclable wastes falls from 30% to
25%? Is the PPP project still bankable?
• The proposed structure includes an annual payment from
Gotham City of $200,000 per year? Is this beneficial to the
City, or not? Should a PPP that is getting revenues from
selling bulk recycled waste also receive an Availability
Payment from the City – Or is this just wasting public money
on “subsidizing private profits”?
• Should the City offer to guarantee of minimum level of
supply of solid waste to the private partner?
• Should Gotham City ask for a revenue-sharing agreement,
for revenues that are above a minimum-level?
• What role should the City take regarding the impacts on the
current informal recyclers in this PPP process?
15
PPP Case Exercise Questions:
16. 16
Gotham City’s PPP Tender for Municipal
Solid Waste Recycling
• Gotham City issued a Request for Qualification
(RfQ) & short-listed 4 private bidding consortia:
1. Roma Recycling Inc. (RRI)
2. Poa Kachizi Pickers, Inc. (BPI)
3. Enviro-Tech, Inc. (ETI)
4. Garbage-In & Garbage-Out (GIGO)
16
17. 17
• Concession structure: 10 year concession. Concessionaire earns its own revenues
from sales of recycled wastes to bulk purchasers + payment from Gotham City
Gotham City Recycling PPP Structure
PPP Risk Category Government Private Concessionaire
Land Acquisition Gotham City Administration
Construction Cost Risk Private Concessionaire
Financing Risk All financing for project is raised by the Private
Concessionaire
Completion Risk Private Concessionaire (Concessionaire provides a
performance bond equal to 1 year of estimated
annual revenues during construction)
Performance Risk (Ability to meet
perform all required waste collection
standards & procedures)
Private Concessionaire (Concessionaire provides a
performance bond equal to 1 year of estimated
annual revenues until year 20)
Demand Risk Gotham City guarantees:
• A minimum annual payment to the private
partner, set through competitive tender.
Private concessionaire assumes demand risks for
any levels above the guaranteed annual payment
from Gotham City.
Political & Regulatory Risks Gothem City Adminstration
Inflation Shared (Private Concessionaire may petition
Gotham City Administration for payment
changes due to inflation as needed during life
of the contract)
Shared (Private Concessionaire may petition
Gotham City Administration for price changes due
to inflation as needed during life of the contract)
Environmental Risks Private concessionaire is liable for any
environmental impacts during the life of the PPP
contract
17
18. 18
• Capacity:
• Provide capacity to collect and sort up to 150,000 tonnes of municipal solid
waste per year, and an average of 75 tonnes per day.
• Ability to recover and to sell four different types of bulk recycled waste
products:
• Paper & Cardboard
• Plastics
• Glass
• Metals
• Ability to transfer and dispose residual non-recyclable waste projects in a
sanitary landfill
• Timing: Facility must be operational within 1 year of the private concessionaire’s
reaching of financial closure for this project. Concession term of 10 years.
• Performance:
• Reliability: Private partner must be available to provide waste collection and
recovery service 99% of the time, according to its scheduled hours of
operations.
Gotham City’s Recycling PPP Project Output Standards
18
19. 19
PPP Technical Proposal Evaluation Criteria: “Technically
Responsive, or Not?”
• Legal: Are all of the legal conditions and risk-allocation measures contained in the
model Concession Contract acceptable to the private bidder?
• Design: Is the design determined to be technically feasible and provide the
capacity to meet the performance standards of the PPP project?
• Timing: will the private partner be able to reliably provide the services by the
required start date and throughout the 10-year life of the contract?
• Strategy for Raising Financing: does the private partner have a realistic and
practical plan for raising the financing required for the project?
• Operating Plan & Performance: Will the private partner be able to meet all of the
required technical performance output standards including both safety and
emission standards?
19
20. 20
PPP Technical Proposal #1:
Roma Recycling, Inc. (“RRI”)
• Legal Structure: All terms & conditions in the model Contract acceptable
• Technical Design & Operation:
• Construction of a 6,000 m2 Recycling Facility
• Purchase of 6 trucks
• Hiring of 75 total staff
• Timing: Construction will be completed 12 months of financial closure
• Strategy for Financing the Project:
• Limited-recourse project financing basis, require 1 year reach financial closure
• Operating Plan & Performance:
• We will provide the capacity to collect & process 150,000 tonnes of wastes per
year and an average of 75 tonnes per day
• Reliability: Our facility will be available a minimum of 99% of the time Average
inspection time:
• Expected hours of facility operation: 9AM to 5PM (8 hours per day), 260 days
per year (5 days per week)
• Will meet all technical standards as required by the PPP Tender Documents
20
21. 21
PPP Technical Proposal #2:
Poa Kachizi Pickers, Inc. (“BPI”)
• Legal Structure: All terms & conditions in the model Contract acceptable
• Technical Design & Operation:
• Construction of a 3,000 m2 Recycling Facility
• Purchase of 4 trucks
• Hiring of 125 total staff
• Timing: Construction will be completed 12 months of financial closure
• Strategy for Financing the Project:
• Limited-recourse project financing basis, require 1 year reach financial closure
• Operating Plan & Performance:
• We will provide the capacity to collect & process 150,000 tonnes of wastes per
year and an average of 75 tonnes per day
• Reliability: Our facility will be available a minimum of 99% of the time Average
inspection time:
• Expected hours of facility operation: 7AM to 11PM (16 hours per day), 360 days
per year (7 days per week)
• Will meet all technical standards as required by the PPP Tender Documents
21
22. 22
PPP Technical Proposal #3:
Enviro-Tech, Inc. (“ETI”)
• Legal Structure: All terms & conditions in the model Contract acceptable
• Technical Design & Operation:
• Construction of a 4,500 m2 Recycling Facility
• Purchase of 5 trucks
• Hiring of 90 total staff
• Timing: Construction will be completed 12 months of financial closure
• Strategy for Financing the Project:
• Limited-recourse project financing basis, require 1 year reach financial
closure
• Operating Plan & Performance:
• We will provide the capacity to collect & process 150,000 tonnes of wastes
per year and an average of 75 tonnes per day
• Reliability: Our facility will be available a minimum of 99% of the time Average
inspection time:
• Expected hours of facility operation: 9AM to 5PM (8 hours per day), 314 days
per year (6 days per week)
• Will meet all technical standards as required by the PPP Tender Documents
22
23. 23
PPP Technical Proposal #4:
Garbage-In, Garbage-Out (“GIGO”)
• Legal Structure: All terms & conditions in the model Contract acceptable
• Technical Design & Operation:
• Construction of a 5,500 m2 Recycling Facility
• Purchase of 6 trucks
• Hiring of 80 total staff
• Timing: Construction will be completed 12 months of financial closure
• Strategy for Financing the Project:
• Limited-recourse project financing basis, require 1 year reach financial closure
• Operating Plan & Performance:
• We will provide the capacity to collect & process 150,000 tonnes of wastes per
year and an average of 75 tonnes per day
• Reliability: Our facility will be available a minimum of 99% of the time Average
inspection time:
• Expected hours of facility operation: 9AM to 5PM (8 hours per day), 260 days per
year (5 days per week)
• Will meet all technical standards as required by the PPP Tender Documents
23
24. 24
24
Working Group Assignments:
1. Evaluate each of these 4 Technical PPP proposals.
2. Decide whether each bid is “technically-
responsive” or not.
• (The next step will be the separate opening and
evaluation of the PPP cost proposals.)