RoHS
                                    Ready




Alternative Power Systems (APS)
for the Automotive Industry
Components for Hybrid,
Electric and Fuel Cell Technology
AU TO M OT I V E D I V I S I O N
T H E 5 A P P L I C AT I O N A R E A S




                                         I
I N N OVAT I V E         TECHNOLOGIES

Tyco Electronics Ltd. is a leading global provider of engineered electronic components, network
solutions and undersea telecommunication systems. We design, manufacture and market
products for customers in industries from automotive, appliance and aerospace and defense to
telecommunications, computers and consumer electronics. The automotive division follows
the globalization goals of our customers, speeds up the integration of new technologies and
enables our customers access to our vast product portfolio and services.




          TERMINALS & CONNECTORS
                       Tyco Electronics offers a broad range of high quality terminals and connectors.
                       Our electrical/electronic interconnection products and solutions are used to electrically
                       and mechanically join wires and cables, printed circuit boards, integrated circuit
                       packages and batteries. Tyco Electronics expanding capabilities include new copper
                       and fiber-optic connectors, wires, cables/cable management systems that are designed
                       to meet automotive industry demands. Our brands encompass the broadest range of
                       connectors in the world, including high-density, high-speed designs for leading-edge
                       communications equipment.




          SENSORS
                       Contact-less measuring eliminates interference effects, wear and tear, and provides
                       increased reliability. Tyco Electronics, one of the largest technology providers for the
                       automobile industry, offers contact-less sensors for a variety of applications.


                       As sensor manufacturer and processing partner, Tyco Electronics also provides
                       project planning support for new sensor applications, assistance in the selection of
                       the appropriate sensor technology for the respective application, and assistance with
                       defining the corresponding mechanical, electrical and magnetic interface.


          Tyco Electronics has a broad electro-mechanical portfolio that includes robust housing technologies,
          connector systems, and temperature stable designs based on foil and cable networks. This combi-
          nation of technologies and experience ensures that reliable and cost effective sensor solutions are
          available for all application types.




II
C A B L E A S S E M B LY S Y S T E M S
             Tyco Electronics is your partner for special cable assemblies.
             We offer research and development capabilities, prototyping, samples as well as
             manufacturing facilities for special cable assemblies. This includes overmold
             technology, semi/fully automatic manufacturing, testing equipment and appliances
             for handling of high volume production.




I N D U C T I V E SYST E M S
             The Automotive Division is your source for interconnection technologies for
             automotive, truck and off-highway OEMs and Tier 1 suppliers. With the design
             competency center in Oostkamp (Belgium), and strategic production centers in Evora
             (Portugal), Bangalore (India), Shuzhou (China), Oostkamp (Belgium), and others,
             Tyco Electronics’ Inductive Systems group is ready to offer you any coil module
             required in the automotive industry.


             The Inductive System group focus lies on the customer requirement, in order to design
to the exact demand. This is achieved by highly technical, intelligent and cost-efficient engineering.


In order to be a leader in design, Tyco Electronics’ Inductive Systems group has a vast product
portfolio, which consists out of antennas, actuators, resolvers, and integrated coil modules.
Next to that, several specific applications are designed.




M E C H AT R O N I C S
             A variety of technical products are designed today by integrating mechanical
             components and electronic hardware into one packaging unit thus creating true
             mechatronic solutions. Mechatronic applications offer amazing and versatile potentials
             related to functionality, cost, space requirements and quality. Tyco Electronics
             contributes to those applications with its wide range of innovative and cost-effective
             product and process technologies.
             Advanced stamping, injection molding and assembly techniques are applied along with
             highly selective surface plating methods.




                                                                                                         III
H I G H S P E E D DATA N E T W O R K I N G
                 High speed data networking within the automobile is becoming more predominant.
                 What was till now restricted to the high end of the market utilizing system such as the
                 MOST network, high speed data transmission based on optical fibers, now with the
                 introduction of MP3 player, display screens and cameras results in the need for high
                 speed networking throughout all platforms.



                 MOST IS A TRADEMARK




     A LT E R N AT I V E P O W E R S Y S T E M S
     CO M P O N E N TS F O R H Y B R I D, E L E C T R I C A N D   FUEL CELL TECHNOLOGY

                 Tyco Electronics is a leader in next-generation transportation technologies and
                 products for hybrid and electric vehicles. The Automotive Division is your source for
                 high voltage power distribution, high current contacts, high voltage connectors and
                 cables, high voltage relays, sensors and temperature protection devices for hybrid and
                 other alternative powered vehicles.




                                               T YCO E L E C T R O N I C S

                         O U R C O M M I T M E N T. Y O U R A D VA N TA G E .




                    Tyco Electronics’ businesses operate in thousands of different areas of industry.
                     The products and services we deliver all have one thing in common. They are
                   vital to everyday living. Individuals and companies worldwide have critical needs.
                                     And every minute of every day, we satisfy them.




IV
R E S T R I C T I O N O N T H E U S E O F H A Z A R D O U S S U B S TA N C E S ( R O H S )
At Tyco Electronics, we’re ready to support your RoHS requirements. We’ve assessed more than 1.5 million end
items/components for RoHS compliance, and issued new part numbers where any change was required to
eliminate the restricted materials. Part numbers in this catalog are identified as:



RoHS Compliant

Part numbers in this catalog are RoHS Compliant, unless marked otherwise.

These products comply with European Union Directive 2002/95/EC as amended 1 January 2006 that restricts
the use of lead, mercury, cadmium, hexavalent chromium, PBB, and PBDE in certain electrical and electronic
products sold into the EU as of 1 July 2006.

Note: For purposes of this Catalog, included within the definition of RoHS Compliant are products that are clearly
“Out of Scope” of the RoHS Directive such as hand tools and other non-electrical accessories.



Non-RoHS Compliant

These part numbers are identified with a “ ” symbol. These products do not comply with the material restrictions
of the European Union Directive 2002/95/EC.



5 of 6 Compliant

A “ ” symbol identifies these part numbers. These products do not fully comply with the European Union
Directive 2002/95/EC because they contain lead in solderable interfaces (they do not contain any of the other
five restricted substances above allowable limits). However, these products may be suitable for use in RoHS
applications where there is an application-based exception for lead in solders, such as the server, storage, or
networking infrastructure exemption.

Note: Information regarding RoHS compliance is provided based on reasonable inquiry of our suppliers and
represents our current actual knowledge based on the information provided by our suppliers. This information
is subject to change. For latest compliance status, refer to our website referenced below.



Getting the Information You Need

Our comprehensive on-line RoHS Customer Support Center provides a forum to answer your questions and
support your RoHS needs. A RoHS FAQ (Frequently Asked Questions) is available with links to more detailed
information. You can also submit RoHS questions and receive a response within 24 hours during a normal work
week. The Support Center also provides:

■   Cross-Reference from Non-compliant to Compliant Products

■   Ability to browse RoHS Compliant Products in our on-line catalog:          RoHS
    http://ecommas.tycoelectronics.com/commerce/alt/RohsAltHome.do
                                                                               Customer
■   Downloadable Technical Data Customer Information Presentation
                                                                               Support
■   More detailed information regarding the definitions used above
                                                                               Center
So whatever your questions when it comes to RoHS, we’ve got the
answers at www.tycoelectronics.com/leadfree




                                                                                                                  V
“AT YO U R S E RV I C E ”




                               Tyco Electronics Online
                               The Tyco Electronics website is an innovative and
                               interactive source for application information,
                               product updates and technical solutions.
                               Our step-by-step software makes our website
                               intuitive and user-friendly to better serve you!
                               Please contact us at:
                               www.tycoelectronics.com/automotive


                               Internet
                               www.tycoelectronics.com
                               www.tycoelectronics.com/automotive
                               www.tycoelectronics.com/automotive/sensors
                               www.tycoelectronicsmost.com


                               Electronic Internet Catalog
                               www.tycoelectronics.com/components




       www.tycoelectronics.com/automotive
     www.tycoelectronics.com/automotive/sensors
           www.tycoelectronicsmost.com

VI
“AT YO U R S E RV I C E ”




                                                    Product and Machine Literature
                                                    Tyco Electronics offers a variety of product specific
                                                    catalogs, brochures and high impact flyers to help better
                                                    serve you!
                                                    For more information on literature for Tyco Electronics’
                                                    Automotive Division, please contact your local
                                                    Tyco Electronics organization or go to
                                                    www.tycoelectronics.com/automotive




Product Information Center
(PIC)
You can rely on Tyco Electronics’ PIC Team to
provide you support for answers to your
general information or technical questions
in an efficient and effective manner.
To reach our PIC staff, please contact your
local Tyco Electronics organization.
See our Global Contacts page.




                                                                                                               VII
AU TO M OT I V E D I V I S I O N




                                                                    Page


 Alternative Power Systems (APS)
 Creating “A Green Advantage”                                       12-10        ✓
 Introduction                                                       12-20        ✓
 2 Position HVA 280 Connector System                                12-30        ✓
 3 Position HVA 280 Connector System                                12-40        ✓
 2 Position HVA 400 Connector System                                12-50        ✓
 2 Position Auxiliary Power Terminal (APT)                          12-60        ✓
 2 Position Low Voltage (LV) 800 Connector                          12-70        ✓
 2 Position High Voltage (HV) 800 Connector                         12-80        ✓
 3 Position High Voltage (HV) 800 Connector                         12-90        ✓
 1 Position IPT Shielded Ring Tongue                                12-10        ✓
 EV 200 Contactor                                                   12-12        ✓
 LEV 100 Contactor                                                  12-13        ✓
 Power Resistor                                                     12-14        ✓
 Typical Make / Break Application                                   12-15        ✓
 High Current Relay (HCR) 200                                       12-16        ✓
 High Current Relay (HCR) 150                                       12-17        ✓
 Battery Disconnect Switch (BDS)-A                                  12-18        ✓
 High Voltage Cable Assemblies                                      12-19        ✓
 Multi-Coil Resolver (MCR)                                          12-20        ✓
 Clutch Position Sensor                                             12-21        ✓
 Dual Clutch Position Sensor                                        12-22        ✓
 Neutral Position Sensor                                            12-23        ✓
 Brake Pedal Position Sensor                                        12-24        ✓
 Thermal Indicator                                                  12-25        ✓
 HFT 5000                                                           12-26        ✓
 Application Tooling                                                12-27        ✓
 Numerical Index                                                    12-28        ✓




VIII
THE PRODUCTS




✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓
✓                  ✓




                       IX
Section Catalog 1654294-3.
                                                                                                               Revised 5-2010.
    Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
    for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


    Engineering Notes




X   All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                             Revised 5-2010.
                              Alternative Power Systems (APS)                                                                    Main Catalog 1654400-1
                              for the Automotive Industry                                                                        Chapter 12 – Issued 4-2010.


                              Creating “A Green Advantage”




Tyco Electronics Ltd. is a    We design, manufacture                           With worldwide engineering,                Global Automotive Division
leading global provider of    and market products for                          manufacturing, sales and
engineered electronic com-    customers in a broad array                       customer service capabilities,             ALTERNATIVE
ponents, network solutions,   of industries including auto-                    Tyco Electronics’ commit-                  POWER SYSTEMS
specialty products and        motive; data communication                       ment is our customers’                     (APS)
undersea telecommunication    systems and consumer elec-                       advantage.
systems, with customers in    tronics; telecommunications;                                                                Tyco Electronics is a leader
more than 150 countries.      aerospace, defense and                                                                      in next-generation trans-
                              marine; medical; energy;                                                                    portation technologies and
                              and lighting.                                                                               products for hybrid and
                                                                                                                          electric vehicles. The Global
                                                                                                                          Automotive Division is your
                                                                                                                          source for high voltage power
                                                                                                                          distribution, high current
                                                                                                                          contacts, high voltage
                                                                                                                          connectors and cables,
                                                                                                                          high voltage relays, sensors
                                                                                                                          and temperature protection
                                                                                                                          devices for hybrid and other
                                                                                                                          alternative powered vehicles.



                              All specifications subject to change. Consult Tyco Electronics for latest specifications.                                12-1
Section Catalog 1654294-3.
                                                                                                                                           Revised 5-2010.
                            Alternative Power Systems (APS)                                                                    Main Catalog 1654400-1
                            for the Automotive Industry                                                                        Chapter 12 – Issued 4-2010.


                            Introduction



High-Power Automotive
Electrical Systems
for Hybrid and Electrical
Vehicles




                            Alternative powered vehicles,                    Electrical systems on conven-              Tyco Electronics offers a wide
                            such as hybrid electric                          tional vehicles are typically              range of components and
                            vehicles (HEV’s), can reduce                     designed for 12 volts, with                subsystems for HEV’s,
                            harmful pollutants and exhaust                   the majority of loads less than            including:
                            emissions. Recent interest in                    30 amps. In contrast, hybrid               ■ High power electrical
                            alternative powered vehicles                     and electric vehicles have                   connectors and cables,
                            creates a new challenge for                      electrical systems with voltage
                            vehicle electrical systems                       levels between 300–800 volts               ■ High power contactors
                            because of the need for                          and currents from 200–1000                   for battery switching and
                            high power electrical system                     amps. High power environ-                    control,
                            technology.                                      ments require design and                   ■ Circuit protection devices,
                                                                             packaging solutions for power                like Raychem PolySwitch™
                            The demand for high power
                                                                             switching, circuit protection,               PPTC’s,
                            electrical components has
                                                                             electrical power distribution              ■ Power Distribution Units.
                            accelerated due to the
                                                                             and interconnection systems.
                            constant development of
                            alternative powered vehicles,
                            high power electrical com-
                            ponents for “drive by wire”
                            electromechanical systems
                            and high-power systems on
                            vehicles with conventional
                            voltage levels.



12-2                        All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                              Revised 5-2010.
                                   Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                   for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                   2 Position HVA 280 Connector System



2 Position HVA 280
Connector System




Application

■ High voltage accessory (HVA) /
  device interconnect




Description

■ Sealed
■ Touch safe
■ 2.8 mm AMP MCP Box/
  Blade Contact System
■ Wire Range: 2.0–4.0 mm2
■ Individually Shielded Cable
■ Wire-to-device
■ Internal safety interlock
■ 360° EMC shielding
■ Finger actuated
  two-stage latch
■ Multiple indexes available




Performance

■ Rated Voltage:
  600 V DC
■ Current Carrying Capacity:
  40 A continuous @ +85 °C on      Ordering Information
  4.0 mm2 wire in connector
                                        Connector                 No. of                                Product                         Overview
  27 A continuous @ +125 °C on          Type                      Positions                             Description                     Part Number
  4.0 mm2 wire in connector
                                                                                                        Plug Housing                    1587819-x
■ Operating Temperature:                HVA 280                   2
                                                                                                        Header Housing                  1587831-x
  –40 °C to +125 °C
■ Degree of Protection:
  IP6K9K, IPX7 mated,
  IP2XB unmated
■ Vibration Profile:
  USCAR-2 (Body Profile)




                                   All specifications subject to change. Consult Tyco Electronics for latest specifications.                           12-3
Section Catalog 1654294-3.
                                                                                                                                              Revised 5-2010.
                                   Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                   for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                   3 Position HVA 280 Connector System



3 Position HVA 280
Connector System




Application

■ High voltage accessory (HVA) /
  device interconnect




Description

■ Sealed
■ Touch Safe
■ 2.8 mm AMP MCP Box/
  Blade Contact System
■ Multicore shielded cable
■ Wire Range: 2 x 2.5–4.0 mm2,
  3 x 2.5–3.0 mm2
■ Wire-to-device
■ 360° EMC shielding
■ Tool actuated latch
■ Multiple indexes available




Performance

■ Rated Voltage:
  600 V DC
■ Current Carrying Capacity:
  30 A continuous @ +125 °C on     Ordering Information
  3 x 2.5 mm2 wire in connector
                                        Connector                 No. of                                Product                         Overview
■ Operating Temperature:                Type                      Positions                             Description                     Part Number
  –40 °C to +125 °C
                                                                                                        Plug Housing                    1587715-x
■ Degree of Protection:                 HVA 280                   3
  IP6K9K, IPX7 mated,                                                                                   Header Housing                  1587727-x
  IP2XB unmated
■ Vibration Profile:
  USCAR-2 (Body Profile)




12-4                               All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                              Revised 5-2010.
                                   Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                   for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                   2 Position HVA 400 Connector System



2 Position HVA 400
Connector System




Application

■ High voltage accessory (HVA) /
  device interconnect




Description

■ Sealed
■ Touch safe
■ 4.0 mm pin/socket contact
  system
■ Wire Range: 3.0–6.0 mm2
■ Individually shielded cable
■ Wire-to-wire
■ External safety interlock
■ 360° EMC shielding
■ Tool actuated latch




Performance

■ Rated Voltage:
  600 V DC
■ Current Carrying Capacity:
  33 A continuous @ +125 °C on
  3.0 mm2 Wire (free in air)
■ Operating Temperature:           Ordering Information
  –40 °C to +125 °C
                                        Connector                 No. of                                Product                         Overview
■ Degree of Protection:                 Type                      Positions                             Description                     Part Number
  IP6K9K, IPX7 mated,
  IP2XB unmated                                                                                         Plug Housing                    1587517-x
                                        HVA 400                   2
■ Vibration Profile:                                                                                    Cap Housing                     1587777-x
  USCAR-2 (Body Profile)




                                   All specifications subject to change. Consult Tyco Electronics for latest specifications.                           12-5
Section Catalog 1654294-3.
                                                                                                                                              Revised 5-2010.
                                   Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                   for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                   2 Position Auxiliary Power Terminal (APT)



2 Position Auxiliary
Power Terminal (APT)




Application

■ High voltage accessory (HVA) /
  device interconnect




Description

■ Auxiliary pigtail system
■ Sealed
■ Touch safe
■ Wire Range: 2.5–6.0 mm2
■ Individually shielded cable
■ Wire-to-device
■ Non-serviceable fixed device
  interface
■ 360° EMC shielding




Performance

■ Rated Voltage:
  600 V DC
■ Current Carrying Capacity:
  30 A continuous @ +125 °C
  on 4.0 mm2 Wire
■ Operating Temperature:           Ordering Information
  –40 °C to +125 °C
                                        Connector                 No. of                                Product                         Overview
■ Degree of Protection:                 Type                      Positions                             Description                     Part Number
  IP6K9K
                                        APT                       2                                     Kit                             1587833-x
■ Vibration Profile:
  USCAR-2 (on Engine)




12-6                               All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                            Revised 5-2010.
                                 Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                 for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                 2 Position LV 800 Connector



2 Position Low Voltage
(LV) 800 Connector




Application

■ Accessory/main interconnect




Description

■ 2 positions
■ Sealed
■ 8.0 mm socket contact system
■ Wire Range: 25.0–50.0 mm2
■ Wire-to-device




Performance

■ Rated Voltage:
  12 V DC
■ Current Carrying Capacity:
  210 A continuous @ +85 °C
  on 50.0 mm2 wire
■ Operating Temperature:
  –40 °C to +130 °C
■ Degree of Protection:
  IP6K9K, IPX7 mated



                                 Ordering Information
                                      Connector                 No. of                                Product                         Overview
                                      Type                      Positions                             Description                     Part Number

                                                                                                      Plug Housing                    1670564-x
                                      LV 800                    2
                                                                                                      Pin Header                      1670559-x




                                 All specifications subject to change. Consult Tyco Electronics for latest specifications.                           12-7
Section Catalog 1654294-3.
                                                                                                                                            Revised 5-2010.
                                 Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                 for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                 2 Position HV 800 Connector



2 Position High Voltage
(HV) 800 Connector




Application

■ Accessory/main interconnect




Description

■ 2 positions
■ Sealed
■ Touch safe
■ 8.0 mm socket contact system
■ Wire Range: 25.0–50.0 mm2
■ Wire-to-device
■ Full integrated interlock
■ 360° EMC shielding




Performance

■ Rated Voltage:
  800 V DC
■ Current Carrying Capacity:
  210 A continuous @ +85 °C
  on 50.0 mm2 wire
■ Operating Temperature:
  –40 °C to +130 °C
■ Degree of Protection:
  IP6K9K, IPX7 mated,            Ordering Information
  IP2XB unmated
                                      Connector                 No. of                                Product                         Overview
                                      Type                      Positions                             Description                     Part Number

                                                                                                      Plug Housing                    1719822-x
                                      HV 800                    2
                                                                                                      Pin Header                      1719833-x




12-8                             All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                            Revised 5-2010.
                                 Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                 for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                 3 Position HV 800 Connector



3 Position High Voltage
(HV) 800 Connector




Application

■ Accessory/main interconnect




Description

■ 3 positions
■ Sealed
■ Touch safe
■ 8.0 mm socket contact system
■ Wire Range: 25.0–50.0 mm2
■ Wire-to-device
■ Full integrated interlock
■ 360° EMC shielding




Performance

■ Rated Voltage:
  800 V DC
■ Current Carrying Capacity:
  210 A continuous @ +85 °C
  on 50.0 mm2 wire
■ Operating Temperature:
  –40 °C to +130 °C
■ Degree of Protection:
  IP6K9K, IPX7 mated,            Ordering Information
  IP2XB unmated
                                      Connector                 No. of                                Product                         Overview
                                      Type                      Positions                             Description                     Part Number

                                                                                                      Plug Housing                    1563425-x
                                      HV 800                    3
                                                                                                      Pin Header                      1563315-x




                                 All specifications subject to change. Consult Tyco Electronics for latest specifications.                           12-9
Section Catalog 1654294-3.
                                                                                                                                            Revised 5-2010.
                                Alternative Power Systems (APS)                                                                Main Catalog 1654400-1
                                for the Automotive Industry                                                                     Chapter 12 – Issued 4-2010.


                                1 Position IPT Shielded Ring Tongue



1 Position IPT Shielded
Terminal, Screwed,
25.0–50.0 mm2


Application

■ Accessory/main interconnect




Description

■ 1 position
■ Sealed
■ Ring tongue
■ Wire Range: 25.0–50.0 mm2
■ Wire-to-device
■ 360° EMC shielding




Performance

■ Rated Voltage:
  800 V DC
■ Current Carrying Capacity:
  200 A continuous @ +105 °C
  on 50.0 mm2 wire
■ Operating Temperature:
  –40 °C to +130 °C
■ Degree of Protection:
  IP6K9K, IPX7 mated


                                Ordering Information
                                     Connector                 Wire Size Range                       Product                          Overview
                                     Type                      (mm2)                                 Description                      Part Number

                                     IPT                       20.0– 50.0                            IPT Shielded Terminal            1991227-x




12-10                           All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                            Revised 5-2010.
                                Alternative Power Systems (APS)                                                                Main Catalog 1654400-1
                                for the Automotive Industry                                                                     Chapter 12 – Issued 4-2010.


                                1 Position IPT Shielded Ring Tongue



1 Position IPT Shielded
Terminal, Screwed,
70.0–120.0 mm2


Application

■ Accessory/main interconnect




Description

■ 1 position
■ Sealed
■ Ring tongue
■ Wire Range: 70.0–120.0 mm2
■ Wire-to-device
■ 360° EMC shielding




Performance

■ Rated Voltage:
  800 V DC
■ Current Carrying Capacity:
  420 A continuous @ +105 °C
  on 120.0 mm2 wire
■ Operating Temperature:
  –40 °C to +130 °C
■ Degree of Protection:
  IP6K9K, IPX7 mated


                                Ordering Information
                                     Connector                 Wire Size Range                       Product                          Overview
                                     Type                      (mm2)                                 Description                      Part Number

                                     IPT                       70.0–120.0                            IPT Shielded Terminal            1670904-x




                                All specifications subject to change. Consult Tyco Electronics for latest specifications.                            12-11
Section Catalog 1654294-3.
                                                                                                                                           Revised 5-2010.
                                Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                Make / Break



EV 200 Contactor




Application

■ Main relay
■ Accessory relay
■ High speed pre-charge relay




Description

■ Form X
■ Available with and
  without Economizer
  (see application note)
■ Hermetically sealed




Performance

■ 500 A DC continuous carry
■ 2,000 A, 320 V DC emergency
  interrupt
■ 900 V DC contact maximum
■ Capacitive make switching
  • 50,000 cycles,
    360 amps peak
  • 50 Cycles, 650 amps Peak
■ 9 to 95 V DC coil voltage
■ 1.6 watts coil power          Ordering Information
                                     Product Description                                                                     Part Number
                                                      ✱✱
                                     EV200AAANA-           (with Economizer)                                                 2098190-1
                                     EV200A1ANA-✱✱ (without Economizer)                                                      2098372-1




12-12                           All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                               Revised 5-2010.
                                    Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                    for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                    Make / Break



LEV 100 Contactor




Application

■ Low cost 135 A sealed
  contactor
■ Side or bottom mount –
  not position sensitive
■ Multiple coil options available




Application

■ Main relay
■ Accessory relay
■ High speed pre-charge relay




Description

■ SPST – no form X
■ Hermetically sealed




Performance

■ 135 A DC continuous carry
■ 200 A DC (>3 minutes carry)
■ 1000 A, 400 V DC emergency        Ordering Information
  Interrupt                              Product Description                                                                     Part Number
■ 900 V DC contact maximum
                                         LEV100A4BNG01                                                                           5-1618389-5
■ 12, 24 and 48 V DC coil voltage
■ 5.5 watts coil power




                                    All specifications subject to change. Consult Tyco Electronics for latest specifications.                          12-13
Section Catalog 1654294-3.
                                                                                                                                           Revised 5-2010.
                                Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                Make / Break



Power Resistor




Application

■ Filter capacitor pre-charge




Description

■ Thick film isotop (shown)
■ Cement encased wirewound
■ Aluminum housed
■ Ceramic housed




Performance

■ Typical 700 joules
  (360 V, 7 mF)
■ 3 charges at
  5 second intervals
■ 500 V DC
■ 2000 V AC flash tested

Available up to 5000 joules
Terminals:
Faston, screw
Mounting:
Screw, clip
                                Ordering Information
                                     Product                                     Description                                 Part Number

                                     Power Resistor                              SQBW40                                      1879068-x




12-14                           All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                                                         Revised 5-2010.
                                                Alternative Power Systems (APS)                                                                            Main Catalog 1654400-1
                                                for the Automotive Industry                                                                                 Chapter 12 – Issued 4-2010.


                                                Make / Break



Typical
Make / Break
Application




                                         Pre-Charge Relay and Resistor

                                                                                                                                         Motor Controller


                         B+
                                                    +A1 –A2
                                                    Main Relay                        Filter Caps

                              From Source
                              (Fuel cell, batteries, generator etc.)
                                                 –A2 +A1                                                                                                       To Load
                         B–


             Vehicle Start Sequence
             ■ Pre-charge relay closes into resistor                                             ■ Positive main propulsion relay closes into partially
             ■ Capacitors charge under current-limit conditions                                    charged capacitors
             ■ Contact welds are prevented                                                       ■ In-rush current is limited due to pre-charge conditions




Capacitive Switching Test Protocols
Test Protocol 1                                                                                  Test Protocol 2
Make/break life capacitive and resistive loads at 320 V DC 1), 2)                                Make/break life capacitive and resistive loads at 320 V DC 1), 2)
                                                                                 Cycles                                                                                        Cycles
@ 90% capacitive pre-charge (make only) see charts below                         50,000          @ 90% capacitive pre-charge (make only) see charts below                      50,000
@ 80% capacitive pre-charge (make only) see charts below                         50              @ 70% capacitive pre-charge (make only) see charts below                      50
@ 200 A make/break 2 consecutive, reverse polarity 1)                            12              @ 250 A, 320 V make/break 2 consecutive, reverse polarity 1)                  10
@ 2000 A break only (1700 A for auxiliary contact model 1)                        1✱             @ Interrupt current maximum, 320 V break only                                  4✱
                                                                                                   (1700 A for auxiliary contact model) 1)


                      Capacitive Make Test Curves for Pre-Charged                                                    Capacitive Make Test Curves for Pre-Charged
                           Motor Controller (Test Protocol 1)                                                             Motor Controller (Test Protocol 2)

                                        80% Pre-Charge

                                                                                                                           80% Pre-Charge
                                                                                                    Current (Amps)
     Current (Amps)




                                                                  90% Pre-Charge


                                                                                                                        90% Pre-Charge




                                           Time (ms)                                                                                          Time (ms)

1)                                                                                                                        2)
     Resistive load includes inductance L = 25 µH. Load @ 2500 A tested @ 200 µH.                                              Life based on projected Weibull Life with 95% Reliability.
✱)   Does not meet dielectric and IR after test.



                                                All specifications subject to change. Consult Tyco Electronics for latest specifications.                                         12-15
Section Catalog 1654294-3.
                                                                                                                                               Revised 5-2010.
                                    Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                    for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                    Carry / Break



High Current Relay
(HCR) 200




Features

■ Normally closed contact
■ Limiting continuous current
  120 A @ +110 °C




Customized Versions on Request

■ Integrated components
  (e.g. resistor, diode)
■ Special marking




Typical Applications

■ Energy management
■ Battery coupling
■ Start-stop




Design

■ ELV/RoHS/WEEE compliant
■ Splash-water and dust-tight;
  protection class IP64 to
  ISO 20653 (DIN 40050-9)
                                    Ordering Information
■ Weight: approx. 230 g
                                         Product                                     Description                                     Part Number
■ Nominal voltage: 12 V
■ Terminals                              HCR 200                                     V23230-D2001-B200                               1-1414995-0
    Quick connect terminals
    (coil)
    Screw terminals (load)




Conditions
All parametric, environmental and
endurance tests are performed
according to EIA Standard
RS-407-A at standard test con-
ditions unless otherwise noted:
23 °C ambient temperature,
20–50 % RH, 29.5 ±1.0 Hg
(998.9 ±33.9 hPa).




12-16                               All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                             Revised 5-2010.
                                  Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                  for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                  Make / Break



High Current Relay
(HCR) 150




Application

  Main relay
  Accessory relay
  High speed pre-charge relay




Description

  Form A, X, C
  Sealed




Performance

  200 A DC continuous carry
  300 A DC emergency interrupt
  To 200 V DC contact maximum
  12 V DC, 24 V DC coil voltage
  3.3 watts coil power




                                  Ordering Information
                                       Product                                     Description                                     Part Number

                                       HCR 150                                     V23132-A2001-A100                               1416010-1




                                  All specifications subject to change. Consult Tyco Electronics for latest specifications.                          12-17
Section Catalog 1654294-3.
                                                                                                                                             Revised 5-2010.
                                  Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                  for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                  Make / Break



Battery Disconnect Switch
(BDS)-A




Application

■ High current loads
  (heaters, pumps)
■ Dual power network
■ Dual battery systems
■ Energy management




Description

■ Compact high current relay
  for multivalent applications,
  sealed, mono and bi-stable




Performance

■ 190 A DC continuous current
  @85 °C
■      40 mOhm voltage drop
    at 100 A (Initial)
■ 1500 A interrupt
■ 15 ms operating time
  (approx. @14 V)
■ Up to 60 V contact voltage


                                  Ordering Information
                                       Product                                     Description                                     Part Number

                                       BDS-A                                       V23130-C2021-A412                               1-1414939-4




12-18                             All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                               Revised 5-2010.
                                    Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                    for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                    High Voltage Cable Assemblies



High Voltage
Cable Assemblies




High voltage cable assemblies
for connections of high voltage
systems that provide reliability
and robustness to meet the safety
requirements of the electric
vehicle market.


■ System integration of high
  voltage harnesses from
  Battery    Power Distribution
  Systems      Contactor Boxes
     Inverters to E-machines
■ Multi-core and individually
  shielded cable capability
■ Capability to process cables
  from 2.5 mm2 to 120 mm2
  in conductor size
■ Design and process
  competence in contact and
  shield crimp technology
■ Capable of end of line
  reliability testing




For ordering information
please contact your
local sales representative.


                                    All specifications subject to change. Consult Tyco Electronics for latest specifications.                          12-19
Section Catalog 1654294-3.
                                                                                                                                               Revised 5-2010.
                                    Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                    for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                    Position Sensors



Multi-Coil Resolver
(MCR)




Application

■ Rotary position sensor
  for E-Motor




Description

■ Analog output
■ Platform product based on
  speed numbers




Performance

  Wide Temperature Range:
  –40 °C to +130 °C
  Robust for harsh environments
  High rotational speed
  Connection technology
  delivered in package
  High reliability, low number of
  components
  Sensing absolute position and
  velocity


By connecting the MCR to an
AVD converter analog output
signals are converted to digital
position signals.




                                    For ordering information please contact your local sales representative.


12-20                               All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                            Revised 5-2010.
                                 Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                 for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                 Sensor Solutions for Alternative Powered Vehicles



Clutch
Position Sensor




Application

■ Alternative powertrain
  solutions




Function

■ Measuring piston position
  at concentric slave cylinder




Technology

■ Permanent magnetic linear
  contact-less displacement
  sensor (PLCD)




Product Features

■ Small design in
■ Measurement Range:
  22.0 mm absolute
■ Highly temperature stable
  (up to +180 °C)
■ Redundancy possible




                                 For ordering information please contact your local sales representative.


                                 All specifications subject to change. Consult Tyco Electronics for latest specifications.                          12-21
Section Catalog 1654294-3.
                                                                                                                                         Revised 5-2010.
                              Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                              for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                              Sensor Solutions for Alternative Powered Vehicles



Dual Clutch
Position Sensor




Application

■ Dual clutch transmission
  for hybrid cars




Function

■ Measuring the position of
  the clutch actuators




Technology

■ Permanent magnetic linear
  contact-less displacement
  sensor (PLCD)




Product Features

■ Two PLCD in one housing
  concept
■ PWM interface
■ Small, very flat design




                              For ordering information please contact your local sales representative.


12-22                         All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                               Revised 5-2010.
                                    Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                    for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                    Sensor Solutions for Alternative Powered Vehicles



Neutral
Position Sensor




Application

■ Start-stop application
  (mild hybrid)




Function

■ Measuring neutral position
  of the transmission




Technology

■ Active permanent magnetic
  linear contact-less
  displacement (PLCD) sensor
  (moving magnet)



Product Features

■ Contact-less measurement
  through transmission wall
■ Measurement Range:
  28 mm absolute
■ Neutral position <2% over
  travel, temperature, life time,
  etc.
■ Optional redundancy possible




                                    For ordering information please contact your local sales representative.


                                    All specifications subject to change. Consult Tyco Electronics for latest specifications.                          12-23
Section Catalog 1654294-3.
                                                                                                                                                Revised 5-2010.
                                     Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                     for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                     Sensor Solutions for Alternative Powered Vehicles



Brake Pedal
Position Sensor




Application

■ Regenerative brake
  for hybrid cars



Function

■ Brake pedal position detection



Technology

■ Permanent magnetic linear
  contact-less displacement
  sensor (PLCD)



Product Features

■ Optional travel or rotational
  measurement possible
■ PWM or analogue output
■ Optional redundancy possible
■ High linearity (<2% over travel,
  temperature, life time, etc.)
■ Optional sensor location pedal
  works or brake master cylinder




                                     For ordering information please contact your local sales representative.


12-24                                All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                                                                   Revised 5-2010.
                                    Alternative Power Systems (APS)                                                                    Main Catalog 1654400-1
                                    for the Automotive Industry                                                                        Chapter 12 – Issued 4-2010.


                                    Make / Break



Thermal Indicator




Thermal Indicator for
Over-Temperature Detection
  Thermal indicator with very
  steep R-T curve
  “Close to digital” resistance
  response
  Direct input into FET of BJT
  No comparator necessary
  Built-in hysteresis to avoid
  cycling
  Different temperatures possible
  from 70 °C up to 165 °C
  Flexible Design:
  can be located wherever the
  potential heat might appear
  Can be put in series to protect
  several cells or places with
  one controller




                                    Tyco Electronics’s thermal                       They also feature a temperature            Finally, the “near digital”
                                    indicators (RTI’s) are used for                  hysteresis response that can               resistance response allows for
                                    over-temperature (OT) signaling.                 minimize signal oscillation                multiple devices to be placed
                                    They provide “silicon-like”                      traditionally achieved using               in series on the same circuit
                                    performance (in a passive                        active components.                         without significant dilution in
                                    component), reduce footprint                     The steep resistance response              system measurement accuracy.
                                    needs and support simple                         and hysteresis also allow for              This allows for a simple, low
                                    distributed monitoring.                          a reduction in support com-                cost implementation of multi-
                                    In contrast to ceramic PTC                       ponents. RTI devices require               point distributed monitoring.
                                    devices, RTI devices provide                     only one ballasting resistor to
                                    clear, “near digital”, OT signals                directly control power FET’s and
                                    due to a steep resistance                        BJT’s. Solutions using ceramic
                                    change with temperature (~10 x                   PTC’s might require a resistor
                                    resistance change per 2 °C).                     network and comparator to
                                                                                     offer similar functionality. This
                                                                                     reduction in support com-
                                                                                     ponents translates directly to
                                                                                     lower system cost and reduced
                                                                                     board area requirements.


                                    For ordering information please contact your local sales representative.


                                    All specifications subject to change. Consult Tyco Electronics for latest specifications.                              12-25
Section Catalog 1654294-3.
                                                                                                                                             Revised 5-2010.
                                  Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
                                  for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


                                  Mechanical Protection for Power Cables



HFT 5000




Description

■ Heat Shrinkable Fabric Tubing
  (HFT)
■ Polyester/polyethylene
  construction




Features

■ Temperature rating 125 °C
  (3000 h), 150 °C (1000 h)
■ 2:1 shrink ratio
■ High performance polyester
  fibers
■ Highly flexible
■ Halogen free
■ Available in many sizes
■ Low shrink temperature




Benefits

■ Excellent mechanical
  protection for power cables
  even at high temperatures
■ Fits perfectly to all cables
  therefore minimum space
  consumption
■ Highly flexible thus no
  constraints regarding routing
  of power cables




                                  For ordering information please contact your local sales representative.


12-26                             All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                           Revised 5-2010.
Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


Application Tooling




Tyco Electronics Tooling
                for the Automotive Industry




Tyco Electronics’ Global Application Tooling Division (GATD) is dedicated to providing high
quality equipment options to meet all levels of your connector product specifications.
We are also able to provide a broad range of equipment for other manufacturer’s products.
Our equipment range is vast and unmatched by others operating in the same industry
segments, as is our global presence and support network in the form of field service
engineers and product managers. You will see from browsing this catalog; we supply
everything from simple hand tools to the most complex automated systems – you name it,
we supply it!


Equipment is segregated into two categories:

Generic Equipment
Where we can supply you with sufficient information referenced by Part Number such that you
can identify and order what you need yourself.

Specialized Equipment
Where you will need help from our specialist product managers to identify what’s just right for
your application.

Finding Equipment Online
Powerful search functions are available to identify appropriate tooling:
● Applicators — www.tooling.tycoelectronics.com/europe/applicator.asp
● Hand Tools — www.tooling.tycoelectronics.com/europe/handtools.asp




All specifications subject to change. Consult Tyco Electronics for latest specifications.                          12-27
Section Catalog 1654294-3.
                                                                                                                     Revised 5-2010.
        Alternative Power Systems (APS)                                                                  Main Catalog 1654400-1
        for the Automotive Industry                                                                      Chapter 12 – Issued 4-2010.


        Numerical Index



          Part Number                      Page            Part Number                      Page    Part Number             Page

          1-1414939-4                     12-18
          1-1414995-0                     12-16
          0-1416010-1                     12-17
          5-1618389-5                     12-13
          0-2098190-1                     12-12
          0-2098372-1                     12-12




        Disclaimer
        While Tyco Electronics and its affiliates referenced herein have made every reasonable effort to ensure
        the accuracy of the information contained in this catalog, Tyco Electronics cannot assure that this
        information is error free. For this reason, Tyco Electronics does not make any representation or offer any
        guarantee that such information is accurate, correct, reliable or current. Tyco Electronics reserves the
        right to make any adjustments to the information at any time. Tyco Electronics expressly disclaims any
        implied warranty regarding the information contained herein, including, but not limited to, the implied
        warranties of merchantability or fitness for a particular purpose. Tyco Electronics' only obligations are
        those stated in Tyco Electronics’ Standard Terms and Conditions of Sale. Tyco Electronics will in no
        case be liable for any incidental, indirect or consequential damages arising from or in connection with,
        including, but not limited to, the sale, resale, use or misuse of its products. Users should rely on their
        own judgment to evaluate the suitability of a product for a certain purpose and test each product for
        its intended application.
        In case of any potential ambiguities or questions, please don’t hesitate to contact us for clarification.

        www.tycoelectronics.com
        www.tycoelectronics.com/automotive
        AMP, AMP MCP, KILOVAC, POLYSWITCH, RAYCHEM, TE (logo) and Tyco Electronics are trademarks
        of the Tyco Electronics group of companies and its licensors.
        USCAR is a trademark of United States Council for Automotive Research. Other product names, logos,
        and company names mentioned herein may be trademarks of their respective owners.



12-28   All specifications subject to change. Consult Tyco Electronics for latest specifications.
Section Catalog 1654294-3.
                                                                                                           Revised 5-2010.
Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


Engineering Notes




All specifications subject to change. Consult Tyco Electronics for latest specifications.                          12-29
Section Catalog 1654294-3.
                                                                                                                   Revised 5-2010.
        Alternative Power Systems (APS)                                                               Main Catalog 1654400-1
        for the Automotive Industry                                                                    Chapter 12 – Issued 4-2010.


        Engineering Notes




12-30   All specifications subject to change. Consult Tyco Electronics for latest specifications.
Global Contacts


Americas
Argentina – Buenos Aires         Canada – Toronto                  Mexico – Mexico City             United States
Phone: +54-11-4733-2202          Phone: +1-905-475-6222            Phone: +52-55-1106-0800          Harrisburg, PA
Fax:    +54-11-4733-2250         Fax:    +1-905-474-5520                   +01-800-733-8926         Phone: +1-717-564-0100
                                 Product Information Center:       Fax:    +52-55-1106-0910         Fax:    +1-717-986-7575
Brasil – São Paulo               Phone: +1-905-470-4425                                             Product Information Center:
Phone: +55-11-2103-6105          Fax:    +1-905-474-5525                                            Phone: +1-800-522-6752
Fax:     +55-11-2103-6204                                          For Latin/South American
                                 Colombia – Bogotá                 Countries not shown              Fax:    +1-717-986-7575
Chile – Santiago                 (Venezuela /Ecuador)              Phone: +54-11-4733-2015
Phone: +56-2-345-0300            Phone: +57-1-319-8999             Fax:    +54-11-4733-2083
Fax:     +56-2-223-1477          Fax:    +57-1-319-8989



Asia/Pacific
Australia – Sydney               Korea – Seoul                     People’s Republic of China       Taiwan – Taipei
Phone: +61-2-9554-2600           Phone: +82-2-3415-4500            Hong Kong                        Phone: +886-2-8768-2788
Fax:    +61-2-9502-2556          Fax:    +82-2-3486-3810           Phone: +852-2738-8731            Fax:    +886-2-8768-2268
Product Information Center:      Malaysia – Kuala Lumpur           Fax:    +852-2735-0243           Thailand – Bangkok
Phone: +61-2-9840-8200           Phone: +60-3-7805-3055            Shanghai                         Phone: +66-2-955-0500
Fax:    +61-2-9634-6188          Fax:    +60-3-7805-3066           Phone: +86-21-2407-1588          Fax:    +66-2-955-0505
Indonesia – Jakarta              New Zealand – Auckland            Fax:    +86-21-2407-1599         Vietnam – Ho Chi Minh City
Phone: +65-6482-0311             Phone: +64-9-634-4580             Singapore – Singapore            Phone: +84-8-930-5546
Fax:   +65-6482-1012             Fax:    +64-9-634-4586            Phone: +65-6482-0311             Fax:    +84-8-930-3443
Japan – Kawasaki, Kanagawa       Philippines – Makati City         Fax:    +65-6482-1012
Phone: +81-44-844-8111           Phone: +632-848-0171
Fax:    +81-44-812-3207          Fax:    +632-867-8661



Europe/Middle East /Africa
Austria – Vienna                 Finland – Helsinki                Lithuania and Latvia             South Africa – Port Elizabeth
Phone: +43-1-905-60-0            Phone: +358-95-12-34-20           Lithuania – Vilnius              Phone: +27-41-503-4500
Fax:   +43-1-905-60-1333         Fax:    +46-8-50-72-50-01         Phone: +370-5-213-1402           Fax:   +27-41-581-0440
Product Information Center:      Product Information Center:       Fax:   +370-5-213-1403
atpic@tycoelectronics.com        pic.nordic@tycoelectronics.com                                     Spain – Barcelona
Phone: +43-1-905-60-1228         Phone: +46-8-50-72-50-20          Netherlands – ’s-Hertogenbosch   Phone: +34-93-291-0330
Fax:   +43-1-905-60-1333         Fax:    +46-8-50-72-52-20         Phone: +31-73-6246-246           Fax:   +34-93-201-7879
                                                                   Fax:   +31-73-6212-365           Product Information Center:
Belarus – Minsk                  France – Cergy-Pontoise Cedex     Product Information Center:      espic@tycoelectronics.com
Phone: +375-17-237-47-94         Phone: +33-1-3420-8888            picbenelux@tycoelectronics.com   Phone: +34-93-291-0366
Fax:   +375-17-237-47-94         Fax:   +33-1-3420-8800            Phone: +31-73-6246-999           Fax:   +34-93-209-1030
Product Information Center:      Product Information Center:       Fax:   +31-73-6246-998
rupic@tycoelectronics.com        francepic@tycoelectronics.com                                      Sweden – Upplands Väsby
Phone: +7-495-790-7902           Phone: +33-1-3420-8686            Norway – Nesbru                  (Switchboard)
Fax:   +7-495-721-1893           Fax:   +33-1-3420-8623            Phone: +47-66-77-88-50           Phone: +46-8-50-72-50-00
                                                                   Fax:    +46-8-50-72-50-01        Fax:    +46-8-50-72-50-01
Belgium – Kessel-Lo              France Export Divisions –         Product Information Center:      Product Information Center:
Phone: +31-73-6246-246           Cergy-Pontoise Cedex              pic.nordic@tycoelectronics.com   pic.nordic@tycoelectronics.com
Fax:   +31-73-6212-365           Phone: +33-1-3420-8866            Phone: +46-8-50-72-50-20         Phone: +46-8-50-72-50-20
Product Information Center:      Fax:   +33-1-3420-8300            Fax:    +46-8-50-72-52-20        Fax:    +46-8-50-72-52-20
picbenelux@tycoelectronics.com
Phone: +31-73-6246-999           Germany – Bensheim                Poland – Warsaw                  Switzerland – Steinach
Fax:   +31-73-6246-998           Phone: +49-6251-133-0             Phone: +48-22-4576-700           Phone: +41-71-447-0447
                                 Fax:   +49-6251-133-1600          Fax:   +48-22-4576-720           Fax:   +41-71-447-0444
Bulgaria – Sofia                 Product Information Center:       Product Information Center:      Product Information Center:
Phone: +359-2-971-2152           Germany-PIC@tycoelectronics.com   plpic@tycoelectronics.com        chpic@tycoelectronics.com
Fax:   +359-2-971-2153           Phone: +49-6251-133-1999          Phone: +48-22-4576-704           Phone: +41-71-447-0447
                                 Fax:   +49-6251-133-1988          Fax:   +48-22-4576-720           Fax:   +41-71-447-0400
Czech Republic and Slovakia
Czech Republic – Kurim           Greece – Athens                   Romania – Bucharest              Turkey – Istanbul
Phone: +420-541-162-108          Phone: +30-210-9370-396/397       Phone: +40-21-311-3479/3596      Phone: +90-212-281-8181/2/3
Fax:   +420-541-162-104          Fax:   +30-210-9370-655           Fax:   +40-21-312-0574                  +90-212-282-5130/5430
Product Information Center:                                                                         Fax:   +90-212-281-8184
czpic@tycoelectronics.com        Hungary – Budapest                Russia – Moscow
Phone: +420-541-162-113          Phone: +36-1-289-1000             Phone: +7-495-790-7902           Ukraine – Kiev
Fax:   +420-541-162-104          Fax:   +36-1-289-1010             Fax:   +7-495-721-1893           Phone: +380-44-206-2265
                                 Product Information Center:       Product Information Center:      Fax:   +380-44-206-2264
Denmark – Glostrup               Phone: +36-1-289-1016             rupic@tycoelectronics.com        Product Information Center:
Phone: +45-43-48-04-00           Fax:   +36-1-289-1017             Phone: +7-495-790-7902           uapic@tycoelectronics.com
Fax:    +46-8-50-72-50-01                                          Fax:   +7-495-721-1893           Phone: +380-44-206-2265
Product Information Center:      India – Bangalore                                                  Fax:   +380-44-206-2264
pic.nordic@tycoelectronics.com   Phone: +91-80-2854-0800           Russia – Yekaterinburg
Phone: +46-8-50-72-50-20         Fax:    +91-80-2854-0814          Phone: +7-343-2531-153           United Kingdom and
Fax:    +46-8-50-72-52-20                                          Fax:   +7-343-2531-152           Ireland – Swindon
                                 Italy – Collegno (Torino)                                          Phone: +44-8706-080208
Egypt – Cairo                    Phone: +39-011-4012-111           Russia – Nizhniy Novgorod        Fax:    +44-208-954-6234
Phone: +20-2417-7647             Fax:    +39-011-4031-116          Phone: +7-831-220-33-05/-06      Product Information Center:
Fax:   +20-2419-2334             Product Information Center:       Fax:   +7-831-220-33-39/-40      picuk@tycoelectronics.com
                                 itpic@tycolectronics.com                                           Phone: +44-800-267-666
Estonia – Tartu                  Phone: +39-011-4012-632           Slovenia – Ljubljana
                                                                   Phone: +386-1561-3270            Fax:    +44-208-420-8095
Phone: +372-5138-274             Fax:    +39-011-4028-7632
Fax:   +372-7400-779                                               Fax:   +386-1561-3240




http://www.tycoelectronics.com/help                                                   www.tycoelectronics.com/automotive
                                                 www.tycoelectronics.com/automotive/sensors • www.tycoelectronicsmost.com
Tyco Electronics AMP GmbH
AMPèrestr. 12–14
64625 Bensheim / Germany
Phone: +49-(0)6251-133-0
Fax:   +49-(0)6251-133-1600

www.tycoelectronics.com
www.tycoelectronics.com/automotive
www.tycoelectronics.com/automotive/sensors
www.tycoelectronicsmost.com
TE (logo) and Tyco Electronics are
trademarks of the Tyco Electronics group
of companies and its licensors.

Tyco Electronics AMP GmbH certified
acc. ISO 14001 and ISO/TS 16949:2002

© 2010 Tyco Electronics Ltd.
1654294-3 Revised 5-2010 5M ST

Automotive High Voltage Products

  • 1.
    RoHS Ready Alternative Power Systems (APS) for the Automotive Industry Components for Hybrid, Electric and Fuel Cell Technology
  • 2.
    AU TO MOT I V E D I V I S I O N
  • 3.
    T H E5 A P P L I C AT I O N A R E A S I
  • 4.
    I N NOVAT I V E TECHNOLOGIES Tyco Electronics Ltd. is a leading global provider of engineered electronic components, network solutions and undersea telecommunication systems. We design, manufacture and market products for customers in industries from automotive, appliance and aerospace and defense to telecommunications, computers and consumer electronics. The automotive division follows the globalization goals of our customers, speeds up the integration of new technologies and enables our customers access to our vast product portfolio and services. TERMINALS & CONNECTORS Tyco Electronics offers a broad range of high quality terminals and connectors. Our electrical/electronic interconnection products and solutions are used to electrically and mechanically join wires and cables, printed circuit boards, integrated circuit packages and batteries. Tyco Electronics expanding capabilities include new copper and fiber-optic connectors, wires, cables/cable management systems that are designed to meet automotive industry demands. Our brands encompass the broadest range of connectors in the world, including high-density, high-speed designs for leading-edge communications equipment. SENSORS Contact-less measuring eliminates interference effects, wear and tear, and provides increased reliability. Tyco Electronics, one of the largest technology providers for the automobile industry, offers contact-less sensors for a variety of applications. As sensor manufacturer and processing partner, Tyco Electronics also provides project planning support for new sensor applications, assistance in the selection of the appropriate sensor technology for the respective application, and assistance with defining the corresponding mechanical, electrical and magnetic interface. Tyco Electronics has a broad electro-mechanical portfolio that includes robust housing technologies, connector systems, and temperature stable designs based on foil and cable networks. This combi- nation of technologies and experience ensures that reliable and cost effective sensor solutions are available for all application types. II
  • 5.
    C A BL E A S S E M B LY S Y S T E M S Tyco Electronics is your partner for special cable assemblies. We offer research and development capabilities, prototyping, samples as well as manufacturing facilities for special cable assemblies. This includes overmold technology, semi/fully automatic manufacturing, testing equipment and appliances for handling of high volume production. I N D U C T I V E SYST E M S The Automotive Division is your source for interconnection technologies for automotive, truck and off-highway OEMs and Tier 1 suppliers. With the design competency center in Oostkamp (Belgium), and strategic production centers in Evora (Portugal), Bangalore (India), Shuzhou (China), Oostkamp (Belgium), and others, Tyco Electronics’ Inductive Systems group is ready to offer you any coil module required in the automotive industry. The Inductive System group focus lies on the customer requirement, in order to design to the exact demand. This is achieved by highly technical, intelligent and cost-efficient engineering. In order to be a leader in design, Tyco Electronics’ Inductive Systems group has a vast product portfolio, which consists out of antennas, actuators, resolvers, and integrated coil modules. Next to that, several specific applications are designed. M E C H AT R O N I C S A variety of technical products are designed today by integrating mechanical components and electronic hardware into one packaging unit thus creating true mechatronic solutions. Mechatronic applications offer amazing and versatile potentials related to functionality, cost, space requirements and quality. Tyco Electronics contributes to those applications with its wide range of innovative and cost-effective product and process technologies. Advanced stamping, injection molding and assembly techniques are applied along with highly selective surface plating methods. III
  • 6.
    H I GH S P E E D DATA N E T W O R K I N G High speed data networking within the automobile is becoming more predominant. What was till now restricted to the high end of the market utilizing system such as the MOST network, high speed data transmission based on optical fibers, now with the introduction of MP3 player, display screens and cameras results in the need for high speed networking throughout all platforms. MOST IS A TRADEMARK A LT E R N AT I V E P O W E R S Y S T E M S CO M P O N E N TS F O R H Y B R I D, E L E C T R I C A N D FUEL CELL TECHNOLOGY Tyco Electronics is a leader in next-generation transportation technologies and products for hybrid and electric vehicles. The Automotive Division is your source for high voltage power distribution, high current contacts, high voltage connectors and cables, high voltage relays, sensors and temperature protection devices for hybrid and other alternative powered vehicles. T YCO E L E C T R O N I C S O U R C O M M I T M E N T. Y O U R A D VA N TA G E . Tyco Electronics’ businesses operate in thousands of different areas of industry. The products and services we deliver all have one thing in common. They are vital to everyday living. Individuals and companies worldwide have critical needs. And every minute of every day, we satisfy them. IV
  • 7.
    R E ST R I C T I O N O N T H E U S E O F H A Z A R D O U S S U B S TA N C E S ( R O H S ) At Tyco Electronics, we’re ready to support your RoHS requirements. We’ve assessed more than 1.5 million end items/components for RoHS compliance, and issued new part numbers where any change was required to eliminate the restricted materials. Part numbers in this catalog are identified as: RoHS Compliant Part numbers in this catalog are RoHS Compliant, unless marked otherwise. These products comply with European Union Directive 2002/95/EC as amended 1 January 2006 that restricts the use of lead, mercury, cadmium, hexavalent chromium, PBB, and PBDE in certain electrical and electronic products sold into the EU as of 1 July 2006. Note: For purposes of this Catalog, included within the definition of RoHS Compliant are products that are clearly “Out of Scope” of the RoHS Directive such as hand tools and other non-electrical accessories. Non-RoHS Compliant These part numbers are identified with a “ ” symbol. These products do not comply with the material restrictions of the European Union Directive 2002/95/EC. 5 of 6 Compliant A “ ” symbol identifies these part numbers. These products do not fully comply with the European Union Directive 2002/95/EC because they contain lead in solderable interfaces (they do not contain any of the other five restricted substances above allowable limits). However, these products may be suitable for use in RoHS applications where there is an application-based exception for lead in solders, such as the server, storage, or networking infrastructure exemption. Note: Information regarding RoHS compliance is provided based on reasonable inquiry of our suppliers and represents our current actual knowledge based on the information provided by our suppliers. This information is subject to change. For latest compliance status, refer to our website referenced below. Getting the Information You Need Our comprehensive on-line RoHS Customer Support Center provides a forum to answer your questions and support your RoHS needs. A RoHS FAQ (Frequently Asked Questions) is available with links to more detailed information. You can also submit RoHS questions and receive a response within 24 hours during a normal work week. The Support Center also provides: ■ Cross-Reference from Non-compliant to Compliant Products ■ Ability to browse RoHS Compliant Products in our on-line catalog: RoHS http://ecommas.tycoelectronics.com/commerce/alt/RohsAltHome.do Customer ■ Downloadable Technical Data Customer Information Presentation Support ■ More detailed information regarding the definitions used above Center So whatever your questions when it comes to RoHS, we’ve got the answers at www.tycoelectronics.com/leadfree V
  • 8.
    “AT YO UR S E RV I C E ” Tyco Electronics Online The Tyco Electronics website is an innovative and interactive source for application information, product updates and technical solutions. Our step-by-step software makes our website intuitive and user-friendly to better serve you! Please contact us at: www.tycoelectronics.com/automotive Internet www.tycoelectronics.com www.tycoelectronics.com/automotive www.tycoelectronics.com/automotive/sensors www.tycoelectronicsmost.com Electronic Internet Catalog www.tycoelectronics.com/components www.tycoelectronics.com/automotive www.tycoelectronics.com/automotive/sensors www.tycoelectronicsmost.com VI
  • 9.
    “AT YO UR S E RV I C E ” Product and Machine Literature Tyco Electronics offers a variety of product specific catalogs, brochures and high impact flyers to help better serve you! For more information on literature for Tyco Electronics’ Automotive Division, please contact your local Tyco Electronics organization or go to www.tycoelectronics.com/automotive Product Information Center (PIC) You can rely on Tyco Electronics’ PIC Team to provide you support for answers to your general information or technical questions in an efficient and effective manner. To reach our PIC staff, please contact your local Tyco Electronics organization. See our Global Contacts page. VII
  • 10.
    AU TO MOT I V E D I V I S I O N Page Alternative Power Systems (APS) Creating “A Green Advantage” 12-10 ✓ Introduction 12-20 ✓ 2 Position HVA 280 Connector System 12-30 ✓ 3 Position HVA 280 Connector System 12-40 ✓ 2 Position HVA 400 Connector System 12-50 ✓ 2 Position Auxiliary Power Terminal (APT) 12-60 ✓ 2 Position Low Voltage (LV) 800 Connector 12-70 ✓ 2 Position High Voltage (HV) 800 Connector 12-80 ✓ 3 Position High Voltage (HV) 800 Connector 12-90 ✓ 1 Position IPT Shielded Ring Tongue 12-10 ✓ EV 200 Contactor 12-12 ✓ LEV 100 Contactor 12-13 ✓ Power Resistor 12-14 ✓ Typical Make / Break Application 12-15 ✓ High Current Relay (HCR) 200 12-16 ✓ High Current Relay (HCR) 150 12-17 ✓ Battery Disconnect Switch (BDS)-A 12-18 ✓ High Voltage Cable Assemblies 12-19 ✓ Multi-Coil Resolver (MCR) 12-20 ✓ Clutch Position Sensor 12-21 ✓ Dual Clutch Position Sensor 12-22 ✓ Neutral Position Sensor 12-23 ✓ Brake Pedal Position Sensor 12-24 ✓ Thermal Indicator 12-25 ✓ HFT 5000 12-26 ✓ Application Tooling 12-27 ✓ Numerical Index 12-28 ✓ VIII
  • 11.
    THE PRODUCTS ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ IX
  • 12.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Engineering Notes X All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 13.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Creating “A Green Advantage” Tyco Electronics Ltd. is a We design, manufacture With worldwide engineering, Global Automotive Division leading global provider of and market products for manufacturing, sales and engineered electronic com- customers in a broad array customer service capabilities, ALTERNATIVE ponents, network solutions, of industries including auto- Tyco Electronics’ commit- POWER SYSTEMS specialty products and motive; data communication ment is our customers’ (APS) undersea telecommunication systems and consumer elec- advantage. systems, with customers in tronics; telecommunications; Tyco Electronics is a leader more than 150 countries. aerospace, defense and in next-generation trans- marine; medical; energy; portation technologies and and lighting. products for hybrid and electric vehicles. The Global Automotive Division is your source for high voltage power distribution, high current contacts, high voltage connectors and cables, high voltage relays, sensors and temperature protection devices for hybrid and other alternative powered vehicles. All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-1
  • 14.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Introduction High-Power Automotive Electrical Systems for Hybrid and Electrical Vehicles Alternative powered vehicles, Electrical systems on conven- Tyco Electronics offers a wide such as hybrid electric tional vehicles are typically range of components and vehicles (HEV’s), can reduce designed for 12 volts, with subsystems for HEV’s, harmful pollutants and exhaust the majority of loads less than including: emissions. Recent interest in 30 amps. In contrast, hybrid ■ High power electrical alternative powered vehicles and electric vehicles have connectors and cables, creates a new challenge for electrical systems with voltage vehicle electrical systems levels between 300–800 volts ■ High power contactors because of the need for and currents from 200–1000 for battery switching and high power electrical system amps. High power environ- control, technology. ments require design and ■ Circuit protection devices, packaging solutions for power like Raychem PolySwitch™ The demand for high power switching, circuit protection, PPTC’s, electrical components has electrical power distribution ■ Power Distribution Units. accelerated due to the and interconnection systems. constant development of alternative powered vehicles, high power electrical com- ponents for “drive by wire” electromechanical systems and high-power systems on vehicles with conventional voltage levels. 12-2 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 15.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. 2 Position HVA 280 Connector System 2 Position HVA 280 Connector System Application ■ High voltage accessory (HVA) / device interconnect Description ■ Sealed ■ Touch safe ■ 2.8 mm AMP MCP Box/ Blade Contact System ■ Wire Range: 2.0–4.0 mm2 ■ Individually Shielded Cable ■ Wire-to-device ■ Internal safety interlock ■ 360° EMC shielding ■ Finger actuated two-stage latch ■ Multiple indexes available Performance ■ Rated Voltage: 600 V DC ■ Current Carrying Capacity: 40 A continuous @ +85 °C on Ordering Information 4.0 mm2 wire in connector Connector No. of Product Overview 27 A continuous @ +125 °C on Type Positions Description Part Number 4.0 mm2 wire in connector Plug Housing 1587819-x ■ Operating Temperature: HVA 280 2 Header Housing 1587831-x –40 °C to +125 °C ■ Degree of Protection: IP6K9K, IPX7 mated, IP2XB unmated ■ Vibration Profile: USCAR-2 (Body Profile) All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-3
  • 16.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. 3 Position HVA 280 Connector System 3 Position HVA 280 Connector System Application ■ High voltage accessory (HVA) / device interconnect Description ■ Sealed ■ Touch Safe ■ 2.8 mm AMP MCP Box/ Blade Contact System ■ Multicore shielded cable ■ Wire Range: 2 x 2.5–4.0 mm2, 3 x 2.5–3.0 mm2 ■ Wire-to-device ■ 360° EMC shielding ■ Tool actuated latch ■ Multiple indexes available Performance ■ Rated Voltage: 600 V DC ■ Current Carrying Capacity: 30 A continuous @ +125 °C on Ordering Information 3 x 2.5 mm2 wire in connector Connector No. of Product Overview ■ Operating Temperature: Type Positions Description Part Number –40 °C to +125 °C Plug Housing 1587715-x ■ Degree of Protection: HVA 280 3 IP6K9K, IPX7 mated, Header Housing 1587727-x IP2XB unmated ■ Vibration Profile: USCAR-2 (Body Profile) 12-4 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 17.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. 2 Position HVA 400 Connector System 2 Position HVA 400 Connector System Application ■ High voltage accessory (HVA) / device interconnect Description ■ Sealed ■ Touch safe ■ 4.0 mm pin/socket contact system ■ Wire Range: 3.0–6.0 mm2 ■ Individually shielded cable ■ Wire-to-wire ■ External safety interlock ■ 360° EMC shielding ■ Tool actuated latch Performance ■ Rated Voltage: 600 V DC ■ Current Carrying Capacity: 33 A continuous @ +125 °C on 3.0 mm2 Wire (free in air) ■ Operating Temperature: Ordering Information –40 °C to +125 °C Connector No. of Product Overview ■ Degree of Protection: Type Positions Description Part Number IP6K9K, IPX7 mated, IP2XB unmated Plug Housing 1587517-x HVA 400 2 ■ Vibration Profile: Cap Housing 1587777-x USCAR-2 (Body Profile) All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-5
  • 18.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. 2 Position Auxiliary Power Terminal (APT) 2 Position Auxiliary Power Terminal (APT) Application ■ High voltage accessory (HVA) / device interconnect Description ■ Auxiliary pigtail system ■ Sealed ■ Touch safe ■ Wire Range: 2.5–6.0 mm2 ■ Individually shielded cable ■ Wire-to-device ■ Non-serviceable fixed device interface ■ 360° EMC shielding Performance ■ Rated Voltage: 600 V DC ■ Current Carrying Capacity: 30 A continuous @ +125 °C on 4.0 mm2 Wire ■ Operating Temperature: Ordering Information –40 °C to +125 °C Connector No. of Product Overview ■ Degree of Protection: Type Positions Description Part Number IP6K9K APT 2 Kit 1587833-x ■ Vibration Profile: USCAR-2 (on Engine) 12-6 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 19.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. 2 Position LV 800 Connector 2 Position Low Voltage (LV) 800 Connector Application ■ Accessory/main interconnect Description ■ 2 positions ■ Sealed ■ 8.0 mm socket contact system ■ Wire Range: 25.0–50.0 mm2 ■ Wire-to-device Performance ■ Rated Voltage: 12 V DC ■ Current Carrying Capacity: 210 A continuous @ +85 °C on 50.0 mm2 wire ■ Operating Temperature: –40 °C to +130 °C ■ Degree of Protection: IP6K9K, IPX7 mated Ordering Information Connector No. of Product Overview Type Positions Description Part Number Plug Housing 1670564-x LV 800 2 Pin Header 1670559-x All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-7
  • 20.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. 2 Position HV 800 Connector 2 Position High Voltage (HV) 800 Connector Application ■ Accessory/main interconnect Description ■ 2 positions ■ Sealed ■ Touch safe ■ 8.0 mm socket contact system ■ Wire Range: 25.0–50.0 mm2 ■ Wire-to-device ■ Full integrated interlock ■ 360° EMC shielding Performance ■ Rated Voltage: 800 V DC ■ Current Carrying Capacity: 210 A continuous @ +85 °C on 50.0 mm2 wire ■ Operating Temperature: –40 °C to +130 °C ■ Degree of Protection: IP6K9K, IPX7 mated, Ordering Information IP2XB unmated Connector No. of Product Overview Type Positions Description Part Number Plug Housing 1719822-x HV 800 2 Pin Header 1719833-x 12-8 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 21.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. 3 Position HV 800 Connector 3 Position High Voltage (HV) 800 Connector Application ■ Accessory/main interconnect Description ■ 3 positions ■ Sealed ■ Touch safe ■ 8.0 mm socket contact system ■ Wire Range: 25.0–50.0 mm2 ■ Wire-to-device ■ Full integrated interlock ■ 360° EMC shielding Performance ■ Rated Voltage: 800 V DC ■ Current Carrying Capacity: 210 A continuous @ +85 °C on 50.0 mm2 wire ■ Operating Temperature: –40 °C to +130 °C ■ Degree of Protection: IP6K9K, IPX7 mated, Ordering Information IP2XB unmated Connector No. of Product Overview Type Positions Description Part Number Plug Housing 1563425-x HV 800 3 Pin Header 1563315-x All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-9
  • 22.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. 1 Position IPT Shielded Ring Tongue 1 Position IPT Shielded Terminal, Screwed, 25.0–50.0 mm2 Application ■ Accessory/main interconnect Description ■ 1 position ■ Sealed ■ Ring tongue ■ Wire Range: 25.0–50.0 mm2 ■ Wire-to-device ■ 360° EMC shielding Performance ■ Rated Voltage: 800 V DC ■ Current Carrying Capacity: 200 A continuous @ +105 °C on 50.0 mm2 wire ■ Operating Temperature: –40 °C to +130 °C ■ Degree of Protection: IP6K9K, IPX7 mated Ordering Information Connector Wire Size Range Product Overview Type (mm2) Description Part Number IPT 20.0– 50.0 IPT Shielded Terminal 1991227-x 12-10 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 23.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. 1 Position IPT Shielded Ring Tongue 1 Position IPT Shielded Terminal, Screwed, 70.0–120.0 mm2 Application ■ Accessory/main interconnect Description ■ 1 position ■ Sealed ■ Ring tongue ■ Wire Range: 70.0–120.0 mm2 ■ Wire-to-device ■ 360° EMC shielding Performance ■ Rated Voltage: 800 V DC ■ Current Carrying Capacity: 420 A continuous @ +105 °C on 120.0 mm2 wire ■ Operating Temperature: –40 °C to +130 °C ■ Degree of Protection: IP6K9K, IPX7 mated Ordering Information Connector Wire Size Range Product Overview Type (mm2) Description Part Number IPT 70.0–120.0 IPT Shielded Terminal 1670904-x All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-11
  • 24.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Make / Break EV 200 Contactor Application ■ Main relay ■ Accessory relay ■ High speed pre-charge relay Description ■ Form X ■ Available with and without Economizer (see application note) ■ Hermetically sealed Performance ■ 500 A DC continuous carry ■ 2,000 A, 320 V DC emergency interrupt ■ 900 V DC contact maximum ■ Capacitive make switching • 50,000 cycles, 360 amps peak • 50 Cycles, 650 amps Peak ■ 9 to 95 V DC coil voltage ■ 1.6 watts coil power Ordering Information Product Description Part Number ✱✱ EV200AAANA- (with Economizer) 2098190-1 EV200A1ANA-✱✱ (without Economizer) 2098372-1 12-12 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 25.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Make / Break LEV 100 Contactor Application ■ Low cost 135 A sealed contactor ■ Side or bottom mount – not position sensitive ■ Multiple coil options available Application ■ Main relay ■ Accessory relay ■ High speed pre-charge relay Description ■ SPST – no form X ■ Hermetically sealed Performance ■ 135 A DC continuous carry ■ 200 A DC (>3 minutes carry) ■ 1000 A, 400 V DC emergency Ordering Information Interrupt Product Description Part Number ■ 900 V DC contact maximum LEV100A4BNG01 5-1618389-5 ■ 12, 24 and 48 V DC coil voltage ■ 5.5 watts coil power All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-13
  • 26.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Make / Break Power Resistor Application ■ Filter capacitor pre-charge Description ■ Thick film isotop (shown) ■ Cement encased wirewound ■ Aluminum housed ■ Ceramic housed Performance ■ Typical 700 joules (360 V, 7 mF) ■ 3 charges at 5 second intervals ■ 500 V DC ■ 2000 V AC flash tested Available up to 5000 joules Terminals: Faston, screw Mounting: Screw, clip Ordering Information Product Description Part Number Power Resistor SQBW40 1879068-x 12-14 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 27.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Make / Break Typical Make / Break Application Pre-Charge Relay and Resistor Motor Controller B+ +A1 –A2 Main Relay Filter Caps From Source (Fuel cell, batteries, generator etc.) –A2 +A1 To Load B– Vehicle Start Sequence ■ Pre-charge relay closes into resistor ■ Positive main propulsion relay closes into partially ■ Capacitors charge under current-limit conditions charged capacitors ■ Contact welds are prevented ■ In-rush current is limited due to pre-charge conditions Capacitive Switching Test Protocols Test Protocol 1 Test Protocol 2 Make/break life capacitive and resistive loads at 320 V DC 1), 2) Make/break life capacitive and resistive loads at 320 V DC 1), 2) Cycles Cycles @ 90% capacitive pre-charge (make only) see charts below 50,000 @ 90% capacitive pre-charge (make only) see charts below 50,000 @ 80% capacitive pre-charge (make only) see charts below 50 @ 70% capacitive pre-charge (make only) see charts below 50 @ 200 A make/break 2 consecutive, reverse polarity 1) 12 @ 250 A, 320 V make/break 2 consecutive, reverse polarity 1) 10 @ 2000 A break only (1700 A for auxiliary contact model 1) 1✱ @ Interrupt current maximum, 320 V break only 4✱ (1700 A for auxiliary contact model) 1) Capacitive Make Test Curves for Pre-Charged Capacitive Make Test Curves for Pre-Charged Motor Controller (Test Protocol 1) Motor Controller (Test Protocol 2) 80% Pre-Charge 80% Pre-Charge Current (Amps) Current (Amps) 90% Pre-Charge 90% Pre-Charge Time (ms) Time (ms) 1) 2) Resistive load includes inductance L = 25 µH. Load @ 2500 A tested @ 200 µH. Life based on projected Weibull Life with 95% Reliability. ✱) Does not meet dielectric and IR after test. All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-15
  • 28.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Carry / Break High Current Relay (HCR) 200 Features ■ Normally closed contact ■ Limiting continuous current 120 A @ +110 °C Customized Versions on Request ■ Integrated components (e.g. resistor, diode) ■ Special marking Typical Applications ■ Energy management ■ Battery coupling ■ Start-stop Design ■ ELV/RoHS/WEEE compliant ■ Splash-water and dust-tight; protection class IP64 to ISO 20653 (DIN 40050-9) Ordering Information ■ Weight: approx. 230 g Product Description Part Number ■ Nominal voltage: 12 V ■ Terminals HCR 200 V23230-D2001-B200 1-1414995-0 Quick connect terminals (coil) Screw terminals (load) Conditions All parametric, environmental and endurance tests are performed according to EIA Standard RS-407-A at standard test con- ditions unless otherwise noted: 23 °C ambient temperature, 20–50 % RH, 29.5 ±1.0 Hg (998.9 ±33.9 hPa). 12-16 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 29.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Make / Break High Current Relay (HCR) 150 Application Main relay Accessory relay High speed pre-charge relay Description Form A, X, C Sealed Performance 200 A DC continuous carry 300 A DC emergency interrupt To 200 V DC contact maximum 12 V DC, 24 V DC coil voltage 3.3 watts coil power Ordering Information Product Description Part Number HCR 150 V23132-A2001-A100 1416010-1 All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-17
  • 30.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Make / Break Battery Disconnect Switch (BDS)-A Application ■ High current loads (heaters, pumps) ■ Dual power network ■ Dual battery systems ■ Energy management Description ■ Compact high current relay for multivalent applications, sealed, mono and bi-stable Performance ■ 190 A DC continuous current @85 °C ■ 40 mOhm voltage drop at 100 A (Initial) ■ 1500 A interrupt ■ 15 ms operating time (approx. @14 V) ■ Up to 60 V contact voltage Ordering Information Product Description Part Number BDS-A V23130-C2021-A412 1-1414939-4 12-18 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 31.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. High Voltage Cable Assemblies High Voltage Cable Assemblies High voltage cable assemblies for connections of high voltage systems that provide reliability and robustness to meet the safety requirements of the electric vehicle market. ■ System integration of high voltage harnesses from Battery Power Distribution Systems Contactor Boxes Inverters to E-machines ■ Multi-core and individually shielded cable capability ■ Capability to process cables from 2.5 mm2 to 120 mm2 in conductor size ■ Design and process competence in contact and shield crimp technology ■ Capable of end of line reliability testing For ordering information please contact your local sales representative. All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-19
  • 32.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Position Sensors Multi-Coil Resolver (MCR) Application ■ Rotary position sensor for E-Motor Description ■ Analog output ■ Platform product based on speed numbers Performance Wide Temperature Range: –40 °C to +130 °C Robust for harsh environments High rotational speed Connection technology delivered in package High reliability, low number of components Sensing absolute position and velocity By connecting the MCR to an AVD converter analog output signals are converted to digital position signals. For ordering information please contact your local sales representative. 12-20 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 33.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Sensor Solutions for Alternative Powered Vehicles Clutch Position Sensor Application ■ Alternative powertrain solutions Function ■ Measuring piston position at concentric slave cylinder Technology ■ Permanent magnetic linear contact-less displacement sensor (PLCD) Product Features ■ Small design in ■ Measurement Range: 22.0 mm absolute ■ Highly temperature stable (up to +180 °C) ■ Redundancy possible For ordering information please contact your local sales representative. All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-21
  • 34.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Sensor Solutions for Alternative Powered Vehicles Dual Clutch Position Sensor Application ■ Dual clutch transmission for hybrid cars Function ■ Measuring the position of the clutch actuators Technology ■ Permanent magnetic linear contact-less displacement sensor (PLCD) Product Features ■ Two PLCD in one housing concept ■ PWM interface ■ Small, very flat design For ordering information please contact your local sales representative. 12-22 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 35.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Sensor Solutions for Alternative Powered Vehicles Neutral Position Sensor Application ■ Start-stop application (mild hybrid) Function ■ Measuring neutral position of the transmission Technology ■ Active permanent magnetic linear contact-less displacement (PLCD) sensor (moving magnet) Product Features ■ Contact-less measurement through transmission wall ■ Measurement Range: 28 mm absolute ■ Neutral position <2% over travel, temperature, life time, etc. ■ Optional redundancy possible For ordering information please contact your local sales representative. All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-23
  • 36.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Sensor Solutions for Alternative Powered Vehicles Brake Pedal Position Sensor Application ■ Regenerative brake for hybrid cars Function ■ Brake pedal position detection Technology ■ Permanent magnetic linear contact-less displacement sensor (PLCD) Product Features ■ Optional travel or rotational measurement possible ■ PWM or analogue output ■ Optional redundancy possible ■ High linearity (<2% over travel, temperature, life time, etc.) ■ Optional sensor location pedal works or brake master cylinder For ordering information please contact your local sales representative. 12-24 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 37.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Make / Break Thermal Indicator Thermal Indicator for Over-Temperature Detection Thermal indicator with very steep R-T curve “Close to digital” resistance response Direct input into FET of BJT No comparator necessary Built-in hysteresis to avoid cycling Different temperatures possible from 70 °C up to 165 °C Flexible Design: can be located wherever the potential heat might appear Can be put in series to protect several cells or places with one controller Tyco Electronics’s thermal They also feature a temperature Finally, the “near digital” indicators (RTI’s) are used for hysteresis response that can resistance response allows for over-temperature (OT) signaling. minimize signal oscillation multiple devices to be placed They provide “silicon-like” traditionally achieved using in series on the same circuit performance (in a passive active components. without significant dilution in component), reduce footprint The steep resistance response system measurement accuracy. needs and support simple and hysteresis also allow for This allows for a simple, low distributed monitoring. a reduction in support com- cost implementation of multi- In contrast to ceramic PTC ponents. RTI devices require point distributed monitoring. devices, RTI devices provide only one ballasting resistor to clear, “near digital”, OT signals directly control power FET’s and due to a steep resistance BJT’s. Solutions using ceramic change with temperature (~10 x PTC’s might require a resistor resistance change per 2 °C). network and comparator to offer similar functionality. This reduction in support com- ponents translates directly to lower system cost and reduced board area requirements. For ordering information please contact your local sales representative. All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-25
  • 38.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Mechanical Protection for Power Cables HFT 5000 Description ■ Heat Shrinkable Fabric Tubing (HFT) ■ Polyester/polyethylene construction Features ■ Temperature rating 125 °C (3000 h), 150 °C (1000 h) ■ 2:1 shrink ratio ■ High performance polyester fibers ■ Highly flexible ■ Halogen free ■ Available in many sizes ■ Low shrink temperature Benefits ■ Excellent mechanical protection for power cables even at high temperatures ■ Fits perfectly to all cables therefore minimum space consumption ■ Highly flexible thus no constraints regarding routing of power cables For ordering information please contact your local sales representative. 12-26 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 39.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Application Tooling Tyco Electronics Tooling for the Automotive Industry Tyco Electronics’ Global Application Tooling Division (GATD) is dedicated to providing high quality equipment options to meet all levels of your connector product specifications. We are also able to provide a broad range of equipment for other manufacturer’s products. Our equipment range is vast and unmatched by others operating in the same industry segments, as is our global presence and support network in the form of field service engineers and product managers. You will see from browsing this catalog; we supply everything from simple hand tools to the most complex automated systems – you name it, we supply it! Equipment is segregated into two categories: Generic Equipment Where we can supply you with sufficient information referenced by Part Number such that you can identify and order what you need yourself. Specialized Equipment Where you will need help from our specialist product managers to identify what’s just right for your application. Finding Equipment Online Powerful search functions are available to identify appropriate tooling: ● Applicators — www.tooling.tycoelectronics.com/europe/applicator.asp ● Hand Tools — www.tooling.tycoelectronics.com/europe/handtools.asp All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-27
  • 40.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Numerical Index Part Number Page Part Number Page Part Number Page 1-1414939-4 12-18 1-1414995-0 12-16 0-1416010-1 12-17 5-1618389-5 12-13 0-2098190-1 12-12 0-2098372-1 12-12 Disclaimer While Tyco Electronics and its affiliates referenced herein have made every reasonable effort to ensure the accuracy of the information contained in this catalog, Tyco Electronics cannot assure that this information is error free. For this reason, Tyco Electronics does not make any representation or offer any guarantee that such information is accurate, correct, reliable or current. Tyco Electronics reserves the right to make any adjustments to the information at any time. Tyco Electronics expressly disclaims any implied warranty regarding the information contained herein, including, but not limited to, the implied warranties of merchantability or fitness for a particular purpose. Tyco Electronics' only obligations are those stated in Tyco Electronics’ Standard Terms and Conditions of Sale. Tyco Electronics will in no case be liable for any incidental, indirect or consequential damages arising from or in connection with, including, but not limited to, the sale, resale, use or misuse of its products. Users should rely on their own judgment to evaluate the suitability of a product for a certain purpose and test each product for its intended application. In case of any potential ambiguities or questions, please don’t hesitate to contact us for clarification. www.tycoelectronics.com www.tycoelectronics.com/automotive AMP, AMP MCP, KILOVAC, POLYSWITCH, RAYCHEM, TE (logo) and Tyco Electronics are trademarks of the Tyco Electronics group of companies and its licensors. USCAR is a trademark of United States Council for Automotive Research. Other product names, logos, and company names mentioned herein may be trademarks of their respective owners. 12-28 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 41.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Engineering Notes All specifications subject to change. Consult Tyco Electronics for latest specifications. 12-29
  • 42.
    Section Catalog 1654294-3. Revised 5-2010. Alternative Power Systems (APS) Main Catalog 1654400-1 for the Automotive Industry Chapter 12 – Issued 4-2010. Engineering Notes 12-30 All specifications subject to change. Consult Tyco Electronics for latest specifications.
  • 43.
    Global Contacts Americas Argentina –Buenos Aires Canada – Toronto Mexico – Mexico City United States Phone: +54-11-4733-2202 Phone: +1-905-475-6222 Phone: +52-55-1106-0800 Harrisburg, PA Fax: +54-11-4733-2250 Fax: +1-905-474-5520 +01-800-733-8926 Phone: +1-717-564-0100 Product Information Center: Fax: +52-55-1106-0910 Fax: +1-717-986-7575 Brasil – São Paulo Phone: +1-905-470-4425 Product Information Center: Phone: +55-11-2103-6105 Fax: +1-905-474-5525 Phone: +1-800-522-6752 Fax: +55-11-2103-6204 For Latin/South American Colombia – Bogotá Countries not shown Fax: +1-717-986-7575 Chile – Santiago (Venezuela /Ecuador) Phone: +54-11-4733-2015 Phone: +56-2-345-0300 Phone: +57-1-319-8999 Fax: +54-11-4733-2083 Fax: +56-2-223-1477 Fax: +57-1-319-8989 Asia/Pacific Australia – Sydney Korea – Seoul People’s Republic of China Taiwan – Taipei Phone: +61-2-9554-2600 Phone: +82-2-3415-4500 Hong Kong Phone: +886-2-8768-2788 Fax: +61-2-9502-2556 Fax: +82-2-3486-3810 Phone: +852-2738-8731 Fax: +886-2-8768-2268 Product Information Center: Malaysia – Kuala Lumpur Fax: +852-2735-0243 Thailand – Bangkok Phone: +61-2-9840-8200 Phone: +60-3-7805-3055 Shanghai Phone: +66-2-955-0500 Fax: +61-2-9634-6188 Fax: +60-3-7805-3066 Phone: +86-21-2407-1588 Fax: +66-2-955-0505 Indonesia – Jakarta New Zealand – Auckland Fax: +86-21-2407-1599 Vietnam – Ho Chi Minh City Phone: +65-6482-0311 Phone: +64-9-634-4580 Singapore – Singapore Phone: +84-8-930-5546 Fax: +65-6482-1012 Fax: +64-9-634-4586 Phone: +65-6482-0311 Fax: +84-8-930-3443 Japan – Kawasaki, Kanagawa Philippines – Makati City Fax: +65-6482-1012 Phone: +81-44-844-8111 Phone: +632-848-0171 Fax: +81-44-812-3207 Fax: +632-867-8661 Europe/Middle East /Africa Austria – Vienna Finland – Helsinki Lithuania and Latvia South Africa – Port Elizabeth Phone: +43-1-905-60-0 Phone: +358-95-12-34-20 Lithuania – Vilnius Phone: +27-41-503-4500 Fax: +43-1-905-60-1333 Fax: +46-8-50-72-50-01 Phone: +370-5-213-1402 Fax: +27-41-581-0440 Product Information Center: Product Information Center: Fax: +370-5-213-1403 atpic@tycoelectronics.com pic.nordic@tycoelectronics.com Spain – Barcelona Phone: +43-1-905-60-1228 Phone: +46-8-50-72-50-20 Netherlands – ’s-Hertogenbosch Phone: +34-93-291-0330 Fax: +43-1-905-60-1333 Fax: +46-8-50-72-52-20 Phone: +31-73-6246-246 Fax: +34-93-201-7879 Fax: +31-73-6212-365 Product Information Center: Belarus – Minsk France – Cergy-Pontoise Cedex Product Information Center: espic@tycoelectronics.com Phone: +375-17-237-47-94 Phone: +33-1-3420-8888 picbenelux@tycoelectronics.com Phone: +34-93-291-0366 Fax: +375-17-237-47-94 Fax: +33-1-3420-8800 Phone: +31-73-6246-999 Fax: +34-93-209-1030 Product Information Center: Product Information Center: Fax: +31-73-6246-998 rupic@tycoelectronics.com francepic@tycoelectronics.com Sweden – Upplands Väsby Phone: +7-495-790-7902 Phone: +33-1-3420-8686 Norway – Nesbru (Switchboard) Fax: +7-495-721-1893 Fax: +33-1-3420-8623 Phone: +47-66-77-88-50 Phone: +46-8-50-72-50-00 Fax: +46-8-50-72-50-01 Fax: +46-8-50-72-50-01 Belgium – Kessel-Lo France Export Divisions – Product Information Center: Product Information Center: Phone: +31-73-6246-246 Cergy-Pontoise Cedex pic.nordic@tycoelectronics.com pic.nordic@tycoelectronics.com Fax: +31-73-6212-365 Phone: +33-1-3420-8866 Phone: +46-8-50-72-50-20 Phone: +46-8-50-72-50-20 Product Information Center: Fax: +33-1-3420-8300 Fax: +46-8-50-72-52-20 Fax: +46-8-50-72-52-20 picbenelux@tycoelectronics.com Phone: +31-73-6246-999 Germany – Bensheim Poland – Warsaw Switzerland – Steinach Fax: +31-73-6246-998 Phone: +49-6251-133-0 Phone: +48-22-4576-700 Phone: +41-71-447-0447 Fax: +49-6251-133-1600 Fax: +48-22-4576-720 Fax: +41-71-447-0444 Bulgaria – Sofia Product Information Center: Product Information Center: Product Information Center: Phone: +359-2-971-2152 Germany-PIC@tycoelectronics.com plpic@tycoelectronics.com chpic@tycoelectronics.com Fax: +359-2-971-2153 Phone: +49-6251-133-1999 Phone: +48-22-4576-704 Phone: +41-71-447-0447 Fax: +49-6251-133-1988 Fax: +48-22-4576-720 Fax: +41-71-447-0400 Czech Republic and Slovakia Czech Republic – Kurim Greece – Athens Romania – Bucharest Turkey – Istanbul Phone: +420-541-162-108 Phone: +30-210-9370-396/397 Phone: +40-21-311-3479/3596 Phone: +90-212-281-8181/2/3 Fax: +420-541-162-104 Fax: +30-210-9370-655 Fax: +40-21-312-0574 +90-212-282-5130/5430 Product Information Center: Fax: +90-212-281-8184 czpic@tycoelectronics.com Hungary – Budapest Russia – Moscow Phone: +420-541-162-113 Phone: +36-1-289-1000 Phone: +7-495-790-7902 Ukraine – Kiev Fax: +420-541-162-104 Fax: +36-1-289-1010 Fax: +7-495-721-1893 Phone: +380-44-206-2265 Product Information Center: Product Information Center: Fax: +380-44-206-2264 Denmark – Glostrup Phone: +36-1-289-1016 rupic@tycoelectronics.com Product Information Center: Phone: +45-43-48-04-00 Fax: +36-1-289-1017 Phone: +7-495-790-7902 uapic@tycoelectronics.com Fax: +46-8-50-72-50-01 Fax: +7-495-721-1893 Phone: +380-44-206-2265 Product Information Center: India – Bangalore Fax: +380-44-206-2264 pic.nordic@tycoelectronics.com Phone: +91-80-2854-0800 Russia – Yekaterinburg Phone: +46-8-50-72-50-20 Fax: +91-80-2854-0814 Phone: +7-343-2531-153 United Kingdom and Fax: +46-8-50-72-52-20 Fax: +7-343-2531-152 Ireland – Swindon Italy – Collegno (Torino) Phone: +44-8706-080208 Egypt – Cairo Phone: +39-011-4012-111 Russia – Nizhniy Novgorod Fax: +44-208-954-6234 Phone: +20-2417-7647 Fax: +39-011-4031-116 Phone: +7-831-220-33-05/-06 Product Information Center: Fax: +20-2419-2334 Product Information Center: Fax: +7-831-220-33-39/-40 picuk@tycoelectronics.com itpic@tycolectronics.com Phone: +44-800-267-666 Estonia – Tartu Phone: +39-011-4012-632 Slovenia – Ljubljana Phone: +386-1561-3270 Fax: +44-208-420-8095 Phone: +372-5138-274 Fax: +39-011-4028-7632 Fax: +372-7400-779 Fax: +386-1561-3240 http://www.tycoelectronics.com/help www.tycoelectronics.com/automotive www.tycoelectronics.com/automotive/sensors • www.tycoelectronicsmost.com
  • 44.
    Tyco Electronics AMPGmbH AMPèrestr. 12–14 64625 Bensheim / Germany Phone: +49-(0)6251-133-0 Fax: +49-(0)6251-133-1600 www.tycoelectronics.com www.tycoelectronics.com/automotive www.tycoelectronics.com/automotive/sensors www.tycoelectronicsmost.com TE (logo) and Tyco Electronics are trademarks of the Tyco Electronics group of companies and its licensors. Tyco Electronics AMP GmbH certified acc. ISO 14001 and ISO/TS 16949:2002 © 2010 Tyco Electronics Ltd. 1654294-3 Revised 5-2010 5M ST