The paper examines a two-machine flow shop problem where job processing times are probabilistically determined, addressing the need to minimize rental costs of machines while considering breakdown intervals. It proposes a simplified algorithm that incorporates job-block criteria and is substantiated through numerical examples. This study highlights real-life applications, particularly in contexts like medical equipment rental, where cost efficiency is crucial.