Content 
1. Introduction and problem definition 
2. System based supervision 
3. Essential conditions 
4. System based approaches in Europe 
5. Developments 
6. Conclusions
Problem definition 
1. Poor compliance & poor risk management 
2. Reactive regulated companies 
3. Too much & irrelevant legislation 
4. Gap expectation of supervision vs. limited capacity
System based supervision Goals: 
1. Smarter: Assessment of level compliance management and adjustment supervision 2. Leverage: Improvement of compliance by double loop learning
Desired level of assurance 
Assurance by regulated company 
Assurance by public supercvisor 
Minimum effort Public supervisor
Compliance management systeem 
Actions 
Safe and sustainable performance 
How? 
1. Compliance management assessment using own CM system standard 2. Result: CM level 1,2,3 or 4 3. Levels 3 and 4 receive adjusted supervision: 
• less output inspections 
• less sanctions if reaction is OK 
Theoretical concepts 
Daily 
practice 
System based approach 
Levels of CM 
Full assurance
Essential conditions 
• Commitment all stakeholders 
• Ability regulated industry (CM systems) 
• Attitude & education supervisors 
• Effective self correction mechanism 
• Shared vision about risk management 
• Speak softly and carry a big stick 
Some participants:
Dilemmas 
• Risk management versus compliance management 
• Paradox of transparancy (criminal law) 
• Certification by third party verifiers
IMPEL project (2010-2012) 
• UK, Scotland, Germany, Italy, Norway, Netherlands (project lead) 
• Use of compliance management systems 
• Desk study, workshops, questionnaire, plant visits
IMPEL project
IMPEL project: findings 
1.Big unused potential for self control 
2.Criteria for effective CMSs: - Risk management - Registration of legal requirements - Senior Management commitment - PDCA cycle for compliance - Internal control - Competencies, knowledge and experience 3. Effective CMS supervision should: 
• have standard criteria for an effective CMS, 
• measure the level of confidence in the CMS, 
• require actions that reflect the level of confidence in the CMS and 
• be backed up by credible sanctions
Developments 
1. Adjustment regulations & licensing (New safety/construction/environment Act) 2. Alignment with criminal law 3. Other domains adopt SBS methodology (transport, health care) 4. PhD projects EUR 5. Follow up IMPEL project?
Conclusions 
1. Huge unused potential in CMS 
2. Multi level assessment supports improvement of CMS effectiveness 3. Essential conditions (commitment, ability, methodology, balance reward/penalties) 4. Usefulness of certificates is limited
Thank you ! Paul Meerman, pmeerman@brabant.nl Martin de Bree, info@nextstepmanagement.nl

More Related Content

Similar to Presentation USEPA Workshop Next Generation Compliance december 12, 2012 Washington

CTO-CybersecurityForum-2010-Des Ward
CTO-CybersecurityForum-2010-Des WardCTO-CybersecurityForum-2010-Des Ward
CTO-CybersecurityForum-2010-Des Wardsegughana
 
INTEGRATED MANAGEMENT SYSTEM IMS
INTEGRATED MANAGEMENT SYSTEM IMSINTEGRATED MANAGEMENT SYSTEM IMS
INTEGRATED MANAGEMENT SYSTEM IMS
SEHAR AREEJ
 
Bpo risk management 2013
Bpo risk management 2013Bpo risk management 2013
Bpo risk management 2013Nidhi Gupta
 
Bpo risk management 2013
Bpo risk management 2013Bpo risk management 2013
Bpo risk management 2013Nidhi Gupta
 
Build a business case for compliance March 2022
Build a business case for compliance March 2022Build a business case for compliance March 2022
Build a business case for compliance March 2022
Nimonik
 
Risk management benchmarking 2013
Risk management benchmarking 2013Risk management benchmarking 2013
Risk management benchmarking 2013Nidhi Gupta
 
Size, complexity and nature of the organisation – a key to effective audit
Size, complexity and nature of the organisation – a key to effective auditSize, complexity and nature of the organisation – a key to effective audit
Size, complexity and nature of the organisation – a key to effective audit
PECB
 
Lean pilots by Mariya Breyter from Dun & Bradstreet
Lean pilots by Mariya Breyter from Dun & BradstreetLean pilots by Mariya Breyter from Dun & Bradstreet
Lean pilots by Mariya Breyter from Dun & Bradstreet
Institut Lean France
 
Learning technologies 2014: The Trickle Down Effect of Compliance
Learning technologies 2014: The Trickle Down Effect of ComplianceLearning technologies 2014: The Trickle Down Effect of Compliance
Learning technologies 2014: The Trickle Down Effect of Compliance
NetDimensions
 
Thorough Compliance Lac Megantic
Thorough Compliance Lac MeganticThorough Compliance Lac Megantic
Thorough Compliance Lac Megantic
ssuser1246df
 
How Standards work together
How Standards work togetherHow Standards work together
How Standards work together
EIBTM
 
Chapter 2-Lecture 4.pptx
Chapter 2-Lecture  4.pptxChapter 2-Lecture  4.pptx
Chapter 2-Lecture 4.pptx
OsmanHassan35
 
Software quality system - Quality Engineering
Software quality system - Quality EngineeringSoftware quality system - Quality Engineering
Software quality system - Quality Engineering
Yash Trivedi
 
Electronic gmp systems (1)
Electronic gmp systems (1)Electronic gmp systems (1)
Electronic gmp systems (1)
TAWFIKABBAD
 

Similar to Presentation USEPA Workshop Next Generation Compliance december 12, 2012 Washington (20)

CTO-CybersecurityForum-2010-Des Ward
CTO-CybersecurityForum-2010-Des WardCTO-CybersecurityForum-2010-Des Ward
CTO-CybersecurityForum-2010-Des Ward
 
INTEGRATED MANAGEMENT SYSTEM IMS
INTEGRATED MANAGEMENT SYSTEM IMSINTEGRATED MANAGEMENT SYSTEM IMS
INTEGRATED MANAGEMENT SYSTEM IMS
 
MRM
MRMMRM
MRM
 
Bpo risk management 2013
Bpo risk management 2013Bpo risk management 2013
Bpo risk management 2013
 
Bpo risk management 2013
Bpo risk management 2013Bpo risk management 2013
Bpo risk management 2013
 
Bpo risk management 2013
Bpo risk management 2013Bpo risk management 2013
Bpo risk management 2013
 
Bpo risk management 2013
Bpo risk management 2013Bpo risk management 2013
Bpo risk management 2013
 
Bpo risk management 2013
Bpo risk management 2013Bpo risk management 2013
Bpo risk management 2013
 
Build a business case for compliance March 2022
Build a business case for compliance March 2022Build a business case for compliance March 2022
Build a business case for compliance March 2022
 
Risk management benchmarking 2013
Risk management benchmarking 2013Risk management benchmarking 2013
Risk management benchmarking 2013
 
Risk management benchmarking 2013
Risk management benchmarking 2013Risk management benchmarking 2013
Risk management benchmarking 2013
 
Size, complexity and nature of the organisation – a key to effective audit
Size, complexity and nature of the organisation – a key to effective auditSize, complexity and nature of the organisation – a key to effective audit
Size, complexity and nature of the organisation – a key to effective audit
 
Lean pilots by Mariya Breyter from Dun & Bradstreet
Lean pilots by Mariya Breyter from Dun & BradstreetLean pilots by Mariya Breyter from Dun & Bradstreet
Lean pilots by Mariya Breyter from Dun & Bradstreet
 
Learning technologies 2014: The Trickle Down Effect of Compliance
Learning technologies 2014: The Trickle Down Effect of ComplianceLearning technologies 2014: The Trickle Down Effect of Compliance
Learning technologies 2014: The Trickle Down Effect of Compliance
 
Thorough Compliance Lac Megantic
Thorough Compliance Lac MeganticThorough Compliance Lac Megantic
Thorough Compliance Lac Megantic
 
How Standards work together
How Standards work togetherHow Standards work together
How Standards work together
 
Chapter 2-Lecture 4.pptx
Chapter 2-Lecture  4.pptxChapter 2-Lecture  4.pptx
Chapter 2-Lecture 4.pptx
 
Performance measurement
Performance measurementPerformance measurement
Performance measurement
 
Software quality system - Quality Engineering
Software quality system - Quality EngineeringSoftware quality system - Quality Engineering
Software quality system - Quality Engineering
 
Electronic gmp systems (1)
Electronic gmp systems (1)Electronic gmp systems (1)
Electronic gmp systems (1)
 

More from Erasmus University Rotterdam

Presentatie Winnend Artikel Vide publicatieprijs 2018
Presentatie Winnend Artikel Vide publicatieprijs 2018Presentatie Winnend Artikel Vide publicatieprijs 2018
Presentatie Winnend Artikel Vide publicatieprijs 2018
Erasmus University Rotterdam
 
Martin de bree kopenhagen 2017 1
Martin de bree  kopenhagen 2017 1Martin de bree  kopenhagen 2017 1
Martin de bree kopenhagen 2017 1
Erasmus University Rotterdam
 
Martin de bree kopenhagen 2017 2
Martin de bree  kopenhagen 2017 2Martin de bree  kopenhagen 2017 2
Martin de bree kopenhagen 2017 2
Erasmus University Rotterdam
 
20161005 publicly induced self regulation (ch&en) presentation martin ...
20161005 publicly induced self regulation (ch&en)    presentation martin ...20161005 publicly induced self regulation (ch&en)    presentation martin ...
20161005 publicly induced self regulation (ch&en) presentation martin ...
Erasmus University Rotterdam
 
20161005 publicly induced self regulation presentation martin de bree
20161005 publicly induced self regulation   presentation martin de bree20161005 publicly induced self regulation   presentation martin de bree
20161005 publicly induced self regulation presentation martin de bree
Erasmus University Rotterdam
 
Kan transportveiligheid een vlucht maken 20160324
Kan transportveiligheid een vlucht maken 20160324Kan transportveiligheid een vlucht maken 20160324
Kan transportveiligheid een vlucht maken 20160324
Erasmus University Rotterdam
 
Presentatie martin de bree dag vd omgevingswet 2 oktober 2014 0.2
Presentatie martin de bree dag vd omgevingswet 2 oktober 2014 0.2Presentatie martin de bree dag vd omgevingswet 2 oktober 2014 0.2
Presentatie martin de bree dag vd omgevingswet 2 oktober 2014 0.2
Erasmus University Rotterdam
 

More from Erasmus University Rotterdam (7)

Presentatie Winnend Artikel Vide publicatieprijs 2018
Presentatie Winnend Artikel Vide publicatieprijs 2018Presentatie Winnend Artikel Vide publicatieprijs 2018
Presentatie Winnend Artikel Vide publicatieprijs 2018
 
Martin de bree kopenhagen 2017 1
Martin de bree  kopenhagen 2017 1Martin de bree  kopenhagen 2017 1
Martin de bree kopenhagen 2017 1
 
Martin de bree kopenhagen 2017 2
Martin de bree  kopenhagen 2017 2Martin de bree  kopenhagen 2017 2
Martin de bree kopenhagen 2017 2
 
20161005 publicly induced self regulation (ch&en) presentation martin ...
20161005 publicly induced self regulation (ch&en)    presentation martin ...20161005 publicly induced self regulation (ch&en)    presentation martin ...
20161005 publicly induced self regulation (ch&en) presentation martin ...
 
20161005 publicly induced self regulation presentation martin de bree
20161005 publicly induced self regulation   presentation martin de bree20161005 publicly induced self regulation   presentation martin de bree
20161005 publicly induced self regulation presentation martin de bree
 
Kan transportveiligheid een vlucht maken 20160324
Kan transportveiligheid een vlucht maken 20160324Kan transportveiligheid een vlucht maken 20160324
Kan transportveiligheid een vlucht maken 20160324
 
Presentatie martin de bree dag vd omgevingswet 2 oktober 2014 0.2
Presentatie martin de bree dag vd omgevingswet 2 oktober 2014 0.2Presentatie martin de bree dag vd omgevingswet 2 oktober 2014 0.2
Presentatie martin de bree dag vd omgevingswet 2 oktober 2014 0.2
 

Recently uploaded

2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
JSchaus & Associates
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
SERUDS INDIA
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
ahcitycouncil
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
Mohammed325561
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
SERUDS INDIA
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
ehbuaw
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
ahcitycouncil
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
ahcitycouncil
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 

Recently uploaded (20)

2024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 372024: The FAR - Federal Acquisition Regulations, Part 37
2024: The FAR - Federal Acquisition Regulations, Part 37
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 

Presentation USEPA Workshop Next Generation Compliance december 12, 2012 Washington

  • 1. Compliance assurance through company compliance management systems Next Generation Environmental Compliance December 12, 2012 Paul Meerman, Provincie Noord-Brabant, The Netherlands Martin de Bree, Next Step Management BV/Erasmus University Rotterdam
  • 3. Content 1. Introduction and problem definition 2. System based supervision 3. Essential conditions 4. System based approaches in Europe 5. Developments 6. Conclusions
  • 4. Problem definition 1. Poor compliance & poor risk management 2. Reactive regulated companies 3. Too much & irrelevant legislation 4. Gap expectation of supervision vs. limited capacity
  • 5. System based supervision Goals: 1. Smarter: Assessment of level compliance management and adjustment supervision 2. Leverage: Improvement of compliance by double loop learning
  • 6. Desired level of assurance Assurance by regulated company Assurance by public supercvisor Minimum effort Public supervisor
  • 7. Compliance management systeem Actions Safe and sustainable performance How? 1. Compliance management assessment using own CM system standard 2. Result: CM level 1,2,3 or 4 3. Levels 3 and 4 receive adjusted supervision: • less output inspections • less sanctions if reaction is OK Theoretical concepts Daily practice System based approach Levels of CM Full assurance
  • 8. Essential conditions • Commitment all stakeholders • Ability regulated industry (CM systems) • Attitude & education supervisors • Effective self correction mechanism • Shared vision about risk management • Speak softly and carry a big stick Some participants:
  • 9. Dilemmas • Risk management versus compliance management • Paradox of transparancy (criminal law) • Certification by third party verifiers
  • 10. IMPEL project (2010-2012) • UK, Scotland, Germany, Italy, Norway, Netherlands (project lead) • Use of compliance management systems • Desk study, workshops, questionnaire, plant visits
  • 12. IMPEL project: findings 1.Big unused potential for self control 2.Criteria for effective CMSs: - Risk management - Registration of legal requirements - Senior Management commitment - PDCA cycle for compliance - Internal control - Competencies, knowledge and experience 3. Effective CMS supervision should: • have standard criteria for an effective CMS, • measure the level of confidence in the CMS, • require actions that reflect the level of confidence in the CMS and • be backed up by credible sanctions
  • 13. Developments 1. Adjustment regulations & licensing (New safety/construction/environment Act) 2. Alignment with criminal law 3. Other domains adopt SBS methodology (transport, health care) 4. PhD projects EUR 5. Follow up IMPEL project?
  • 14. Conclusions 1. Huge unused potential in CMS 2. Multi level assessment supports improvement of CMS effectiveness 3. Essential conditions (commitment, ability, methodology, balance reward/penalties) 4. Usefulness of certificates is limited
  • 15. Thank you ! Paul Meerman, pmeerman@brabant.nl Martin de Bree, info@nextstepmanagement.nl