This document provides an overview of the development of the TAC Higher Secondary School System campus from 1998-2010. It describes the initial 500 square yard residential house campus from 1998. It then outlines the conceptual design and phase 1 construction of the new 1.5 acre campus in 2006, which was completed in 2008 and included a covered area of 52,000 square feet. The document includes photos showing the entrance, labs, classrooms, library, and other facilities on the expanded campus, as well as images of students, teachers, and families involved with the school over this period.