SlideShare a Scribd company logo
1 of 22
S. Scott Sittner
Corporate Quality Management Consultant, ANSI-ASME-NQA-1, Certified Lead Auditor, Certified Auditor Trainer
10 CFR Part 21: Reporting of Defects and NonCompliance
10 CFR Part 50.55(e): Conditions of Construction Permits, Early Site Permits,
Combined Licenses, and Manufacturing Licenses.
NRC Requirements
DOOSAN Proprietary and Confidential 2
Table of Contents 2
Learning Objectives 3
Objective 1 4
Overview 5, 6
Definitions: Defect 7
Definitions: Basic Component, Deviation, Evaluation,
Non-Conformance 8
Definitions: Notification, Substantial Safety Hazard 9
Commercial Grade Item (CGI) 10, 11
Dedication 12, 13
Posting 14
Procedures for Notification: Evaluation and Deviations 15, 16
Procedures for Notification: 10 CFR 21, 10 CFR 50.55(e) 17
Failure to Notify 18
Procurement Documents 19
Inspection 22
Records 21
Maintenance and Inspection of Records 22
S. S. Sittner
NRC Requirements: Table of Contents
DOOSAN Proprietary and Confidential 3
S. S. Sittner
1.) Develop and understanding of 10 CFR 21, the relationship to
procurement and vendors, and responsibilities of licensees for
implementation..
2.) Identify the requirements of Commercial Grade Items (CGIs) in
NRC IPs 43004 and 38703.
3.) Understand NRC QA Procedures through Inspection Procedures
35021, 3572 and 4054.
4.) Understand NRC Inspection Procedures through 10 CFR 52,
NRC IPs 65002, 36001, 35017 and Generic Letter 91-05.
5.) Identify NRC concerns regarding Counterfeit Parts as identified in
NRC Generic Letter 89-02.
NRC Requirements: Learning Objectives
DOOSAN Proprietary and Confidential 4
S. S. Sittner
NRC Requirements: Objective 1
Develop an understanding of 10 CFR 21, the relationship to
Procurement, Vendors, and the responsibilities of licensees
for implementation.
DOOSAN Proprietary and Confidential 5
S. S. Sittner
Overview
10 CFR 21 establishes the requirement to immediately
notify the NRC:
• Of the reasonable potential of substantial safety hazards,
followed by
• Written notification of evaluation results whether the facility,
activity, or basic component supplied to such a facility or
activity contains defects, which could create a substantial
safety hazard.
Exemption: Suppliers of Commercial Grade Items are exempt
from the provisions of this part to the extent that they supply
Commercial Grade Items.
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
DOOSAN Proprietary and Confidential 6
S. S. Sittner
10 CFR 50.55 (e)
Applies to holders of construction permits and COLs
under 10 CFR 52, and establishes the requirement to
evaluate deviations and failures to comply to identify
defects and failures to comply associated with
substantial safety hazards, and to notify the NRC of
defects which could create a substantial safety hazard.
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
DOOSAN Proprietary and Confidential 7
S. S. Sittner
Defect means:
 A deviation in a basic component that could create a substantial safety
hazard.
 The installation, use, or operation of a basic component containing a defect
.
 A deviation in a portion of a facility subject to the:
• Early site permit
• Standard design certification
• Standard design approval
• Construction permit
• Combined license or manufacturing license requirements of part 50 or part 52, provided the
deviation could create a substantial safety hazard, and the portion of the facility containing
the has been offered to the purchaser for acceptance.
 A condition or circumstance involving a basic component that could
contribute to the exceeding or a safety limit, or
 An error, omission or other circumstance in a design certification, or
standard design approval that could create a substantial safety hazard.
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
DOOSAN Proprietary and Confidential
S. S. Sittner
 BASIC COMPONENT: A safety-related item. It includes design,
inspection, testing or consulting services important to safety that
are associated with the component hardware, whether these
services are performed by the component supplier or other.
 DEVIATION: A departure from the technical requirements included
in a procurement document or specified in early site permit
information, a standard design certification or standard design
approval.
 EVALUATION: The process of determining whether a particular
deviation could create a substantial hazard or determining whether
a failure to comply is associated with a substantial safety hazard.
 Non-Conformance: Failure to meet a specification or requirement
of 10 CFR 50, Appendix B.
8
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
DOOSAN Proprietary and Confidential
9
S. S. Sittner
Notification:
• The telephonic communication to the NRC Operations Center and written
transmittal of information to the NRC Document Control Desk.
• Two working days are allotted from notification to phone call to the NRC
• Within 30 days, must provide final report.
Substantial Safety Hazard:
• A loss of safety function to the extent that there is a major reduction in the
degree of protection provided to public health and safety for any facility or
activity licensed or otherwise approved or regulated by the NRC, other than
for export.
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
DOOSAN Proprietary and Confidential 10
S. S. Sittner
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
Commercial Grade Item (CGI)
When applied to nuclear power plants licensed pursuant to 10 CFR Part
30, 40, 50 (specifically 50.55(e)), 52, 60, Commercial Grade Item:
• Is a structure, system or component, or part thereof that effects its
safety function, that was not designed and manufactured as a basic
component.
• Does not include items where the design and manufacturing process
require in-process inspections and verifications to ensure that defect
s or failures to comply are identified and corrected (i.e., one or more
critical characteristics of the item cannot be verified).
DOOSAN Proprietary and Confidential 11
S. S. Sittner
Commercial Grade Item (CGI) (continued)
When applied to facilities and activities licensed pursuant to 10 CFR Parts
20, 40, 50 (other than nuclear power plants), 60, 61, 63, 70, 71, or 72,
Commercial Grade Items Means that it is:
 Not Subject to Design or Specification Requirements, that are
unique to those facilities or activities;
 Used in applications other than those facilities or activities; and
 To be ordered from the manufacturer/supplier on the basis of
specifications set forth in the manufacturer’s published product
description (e.g. a catalog).
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
DOOSAN Proprietary and Confidential
12
S. S. Sittner
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
DEDICATION
When applied to nuclear power plants licensed pursuant to 10 CFR Part
30, 40, 50, 60 dedication is:
• An acceptance process undertaken to provide reasonable assurance that a
commercial grade item to be used as a basic component will perform its
intended safety function and,
• Deemed equivalent to an item designed and manufactured under a 10 CFR
50, Appendix B, Quality Assurance Program.
The Assurance is achieved by:
• Identifying the critical characteristics of the item and
• Verifying their acceptability by inspections, tests, or analysis performed by the
purchaser or third-party dedicating entity after delivery, supplemented as
necessary by one or more of the following:
 Commercial Grade Surveys
 Product Inspection or Witness and Hold Points at the Manufacturer’s
Facility and
 Analysis of Historical Records for acceptable performance. In all
cases, the dedication process must be conducted in accordance
with the applicable provisions of 10 CFR Part 50, appendix B.
DOOSAN Proprietary and Confidential 13
S. S. Sittner
DEDICATION continued
When applied to facilities and activities licensed pursuant to
10 CFR Parts 30, 40, 50 (other than nuclear power plants),
60, 61, 63, 70, 71, or 72, dedication:
 Occurs after receipt when that item is designated for use as
a basic component, if licensee is conducting the dedication a
s opposed to a 3rd party.
The process is considered complete when the item is
designated for use as a Basic Component.
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
DOOSAN Proprietary and Confidential 14
S. S. Sittner
POSTING
Each individual, partnership, corporation, dedicating entity, or other
entity subject to the regulations in this part shall post current copies of:
• The regulations in 10 CFR 21
• Section 206 of the Energy Reorganization Act of 1974, and
• Procedures adopted pursuant to the regulations in this part.
These documents must be posted in a conspicuous position on any
premises within the United States where the activities subject to
10 CFR 21 are conducted.
NOTE: A similar posting requirement exists for 10 CFR 50.55 (e)
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
DOOSAN Proprietary and Confidential
15
S. S. Sittner
Procedures for Notification: Evaluations and Deviations
Permit holders and licensees are required to adopt appropriate procedures for
notification of failure to comply (or existence of a defect and its evaluation).
Any facility subject to this regulation must adopt the following appropriate
procedures, including to:
• If such an evaluation cannot be completed within 60 days, an interim report
must be prepared and submitted to the Commission.
• The interim report should:
1.) Describe the deviation or failure to comply that is being evaluated
2.) Should also state when the evaluation will be completed
3.) Be submitted in writing within 60 days of discovery of the deviation or failure to comply
.
• Ensure that a director or responsible officer subject to the regulations of this
part is informed in all cases, within the 5 working days after completion of
the evaluation.
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
DOOSAN Proprietary and Confidential 16
S. S. Sittner
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
Procedures for Notification: Evaluations and Deviations (CONTINUED)
• The dedicating entity is responsible for:
1.) Identifying and evaluating deviations.
2.) Reporting defects and failures to comply for the dedicated
item, and
3.) Maintaining auditable records of the dedication process
NOTE: A similar posting requirement exists for 10 cfr 50.55 (e)
DOOSAN Proprietary and Confidential 17
S. S. Sittner
Procedures for Notification: 10 CFRs 21 and 50.55(e)
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
REQUIREMENT
10 CFR 21
• Initial notification by facsimile to the
NRC Operations Center within 2 days
following receipt of information by the
director or responsible corporate officer
on the identification of a defect or a
failure to comply. Does not apply to
interim reports.
• Written notification to NRC’s Document
Control Desk within 30 days following
receipt of information by the director or
responsible corporate officer on the
identification of a defect or a failure to
comply
REQUIREMENT
10 CFR 50.55(e)
• Initial notification by facsimile to the
NRC Operations Center within 2 days
following receipt of information by the
director or responsible corporate officer
on the identification of a defect or a
failure to comply.
• Written notification shall be submitted to
the NRC Document Control Desk, with
a copy to the appropriate Regional
Administrator and a copy to the
appropriate NRC resident inspector
within 30 days following receipt of
information by the director or
responsible corporate officer of a defect
or a failure to comply.
DOOSAN Proprietary and Confidential 18
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
Failure to Notify
Failure to notify refers to:
• Any Director or Responsible Officer of an entity (including dedicating entity) who
knowingly and consciously fails to provide the notice required as by 21.21
• Any NRC licensee or applicant for a license (including and applicant for, or holder of,
a permit), applicant for a design certification who fails to provide the notice required
by 21.21, or otherwise fails to comply with the applicable requirements.
S. S. Sittner
DOOSAN Proprietary and Confidential 19
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
Procurement Documents
Each individual, corporation, partnership, dedicating entity, or other entity
subject to the regulations should ensure that each procurement document for
a facility, or a basic component issued by him, her or it on or after January 6,
1978, specifies that the provisions of 10 CFR Part 21 apply.
S. S. Sittner
DOOSAN Proprietary and Confidential 20
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
Inspection
Each individual, corporation, partnership, dedicating entity, or other entity subject
to the regulations in this part must permit the Commission to inspect records,
premises, activities, and basic components as necessary to accomplish the
purposes of this part.
S. S. Sittner
DOOSAN Proprietary and Confidential 21
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
Records
REQUIREMENT
10 CFR 21
• Retain evaluations of all deviations and
failures to comply for a minimum of 5
years after the date of the evaluation;
REQUIREMENT
10 CFR 50.55(e)
• Retain records of evaluations of all
deviations and failures to comply under
paragraph for …minimum of 10 years
after the date of the evaluation;
• Retain records of all interim reports to
the Commission…for the minimum time
period of 10 years.
• Maintaining records in accordance with
this section satisfies the recordkeeping
obligations under Part 21.
In coordination with 10 CFR Part 21, the requirements of 50.55 (e) are satisfied when the defect or
failure to comply associated with a substantial safety hazard has been previously reported under
Part 21 or under 50.55(e).
S. S. Sittner
DOOSAN Proprietary and Confidential 22
NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
Maintenance and Inspection of Records
Each individual, corporation, partnership, dedicating entity, or other entity subject to the
regulations in the part must prepare and maintain records, specifically:
• Retain evaluations of all deviations and failures to comply for a minimum of five years
after the date of the evaluation.
Applicants for standard design certification must comply with subparts B and E of Part 52.
The Commission must be granted the opportunity to inspect records pertaining to basic
components that relate to:
• The identification and evaluation of deviations, and
• The reporting of defects and failures to comply, including (any advice given to
purchasers or licensees on the placement, erection, installation, operation,
maintenance, modification, or inspection of a basic component.
S. S. Sittner

More Related Content

Viewers also liked

Your Team's Got Talent
Your Team's Got Talent Your Team's Got Talent
Your Team's Got Talent Kara Rice
 
Root Cause Analysis
Root Cause Analysis Root Cause Analysis
Root Cause Analysis Grafic.guru
 
FirstBank Nigeria Annual Report & Accounts 2010
FirstBank Nigeria Annual Report & Accounts 2010FirstBank Nigeria Annual Report & Accounts 2010
FirstBank Nigeria Annual Report & Accounts 2010FirstBank, Nigeria
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysismtalhausmani
 
Solving Manufacturing Problems
Solving Manufacturing ProblemsSolving Manufacturing Problems
Solving Manufacturing ProblemsRonald Shewchuk
 
Advanced Root Cause Analysis
Advanced Root Cause AnalysisAdvanced Root Cause Analysis
Advanced Root Cause AnalysisEric Sloof
 
CAT001: Root Cause Analysis
CAT001: Root Cause AnalysisCAT001: Root Cause Analysis
CAT001: Root Cause AnalysisCharles Tsai
 
Root Cause Analysis - methods and best practice
Root Cause Analysis - methods and best practiceRoot Cause Analysis - methods and best practice
Root Cause Analysis - methods and best practiceMedgate Inc.
 
Implementing a Segmentation Strategy
Implementing a Segmentation StrategyImplementing a Segmentation Strategy
Implementing a Segmentation StrategySusan Abbott
 
Call Center Process Management 101
Call Center Process Management 101Call Center Process Management 101
Call Center Process Management 101Sarfraz Taj
 
CUSTOMER ANALYTICS & SEGMENTATION FOR CUSTOMER CENTRIC ORGANIZATION & MARKETI...
CUSTOMER ANALYTICS & SEGMENTATION FOR CUSTOMER CENTRIC ORGANIZATION & MARKETI...CUSTOMER ANALYTICS & SEGMENTATION FOR CUSTOMER CENTRIC ORGANIZATION & MARKETI...
CUSTOMER ANALYTICS & SEGMENTATION FOR CUSTOMER CENTRIC ORGANIZATION & MARKETI...Data Science Thailand
 
Root Cause Analysis By Deepak
Root Cause Analysis By DeepakRoot Cause Analysis By Deepak
Root Cause Analysis By DeepakDEEPAK SAHOO
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysistqmdoctor
 
5 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 20095 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 2009ExerciseLeanLLC
 
Customer Service Call Center Benchmark Study
Customer Service  Call Center Benchmark StudyCustomer Service  Call Center Benchmark Study
Customer Service Call Center Benchmark StudyChris Scafario
 

Viewers also liked (20)

Your Team's Got Talent
Your Team's Got Talent Your Team's Got Talent
Your Team's Got Talent
 
2011 Annual Report & Accounts
2011 Annual Report & Accounts2011 Annual Report & Accounts
2011 Annual Report & Accounts
 
Root Cause Analysis
Root Cause Analysis Root Cause Analysis
Root Cause Analysis
 
FirstBank Nigeria Annual Report & Accounts 2010
FirstBank Nigeria Annual Report & Accounts 2010FirstBank Nigeria Annual Report & Accounts 2010
FirstBank Nigeria Annual Report & Accounts 2010
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
#8 Root Cause Analysis
#8 Root Cause Analysis#8 Root Cause Analysis
#8 Root Cause Analysis
 
Solving Manufacturing Problems
Solving Manufacturing ProblemsSolving Manufacturing Problems
Solving Manufacturing Problems
 
RCA - Root Cause Analysis
RCA - Root Cause AnalysisRCA - Root Cause Analysis
RCA - Root Cause Analysis
 
5S Plus Safety
5S Plus Safety5S Plus Safety
5S Plus Safety
 
Advanced Root Cause Analysis
Advanced Root Cause AnalysisAdvanced Root Cause Analysis
Advanced Root Cause Analysis
 
CAT001: Root Cause Analysis
CAT001: Root Cause AnalysisCAT001: Root Cause Analysis
CAT001: Root Cause Analysis
 
Root Cause Analysis - methods and best practice
Root Cause Analysis - methods and best practiceRoot Cause Analysis - methods and best practice
Root Cause Analysis - methods and best practice
 
Implementing a Segmentation Strategy
Implementing a Segmentation StrategyImplementing a Segmentation Strategy
Implementing a Segmentation Strategy
 
Call Center Process Management 101
Call Center Process Management 101Call Center Process Management 101
Call Center Process Management 101
 
DMAIC Vs. DMADV
DMAIC Vs. DMADVDMAIC Vs. DMADV
DMAIC Vs. DMADV
 
CUSTOMER ANALYTICS & SEGMENTATION FOR CUSTOMER CENTRIC ORGANIZATION & MARKETI...
CUSTOMER ANALYTICS & SEGMENTATION FOR CUSTOMER CENTRIC ORGANIZATION & MARKETI...CUSTOMER ANALYTICS & SEGMENTATION FOR CUSTOMER CENTRIC ORGANIZATION & MARKETI...
CUSTOMER ANALYTICS & SEGMENTATION FOR CUSTOMER CENTRIC ORGANIZATION & MARKETI...
 
Root Cause Analysis By Deepak
Root Cause Analysis By DeepakRoot Cause Analysis By Deepak
Root Cause Analysis By Deepak
 
Root Cause Analysis
Root Cause AnalysisRoot Cause Analysis
Root Cause Analysis
 
5 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 20095 Why Training Slides Oct 14, 2009
5 Why Training Slides Oct 14, 2009
 
Customer Service Call Center Benchmark Study
Customer Service  Call Center Benchmark StudyCustomer Service  Call Center Benchmark Study
Customer Service Call Center Benchmark Study
 

Similar to 2.2 SITTNER NRC REQUIREMENTS 10 CFR 21

2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...
2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...
2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...SCOTT SITTNER
 
Corrective action reports
Corrective action reportsCorrective action reports
Corrective action reportsApril Orc
 
SAEP-1151_inspection requirement.PDF
SAEP-1151_inspection requirement.PDFSAEP-1151_inspection requirement.PDF
SAEP-1151_inspection requirement.PDFMohammedZiauddin25
 
Terms defenations-abriviations
Terms defenations-abriviationsTerms defenations-abriviations
Terms defenations-abriviationsAta Alvi
 
CFR Part 820 Transition Update.pdf
CFR Part 820 Transition Update.pdfCFR Part 820 Transition Update.pdf
CFR Part 820 Transition Update.pdfMinShikar
 
ASME-BTH-standards-committee.pdf
ASME-BTH-standards-committee.pdfASME-BTH-standards-committee.pdf
ASME-BTH-standards-committee.pdfMuhammad79350
 
Qualification & validation concept & terminology
Qualification & validation concept & terminologyQualification & validation concept & terminology
Qualification & validation concept & terminologyMuhammad Luqman Ikram
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxRamkumar906213
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxRamkumar906213
 
8.3 Control of Nonconforming Material
8.3 Control of Nonconforming Material8.3 Control of Nonconforming Material
8.3 Control of Nonconforming MaterialBrian McAuliffe
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineIEI GSC
 
Enefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approvalEnefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approvalSbremkamp
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013leo040490
 
Construction Documents Required by the Connecticut Building Code
Construction Documents Required by the Connecticut Building CodeConstruction Documents Required by the Connecticut Building Code
Construction Documents Required by the Connecticut Building CodeMilton Grew
 
2 mcs cert process
2 mcs cert process2 mcs cert process
2 mcs cert processedge7557
 

Similar to 2.2 SITTNER NRC REQUIREMENTS 10 CFR 21 (20)

2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...
2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...
2.3 SITTNER NRC REQUIREMENTS RELATED TO INSPECTION OF COMMERCIAL GRADE DEDICA...
 
Corrective action reports
Corrective action reportsCorrective action reports
Corrective action reports
 
019113
019113019113
019113
 
NCRB AFRS proposal
NCRB AFRS proposalNCRB AFRS proposal
NCRB AFRS proposal
 
SAEP-1151_inspection requirement.PDF
SAEP-1151_inspection requirement.PDFSAEP-1151_inspection requirement.PDF
SAEP-1151_inspection requirement.PDF
 
Terms defenations-abriviations
Terms defenations-abriviationsTerms defenations-abriviations
Terms defenations-abriviations
 
CFR Part 820 Transition Update.pdf
CFR Part 820 Transition Update.pdfCFR Part 820 Transition Update.pdf
CFR Part 820 Transition Update.pdf
 
ASME-BTH-standards-committee.pdf
ASME-BTH-standards-committee.pdfASME-BTH-standards-committee.pdf
ASME-BTH-standards-committee.pdf
 
Qualification & validation concept & terminology
Qualification & validation concept & terminologyQualification & validation concept & terminology
Qualification & validation concept & terminology
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
 
EQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptxEQUIPMENT QUALIFICATION.pptx
EQUIPMENT QUALIFICATION.pptx
 
8.3 Control of Nonconforming Material
8.3 Control of Nonconforming Material8.3 Control of Nonconforming Material
8.3 Control of Nonconforming Material
 
Quality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipelineQuality Control & Quality Assurance of MS pipeline
Quality Control & Quality Assurance of MS pipeline
 
10 cfr 21
10 cfr 2110 cfr 21
10 cfr 21
 
Claims and insolvencies (1)
Claims and insolvencies (1)Claims and insolvencies (1)
Claims and insolvencies (1)
 
Enefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approvalEnefen how to_have_a_successful_field_inspection_approval
Enefen how to_have_a_successful_field_inspection_approval
 
Itaac
ItaacItaac
Itaac
 
Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013Presentacion asme seccion viii division 2 2013
Presentacion asme seccion viii division 2 2013
 
Construction Documents Required by the Connecticut Building Code
Construction Documents Required by the Connecticut Building CodeConstruction Documents Required by the Connecticut Building Code
Construction Documents Required by the Connecticut Building Code
 
2 mcs cert process
2 mcs cert process2 mcs cert process
2 mcs cert process
 

2.2 SITTNER NRC REQUIREMENTS 10 CFR 21

  • 1. S. Scott Sittner Corporate Quality Management Consultant, ANSI-ASME-NQA-1, Certified Lead Auditor, Certified Auditor Trainer 10 CFR Part 21: Reporting of Defects and NonCompliance 10 CFR Part 50.55(e): Conditions of Construction Permits, Early Site Permits, Combined Licenses, and Manufacturing Licenses. NRC Requirements
  • 2. DOOSAN Proprietary and Confidential 2 Table of Contents 2 Learning Objectives 3 Objective 1 4 Overview 5, 6 Definitions: Defect 7 Definitions: Basic Component, Deviation, Evaluation, Non-Conformance 8 Definitions: Notification, Substantial Safety Hazard 9 Commercial Grade Item (CGI) 10, 11 Dedication 12, 13 Posting 14 Procedures for Notification: Evaluation and Deviations 15, 16 Procedures for Notification: 10 CFR 21, 10 CFR 50.55(e) 17 Failure to Notify 18 Procurement Documents 19 Inspection 22 Records 21 Maintenance and Inspection of Records 22 S. S. Sittner NRC Requirements: Table of Contents
  • 3. DOOSAN Proprietary and Confidential 3 S. S. Sittner 1.) Develop and understanding of 10 CFR 21, the relationship to procurement and vendors, and responsibilities of licensees for implementation.. 2.) Identify the requirements of Commercial Grade Items (CGIs) in NRC IPs 43004 and 38703. 3.) Understand NRC QA Procedures through Inspection Procedures 35021, 3572 and 4054. 4.) Understand NRC Inspection Procedures through 10 CFR 52, NRC IPs 65002, 36001, 35017 and Generic Letter 91-05. 5.) Identify NRC concerns regarding Counterfeit Parts as identified in NRC Generic Letter 89-02. NRC Requirements: Learning Objectives
  • 4. DOOSAN Proprietary and Confidential 4 S. S. Sittner NRC Requirements: Objective 1 Develop an understanding of 10 CFR 21, the relationship to Procurement, Vendors, and the responsibilities of licensees for implementation.
  • 5. DOOSAN Proprietary and Confidential 5 S. S. Sittner Overview 10 CFR 21 establishes the requirement to immediately notify the NRC: • Of the reasonable potential of substantial safety hazards, followed by • Written notification of evaluation results whether the facility, activity, or basic component supplied to such a facility or activity contains defects, which could create a substantial safety hazard. Exemption: Suppliers of Commercial Grade Items are exempt from the provisions of this part to the extent that they supply Commercial Grade Items. NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
  • 6. DOOSAN Proprietary and Confidential 6 S. S. Sittner 10 CFR 50.55 (e) Applies to holders of construction permits and COLs under 10 CFR 52, and establishes the requirement to evaluate deviations and failures to comply to identify defects and failures to comply associated with substantial safety hazards, and to notify the NRC of defects which could create a substantial safety hazard. NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
  • 7. DOOSAN Proprietary and Confidential 7 S. S. Sittner Defect means:  A deviation in a basic component that could create a substantial safety hazard.  The installation, use, or operation of a basic component containing a defect .  A deviation in a portion of a facility subject to the: • Early site permit • Standard design certification • Standard design approval • Construction permit • Combined license or manufacturing license requirements of part 50 or part 52, provided the deviation could create a substantial safety hazard, and the portion of the facility containing the has been offered to the purchaser for acceptance.  A condition or circumstance involving a basic component that could contribute to the exceeding or a safety limit, or  An error, omission or other circumstance in a design certification, or standard design approval that could create a substantial safety hazard. NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
  • 8. DOOSAN Proprietary and Confidential S. S. Sittner  BASIC COMPONENT: A safety-related item. It includes design, inspection, testing or consulting services important to safety that are associated with the component hardware, whether these services are performed by the component supplier or other.  DEVIATION: A departure from the technical requirements included in a procurement document or specified in early site permit information, a standard design certification or standard design approval.  EVALUATION: The process of determining whether a particular deviation could create a substantial hazard or determining whether a failure to comply is associated with a substantial safety hazard.  Non-Conformance: Failure to meet a specification or requirement of 10 CFR 50, Appendix B. 8 NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
  • 9. DOOSAN Proprietary and Confidential 9 S. S. Sittner Notification: • The telephonic communication to the NRC Operations Center and written transmittal of information to the NRC Document Control Desk. • Two working days are allotted from notification to phone call to the NRC • Within 30 days, must provide final report. Substantial Safety Hazard: • A loss of safety function to the extent that there is a major reduction in the degree of protection provided to public health and safety for any facility or activity licensed or otherwise approved or regulated by the NRC, other than for export. NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
  • 10. DOOSAN Proprietary and Confidential 10 S. S. Sittner NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance Commercial Grade Item (CGI) When applied to nuclear power plants licensed pursuant to 10 CFR Part 30, 40, 50 (specifically 50.55(e)), 52, 60, Commercial Grade Item: • Is a structure, system or component, or part thereof that effects its safety function, that was not designed and manufactured as a basic component. • Does not include items where the design and manufacturing process require in-process inspections and verifications to ensure that defect s or failures to comply are identified and corrected (i.e., one or more critical characteristics of the item cannot be verified).
  • 11. DOOSAN Proprietary and Confidential 11 S. S. Sittner Commercial Grade Item (CGI) (continued) When applied to facilities and activities licensed pursuant to 10 CFR Parts 20, 40, 50 (other than nuclear power plants), 60, 61, 63, 70, 71, or 72, Commercial Grade Items Means that it is:  Not Subject to Design or Specification Requirements, that are unique to those facilities or activities;  Used in applications other than those facilities or activities; and  To be ordered from the manufacturer/supplier on the basis of specifications set forth in the manufacturer’s published product description (e.g. a catalog). NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
  • 12. DOOSAN Proprietary and Confidential 12 S. S. Sittner NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance DEDICATION When applied to nuclear power plants licensed pursuant to 10 CFR Part 30, 40, 50, 60 dedication is: • An acceptance process undertaken to provide reasonable assurance that a commercial grade item to be used as a basic component will perform its intended safety function and, • Deemed equivalent to an item designed and manufactured under a 10 CFR 50, Appendix B, Quality Assurance Program. The Assurance is achieved by: • Identifying the critical characteristics of the item and • Verifying their acceptability by inspections, tests, or analysis performed by the purchaser or third-party dedicating entity after delivery, supplemented as necessary by one or more of the following:  Commercial Grade Surveys  Product Inspection or Witness and Hold Points at the Manufacturer’s Facility and  Analysis of Historical Records for acceptable performance. In all cases, the dedication process must be conducted in accordance with the applicable provisions of 10 CFR Part 50, appendix B.
  • 13. DOOSAN Proprietary and Confidential 13 S. S. Sittner DEDICATION continued When applied to facilities and activities licensed pursuant to 10 CFR Parts 30, 40, 50 (other than nuclear power plants), 60, 61, 63, 70, 71, or 72, dedication:  Occurs after receipt when that item is designated for use as a basic component, if licensee is conducting the dedication a s opposed to a 3rd party. The process is considered complete when the item is designated for use as a Basic Component. NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
  • 14. DOOSAN Proprietary and Confidential 14 S. S. Sittner POSTING Each individual, partnership, corporation, dedicating entity, or other entity subject to the regulations in this part shall post current copies of: • The regulations in 10 CFR 21 • Section 206 of the Energy Reorganization Act of 1974, and • Procedures adopted pursuant to the regulations in this part. These documents must be posted in a conspicuous position on any premises within the United States where the activities subject to 10 CFR 21 are conducted. NOTE: A similar posting requirement exists for 10 CFR 50.55 (e) NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
  • 15. DOOSAN Proprietary and Confidential 15 S. S. Sittner Procedures for Notification: Evaluations and Deviations Permit holders and licensees are required to adopt appropriate procedures for notification of failure to comply (or existence of a defect and its evaluation). Any facility subject to this regulation must adopt the following appropriate procedures, including to: • If such an evaluation cannot be completed within 60 days, an interim report must be prepared and submitted to the Commission. • The interim report should: 1.) Describe the deviation or failure to comply that is being evaluated 2.) Should also state when the evaluation will be completed 3.) Be submitted in writing within 60 days of discovery of the deviation or failure to comply . • Ensure that a director or responsible officer subject to the regulations of this part is informed in all cases, within the 5 working days after completion of the evaluation. NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance
  • 16. DOOSAN Proprietary and Confidential 16 S. S. Sittner NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance Procedures for Notification: Evaluations and Deviations (CONTINUED) • The dedicating entity is responsible for: 1.) Identifying and evaluating deviations. 2.) Reporting defects and failures to comply for the dedicated item, and 3.) Maintaining auditable records of the dedication process NOTE: A similar posting requirement exists for 10 cfr 50.55 (e)
  • 17. DOOSAN Proprietary and Confidential 17 S. S. Sittner Procedures for Notification: 10 CFRs 21 and 50.55(e) NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance REQUIREMENT 10 CFR 21 • Initial notification by facsimile to the NRC Operations Center within 2 days following receipt of information by the director or responsible corporate officer on the identification of a defect or a failure to comply. Does not apply to interim reports. • Written notification to NRC’s Document Control Desk within 30 days following receipt of information by the director or responsible corporate officer on the identification of a defect or a failure to comply REQUIREMENT 10 CFR 50.55(e) • Initial notification by facsimile to the NRC Operations Center within 2 days following receipt of information by the director or responsible corporate officer on the identification of a defect or a failure to comply. • Written notification shall be submitted to the NRC Document Control Desk, with a copy to the appropriate Regional Administrator and a copy to the appropriate NRC resident inspector within 30 days following receipt of information by the director or responsible corporate officer of a defect or a failure to comply.
  • 18. DOOSAN Proprietary and Confidential 18 NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance Failure to Notify Failure to notify refers to: • Any Director or Responsible Officer of an entity (including dedicating entity) who knowingly and consciously fails to provide the notice required as by 21.21 • Any NRC licensee or applicant for a license (including and applicant for, or holder of, a permit), applicant for a design certification who fails to provide the notice required by 21.21, or otherwise fails to comply with the applicable requirements. S. S. Sittner
  • 19. DOOSAN Proprietary and Confidential 19 NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance Procurement Documents Each individual, corporation, partnership, dedicating entity, or other entity subject to the regulations should ensure that each procurement document for a facility, or a basic component issued by him, her or it on or after January 6, 1978, specifies that the provisions of 10 CFR Part 21 apply. S. S. Sittner
  • 20. DOOSAN Proprietary and Confidential 20 NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance Inspection Each individual, corporation, partnership, dedicating entity, or other entity subject to the regulations in this part must permit the Commission to inspect records, premises, activities, and basic components as necessary to accomplish the purposes of this part. S. S. Sittner
  • 21. DOOSAN Proprietary and Confidential 21 NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance Records REQUIREMENT 10 CFR 21 • Retain evaluations of all deviations and failures to comply for a minimum of 5 years after the date of the evaluation; REQUIREMENT 10 CFR 50.55(e) • Retain records of evaluations of all deviations and failures to comply under paragraph for …minimum of 10 years after the date of the evaluation; • Retain records of all interim reports to the Commission…for the minimum time period of 10 years. • Maintaining records in accordance with this section satisfies the recordkeeping obligations under Part 21. In coordination with 10 CFR Part 21, the requirements of 50.55 (e) are satisfied when the defect or failure to comply associated with a substantial safety hazard has been previously reported under Part 21 or under 50.55(e). S. S. Sittner
  • 22. DOOSAN Proprietary and Confidential 22 NRC Requirements: 10 CFR 21 Reporting Defects and Noncompliance Maintenance and Inspection of Records Each individual, corporation, partnership, dedicating entity, or other entity subject to the regulations in the part must prepare and maintain records, specifically: • Retain evaluations of all deviations and failures to comply for a minimum of five years after the date of the evaluation. Applicants for standard design certification must comply with subparts B and E of Part 52. The Commission must be granted the opportunity to inspect records pertaining to basic components that relate to: • The identification and evaluation of deviations, and • The reporting of defects and failures to comply, including (any advice given to purchasers or licensees on the placement, erection, installation, operation, maintenance, modification, or inspection of a basic component. S. S. Sittner