VHS HSE Culture Introduction
Program Implementation
Jul. 2015 Markus Dong
2
HSE Culture Introduction into VHS
HSE文化导入项目
3
What We Will Achieve?
Now
Change the Awareness from ZERO LTA to ZERO
INJURY!
改变意识!变零工损事故为零伤害事故!
Future (1~2 year)
Change the Awareness to Culture.
将意识固化成文化、习惯
Strategy (2~4 year)
Zero LTA  Zero Injury??????
4
How We Can Achieve?
7 main Indicators for HSE culture
• HSE System Establishment
• Management Commitment
• HSE Experts Reputation/Rank
• Training frequency/efficiency
• Improve Safety by Encourage
• Promotion/Bonus by Safety Record
• Risk Level/Improvement
0
0.2
0.4
0.6
0.8
1
System
Committement
HSE Experts
TrainingEncourage
Evalution by
Safety
Risk
5
What We are Achieving? (Main Roadmap)
• HSE system establishment & improvement
(According to the HSE function to establish the mgmt. requirement)
• 2013-04-17 WSS
• 2013-04~2013-06 HSE daily auditing system;
• 2013-06~2013-08 HSE workshop management manual & training;
• 2013-12~2014-04 risk re-evaluation by working process & training;
• 2014-07~2014-12 Safety operating regulation review & training;
• 2015-03~2015-06 VHS HSE Handbook release;
• 2015-06~
6
What We are Achieving? (Main Roadmap)
• Management Commitment
• 2014-02-25 VHS HSE committee members adjustment, commitment from top to
down;
• 2014-06-30 Mr. Andrae (VHS CEO), 99 score (10th~13th June training);
• 2014-07-11 VHS new quarterly HSE committee meeting;
• 2014-08-14 1st totally employee meeting: from every leader shall take the safety
responsibility;
• 2014-10-29 FY14/15 Q1 committee meeting: Change the awareness from
ZERO LTA to ZERO INJURY! Leader safety training shall above 85 score;
• 2014-03-12 FY14/15 2nd & 3rd totally employee meeting: encourage the safety.
• 2015-05-12 Mr. Helio (VHS CPO), 98 score (12th~15th May training);
7
What We are Achieving? (Main Roadmap)
• Training frequency/efficiency
• 2013-06 go on the quarterly (every Friday) total workforce training;
• 2013-11 conduct double-week incident lessons learned;
• 2014-04 review & re-build the HSE training system;
• 2014-10 besides own employee, regular training began to systemic cover all fixed
sub-contractors;
• 2015-03 review & update HSE training material;
• 2015-06 plan to focus on office employee training...
8
What We are Achieving? (Main Roadmap)
• Improve Safety by Encourage
• 2013-11 HSE & OpEx Star kick off;
• 2015-05 Maybe a Practical patent in the future**;
• Promotion/Bonus by Safety Record
• Recently, bonus by safety record included in whole new salary system
(HR)
• Risk Level/improvement
• HSE Experts Reputation/Rank
9
M-shop, Bay 2 boiler maker, Mr. Wang Sheng
Bar linkage mechanism, cable protection device, safety & efficiency.
10
Solution (Q4 & FY15/16)
Three carriages (cover all employee)
• Near Miss Reporting & First Aid Kits Usage Recording
& Analysis;
• Be safety by efficiency encourage  CIP;
• After work, No waste material, Clean the workplace;
11
FY14/15 Q1~Q3
HSE Performance Review
12
FY14/15 HSE Performance Review
(2015-09-15 updated)
Frequency Rate Voith Hydro Shanghai
Accidents per one Million Working hours
In Number of reported accidents per 1 million worked hours.
Based on 1950 h/year per employee, dependent on region.
Target FY14/15 <2
9.0
6.0
1.6
0.8 0.8
2.5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
FY 08/09 FY 09/10 FY10/11 FY11/12 FY12/13 FY13/14 FY14/15
YTD
Oct 14 Nov 14 Dec 14 Jan 15 Feb 15 Mar 15 Apr 15 May 15 Jun 15 Jul 15 Aug 15 Sep 15
Frequency Rate
(FR)
Manufacturing
Benchmark
13
Office
办公室
QM
质量部
E-shop
发电机车间
M-shop
水轮机车间 Total
总计Preparation Grinding Assembling Welding Machining Finishing Material Maintenance Runner Site
准备工段 打磨工段 装配工段 焊接工段 机加工工段 完工工段 吊运工段 维修工段 转轮工地
TIFR KPI
指标
0 ≤ 1 ≤ 4 ≤ 1 ≤ 2 ≤ 1 ≤ 5 ≤ 5 ≤ 4 ≤ 1 ≤ 1 ≤ 1 ≤ 26
Oct-2014 0 0 2 0 0 0 1 0 0 0 0 0 3
Nov-2014 0 0 0 0 0 0 0 1 2 1 0 0 4
Dec-2014 0 0 0 0 0 0 0 0 0 0 0 0 0
Jan-2015 0 0 2 0 0 0 0 2 0 0 0 0 4
Feb-2015 0 0 0 0 0 0 0 1 0 0 0 0 1
Mar-2015 0 0 0 0 0 0 0 0 0 0 0 0 0
Apr-2015 0 0 0 0 0 1 0 1 1 0 0 0 3
May-2015 0 0 1 0 0 0 1 0 0 0 0 0 2
June-2015 0 0 0 0 1 0 0 0 0 0 0 0 1
July-2015 0
Aug-2015 0
Sep-2015 0
Oct-2015
Total
总计
0 0 5 0 1 1 2 5 3 1 0 0 18
Accident/Incident Stats (TIFR)
Including the VOITH own employee and outside personnel
VHS HSE Monthly Meeting | Markus Dong | FY14_15
High light: From Jun. to Sep., Summer Season, according to the history stat, more injury in this period.
2014/13 injury
2013/19 injury (8 heatstroke)
2012/11 injury
14
Weekly Audit Report and Analysis
周HSE检查情况以及分析
chemical
mgmt
化学品管
理
Machine
safety
设备安全
fire
fighting
消防
PPE
劳动保护
special
equipmen
t
特种设备
Tools
safety
工具安全
Sub-con
相关方
dangerous
work
危险作业
first aid
mgmt
急救管理
waste
mgmt
废弃物管
理
Energy
能源
5S
others
其他
Average 15 23 21 4 4 25 3 3 0 9 3 8 10
Oct 24 12 7 0 4 16 5 3 0 18 8 18 4
Nov. 14 11 9 3 2 17 1 4 0 18 2 20 5
Dec. 10 14 11 5 5 26 2 5 0 14 4 4 8
Jan. 7 19 11 2 5 22 2 2 0 21 11 2 5
Feb. 7 5 6 3 1 11 2 4 0 7 9 12 5
Mar. 14 11 8 4 2 23 5 3 0 8 8 13 14
Apr 19 17 15 4 1 27 2 4 0 12 6 8 7
May 6 20 9 2 2 21 11 6 0 18 10 5 6
Jun 10 13 11 5 5 12 3 2 0 18 3 6 5
15
23
21
4 4
25
3
3
0
9
3
8
10
24
12
7
0
4
16
5
3
0
18
8
18
4
14
11
9
3
2
17
1
4
0
18
2
20
5
10
14
11
5 5
26
2
5
0
14
4 4
8
7
19
11
2
5
22
2 2
0
21
11
2
5
7
5
6
3
1
11
2
4
0
7
9
12
5
14
11
8
4
2
23
5
3
0
8 8
13
14
19
17
15
4
1
27
2
4
0
12
6
8
7
6
20
9
2 2
21
11
6
0
18
10
5
6
10
13
11
5 5
12
3
2
0
18
3
6
5
0
5
10
15
20
25
30
15
Weekly Audit Report and Analysis
周HSE检查情况以及分析
VHS HSE Monthly Meeting | Markus Dong | FY14_15
Audit
Day
12 9 8 10 9 5 9 9 9 8
Average Oct. Nov. Dec. Jan. Feb. Mar. Apr. May. Jun. Jul Aug. Sep.
Uncorrected 13 3 10 3 4 3 3 2 2 2
Corrected 114 116 96 105 105 69 110 120 114 91
114
116
96
105 105 69 110 120 114 91
13
3
10
3 4 3 3 2 2 2
20%
30%
40%
50%
60%
70%
80%
90%
100%
16
Fatal
Lost Time
Accident
(LTA)
First Aid Injury
(FAI)
Near Miss / Incident (NM)
Unsafe Acts & Conditions
(Safety Committee, Audits, Stop
Observation)
0
0
865+93
17+1↓
16+1↑
Safety Triangle Stats. and Analysis;
安全金字塔
Fatal
Lost Time
Accident
(LTA)
First Aid Injury
(FAI)
Near Miss / Incident (NM)
Unsafe Acts & Conditions
(Safety Committee, Audits, Stop
Observation)
3+1
0
1524
30
15
FY 13/14
FY 14/15
VHS HSE Monthly Meeting | Markus Dong | FY14_15
17
Total Injury Analysis
Head:4+1
Hand & Arm:5+3
Body: 2+0
Leg & Foot:1+1
Others:0+1
Among 12 injury Q1~Q2:
• 2 of 4 head injury related with “stood up”,
another 2 are improper operation;
• 5 Hand injury related with “small
transportation”, “Tools”, “Slip”;
• 2 of 12 injury happened in 2nd shift.
Among 7 injury in Q3
• 1 head injury
• 3 hand injury (because of platform door &
cabinet door ) & one highlight (by chain)
• 1 heatstroke (non reportable accident)
FY13/14
• Head:3
• Hand & Arm: 14
• Body: 4
• Leg:11
• Others:2
18
Total Near Miss Analysis
Among 20 near miss reporting Q1~Q3
• 9 near miss because of internal transportation, 4 forklift & 5
crane. (meeting with cranes operators & riggers/done)
• 3 waste burning because of operators pay less attention to
the environment.
• 1 significant near miss in 13th July. (Press Machine,
corrective action done)
19
Contact:
Markus Dong
HSE & Sustainability Manager
Tel. 86 21 2408 9919
Junhua.Dong@voith.com

More Related Content

Viewers also liked

Electricity on site
Electricity on siteElectricity on site
Electricity on site
زعما فعلا عايش
 
Aaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders SummitAaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders Summit
Media Corp International
 
IMS Internal Auditor Course
IMS Internal Auditor CourseIMS Internal Auditor Course
IMS Internal Auditor CourseThomas Mathew
 
Safety day 2012
Safety day 2012Safety day 2012
Safety day 2012
mmbrahme
 
Description of inergen system
Description of inergen systemDescription of inergen system
Description of inergen system
زعما فعلا عايش
 
Accident causes
Accident causesAccident causes
Safety Stop Card
Safety Stop CardSafety Stop Card
Safety Stop Card
Chan Eng Wee
 
Safety quiz
Safety quizSafety quiz
Safety quiz
Rishi Maskara
 
Safety & health in ramadan by ammar
Safety & health in ramadan by ammarSafety & health in ramadan by ammar
Safety & health in ramadan by ammar
Ammar Abdelgader, Ph.D.
 
Tric final
Tric finalTric final
World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide share
Fitri Ifony
 
Sistema stop
Sistema  stopSistema  stop
Occupational Health Surveillance
Occupational Health SurveillanceOccupational Health Surveillance
Occupational Health Surveillance
spzahoor
 
Safety Week Activity Report
Safety Week Activity ReportSafety Week Activity Report
Safety Week Activity Report
Syed Owais Mukhtar
 
3 basics of stop
3  basics of stop3  basics of stop
3 basics of stop
زعما فعلا عايش
 
Monthly safety report 2012 07_july
Monthly safety report 2012 07_julyMonthly safety report 2012 07_july
Monthly safety report 2012 07_july
ChinaHarbour
 
E-safety quiz
E-safety quizE-safety quiz
E-safety quiz
tonybattista
 
46th NSD
46th NSD46th NSD
46th NSD
vasant oak
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system training
Fitri Ifony
 
Safety and General Quiz Finals 2014
Safety and General Quiz Finals 2014Safety and General Quiz Finals 2014
Safety and General Quiz Finals 2014
Soham Banerjee
 

Viewers also liked (20)

Electricity on site
Electricity on siteElectricity on site
Electricity on site
 
Aaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders SummitAaron Neilson, Safesearch, presents at the OHS Leaders Summit
Aaron Neilson, Safesearch, presents at the OHS Leaders Summit
 
IMS Internal Auditor Course
IMS Internal Auditor CourseIMS Internal Auditor Course
IMS Internal Auditor Course
 
Safety day 2012
Safety day 2012Safety day 2012
Safety day 2012
 
Description of inergen system
Description of inergen systemDescription of inergen system
Description of inergen system
 
Accident causes
Accident causesAccident causes
Accident causes
 
Safety Stop Card
Safety Stop CardSafety Stop Card
Safety Stop Card
 
Safety quiz
Safety quizSafety quiz
Safety quiz
 
Safety & health in ramadan by ammar
Safety & health in ramadan by ammarSafety & health in ramadan by ammar
Safety & health in ramadan by ammar
 
Tric final
Tric finalTric final
Tric final
 
World safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide shareWorld safety day proposal rev.02 for slide share
World safety day proposal rev.02 for slide share
 
Sistema stop
Sistema  stopSistema  stop
Sistema stop
 
Occupational Health Surveillance
Occupational Health SurveillanceOccupational Health Surveillance
Occupational Health Surveillance
 
Safety Week Activity Report
Safety Week Activity ReportSafety Week Activity Report
Safety Week Activity Report
 
3 basics of stop
3  basics of stop3  basics of stop
3 basics of stop
 
Monthly safety report 2012 07_july
Monthly safety report 2012 07_julyMonthly safety report 2012 07_july
Monthly safety report 2012 07_july
 
E-safety quiz
E-safety quizE-safety quiz
E-safety quiz
 
46th NSD
46th NSD46th NSD
46th NSD
 
Integrated management system training
Integrated management system trainingIntegrated management system training
Integrated management system training
 
Safety and General Quiz Finals 2014
Safety and General Quiz Finals 2014Safety and General Quiz Finals 2014
Safety and General Quiz Finals 2014
 

Similar to 2015-06 HSE Culture Program

5S_Kaizen Bulletin_No61
5S_Kaizen Bulletin_No615S_Kaizen Bulletin_No61
5S_Kaizen Bulletin_No61
Manu Pauwelyn
 
Lean midland presentation-161013
Lean midland presentation-161013Lean midland presentation-161013
Lean midland presentation-161013
Kinetik Solutions Ltd
 
Starring committee meeting
Starring committee meetingStarring committee meeting
Starring committee meeting
Abdelhamed Elshazly
 
Achievements
AchievementsAchievements
Achievements
Peter Townsend
 
Global HSE Newsletter March 2014
Global HSE Newsletter March 2014Global HSE Newsletter March 2014
Global HSE Newsletter March 2014
Mohammad Ghadban
 
ISO 31000.pdf
ISO 31000.pdfISO 31000.pdf
ISO 31000.pdf
ssuser840a78
 
MM PsychoTools (Psychomotor assessments) Presentation
MM PsychoTools (Psychomotor assessments) PresentationMM PsychoTools (Psychomotor assessments) Presentation
MM PsychoTools (Psychomotor assessments) Presentation
kenneth mashele
 
UFR Hse supervision Resume
UFR Hse supervision ResumeUFR Hse supervision Resume
UFR Hse supervision Resume
olorunyomi wale
 
KPI .pdf
KPI .pdfKPI .pdf
KPI .pdf
ssuser089410
 
PCAPP Update 26 February 2014
PCAPP Update 26 February 2014PCAPP Update 26 February 2014
Sharad Kumar Singh
Sharad Kumar SinghSharad Kumar Singh
Sharad Kumar Singh
Sharad Kumar Singh
 
Bizsafe Risk Assessment
Bizsafe Risk AssessmentBizsafe Risk Assessment
Bizsafe Risk Assessment
searchgeeksg
 
Bizsafe risk assessment
Bizsafe risk assessmentBizsafe risk assessment
Bizsafe risk assessment
searchgeeksg
 
Mushtaq hussain profile
Mushtaq hussain   profileMushtaq hussain   profile
Mushtaq hussain profile
MushtaqHussain55
 
Use of lean metrics apm 170216 slides to share
Use of lean metrics apm 170216 slides to shareUse of lean metrics apm 170216 slides to share
Use of lean metrics apm 170216 slides to share
Association for Project Management
 
Test Metrics in Agile - powerful tool to support changes - Zavertailo Iuliia
Test Metrics in Agile - powerful tool to support changes - Zavertailo IuliiaTest Metrics in Agile - powerful tool to support changes - Zavertailo Iuliia
Test Metrics in Agile - powerful tool to support changes - Zavertailo Iuliia
Yulia Zavertailo
 
Resume of shameem ahamed
Resume of shameem ahamedResume of shameem ahamed
Resume of shameem ahamed
Shameem Ahamed
 
Safety Pillar internal audit
Safety Pillar internal auditSafety Pillar internal audit
Safety Pillar internal audit
Rupesh Kumar Verma
 
Waseem HSE Officer CV
Waseem HSE Officer CVWaseem HSE Officer CV
Waseem HSE Officer CV
Mohammad Waseem
 
Naren_Saudi
Naren_SaudiNaren_Saudi

Similar to 2015-06 HSE Culture Program (20)

5S_Kaizen Bulletin_No61
5S_Kaizen Bulletin_No615S_Kaizen Bulletin_No61
5S_Kaizen Bulletin_No61
 
Lean midland presentation-161013
Lean midland presentation-161013Lean midland presentation-161013
Lean midland presentation-161013
 
Starring committee meeting
Starring committee meetingStarring committee meeting
Starring committee meeting
 
Achievements
AchievementsAchievements
Achievements
 
Global HSE Newsletter March 2014
Global HSE Newsletter March 2014Global HSE Newsletter March 2014
Global HSE Newsletter March 2014
 
ISO 31000.pdf
ISO 31000.pdfISO 31000.pdf
ISO 31000.pdf
 
MM PsychoTools (Psychomotor assessments) Presentation
MM PsychoTools (Psychomotor assessments) PresentationMM PsychoTools (Psychomotor assessments) Presentation
MM PsychoTools (Psychomotor assessments) Presentation
 
UFR Hse supervision Resume
UFR Hse supervision ResumeUFR Hse supervision Resume
UFR Hse supervision Resume
 
KPI .pdf
KPI .pdfKPI .pdf
KPI .pdf
 
PCAPP Update 26 February 2014
PCAPP Update 26 February 2014PCAPP Update 26 February 2014
PCAPP Update 26 February 2014
 
Sharad Kumar Singh
Sharad Kumar SinghSharad Kumar Singh
Sharad Kumar Singh
 
Bizsafe Risk Assessment
Bizsafe Risk AssessmentBizsafe Risk Assessment
Bizsafe Risk Assessment
 
Bizsafe risk assessment
Bizsafe risk assessmentBizsafe risk assessment
Bizsafe risk assessment
 
Mushtaq hussain profile
Mushtaq hussain   profileMushtaq hussain   profile
Mushtaq hussain profile
 
Use of lean metrics apm 170216 slides to share
Use of lean metrics apm 170216 slides to shareUse of lean metrics apm 170216 slides to share
Use of lean metrics apm 170216 slides to share
 
Test Metrics in Agile - powerful tool to support changes - Zavertailo Iuliia
Test Metrics in Agile - powerful tool to support changes - Zavertailo IuliiaTest Metrics in Agile - powerful tool to support changes - Zavertailo Iuliia
Test Metrics in Agile - powerful tool to support changes - Zavertailo Iuliia
 
Resume of shameem ahamed
Resume of shameem ahamedResume of shameem ahamed
Resume of shameem ahamed
 
Safety Pillar internal audit
Safety Pillar internal auditSafety Pillar internal audit
Safety Pillar internal audit
 
Waseem HSE Officer CV
Waseem HSE Officer CVWaseem HSE Officer CV
Waseem HSE Officer CV
 
Naren_Saudi
Naren_SaudiNaren_Saudi
Naren_Saudi
 

2015-06 HSE Culture Program

  • 1. 1 VHS HSE Culture Introduction Program Implementation Jul. 2015 Markus Dong
  • 2. 2 HSE Culture Introduction into VHS HSE文化导入项目
  • 3. 3 What We Will Achieve? Now Change the Awareness from ZERO LTA to ZERO INJURY! 改变意识!变零工损事故为零伤害事故! Future (1~2 year) Change the Awareness to Culture. 将意识固化成文化、习惯 Strategy (2~4 year) Zero LTA  Zero Injury??????
  • 4. 4 How We Can Achieve? 7 main Indicators for HSE culture • HSE System Establishment • Management Commitment • HSE Experts Reputation/Rank • Training frequency/efficiency • Improve Safety by Encourage • Promotion/Bonus by Safety Record • Risk Level/Improvement 0 0.2 0.4 0.6 0.8 1 System Committement HSE Experts TrainingEncourage Evalution by Safety Risk
  • 5. 5 What We are Achieving? (Main Roadmap) • HSE system establishment & improvement (According to the HSE function to establish the mgmt. requirement) • 2013-04-17 WSS • 2013-04~2013-06 HSE daily auditing system; • 2013-06~2013-08 HSE workshop management manual & training; • 2013-12~2014-04 risk re-evaluation by working process & training; • 2014-07~2014-12 Safety operating regulation review & training; • 2015-03~2015-06 VHS HSE Handbook release; • 2015-06~
  • 6. 6 What We are Achieving? (Main Roadmap) • Management Commitment • 2014-02-25 VHS HSE committee members adjustment, commitment from top to down; • 2014-06-30 Mr. Andrae (VHS CEO), 99 score (10th~13th June training); • 2014-07-11 VHS new quarterly HSE committee meeting; • 2014-08-14 1st totally employee meeting: from every leader shall take the safety responsibility; • 2014-10-29 FY14/15 Q1 committee meeting: Change the awareness from ZERO LTA to ZERO INJURY! Leader safety training shall above 85 score; • 2014-03-12 FY14/15 2nd & 3rd totally employee meeting: encourage the safety. • 2015-05-12 Mr. Helio (VHS CPO), 98 score (12th~15th May training);
  • 7. 7 What We are Achieving? (Main Roadmap) • Training frequency/efficiency • 2013-06 go on the quarterly (every Friday) total workforce training; • 2013-11 conduct double-week incident lessons learned; • 2014-04 review & re-build the HSE training system; • 2014-10 besides own employee, regular training began to systemic cover all fixed sub-contractors; • 2015-03 review & update HSE training material; • 2015-06 plan to focus on office employee training...
  • 8. 8 What We are Achieving? (Main Roadmap) • Improve Safety by Encourage • 2013-11 HSE & OpEx Star kick off; • 2015-05 Maybe a Practical patent in the future**; • Promotion/Bonus by Safety Record • Recently, bonus by safety record included in whole new salary system (HR) • Risk Level/improvement • HSE Experts Reputation/Rank
  • 9. 9 M-shop, Bay 2 boiler maker, Mr. Wang Sheng Bar linkage mechanism, cable protection device, safety & efficiency.
  • 10. 10 Solution (Q4 & FY15/16) Three carriages (cover all employee) • Near Miss Reporting & First Aid Kits Usage Recording & Analysis; • Be safety by efficiency encourage  CIP; • After work, No waste material, Clean the workplace;
  • 12. 12 FY14/15 HSE Performance Review (2015-09-15 updated) Frequency Rate Voith Hydro Shanghai Accidents per one Million Working hours In Number of reported accidents per 1 million worked hours. Based on 1950 h/year per employee, dependent on region. Target FY14/15 <2 9.0 6.0 1.6 0.8 0.8 2.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FY 08/09 FY 09/10 FY10/11 FY11/12 FY12/13 FY13/14 FY14/15 YTD Oct 14 Nov 14 Dec 14 Jan 15 Feb 15 Mar 15 Apr 15 May 15 Jun 15 Jul 15 Aug 15 Sep 15 Frequency Rate (FR) Manufacturing Benchmark
  • 13. 13 Office 办公室 QM 质量部 E-shop 发电机车间 M-shop 水轮机车间 Total 总计Preparation Grinding Assembling Welding Machining Finishing Material Maintenance Runner Site 准备工段 打磨工段 装配工段 焊接工段 机加工工段 完工工段 吊运工段 维修工段 转轮工地 TIFR KPI 指标 0 ≤ 1 ≤ 4 ≤ 1 ≤ 2 ≤ 1 ≤ 5 ≤ 5 ≤ 4 ≤ 1 ≤ 1 ≤ 1 ≤ 26 Oct-2014 0 0 2 0 0 0 1 0 0 0 0 0 3 Nov-2014 0 0 0 0 0 0 0 1 2 1 0 0 4 Dec-2014 0 0 0 0 0 0 0 0 0 0 0 0 0 Jan-2015 0 0 2 0 0 0 0 2 0 0 0 0 4 Feb-2015 0 0 0 0 0 0 0 1 0 0 0 0 1 Mar-2015 0 0 0 0 0 0 0 0 0 0 0 0 0 Apr-2015 0 0 0 0 0 1 0 1 1 0 0 0 3 May-2015 0 0 1 0 0 0 1 0 0 0 0 0 2 June-2015 0 0 0 0 1 0 0 0 0 0 0 0 1 July-2015 0 Aug-2015 0 Sep-2015 0 Oct-2015 Total 总计 0 0 5 0 1 1 2 5 3 1 0 0 18 Accident/Incident Stats (TIFR) Including the VOITH own employee and outside personnel VHS HSE Monthly Meeting | Markus Dong | FY14_15 High light: From Jun. to Sep., Summer Season, according to the history stat, more injury in this period. 2014/13 injury 2013/19 injury (8 heatstroke) 2012/11 injury
  • 14. 14 Weekly Audit Report and Analysis 周HSE检查情况以及分析 chemical mgmt 化学品管 理 Machine safety 设备安全 fire fighting 消防 PPE 劳动保护 special equipmen t 特种设备 Tools safety 工具安全 Sub-con 相关方 dangerous work 危险作业 first aid mgmt 急救管理 waste mgmt 废弃物管 理 Energy 能源 5S others 其他 Average 15 23 21 4 4 25 3 3 0 9 3 8 10 Oct 24 12 7 0 4 16 5 3 0 18 8 18 4 Nov. 14 11 9 3 2 17 1 4 0 18 2 20 5 Dec. 10 14 11 5 5 26 2 5 0 14 4 4 8 Jan. 7 19 11 2 5 22 2 2 0 21 11 2 5 Feb. 7 5 6 3 1 11 2 4 0 7 9 12 5 Mar. 14 11 8 4 2 23 5 3 0 8 8 13 14 Apr 19 17 15 4 1 27 2 4 0 12 6 8 7 May 6 20 9 2 2 21 11 6 0 18 10 5 6 Jun 10 13 11 5 5 12 3 2 0 18 3 6 5 15 23 21 4 4 25 3 3 0 9 3 8 10 24 12 7 0 4 16 5 3 0 18 8 18 4 14 11 9 3 2 17 1 4 0 18 2 20 5 10 14 11 5 5 26 2 5 0 14 4 4 8 7 19 11 2 5 22 2 2 0 21 11 2 5 7 5 6 3 1 11 2 4 0 7 9 12 5 14 11 8 4 2 23 5 3 0 8 8 13 14 19 17 15 4 1 27 2 4 0 12 6 8 7 6 20 9 2 2 21 11 6 0 18 10 5 6 10 13 11 5 5 12 3 2 0 18 3 6 5 0 5 10 15 20 25 30
  • 15. 15 Weekly Audit Report and Analysis 周HSE检查情况以及分析 VHS HSE Monthly Meeting | Markus Dong | FY14_15 Audit Day 12 9 8 10 9 5 9 9 9 8 Average Oct. Nov. Dec. Jan. Feb. Mar. Apr. May. Jun. Jul Aug. Sep. Uncorrected 13 3 10 3 4 3 3 2 2 2 Corrected 114 116 96 105 105 69 110 120 114 91 114 116 96 105 105 69 110 120 114 91 13 3 10 3 4 3 3 2 2 2 20% 30% 40% 50% 60% 70% 80% 90% 100%
  • 16. 16 Fatal Lost Time Accident (LTA) First Aid Injury (FAI) Near Miss / Incident (NM) Unsafe Acts & Conditions (Safety Committee, Audits, Stop Observation) 0 0 865+93 17+1↓ 16+1↑ Safety Triangle Stats. and Analysis; 安全金字塔 Fatal Lost Time Accident (LTA) First Aid Injury (FAI) Near Miss / Incident (NM) Unsafe Acts & Conditions (Safety Committee, Audits, Stop Observation) 3+1 0 1524 30 15 FY 13/14 FY 14/15 VHS HSE Monthly Meeting | Markus Dong | FY14_15
  • 17. 17 Total Injury Analysis Head:4+1 Hand & Arm:5+3 Body: 2+0 Leg & Foot:1+1 Others:0+1 Among 12 injury Q1~Q2: • 2 of 4 head injury related with “stood up”, another 2 are improper operation; • 5 Hand injury related with “small transportation”, “Tools”, “Slip”; • 2 of 12 injury happened in 2nd shift. Among 7 injury in Q3 • 1 head injury • 3 hand injury (because of platform door & cabinet door ) & one highlight (by chain) • 1 heatstroke (non reportable accident) FY13/14 • Head:3 • Hand & Arm: 14 • Body: 4 • Leg:11 • Others:2
  • 18. 18 Total Near Miss Analysis Among 20 near miss reporting Q1~Q3 • 9 near miss because of internal transportation, 4 forklift & 5 crane. (meeting with cranes operators & riggers/done) • 3 waste burning because of operators pay less attention to the environment. • 1 significant near miss in 13th July. (Press Machine, corrective action done)
  • 19. 19 Contact: Markus Dong HSE & Sustainability Manager Tel. 86 21 2408 9919 Junhua.Dong@voith.com