This document provides an overview of Mr. Awang Mohd Nor Awang Hamzani, the Construction Manager for the Petronas LNG Train 9 Project. It discusses his background, career history, daily routine, thoughts on the project, and what he sees as going well. Some key points include that he used to work for Shell for 28 years, is proud to work on a Petronas project in his hometown of Bintulu, and feels the project is achieving well with over 13 million man-hours worked without lost time injury due to good coordination between subcontractors.
This document provides information about advertising opportunities at Setia City Mall located in Kuala Lumpur, Malaysia. It includes details on the mall's location, size, key tenants, and customer demographics. Various internal advertising options are outlined such as lightbox displays, wallscapes, and pillar wraps located throughout the property. Specifications including pricing and availability are provided for each advertising placement.
The document provides an analysis of the Telekom Tower building in Kuala Lumpur, Malaysia. It includes fast facts about the building, its history and architect. The analysis covers the building's site context, accessibility, climate response and relationships to surroundings. It examines the architectural layout including floor plans, elevations, sections and circulation. It also analyzes the building style, elements, construction materials and sustainability features. The analysis compares Telekom Tower to another nearby building called The Bow.
Lifting Plan for INSTALLATION XCR40 & XCR41 by using Crawler Crane CC2800-1 &...Abdul Karim
This document contains specifications for two crawler cranes:
1) A Demag CC 2800-1(SSL) 600-ton crawler crane with a 60m main boom, 30m mast, 180 ton crane counterweight, and capable of lifting 160 tons.
2) A Hitachi Sumitomo SCX 1500A-3 150-ton crawler crane with a 30m main boom, 56.4 ton crane counterweight, and capable of lifting 72 tons.
The document also includes lifting configuration diagrams and approvals for the cranes.
1) A supported scaffold is a scaffold that is attached to the ground rather than suspended by cables. A competent person is able to identify hazards, unsafe working conditions, and has authority to eliminate hazards.
2) Scaffolds must be inspected at the beginning of each shift and after any occurrence that could impact structural integrity. Damaged parts must be repaired, replaced, or removed from service.
3) Fall protection such as guardrails or personal fall arrest systems are required for scaffolds over 10 feet tall and workers must be trained on scaffold safety hazards and procedures.
This document provides a safety analysis and procedures for using an arc welder. It outlines the following key points:
- A minimum 35 foot diameter welding area must be established and cleared of flammables, with a 2A20B:C fire extinguisher and fire alarm readily available. Ventilation must avoid triggering smoke detectors.
- Nine welding tasks are described along with associated hazards like flashing, sparks, slag splatter, tripping, and burns. Controls for each hazard are provided like wearing protective equipment, exhaust fans, and marking hot materials.
- Required training includes welder operation, fire extinguisher use, and fire alarm location. Personal protective equipment of a welding hood, jacket, gloves
This document provides an overview of Mr. Awang Mohd Nor Awang Hamzani, the Construction Manager for the Petronas LNG Train 9 Project. It discusses his background, career history, daily routine, thoughts on the project, and what he sees as going well. Some key points include that he used to work for Shell for 28 years, is proud to work on a Petronas project in his hometown of Bintulu, and feels the project is achieving well with over 13 million man-hours worked without lost time injury due to good coordination between subcontractors.
This document provides information about advertising opportunities at Setia City Mall located in Kuala Lumpur, Malaysia. It includes details on the mall's location, size, key tenants, and customer demographics. Various internal advertising options are outlined such as lightbox displays, wallscapes, and pillar wraps located throughout the property. Specifications including pricing and availability are provided for each advertising placement.
The document provides an analysis of the Telekom Tower building in Kuala Lumpur, Malaysia. It includes fast facts about the building, its history and architect. The analysis covers the building's site context, accessibility, climate response and relationships to surroundings. It examines the architectural layout including floor plans, elevations, sections and circulation. It also analyzes the building style, elements, construction materials and sustainability features. The analysis compares Telekom Tower to another nearby building called The Bow.
Lifting Plan for INSTALLATION XCR40 & XCR41 by using Crawler Crane CC2800-1 &...Abdul Karim
This document contains specifications for two crawler cranes:
1) A Demag CC 2800-1(SSL) 600-ton crawler crane with a 60m main boom, 30m mast, 180 ton crane counterweight, and capable of lifting 160 tons.
2) A Hitachi Sumitomo SCX 1500A-3 150-ton crawler crane with a 30m main boom, 56.4 ton crane counterweight, and capable of lifting 72 tons.
The document also includes lifting configuration diagrams and approvals for the cranes.
1) A supported scaffold is a scaffold that is attached to the ground rather than suspended by cables. A competent person is able to identify hazards, unsafe working conditions, and has authority to eliminate hazards.
2) Scaffolds must be inspected at the beginning of each shift and after any occurrence that could impact structural integrity. Damaged parts must be repaired, replaced, or removed from service.
3) Fall protection such as guardrails or personal fall arrest systems are required for scaffolds over 10 feet tall and workers must be trained on scaffold safety hazards and procedures.
This document provides a safety analysis and procedures for using an arc welder. It outlines the following key points:
- A minimum 35 foot diameter welding area must be established and cleared of flammables, with a 2A20B:C fire extinguisher and fire alarm readily available. Ventilation must avoid triggering smoke detectors.
- Nine welding tasks are described along with associated hazards like flashing, sparks, slag splatter, tripping, and burns. Controls for each hazard are provided like wearing protective equipment, exhaust fans, and marking hot materials.
- Required training includes welder operation, fire extinguisher use, and fire alarm location. Personal protective equipment of a welding hood, jacket, gloves
This document provides a brief summary of key milestones in Switzerland's history:
- Switzerland began as an alliance of states in 1291 and solidified as a federal state with the 1848 Federal Constitution.
- The Reformation in 1525 divided Switzerland along religious lines and led to four wars between Catholic and Protestant areas until 1712.
- The 1648 Peace of Westphalia recognized Switzerland's independence and neutrality under international law.
- From 1798-1803 the Helvetic Republic established a centralized state but Switzerland was forced to abandon its neutrality and became a theatre of war until the 1803 Act of Mediation restored power to the cantons.