3: Engineering Cost and Estimation
Dr. Mohsin Siddique
Assistant Professor
msiddique@sharjah.ac.ae
Ext: 29431
Date: 23/09/2014
Engineering Economics
University of Sharjah
Dept. of Civil and Env. Engg.
2
Part I
Outcome of Today’s Lecture
3
After completing this lecture…
The students should be able to:
Define various cost concepts
Provide specific examples of how and why these engineering
cost concepts are important
Engineering Costs
4
Fixed Cost: These constant or unchanging regardless of the level
of output or activity.
Example: In production environment, costs for factory floor space and
equipment remains the same regardless of production quantity, number of
employee and level of work in progress.
Variable Costs: These are not constant and depends in level of out
or activity.
Example: Labor costs are variable cost because it depend on number of
employees and number of hours they work
Marginal Costs: It is the variable cost for one more unit.
Average Costs: It is total cost divided by number of units
Engineering Costs
5
Let’s take example of two student enrolled in engineering one is full time
while other is a part time. student A full time student can enroll in 12-18
credit hours for a fixed fee of $1800. Overload credits are charged at
$120/credit
Part-time student: It is case of variable cost. He has to pay according to
number of credits he choose.
Full-time student: It is the case of fixed cost, regardless of number of
credit hours he has to pay tuition fee.
Fixed cost: $1800 per semester for 12-18 credits
Avg. cost if student chooses 12 credits: 1800/12= $150/credit
Avg. cost if student chooses 18 credits: 1800/18= $ 100/credit
Variable cost: It will cost of addition credit beyond 18 and if the student
chooses to enroll in 21 credits.
Variable cost for addition credit beyond17: $0
Variable cost for addition credit beyond18: $120
Example 2-1
6
Example 2-1
7
Total Cost= Total Fixed cost + TotalVariable cost
Engineering Costs
8
Profit-loss breakeven chart. It
is plot of revenue against costs for
various level of outputs (activity).
It allows to understand breakpoint
and region of profit and loss.
Terminologies:
Break-even point: the level of
activity at which total cost of
product/goods/services equals to
revenue
Profit region: values of variable x
greater than break point where
total revenue is greater than total
cost
Loss region:Values of variable x
less than breakpoint where total
revenue is less than total cost
Profit loss breakeven
chart figure here
Engineering Costs (Example 2-1 continued)
9
Profit-loss breakeven chart. It
is plot of revenue against costs for
various level of outputs (activity).
It allows to understand breakpoint
and region of profit and loss.
Terminologies:
Breakeven point: 15 students
Profit region: for more than 15,
FSSe will be in profit
Loss region: For less than 15, FSSe
will be in loss
Engineering Costs
10
Linear and non-linear cost
relation
For example:
Employees are often paid 150% of
their hourly rate for overtime. In
this case fixed cost is €3000 while
variable cost
Up to 10 units is €200 per unit
and
For 5 more units €300 per unit
Avg. cost at 5 units = (3000+200x5)/5= € 800
Avg. cost at 10 units = (3000+200x )/10=
Avg. cost at 12 units = (3000+200x10+300x2)/12= € 467
Avg. cost at 15 units = (3000+200x10+300x5)/15=
Total Cost= Total Fixed cost +
TotalVariable cost
Engineering Costs
11
Problem:
A private owned summer camp for youngsters has the following data for a
12 week session:
Charges per camper: $120 per week
Fixed costs: $48000
Variable cost per camper: $80 per week
Capacity: 200 campers
(a). Develop the mathematical relationship for total cost and total revenue
(b).What is the total number of campers that will allow the camp to just
break even
(c).What is profit or loss for the 12 week session if the camp operates at
80% capacity.
Engineering Costs
12
x = number of campers
(a) Total Cost = Fixed Cost +Variable Cost
= $48,000 + $80 (12) x
Total Revenue = $120 (12) x
(b) Break-even when Total Cost = Total Revenue
$48,000 + $960 x = $1,440 x
$4,800 = $480 x
x = 100 campers to break-even
(c) capacity is 200 campers
80% of capacity is 160 campers
@ 160 campers x = 160
Total Cost = $48,000 + $80 (12) (160) = $201,600
Total Revenue = $120 (12) (160) = $230,400
Profit = Revenue – Cost = $230,400 - $201,600 = $28,800
Engineering Costs
13
Sunk Cost:
A sunk cost is money already spent as a
result of past decision.
e.g., (i) If 5 students signed up for the
engineering course than in example 2-1,
the advertising cost would be sunk cost
(ii). Price of two years old pc purchase
at $2000 is sunk cost which has no
influence on current market value of
$400 of pc
(iii). _________________________
____________________________
____________________________
Engineering Costs
14
Opportunity cost: An opportunity cost is associated with using a
resource in one activity instead of another.
Every time we use business resource in one activity we, we give up
the opportunity to use the same resource at that time in some
other activity.
“An opportunity cost is the benefit that is forgone by engaging a business
resource in a chosen activity instead of engaging that same resource in
the forgone activity”
Example
Engineering Costs
15
Opportunity cost:
Examples:
Suppose that friends invite a college student to travel through
Europe over the summer break.
Cost analysis: In considering the offer, student computes the total
cost of travel as $ 3000 for 10 weeks and after checking his bank
account he agrees to go with them.
However, true cost to the student includes not only his out-of pocket
cash costs but also opportunity costs. By taking the trip, the student
is giving up the opportunity to earn $ 5000 as a summer intern at a
local business.
Thus the student total cost will comprise the $3000 cash cost as
well as $5000 opportunity cost.
Example 2-2
16
Example 2-2
17
Engineering Costs
18
Recurring and Nonrecurring costs
Recurring costs refers to any expense that is know and anticipated
and that occurs at regular interval.
Nonrecurring costs are one-of-a-kind expenses that occur at irregular
intervals and thus are sometimes difficult to plan for or anticipate
from a budgeting perspective.
________________________________________________
________________________________________________
________________________________________________
In engineering economics analysis, recurring costs are modeled as
cash flow that occur at regular interval. Nonrecurring costs can also
be handled if we are able to anticipate their timing and size.
Engineering Costs
19
Incremental costs
One of fundamental principle in engineering economics analysis is that in
choosing between competing alternatives, the focus is one difference
between those alternative.
For example:You may be interested in comparing two car lease
options. In both of the cases (say case A and case B) total car prices
after lease time are same.
What else would you like analyze to make a decision ??
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
_________________________________________________
Example 2-3
20
Engineering Costs
21
A cash cost is a cash transaction, or cash flow. If a company
purchases an asset, it realizes a cash cost.
A book cost is not a cash flow, but it is an accounting entry
that represents some change in value.
When a company records a depreciation charge of $4 million
in a tax year, no money changes hands. However, the company
is saying in effect that the market value of its physical,
depreciable assets has decreased by $4 million during the year.
Life-cycle costs refer to costs that occur over the various
phases of a product or service life cycle, from needs
assessment through design, production, and operation to
decline and retirement.
22
Part II
Date: 25/09/2014
Outcome of Today’s Lecture
23
After completing this lecture…
The students should be able to:
Define engineering estimating
Explain the three types of engineering estimates, as well as common
difficulties encountered in making engineering cost estimates
Use several common mathematical estimating models in cost estimating
Discuss the impact of learning curve on cost estimates
State the relationship between cost estimating and estimating project
benefits
Draw cash flow diagrams to show project costs and benefits
Cost Estimating
24
Engineering economic analysis focuses on future consequences of
present decisions and therefore one must estimate all cost related
variables
Estimates for engineering economic analysis include purchase costs,
annual revenue, yearly maintenance, interest rates for investments,
annual labor and insurance costs and tax rates etc
Types of Estimates
1. Rough Estimate
2. Semi-detailed estimate
3. Detailed estimate
Cost Estimating
25
Types of Estimates
1. Rough Estimates: These are order of magnitude estimate used for
high level planning for determining project feasibility and in a project
initial planning and evaluation phase.
These estimates require minimum resources to develop and their
accuracy is -30 to 60%.
2. Semi-detailed estimates: These are used for budgeting purpose at
a project’s conceptual or preliminary design stage.These are more
detailed than rough but still require time and resources.
Their accuracy is generally -15 to 20%
3. Detailed estimates: These are used during project detailed design
and contract bidding phases.These involve most time and resources and
thus are much more accurate than rough estimates.
The accuracy is general -3 to 5%
Cost Estimating
26
Difficulties in Estimation
One of a kind estimates: The first time something is done, it is difficult
to estimate costs required to design, produce, and maintain a product over
its life cycle.
E.g., NASA first space mission, ___________________________
__________________________________________________
Time and effort available: Our ability to develop engineering estimates is
constrained by the time and man-power availability
Estimator Expertise:The past is our greatest teacher and knowledge is
power.
The more experienced and knowledgeable this estimator is, the more
accurate the estimate will be.
Estimating Models
27
1. Per unit model
2. Segmenting model
3. Cost indexes
4. Power-sizing model
5. Triangulation
6. Improvement and learning curve
Estimating Models
28
1. Per-unit model: It is a simple but useful model in which a cost
estimate is made for a single unit, then the total cost estimate
results from multiplying the estimated cost per unit times the
number of units.
It is commonly used in construction industry.
Example:
Cost of $65 per square meter
Service cost per customer
Gasoline cost per km
________________________________________________
________________________________________________
________________________________________________
Estimating Models
29
2. Segmenting model: It can be described as Divide and Conquer
It partitions the total estimation task into segments. Each segment is
estimated, then the segment estimates are combined for the total
cost estimate.
Estimating Models
30
3. Cost indexes: It can be used to account for historical changes in
costs.The widely reported Consumer Price Index (CPI) is an
example.
Cost index data are available from a variety of sources.
Suppose A is a time point in the past and B is the current time. Let
IVA denote the index value at time A and IVB denote the current
index value for the cost estimate of interest.To estimate the current
cost based on the cost at time A, use the equation:
(Cost at time B)/ (Cost at time A) = (IVB / IVA)
Cost at time B = (Cost at time A) (IVB / IVA)
Example 2-7
31
Miriam is interested in estimating the annual labor and material
costs for a new production facility. She was able to obtain the
following labor and material cost data:
Labor costs:
Labor cost index value was at 124 ten years ago and is 188 today
Annual labor costs for a similar facility were $575,500 ten years ago
Material Costs
Material cost index value was at 544 three years ago and is 715 today
Annual material costs for a similar facility were $ 2,455,000 three year ago
Example 2-7
32
Solution: Miriam will use cost index equation for cost estimates for
annual labor and material cost
871800$
124
188
755005cost todayAnnual
agoyears10eIndex valu
todayeIndex valu
agoyears10costAnnualcost todayAnnual
agoyears10eIndex valu
todayeIndex valu
agoyears10costAnnual
cost todayAnnual
==
=
=
3227000$
544
715
2455000cost todayAnnual
agoyears3eIndex valu
todayeIndex valu
agoyears3costAnnual
cost todayAnnual
==
=
Annual
Labor
Cost
Annual
Material
Cost
Estimating Models
33
4. Power-sizing model: It accounts explicitly for economies of
scale.
For example, the cost of constructing a six-story building will
typically be less than double the construction cost of a comparable
three-story building.
To estimate the cost of B based on the cost of comparable item A,
use the equation
Cost of B = (Cost of A) [ ("Size" of B) / ("Size" of A) ] x
where x is the appropriate power-sizing exponent, available from a
variety of sources.
An economy of scale is indicated by an exponent less than 1.0.An
exponent of 1.0 indicates no economy of scale, and an exponent
greater than 1.0 indicates a diseconomy of scale.
"Size" is used here in a general sense to indicate physical size,
capacity, or some other appropriate comparison unit.
Example 2-8
34
Based on her work in example 2-7, Miriam has been asked to estimate the
today’s cost of a 2500ft2 heat exchange system for the new plant being
analyzed. She has the following data
Her company paid $50000 for a 1000ft2 heat exchanger 5 years ago
Heat exchangers within this range of capacity has a power sizing
exponent (x) of 0.55
Five years ago the Heat Exchanger Cost Index (HECI) was 1306; it is
1487 today
Solution:
Miriam will use the following equation of power sizing model;
Cost of 2500ft2 = (Cost of 1000ft2) [ ("Size" of 2500ft2) / ("Size" of 1000ft2) ] x
where x =0.55
Example 2-8
35
Cost of 2500ft2 equipment = (50000) [ (2500) / (1000) ] 0.55
Cost of 2500ft2 equipment =$82,800
Miriam knows that the $82,800 reflects only the scaling up of the
cost of the 1000 ft2 model to 2500 ft2 model. Now she will use
following equation of cost index model to determine the today’s
cost of equipment
300,94$
1306
1487
82800cost todayAnnual
agoyears5eIndex valu
todayeIndex valu
agoyears5costEquipment
cost todayEquipment
==
=
Problem
36
Padre works for a trade magazine that publishes lists of Power-Sizing
Exponent (PSE) that reflects economies of scale for developing engineering
estimates of various types of equipment. Padre has been unable to find any
published data on theVMIC machine and wants to list its PSE value in his
next issue. Given the following data calculate the PSE that Padre should
publish.
Cost ofVMIC-200 today= $100,000
Cost ofVMIC-100 10 years ago=$45,000
VMIC equipment index today= 856
VMIC equipment index 10 years ago=604
Problem
37
Solution:
Using Cost Index Model
Cost ofVMIC – 50 today = 45,000 (856/604) = $63,775
Using Power Sizing Model:
(63,775/100,000) = (50/100)x
log (0.63775) = x log (0.50)
x = 0.65
Estimating Models
38
5.Triangulation is used in engineering surveying. In this technique
surveyor is able to map points by using three fixed points and
horizontal distances.
Triangulation in cost estimating might involve using different sources
of data or using different quantitative models to arrive at the value
being estimated.
As decision makers we should approach our economic estimate
from different perspectives because such varied perspectives add
richness, confidence, and quality to the estimate.
Estimating Models
39
6. Improvement and the learning curve
One common phenomenon observed, regardless of the task being
performed, is that as the number of repetitions increases, performance
becomes faster and more accurate.This is the concept of learning and
improvement in the activities that people perform.
The learning curve captures the relationship between task performance
and task repetition.
In general as output doubles the-unit production time will be reduced to some
fixed percentage, the learning curve percentage or learning curve rate.
For example: It may take 300 minutes to produce the third unit in first
production run involving a task with a 95% learning time curve. In this case
the sixth (2 x 3) unit during 2nd run will take 300(0.95) = 285 minutes to
produce.
Estimating Models
40
6. Improvement and the learning curve
The following expression can be used for time estimating in
repetitive tasks
Estimating Models
41
6. Improvement and the learning curve
When thousands or even millions
of units are being produced, the
learning curve effect is
ignored/vanished at a time/stage
called steady state.
Steady state is the time at which the
physical constraints of performing
the task prevent the achievement of
any more learning or improvement.
Number of units
time
Steady state
Example
42
6. Calculate the time to required to produce the hundredth unit of a
production run if the first unit took 32 minute to produce and the
learning curve rate for production is 80%.
Problem
43
If 200 labor hours were required to produce the 1st unit in a production
run and 60 labor hours were required to produce the 7th unit, what was
the learning curve rate during production.
SOLUTION
TN=Tintial Nb ==> T(7) = T(1) x 7b
60 = (200) x 7b
0.300 = 7b
log 0.30= b log (7)
b = log (0.30)/log (7) = -0.62
b is defined as log (learning curve rate)/ log 20
b = [log (learning curve rate)/lob 2.0] = -0.62
log (learning curve rate) = -0.187
learning curve rate = 10(-0.187) = .650 = 65%
Estimating benefits
44
Same concepts of cost can be applied to estimate benefits
Cash Flow: Estimation and Diagramming
45
Cash flow
Cash inflows are the receipts,
revenues, incomes and saving
generated by project and business
activity. A plus sign indicates a cash
inflow
Cash outflows are costs, operation
and maintenance costs, disbursements,
expenses and taxes caused by projects
and business activity. A negative or
minus sign indicates a cash outflow.
Cash Flow Diagram (CFD)
46
Cash flow diagrams visually represent income and expenses over some
time interval.
It is graphical representation of cash flows drawn on the y-axis and a time
scale along x-axis.
Cash Flow Diagram (CFD)
47
Categories of Cash Flows
The expenses and receipts due to engineering projects usually fall into one
of the following categories:
First cost: expense to build or to buy and install
Operations and maintenance (O&M): annual expense, such as electricity,
labor, and minor repairs
Salvage value: receipt at project termination for sale or transfer of the
equipment (can be a salvage cost)
Revenues: annual receipts due to sale of products or services
Overhaul: major capital expenditure that occurs during the asset’s life
Revenue
48
Drawing a Cash Flow Diagram
A CFD is created by first drawing a segmented time-based
horizontal line, divided into appropriate time unit. Each time
when there is a cash flow, a vertical arrow is added − pointing
down for costs and up for revenues or benefits.The cost flows
are drawn to relative scale
49
Drawing a Cash Flow Diagram
In a cash flow diagram (CFD) the end of period t is the same as
the beginning of period (t+1)
Beginning of period cash flows are: rent, lease, and insurance
payments
End-of-period cash flows are: O&M, salvages, revenues, overhauls
The choice of time 0 is arbitrary. It can be when a project is
analyzed, when funding is approved, or when construction begins
One person’s cash outflow (represented as a negative value) is
another person’s inflow (represented as a positive value)
It is better to show two or more cash flows occurring in the
same year individually so that there is a clear connection from
the problem statement to each cash flow in the diagram
Cash Flow Diagram
50
For example, consider a truck that is going to be purchased for $55,000. It
will cost $9,500 each year to operate including fuel and maintenance. It will
need to have its engine rebuilt in 6 years for a cost of $22,000 and it will be
sold at year 9 for $6,000. Here is the cash flow diagram:
Note that it is customary to take cash flows during a year at the end of the
year, or EOY (end-of-year).There are certain cash flows for which this is
not appropriate and must be handled differently.
51
Cash Flow Diagram
Example: A man borrowed $1,000 from a bank at 8% interest.Two
end-of-year payments: at the end of the first year, he will repay half of
the $1000 principal plus the interest that is due.At the end of the
second year, he will repay the remaining half plus the interest for the
second year.
Cash flow for this problem is:
End of year Cash flow
0 +$1000
1 -$580 (-$500 - $80)
2 -$540 (-$500 - $40)
$1,000
0
1 2
$580
$540
52
ThankYou
Feel Free to Contact
msiddique@sharjah.ac.ae
Tel. +971 6 5050943 (Ext. 2943)

More Related Content

What's hot

MC0079 SMU 2013 Falll Session
MC0079 SMU 2013 Falll SessionMC0079 SMU 2013 Falll Session
MC0079 SMU 2013 Falll SessionNarinder Kumar
 
Chapter 18 sensitivity analysis
Chapter 18   sensitivity analysisChapter 18   sensitivity analysis
Chapter 18 sensitivity analysisBich Lien Pham
 
Cost accounting a managerial emphasis canadian 7th edition horngren datar raj...
Cost accounting a managerial emphasis canadian 7th edition horngren datar raj...Cost accounting a managerial emphasis canadian 7th edition horngren datar raj...
Cost accounting a managerial emphasis canadian 7th edition horngren datar raj...roraxita
 
8. Rate of return analysis
8. Rate of return analysis8. Rate of return analysis
8. Rate of return analysisMohsin Siddique
 
Lecture # 6 cost estimation ii
Lecture # 6 cost estimation iiLecture # 6 cost estimation ii
Lecture # 6 cost estimation iiBich Lien Pham
 
Cost Behavior
Cost BehaviorCost Behavior
Cost BehaviorAIS_USU
 
Chapter 19 decision-making under risk
Chapter 19   decision-making under riskChapter 19   decision-making under risk
Chapter 19 decision-making under riskBich Lien Pham
 
Mb0048 operations research
Mb0048   operations researchMb0048   operations research
Mb0048 operations researchsmumbahelp
 
COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY
COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY
COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY SOURAV DAS
 
Business Mathematics in decision making
Business Mathematics in decision makingBusiness Mathematics in decision making
Business Mathematics in decision makingFahad Fu
 
History of Operations Research
History of Operations ResearchHistory of Operations Research
History of Operations ResearchKarishma Chaudhary
 
C ost+behaviour+estimation
C ost+behaviour+estimationC ost+behaviour+estimation
C ost+behaviour+estimationKhalid Aziz
 
Production & Operation Management Chapter21[1]
Production & Operation Management Chapter21[1]Production & Operation Management Chapter21[1]
Production & Operation Management Chapter21[1]Hariharan Ponnusamy
 
Linear programming manufacturing application
Linear programming manufacturing applicationLinear programming manufacturing application
Linear programming manufacturing applicationMuneeb Ahmed
 

What's hot (20)

Engineering Economy
Engineering EconomyEngineering Economy
Engineering Economy
 
MC0079 SMU 2013 Falll Session
MC0079 SMU 2013 Falll SessionMC0079 SMU 2013 Falll Session
MC0079 SMU 2013 Falll Session
 
Cost concepts
Cost conceptsCost concepts
Cost concepts
 
Chapter 18 sensitivity analysis
Chapter 18   sensitivity analysisChapter 18   sensitivity analysis
Chapter 18 sensitivity analysis
 
Lo4b (nabil) breakeven analysis
Lo4b (nabil)   breakeven analysisLo4b (nabil)   breakeven analysis
Lo4b (nabil) breakeven analysis
 
Cost accounting a managerial emphasis canadian 7th edition horngren datar raj...
Cost accounting a managerial emphasis canadian 7th edition horngren datar raj...Cost accounting a managerial emphasis canadian 7th edition horngren datar raj...
Cost accounting a managerial emphasis canadian 7th edition horngren datar raj...
 
Lo4a(arif)
Lo4a(arif)Lo4a(arif)
Lo4a(arif)
 
8. Rate of return analysis
8. Rate of return analysis8. Rate of return analysis
8. Rate of return analysis
 
Lecture # 6 cost estimation ii
Lecture # 6 cost estimation iiLecture # 6 cost estimation ii
Lecture # 6 cost estimation ii
 
Cost Behavior
Cost BehaviorCost Behavior
Cost Behavior
 
Quantitative Techniques
Quantitative TechniquesQuantitative Techniques
Quantitative Techniques
 
Model Uncertainty
Model UncertaintyModel Uncertainty
Model Uncertainty
 
Chapter 19 decision-making under risk
Chapter 19   decision-making under riskChapter 19   decision-making under risk
Chapter 19 decision-making under risk
 
Mb0048 operations research
Mb0048   operations researchMb0048   operations research
Mb0048 operations research
 
COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY
COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY
COST NOTES LECTURE ALL COST CURVES NUMERICALS EXAMPLES THEORY
 
Business Mathematics in decision making
Business Mathematics in decision makingBusiness Mathematics in decision making
Business Mathematics in decision making
 
History of Operations Research
History of Operations ResearchHistory of Operations Research
History of Operations Research
 
C ost+behaviour+estimation
C ost+behaviour+estimationC ost+behaviour+estimation
C ost+behaviour+estimation
 
Production & Operation Management Chapter21[1]
Production & Operation Management Chapter21[1]Production & Operation Management Chapter21[1]
Production & Operation Management Chapter21[1]
 
Linear programming manufacturing application
Linear programming manufacturing applicationLinear programming manufacturing application
Linear programming manufacturing application
 

Similar to 3 150316005311-conversion-gate01

Engineering costs and cost estimating
Engineering costs and cost estimatingEngineering costs and cost estimating
Engineering costs and cost estimatinganwar khan
 
Engineering Cost & Estimation .pptx
Engineering Cost & Estimation .pptxEngineering Cost & Estimation .pptx
Engineering Cost & Estimation .pptxSAMIRDE6
 
Engineering economics ECO-202
Engineering economics ECO-202Engineering economics ECO-202
Engineering economics ECO-202Saqib Imran
 
Engineering economics eco202
Engineering economics eco202Engineering economics eco202
Engineering economics eco202Saqib Imran
 
Bus 7800 week 2
Bus 7800 week 2Bus 7800 week 2
Bus 7800 week 2OUHainesM
 
Business Canvas and SWOT Analysis For mo.docx
             Business Canvas and SWOT Analysis   For mo.docx             Business Canvas and SWOT Analysis   For mo.docx
Business Canvas and SWOT Analysis For mo.docxhallettfaustina
 
Cost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptxCost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptxSudipBalLama
 
Chapter 2 Managerial Accounting 15th edition by Garison
Chapter 2 Managerial Accounting 15th edition by Garison Chapter 2 Managerial Accounting 15th edition by Garison
Chapter 2 Managerial Accounting 15th edition by Garison MuhammadUsman208471
 
Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation tobiassommer2013
 
2.Chapter two.pptx
2.Chapter two.pptx2.Chapter two.pptx
2.Chapter two.pptxAberraBeri
 
WEEK 5 PROBLEM SET Due week 5 and worth 200 points. Yo.docx
WEEK 5 PROBLEM SET Due week 5 and worth 200 points.   Yo.docxWEEK 5 PROBLEM SET Due week 5 and worth 200 points.   Yo.docx
WEEK 5 PROBLEM SET Due week 5 and worth 200 points. Yo.docxcockekeshia
 
3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf18010YeashRahman
 
Variance Analysis in Standard Costing
Variance Analysis in Standard CostingVariance Analysis in Standard Costing
Variance Analysis in Standard CostingVivek Mahajan
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimatesnagashree123
 

Similar to 3 150316005311-conversion-gate01 (20)

Engineering costs and cost estimating
Engineering costs and cost estimatingEngineering costs and cost estimating
Engineering costs and cost estimating
 
Engineering Cost & Estimation .pptx
Engineering Cost & Estimation .pptxEngineering Cost & Estimation .pptx
Engineering Cost & Estimation .pptx
 
Engineering economics ECO-202
Engineering economics ECO-202Engineering economics ECO-202
Engineering economics ECO-202
 
Engineering economics eco202
Engineering economics eco202Engineering economics eco202
Engineering economics eco202
 
Bus 7800 week 2
Bus 7800 week 2Bus 7800 week 2
Bus 7800 week 2
 
Nce603 mod unit3
Nce603 mod unit3Nce603 mod unit3
Nce603 mod unit3
 
Cost Concepts.ppt
Cost Concepts.pptCost Concepts.ppt
Cost Concepts.ppt
 
Business Canvas and SWOT Analysis For mo.docx
             Business Canvas and SWOT Analysis   For mo.docx             Business Canvas and SWOT Analysis   For mo.docx
Business Canvas and SWOT Analysis For mo.docx
 
Project cost management
Project cost management Project cost management
Project cost management
 
Cost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptxCost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptx
 
Chapter 2 Managerial Accounting 15th edition by Garison
Chapter 2 Managerial Accounting 15th edition by Garison Chapter 2 Managerial Accounting 15th edition by Garison
Chapter 2 Managerial Accounting 15th edition by Garison
 
marginal costing
marginal costingmarginal costing
marginal costing
 
Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation Training on Financial and Economic Project Evaluation
Training on Financial and Economic Project Evaluation
 
Cost acoounting
Cost acoountingCost acoounting
Cost acoounting
 
2.Chapter two.pptx
2.Chapter two.pptx2.Chapter two.pptx
2.Chapter two.pptx
 
WEEK 5 PROBLEM SET Due week 5 and worth 200 points. Yo.docx
WEEK 5 PROBLEM SET Due week 5 and worth 200 points.   Yo.docxWEEK 5 PROBLEM SET Due week 5 and worth 200 points.   Yo.docx
WEEK 5 PROBLEM SET Due week 5 and worth 200 points. Yo.docx
 
3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf
 
Variance Analysis in Standard Costing
Variance Analysis in Standard CostingVariance Analysis in Standard Costing
Variance Analysis in Standard Costing
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimates
 
Cost studies model_answers_2014_jan
Cost studies model_answers_2014_janCost studies model_answers_2014_jan
Cost studies model_answers_2014_jan
 

More from abidiqbal55

Network theorems chapter 9
Network theorems chapter 9Network theorems chapter 9
Network theorems chapter 9abidiqbal55
 
Method of analysis chapter 8
Method of analysis chapter 8Method of analysis chapter 8
Method of analysis chapter 8abidiqbal55
 
Method of analysis chapter 8 final
Method of analysis chapter 8 finalMethod of analysis chapter 8 final
Method of analysis chapter 8 finalabidiqbal55
 
Inductors chapter 11
Inductors chapter 11Inductors chapter 11
Inductors chapter 11abidiqbal55
 
Capacitor chapter 10
Capacitor chapter 10Capacitor chapter 10
Capacitor chapter 10abidiqbal55
 
Ac series parallel chapter 13
Ac series parallel chapter 13Ac series parallel chapter 13
Ac series parallel chapter 13abidiqbal55
 
10 150316005543-conversion-gate01
10 150316005543-conversion-gate0110 150316005543-conversion-gate01
10 150316005543-conversion-gate01abidiqbal55
 
9 150316005537-conversion-gate01
9 150316005537-conversion-gate019 150316005537-conversion-gate01
9 150316005537-conversion-gate01abidiqbal55
 
8 150316005531-conversion-gate01
8 150316005531-conversion-gate018 150316005531-conversion-gate01
8 150316005531-conversion-gate01abidiqbal55
 
7 150316005526-conversion-gate01
7 150316005526-conversion-gate017 150316005526-conversion-gate01
7 150316005526-conversion-gate01abidiqbal55
 
6 150316005521-conversion-gate01
6 150316005521-conversion-gate016 150316005521-conversion-gate01
6 150316005521-conversion-gate01abidiqbal55
 
5moreinterestformulas 150316005456-conversion-gate01
5moreinterestformulas 150316005456-conversion-gate015moreinterestformulas 150316005456-conversion-gate01
5moreinterestformulas 150316005456-conversion-gate01abidiqbal55
 
5 150316005456-conversion-gate01
5 150316005456-conversion-gate015 150316005456-conversion-gate01
5 150316005456-conversion-gate01abidiqbal55
 
4 interestandequivalence-150316005410-conversion-gate01
4 interestandequivalence-150316005410-conversion-gate014 interestandequivalence-150316005410-conversion-gate01
4 interestandequivalence-150316005410-conversion-gate01abidiqbal55
 
2 decisionmakingandprofessionalethics-150316005212-conversion-gate01
2 decisionmakingandprofessionalethics-150316005212-conversion-gate012 decisionmakingandprofessionalethics-150316005212-conversion-gate01
2 decisionmakingandprofessionalethics-150316005212-conversion-gate01abidiqbal55
 
1 introductiontoengineeringeconomics-150316005104-conversion-gate01
1 introductiontoengineeringeconomics-150316005104-conversion-gate011 introductiontoengineeringeconomics-150316005104-conversion-gate01
1 introductiontoengineeringeconomics-150316005104-conversion-gate01abidiqbal55
 

More from abidiqbal55 (18)

Lecture 1
Lecture 1Lecture 1
Lecture 1
 
Network theorems chapter 9
Network theorems chapter 9Network theorems chapter 9
Network theorems chapter 9
 
Method of analysis chapter 8
Method of analysis chapter 8Method of analysis chapter 8
Method of analysis chapter 8
 
Method of analysis chapter 8 final
Method of analysis chapter 8 finalMethod of analysis chapter 8 final
Method of analysis chapter 8 final
 
Inductors chapter 11
Inductors chapter 11Inductors chapter 11
Inductors chapter 11
 
Capacitor chapter 10
Capacitor chapter 10Capacitor chapter 10
Capacitor chapter 10
 
Ac series parallel chapter 13
Ac series parallel chapter 13Ac series parallel chapter 13
Ac series parallel chapter 13
 
Chap5 engeco
Chap5 engecoChap5 engeco
Chap5 engeco
 
10 150316005543-conversion-gate01
10 150316005543-conversion-gate0110 150316005543-conversion-gate01
10 150316005543-conversion-gate01
 
9 150316005537-conversion-gate01
9 150316005537-conversion-gate019 150316005537-conversion-gate01
9 150316005537-conversion-gate01
 
8 150316005531-conversion-gate01
8 150316005531-conversion-gate018 150316005531-conversion-gate01
8 150316005531-conversion-gate01
 
7 150316005526-conversion-gate01
7 150316005526-conversion-gate017 150316005526-conversion-gate01
7 150316005526-conversion-gate01
 
6 150316005521-conversion-gate01
6 150316005521-conversion-gate016 150316005521-conversion-gate01
6 150316005521-conversion-gate01
 
5moreinterestformulas 150316005456-conversion-gate01
5moreinterestformulas 150316005456-conversion-gate015moreinterestformulas 150316005456-conversion-gate01
5moreinterestformulas 150316005456-conversion-gate01
 
5 150316005456-conversion-gate01
5 150316005456-conversion-gate015 150316005456-conversion-gate01
5 150316005456-conversion-gate01
 
4 interestandequivalence-150316005410-conversion-gate01
4 interestandequivalence-150316005410-conversion-gate014 interestandequivalence-150316005410-conversion-gate01
4 interestandequivalence-150316005410-conversion-gate01
 
2 decisionmakingandprofessionalethics-150316005212-conversion-gate01
2 decisionmakingandprofessionalethics-150316005212-conversion-gate012 decisionmakingandprofessionalethics-150316005212-conversion-gate01
2 decisionmakingandprofessionalethics-150316005212-conversion-gate01
 
1 introductiontoengineeringeconomics-150316005104-conversion-gate01
1 introductiontoengineeringeconomics-150316005104-conversion-gate011 introductiontoengineeringeconomics-150316005104-conversion-gate01
1 introductiontoengineeringeconomics-150316005104-conversion-gate01
 

Recently uploaded

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 

Recently uploaded (20)

★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 

3 150316005311-conversion-gate01

  • 1. 3: Engineering Cost and Estimation Dr. Mohsin Siddique Assistant Professor msiddique@sharjah.ac.ae Ext: 29431 Date: 23/09/2014 Engineering Economics University of Sharjah Dept. of Civil and Env. Engg.
  • 3. Outcome of Today’s Lecture 3 After completing this lecture… The students should be able to: Define various cost concepts Provide specific examples of how and why these engineering cost concepts are important
  • 4. Engineering Costs 4 Fixed Cost: These constant or unchanging regardless of the level of output or activity. Example: In production environment, costs for factory floor space and equipment remains the same regardless of production quantity, number of employee and level of work in progress. Variable Costs: These are not constant and depends in level of out or activity. Example: Labor costs are variable cost because it depend on number of employees and number of hours they work Marginal Costs: It is the variable cost for one more unit. Average Costs: It is total cost divided by number of units
  • 5. Engineering Costs 5 Let’s take example of two student enrolled in engineering one is full time while other is a part time. student A full time student can enroll in 12-18 credit hours for a fixed fee of $1800. Overload credits are charged at $120/credit Part-time student: It is case of variable cost. He has to pay according to number of credits he choose. Full-time student: It is the case of fixed cost, regardless of number of credit hours he has to pay tuition fee. Fixed cost: $1800 per semester for 12-18 credits Avg. cost if student chooses 12 credits: 1800/12= $150/credit Avg. cost if student chooses 18 credits: 1800/18= $ 100/credit Variable cost: It will cost of addition credit beyond 18 and if the student chooses to enroll in 21 credits. Variable cost for addition credit beyond17: $0 Variable cost for addition credit beyond18: $120
  • 7. Example 2-1 7 Total Cost= Total Fixed cost + TotalVariable cost
  • 8. Engineering Costs 8 Profit-loss breakeven chart. It is plot of revenue against costs for various level of outputs (activity). It allows to understand breakpoint and region of profit and loss. Terminologies: Break-even point: the level of activity at which total cost of product/goods/services equals to revenue Profit region: values of variable x greater than break point where total revenue is greater than total cost Loss region:Values of variable x less than breakpoint where total revenue is less than total cost Profit loss breakeven chart figure here
  • 9. Engineering Costs (Example 2-1 continued) 9 Profit-loss breakeven chart. It is plot of revenue against costs for various level of outputs (activity). It allows to understand breakpoint and region of profit and loss. Terminologies: Breakeven point: 15 students Profit region: for more than 15, FSSe will be in profit Loss region: For less than 15, FSSe will be in loss
  • 10. Engineering Costs 10 Linear and non-linear cost relation For example: Employees are often paid 150% of their hourly rate for overtime. In this case fixed cost is €3000 while variable cost Up to 10 units is €200 per unit and For 5 more units €300 per unit Avg. cost at 5 units = (3000+200x5)/5= € 800 Avg. cost at 10 units = (3000+200x )/10= Avg. cost at 12 units = (3000+200x10+300x2)/12= € 467 Avg. cost at 15 units = (3000+200x10+300x5)/15= Total Cost= Total Fixed cost + TotalVariable cost
  • 11. Engineering Costs 11 Problem: A private owned summer camp for youngsters has the following data for a 12 week session: Charges per camper: $120 per week Fixed costs: $48000 Variable cost per camper: $80 per week Capacity: 200 campers (a). Develop the mathematical relationship for total cost and total revenue (b).What is the total number of campers that will allow the camp to just break even (c).What is profit or loss for the 12 week session if the camp operates at 80% capacity.
  • 12. Engineering Costs 12 x = number of campers (a) Total Cost = Fixed Cost +Variable Cost = $48,000 + $80 (12) x Total Revenue = $120 (12) x (b) Break-even when Total Cost = Total Revenue $48,000 + $960 x = $1,440 x $4,800 = $480 x x = 100 campers to break-even (c) capacity is 200 campers 80% of capacity is 160 campers @ 160 campers x = 160 Total Cost = $48,000 + $80 (12) (160) = $201,600 Total Revenue = $120 (12) (160) = $230,400 Profit = Revenue – Cost = $230,400 - $201,600 = $28,800
  • 13. Engineering Costs 13 Sunk Cost: A sunk cost is money already spent as a result of past decision. e.g., (i) If 5 students signed up for the engineering course than in example 2-1, the advertising cost would be sunk cost (ii). Price of two years old pc purchase at $2000 is sunk cost which has no influence on current market value of $400 of pc (iii). _________________________ ____________________________ ____________________________
  • 14. Engineering Costs 14 Opportunity cost: An opportunity cost is associated with using a resource in one activity instead of another. Every time we use business resource in one activity we, we give up the opportunity to use the same resource at that time in some other activity. “An opportunity cost is the benefit that is forgone by engaging a business resource in a chosen activity instead of engaging that same resource in the forgone activity” Example
  • 15. Engineering Costs 15 Opportunity cost: Examples: Suppose that friends invite a college student to travel through Europe over the summer break. Cost analysis: In considering the offer, student computes the total cost of travel as $ 3000 for 10 weeks and after checking his bank account he agrees to go with them. However, true cost to the student includes not only his out-of pocket cash costs but also opportunity costs. By taking the trip, the student is giving up the opportunity to earn $ 5000 as a summer intern at a local business. Thus the student total cost will comprise the $3000 cash cost as well as $5000 opportunity cost.
  • 18. Engineering Costs 18 Recurring and Nonrecurring costs Recurring costs refers to any expense that is know and anticipated and that occurs at regular interval. Nonrecurring costs are one-of-a-kind expenses that occur at irregular intervals and thus are sometimes difficult to plan for or anticipate from a budgeting perspective. ________________________________________________ ________________________________________________ ________________________________________________ In engineering economics analysis, recurring costs are modeled as cash flow that occur at regular interval. Nonrecurring costs can also be handled if we are able to anticipate their timing and size.
  • 19. Engineering Costs 19 Incremental costs One of fundamental principle in engineering economics analysis is that in choosing between competing alternatives, the focus is one difference between those alternative. For example:You may be interested in comparing two car lease options. In both of the cases (say case A and case B) total car prices after lease time are same. What else would you like analyze to make a decision ?? _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________ _________________________________________________
  • 21. Engineering Costs 21 A cash cost is a cash transaction, or cash flow. If a company purchases an asset, it realizes a cash cost. A book cost is not a cash flow, but it is an accounting entry that represents some change in value. When a company records a depreciation charge of $4 million in a tax year, no money changes hands. However, the company is saying in effect that the market value of its physical, depreciable assets has decreased by $4 million during the year. Life-cycle costs refer to costs that occur over the various phases of a product or service life cycle, from needs assessment through design, production, and operation to decline and retirement.
  • 23. Outcome of Today’s Lecture 23 After completing this lecture… The students should be able to: Define engineering estimating Explain the three types of engineering estimates, as well as common difficulties encountered in making engineering cost estimates Use several common mathematical estimating models in cost estimating Discuss the impact of learning curve on cost estimates State the relationship between cost estimating and estimating project benefits Draw cash flow diagrams to show project costs and benefits
  • 24. Cost Estimating 24 Engineering economic analysis focuses on future consequences of present decisions and therefore one must estimate all cost related variables Estimates for engineering economic analysis include purchase costs, annual revenue, yearly maintenance, interest rates for investments, annual labor and insurance costs and tax rates etc Types of Estimates 1. Rough Estimate 2. Semi-detailed estimate 3. Detailed estimate
  • 25. Cost Estimating 25 Types of Estimates 1. Rough Estimates: These are order of magnitude estimate used for high level planning for determining project feasibility and in a project initial planning and evaluation phase. These estimates require minimum resources to develop and their accuracy is -30 to 60%. 2. Semi-detailed estimates: These are used for budgeting purpose at a project’s conceptual or preliminary design stage.These are more detailed than rough but still require time and resources. Their accuracy is generally -15 to 20% 3. Detailed estimates: These are used during project detailed design and contract bidding phases.These involve most time and resources and thus are much more accurate than rough estimates. The accuracy is general -3 to 5%
  • 26. Cost Estimating 26 Difficulties in Estimation One of a kind estimates: The first time something is done, it is difficult to estimate costs required to design, produce, and maintain a product over its life cycle. E.g., NASA first space mission, ___________________________ __________________________________________________ Time and effort available: Our ability to develop engineering estimates is constrained by the time and man-power availability Estimator Expertise:The past is our greatest teacher and knowledge is power. The more experienced and knowledgeable this estimator is, the more accurate the estimate will be.
  • 27. Estimating Models 27 1. Per unit model 2. Segmenting model 3. Cost indexes 4. Power-sizing model 5. Triangulation 6. Improvement and learning curve
  • 28. Estimating Models 28 1. Per-unit model: It is a simple but useful model in which a cost estimate is made for a single unit, then the total cost estimate results from multiplying the estimated cost per unit times the number of units. It is commonly used in construction industry. Example: Cost of $65 per square meter Service cost per customer Gasoline cost per km ________________________________________________ ________________________________________________ ________________________________________________
  • 29. Estimating Models 29 2. Segmenting model: It can be described as Divide and Conquer It partitions the total estimation task into segments. Each segment is estimated, then the segment estimates are combined for the total cost estimate.
  • 30. Estimating Models 30 3. Cost indexes: It can be used to account for historical changes in costs.The widely reported Consumer Price Index (CPI) is an example. Cost index data are available from a variety of sources. Suppose A is a time point in the past and B is the current time. Let IVA denote the index value at time A and IVB denote the current index value for the cost estimate of interest.To estimate the current cost based on the cost at time A, use the equation: (Cost at time B)/ (Cost at time A) = (IVB / IVA) Cost at time B = (Cost at time A) (IVB / IVA)
  • 31. Example 2-7 31 Miriam is interested in estimating the annual labor and material costs for a new production facility. She was able to obtain the following labor and material cost data: Labor costs: Labor cost index value was at 124 ten years ago and is 188 today Annual labor costs for a similar facility were $575,500 ten years ago Material Costs Material cost index value was at 544 three years ago and is 715 today Annual material costs for a similar facility were $ 2,455,000 three year ago
  • 32. Example 2-7 32 Solution: Miriam will use cost index equation for cost estimates for annual labor and material cost 871800$ 124 188 755005cost todayAnnual agoyears10eIndex valu todayeIndex valu agoyears10costAnnualcost todayAnnual agoyears10eIndex valu todayeIndex valu agoyears10costAnnual cost todayAnnual == = = 3227000$ 544 715 2455000cost todayAnnual agoyears3eIndex valu todayeIndex valu agoyears3costAnnual cost todayAnnual == = Annual Labor Cost Annual Material Cost
  • 33. Estimating Models 33 4. Power-sizing model: It accounts explicitly for economies of scale. For example, the cost of constructing a six-story building will typically be less than double the construction cost of a comparable three-story building. To estimate the cost of B based on the cost of comparable item A, use the equation Cost of B = (Cost of A) [ ("Size" of B) / ("Size" of A) ] x where x is the appropriate power-sizing exponent, available from a variety of sources. An economy of scale is indicated by an exponent less than 1.0.An exponent of 1.0 indicates no economy of scale, and an exponent greater than 1.0 indicates a diseconomy of scale. "Size" is used here in a general sense to indicate physical size, capacity, or some other appropriate comparison unit.
  • 34. Example 2-8 34 Based on her work in example 2-7, Miriam has been asked to estimate the today’s cost of a 2500ft2 heat exchange system for the new plant being analyzed. She has the following data Her company paid $50000 for a 1000ft2 heat exchanger 5 years ago Heat exchangers within this range of capacity has a power sizing exponent (x) of 0.55 Five years ago the Heat Exchanger Cost Index (HECI) was 1306; it is 1487 today Solution: Miriam will use the following equation of power sizing model; Cost of 2500ft2 = (Cost of 1000ft2) [ ("Size" of 2500ft2) / ("Size" of 1000ft2) ] x where x =0.55
  • 35. Example 2-8 35 Cost of 2500ft2 equipment = (50000) [ (2500) / (1000) ] 0.55 Cost of 2500ft2 equipment =$82,800 Miriam knows that the $82,800 reflects only the scaling up of the cost of the 1000 ft2 model to 2500 ft2 model. Now she will use following equation of cost index model to determine the today’s cost of equipment 300,94$ 1306 1487 82800cost todayAnnual agoyears5eIndex valu todayeIndex valu agoyears5costEquipment cost todayEquipment == =
  • 36. Problem 36 Padre works for a trade magazine that publishes lists of Power-Sizing Exponent (PSE) that reflects economies of scale for developing engineering estimates of various types of equipment. Padre has been unable to find any published data on theVMIC machine and wants to list its PSE value in his next issue. Given the following data calculate the PSE that Padre should publish. Cost ofVMIC-200 today= $100,000 Cost ofVMIC-100 10 years ago=$45,000 VMIC equipment index today= 856 VMIC equipment index 10 years ago=604
  • 37. Problem 37 Solution: Using Cost Index Model Cost ofVMIC – 50 today = 45,000 (856/604) = $63,775 Using Power Sizing Model: (63,775/100,000) = (50/100)x log (0.63775) = x log (0.50) x = 0.65
  • 38. Estimating Models 38 5.Triangulation is used in engineering surveying. In this technique surveyor is able to map points by using three fixed points and horizontal distances. Triangulation in cost estimating might involve using different sources of data or using different quantitative models to arrive at the value being estimated. As decision makers we should approach our economic estimate from different perspectives because such varied perspectives add richness, confidence, and quality to the estimate.
  • 39. Estimating Models 39 6. Improvement and the learning curve One common phenomenon observed, regardless of the task being performed, is that as the number of repetitions increases, performance becomes faster and more accurate.This is the concept of learning and improvement in the activities that people perform. The learning curve captures the relationship between task performance and task repetition. In general as output doubles the-unit production time will be reduced to some fixed percentage, the learning curve percentage or learning curve rate. For example: It may take 300 minutes to produce the third unit in first production run involving a task with a 95% learning time curve. In this case the sixth (2 x 3) unit during 2nd run will take 300(0.95) = 285 minutes to produce.
  • 40. Estimating Models 40 6. Improvement and the learning curve The following expression can be used for time estimating in repetitive tasks
  • 41. Estimating Models 41 6. Improvement and the learning curve When thousands or even millions of units are being produced, the learning curve effect is ignored/vanished at a time/stage called steady state. Steady state is the time at which the physical constraints of performing the task prevent the achievement of any more learning or improvement. Number of units time Steady state
  • 42. Example 42 6. Calculate the time to required to produce the hundredth unit of a production run if the first unit took 32 minute to produce and the learning curve rate for production is 80%.
  • 43. Problem 43 If 200 labor hours were required to produce the 1st unit in a production run and 60 labor hours were required to produce the 7th unit, what was the learning curve rate during production. SOLUTION TN=Tintial Nb ==> T(7) = T(1) x 7b 60 = (200) x 7b 0.300 = 7b log 0.30= b log (7) b = log (0.30)/log (7) = -0.62 b is defined as log (learning curve rate)/ log 20 b = [log (learning curve rate)/lob 2.0] = -0.62 log (learning curve rate) = -0.187 learning curve rate = 10(-0.187) = .650 = 65%
  • 44. Estimating benefits 44 Same concepts of cost can be applied to estimate benefits
  • 45. Cash Flow: Estimation and Diagramming 45 Cash flow Cash inflows are the receipts, revenues, incomes and saving generated by project and business activity. A plus sign indicates a cash inflow Cash outflows are costs, operation and maintenance costs, disbursements, expenses and taxes caused by projects and business activity. A negative or minus sign indicates a cash outflow.
  • 46. Cash Flow Diagram (CFD) 46 Cash flow diagrams visually represent income and expenses over some time interval. It is graphical representation of cash flows drawn on the y-axis and a time scale along x-axis.
  • 47. Cash Flow Diagram (CFD) 47 Categories of Cash Flows The expenses and receipts due to engineering projects usually fall into one of the following categories: First cost: expense to build or to buy and install Operations and maintenance (O&M): annual expense, such as electricity, labor, and minor repairs Salvage value: receipt at project termination for sale or transfer of the equipment (can be a salvage cost) Revenues: annual receipts due to sale of products or services Overhaul: major capital expenditure that occurs during the asset’s life Revenue
  • 48. 48 Drawing a Cash Flow Diagram A CFD is created by first drawing a segmented time-based horizontal line, divided into appropriate time unit. Each time when there is a cash flow, a vertical arrow is added − pointing down for costs and up for revenues or benefits.The cost flows are drawn to relative scale
  • 49. 49 Drawing a Cash Flow Diagram In a cash flow diagram (CFD) the end of period t is the same as the beginning of period (t+1) Beginning of period cash flows are: rent, lease, and insurance payments End-of-period cash flows are: O&M, salvages, revenues, overhauls The choice of time 0 is arbitrary. It can be when a project is analyzed, when funding is approved, or when construction begins One person’s cash outflow (represented as a negative value) is another person’s inflow (represented as a positive value) It is better to show two or more cash flows occurring in the same year individually so that there is a clear connection from the problem statement to each cash flow in the diagram
  • 50. Cash Flow Diagram 50 For example, consider a truck that is going to be purchased for $55,000. It will cost $9,500 each year to operate including fuel and maintenance. It will need to have its engine rebuilt in 6 years for a cost of $22,000 and it will be sold at year 9 for $6,000. Here is the cash flow diagram: Note that it is customary to take cash flows during a year at the end of the year, or EOY (end-of-year).There are certain cash flows for which this is not appropriate and must be handled differently.
  • 51. 51 Cash Flow Diagram Example: A man borrowed $1,000 from a bank at 8% interest.Two end-of-year payments: at the end of the first year, he will repay half of the $1000 principal plus the interest that is due.At the end of the second year, he will repay the remaining half plus the interest for the second year. Cash flow for this problem is: End of year Cash flow 0 +$1000 1 -$580 (-$500 - $80) 2 -$540 (-$500 - $40) $1,000 0 1 2 $580 $540
  • 52. 52 ThankYou Feel Free to Contact msiddique@sharjah.ac.ae Tel. +971 6 5050943 (Ext. 2943)