PREPARATION OF
DETAILED PROJECT REPORT
(MODULE – 5)
Ministry of Housing and Urban Poverty Alleviation
RAJIV AWAS YOJANA
1
INTRODUCTION
RAJIV AWAS YOJANA
2
RAY envisages two-step implementation strategy i.e.
1. Preparation of Slum free City Plan of Action (SFCPoA) and
2. Preparation of projects for selected slums.
For intervention in the selected slum(s),Detailed Project
Reports ( DPRs) are to be prepared on ‘Whole Slum basis’.
The presentation outlines :
• DPR preparation and submission process
• Types of intervention
• Admissible components
• Steps in DPR preparation
• Suggested contents of DPR
Ministry of Housing and Urban Poverty Alleviation
DPR PREPARATION AND SUBMISSION PROCESS
RAJIV AWAS YOJANA
3
• Implementing agencies (States/UTs/ULBs/Parastatals &
Central Govt. Agencies) would be required to prepare DPRs
covering ‘Whole Slum’ on the basis of prioritisation of slums in
SFCPoAs.
• States / UTs have the liberty to submit DPRs for sanction,
pending the preparation of SFCPoAs only in the first year of
launch of the scheme, thereafter implementing agencies are
required to prepare SFCPoA first and then DPR for selected
slum.
• During the pendency of SFCPoA finalisation, cities are
expected to list existing slums in the city & give reasons and
justification for the selection of slum for intervention.
• While selecting slum for preparation of DPR it should be
ensured by State / ULB that the slum dwellers are residing in
the slum for a period of 5 years
Ministry of Housing and Urban Poverty Alleviation
DPR PREPARATION AND SUBMISSION PROCESS
RAJIV AWAS YOJANA
4
• DPRs are required to be submitted with the executive
summary, checklists and undertaking by State / ULB
duly filled for facilitating faster approval.
• DPRs are to be submitted to the Ministry by the State
Level Nodal Agency (SLNA) with the approval of the
State Level Sanctioning & Monitoring Committee
(SLSMC) for sanction by a Central Sanctioning and
Monitoring Committee (CSMC).
• DPRs can be submitted to the appraisal agencies also
after making entry in the IPoMS.
Ministry of Housing and Urban Poverty Alleviation
TYPE OF INTERVENTIONS
RAJIV AWAS YOJANA
5
Following interventions can be taken up as per requirement of Project:
• In-situ re-development (Housing and Infrastructure )
• In-situ up-gradation (Filling gaps in Housing and Infrastructure)
• Relocation (Housing & infrastructure). Only in unavoidable cases &
after prior consent of slum dwellers.
Cluster of slums should be preferred to obtain advantages of
integration of connectivity with city wide network of infrastructure
and optimum use of land.
Execution of Project :
 Execution of projects should be taken up by ULBs.
 Preference may be given for beneficiaries led execution.
 In exceptional cases execution can be taken up by Parastatals after
consent of concerned ULB.
Ministry of Housing and Urban Poverty Alleviation
ADMISSIBLE COMPONENTS
RAJIV AWAS YOJANA
6
• Housing :
i. New dwelling (single or multi storied) units with 21-27 Sqm carpet
area (CA). (2 rooms, kitchen, bath & toilet).
ii. Rental dwelling units (single or multi storied) with CA 16-20 Sqm
with shared civic infrastructure. ( 21-27 Sqm in exceptional cases)
iii. Incremental : Up-gradation of existing DUs by providing additional
room, kitchen, toilet ( either or all) limited to 21-27 Sqm CA.
• Social Infrastructure :
i. Anganwadi, Pre schools, Child care Centres, Livelihood Centre.
Multi purpose community Centre. Library cum study center,
Training center for computer training with internet provisions
ii. Community toilets, Parks and Play equipment.
iii. Health centres/ sub Centres ( if funds are not available from other
scheme)
Ministry of Housing and Urban Poverty Alleviation
ADMISSIBLE COMPONENTS ( Cont..)
RAJIV AWAS YOJANA
7
• Basic civic Infrastructure :
i. Roads ( Internal and approach), Water Supply, Sewerage, Drainage,
Solid Waste Management, Street Lights, Internet cables, Rain Water
Harvesting.
ii. Temporary transit units
iii. Retaining wall, fencing and boundary wall ( in exceptional cases)
iv. Animal pen, cattle/rickshaw/ work shed
v. Site Development i/c leveling & Landscaping
• Convergence with ongoing Schemes of:
i. Health, Education and Social welfare.
ii. Infrastructure Connectivity.
• Other Charges* :
i. O&M cost, up-to 4% of the project cost (One time).
ii. DPR preparation, PM, TPIM, social audit etc.
(*By the Centre and State in the same proportion as the funding pattern)
Ministry of Housing and Urban Poverty Alleviation
ADMISSIBLE COMPONENTS ( Cont..)
RAJIV AWAS YOJANA
8
• The upper ceiling of Rs 5 Lakh per DU (i/c cost of civic and social
infrastructure) for cities with population more than 5 lakh and for
North East & Special category States irrespective of population.
• The upper ceiling of Rs 4 Lakh per DU (i/c cost of civic and social
infrastructure) for cities with population less than 5 lakh.
• Cost of civic infrastructure and social amenities per DU should not
exceed 25% of the cost.
 Following components are not admissible for GoI funding
• Contingencies as percentage considered in DPR
• Price Escalation and any percentage above SOR
• Tender Premium.
• Departmental Charges of Implementing Agency.
Ministry of Housing and Urban Poverty Alleviation
STEPS IN DPR PREPARATION
RAJIV AWAS YOJANA
9
1. Selection of Slum –
i. Cities are expected to list existing slums in the city & give reasons
and justification for the selection of slum for intervention.
ii. DPR is to be prepared for one or more slums based on type of project
suitable to tackle the problem faced by selected slum.
iii. While deciding type of project it is to be ensured that slum dwellers /
communities views are taken into account.
2. Land possession and land use –
It is to be ensured that :
i. The land is in the possession of ULB and free from encroachment.
The land use is residential.
ii. The proposal is on tenable land.
Ministry of Housing and Urban Poverty Alleviation
STEPS IN DPR PREPARATION Cont..
RAJIV AWAS YOJANA
10
3. Survey and Mapping of selected slum –
i. Readable Plan ( Scale 1:500) showing physical boundary of
slum, roads, lanes, manhole positions, drains, boundary of
dwelling units, community property (if any), open space,
electric poles, trees, telephone poles etc.
ii. Contour Maps indicating ground slope and direction of
drainage. Survey should extend to existing nallahs / drains to
capture ground and invert elevations.
iii. House type, (such as Kutcha / dilapidated, semi Pucca and
Pucca, etc.) shall be noted giving an identification number.
iv. Infrastructure maps showing existing underground utilities
v. Surrounding area up to a reasonable distance, say 100 m to
depict adjoining road / property and administrative
boundaries.
Ministry of Housing and Urban Poverty Alleviation
STEPS IN DPR PREPARATION Cont..
RAJIV AWAS YOJANA
11
4. Assessment of deficiencies in slums –
 Deficiencies are to be assessed in terms of :
i. Housing
ii. Basic civic infrastructure. and
iii. Social amenities ( Community facilities)
Assessment of demand needs to be done to meet the current deficiency and to
bridge the gap between the future and the present demand.
5. Integration of social infrastructure –
The DPR should aim at integrating social infra as under :
i. Education,
ii. Health and
iii. Social security.
 Apart from provisions, it is to be ensured that operationalising these facilities is
also taken care of during project preparation and implementation.
Ministry of Housing and Urban Poverty Alleviation
STEPS IN DPR PREPARATION Cont..
RAJIV AWAS YOJANA
12
6. Establish linkage with citywide network :
• For all types of projects, in-slum infrastructure requires to be linked
with city-wide infrastructure
• It is to be checked whether the city-wide system is capable to deliver
the increased demand exerted by development of slum and up-
gradation.
7. Statutory Approvals –
 Statutory approvals as per bye laws, master plan, fire safety
norms, Environmental clearance etc. as applicable for the project are to
be taken. These type of approvals are only illustrative and may be vary
for different ULBs/Cities .
 The stipulations / regulations might undergo change. States / ULBs
are expected to get the clearance / approval from appropriate
authorities as per amended stipulations / regulations.
Ministry of Housing and Urban Poverty Alleviation
STEPS IN DPR PREPARATION Cont..
RAJIV AWAS YOJANA
13
8. Preparation of detailed design after assessment of
Demand / Gap
• The Housing design should be done as per National
Building Code, BIS Codes.
• The design of Infrastructure components should be done
as per CPHEEO Manuals, IRC Codes with amendments
and other relevant specifications as applicable.
• The design should be finalised after proper geotechnical
and hydrological investigation
• Conservation of the environment and ecology should be
built into the habitat planning.
• The DPR should include hazard resistant planning and
design, taking into account proper site selection.
Ministry of Housing and Urban Poverty Alleviation
STEPS IN DPR PREPARATION Cont..
RAJIV AWAS YOJANA
14
9. Estimate Project Cost –
• The cost estimates have to be worked out on the basis of
Detailed Bill of Quantities ( BOQ), with detailed measurement of
L,B,D/H using applicable current Schedule of Rates (SOR).
• If the applicable SORs relates to a year which is one or more
years prior to ‘current’ year, appropriate cost index may be
applied to update such rates, as approved by competent
authority.
• In addition to permanent works, temporary transit
accommodation cost should be also included in the estimate.
• The DPR shall be submitted duly authenticated and cost
estimates shall be certified by competent technical authority at
ULB and State/UT level.
Ministry of Housing and Urban Poverty Alleviation
STEPS IN DPR PREPARATION Cont..
RAJIV AWAS YOJANA
15
10. Implementation and Management arrangements
The arrangement should mention the role of:
• State Level Nodal Agency (SLNA) & State Level Technical Cell (SLTC),
• City Level Mission & City Level Technical Cell (CLTC),
• Project Management Consultants
• Third Party Inspection & Monitoring Agency (TPIMA)
The DPR should provide a time-bound action plan including :
• Tendering, Appointment of Contractors,
• Construction Schedule, Post-construction activities.
• Measurable milestone through IPoMS.
• Quality Assurance and Quality Control
• Project Schedule in the form of Gantt chart
i. Showing monthly targets.
ii. Quarterly Fund requirement.
iii. Schedule of slum-wise Project Delivery
Ministry of Housing and Urban Poverty Alleviation
STEPS IN DPR PREPARATION Cont..
RAJIV AWAS YOJANA
16
11. O&M arrangements of the assets –
• O & M cost up-to 4% of the project cost ( One time).
(As per applicable ratio for the city i.e. 50:50 for cities with
population more than 5 lakh, 75:25 for cities with population less
than 5 lakh and 80:20 for cities in NE and special category
States).
• The maintenance fund should be utilised as corpus fund and
placed at the disposal of ULBs to administer involving the
communities.
Ministry of Housing and Urban Poverty Alleviation
SUGGESTED CONTENTS OF DPR
RAJIV AWAS YOJANA
17
• Checklist of documents required in the DPR.
• Administrative and Technical checklist
• Executive Summary
• Introduction
• Salient features of SFCP & its linkage with the project
• Justification of the project ( Prioritisation)
• Project Concept and Scope
• Description of Project and Planning
• Slum Survey
i. Socio economic survey and Livelihood survey( Modified NBO format)
ii. Physical survey ( TSS) ( House footprints and infrastructure details
of the area)
iii. Validation of data by competent authority
iv. Beneficiaries identification through UIDAI.
Ministry of Housing and Urban Poverty Alleviation
SUGGESTED CONTENTS OF DPR ( Cont..)
RAJIV AWAS YOJANA
18
• Community Participation
i. Focus Group Discussions,
ii. Beneficiaries consent for relocation, accepting DUs on upper floors in
multistoried building and financial contribution,
iii. Community involvement from planning stage to allotment, O&M plan,
iv. Beneficiaries contribution and mobilization. Photographs of activities.
• Provision of Housing
i. Planning & Design of Single/ Multistoried building. Type/Area/Cost
ii. Disaster Management and Mitigation strategies
iii. Adoption of green technology in the project
• Provision of Community Facilities
• Planning & Design of Anganwadi, Health Centre/sub-Centre, Livelihood
Centre, Multi-purpose Community Centre, Community Park, Community
Toilet, Informal Education Centre, Informal sector Markets etc. as
applicable
• Provision of Urban Infrastructure
• Planning & Design of Roads, Water Supply, Sewerage, Storm Water
Drainage, Solid Waste Management, Rain Water Harvesting and
Streetlights
Ministry of Housing and Urban Poverty Alleviation
SUGGESTED CONTENTS OF DPR ( Cont..)
RAJIV AWAS YOJANA
19
• Statutory approvals including Environmental Clearance ( if required)
• Project Cost Estimate using current SOR ( Abstract & Detailed Estimate)
• Project Implementation & Management Framework
i. Institutional Capacity ( Infrastructure, man power etc)
ii. Institutional framework ( Creation of Cells)
iii. Implementation schedule ( Bar Chart )
iv. Quarterly component wise investment schedule vis-a-vis means of finance
(Central/State/ULB/Beneficiaries share)
v. Project Management Set-up
vi. Monitoring mechanism at State/ULB/Community level
vii. Quality Control & Quality Assurance plan
• Operation & Maintenance Plan
i. Mechanism proposed
ii. Fund requirement, creation of corpus fund
Ministry of Housing and Urban Poverty Alleviation
SUGGESTED CONTENTS OF DPR ( Cont..)
RAJIV AWAS YOJANA
20
• Financing Arrangement: Component wise financial statement for each
slum indicating cost, Central/State/ULB/Beneficiaries share or/and any
other share. One consolidated statement covering all slums should also be
furnished.
• Drawings –
i. Location Plan(s) of City and Slum(s), Land use map
ii. Physical survey maps, Contour plans
iii. Photographs covering the entire slum and Community participation
iv. Slum/Area layout Plan ( Foot prints of existing / proposed houses
and infrastructure connectivity)
v. On site Infrastructure service plan (water supply, sewerage, roads,
drainage etc.) and linkage with city wide infrastructure ,
vi. Architectural and Structural Drawings of Buildings
vii. L section/ Cross section/ Elevation of Roads, SWD, Sewerage, Water
Supply, Boundary Wall, Retaining Wall etc.
Ministry of Housing and Urban Poverty Alleviation
SUGGESTED CONTENTS OF DPR ( Cont..)
RAJIV AWAS YOJANA
21
• Annexures to DPR:
i. List of Beneficiaries
ii. Sample copy of consent of beneficiaries
iii. Sample copy of house holds survey.
iv. Copy of Act/ Legislation for conferment of tenure rights
v. Sample copy of allotment letter indicating ownership / lease rights.
vi. Copy of minutes of SLSMC indicating approval of project.
vii. Copies of MoA signed between ULB/parastatals, State and MoHUPA.
viii. Reforms – Status and Proposals
ix. Undertakings of ULB and SLNA
x. Details of educational and health facilities for scheme
xi. Copies of statutory approvals
xii. Photographs covering existing housing and infrastructure of entire slum
xiii. Photographs of ‘Micro Planning’ with the community
Ministry of Housing and Urban Poverty Alleviation
RAJIV AWAS YOJANA
22
Discussion forum on RAY VAARTA available at
www.mhupa-ray.gov.in can be used for queries related
to DPR preparation
Thank You
Ministry of Housing and Urban Poverty Alleviation

More Related Content

Similar to 12DPRpreparationmodule.pdf

SUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPTSUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
gayathrysatheesan1
 
Jnnurm
JnnurmJnnurm
Report housing.pptx
Report housing.pptxReport housing.pptx
Report housing.pptx
JamesJungco2
 
Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)
SQSY
 
Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)malapatansarangani
 
JNnURM
JNnURMJNnURM
Urban planning for smart cities - Smart tools for Smart Cities
Urban planning for smart cities - Smart tools for Smart CitiesUrban planning for smart cities - Smart tools for Smart Cities
Urban planning for smart cities - Smart tools for Smart Cities
Vivek Pai
 
Water Plus presentation by Sikander Zulkarnain
Water Plus presentation by Sikander ZulkarnainWater Plus presentation by Sikander Zulkarnain
Water Plus presentation by Sikander Zulkarnain
SikanderZulkarnain1
 
2cmc to r for sewarage system design
2cmc to r for sewarage system design 2cmc to r for sewarage system design
2cmc to r for sewarage system design
aberanegash
 
Broadway corridor-planning-program-presentation-may-2018
Broadway corridor-planning-program-presentation-may-2018Broadway corridor-planning-program-presentation-may-2018
Broadway corridor-planning-program-presentation-may-2018
Kathryn Huang
 
Community planning.pdf
Community planning.pdfCommunity planning.pdf
Community planning.pdf
SavithaBG1
 
CIL: Evidence
CIL: EvidenceCIL: Evidence
CIL: Evidence
PAS_Team
 
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WRI Ross Center for Sustainable Cities
 
Presentación ppp casa paulista ingles
Presentación ppp casa paulista inglesPresentación ppp casa paulista ingles
Presentación ppp casa paulista inglesEraikune
 
Bottom up budgeting-by_kuki
Bottom up budgeting-by_kukiBottom up budgeting-by_kuki
Bottom up budgeting-by_kuki
WBKDC
 
SMART CITY MISSION.pdf
SMART CITY MISSION.pdfSMART CITY MISSION.pdf
SMART CITY MISSION.pdf
DeepanjaliSharmaVats
 
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
NOSPlan - National Organisation of Students of Planning
 
Satellite township1
Satellite township1Satellite township1
Satellite township1
shivani reddy
 

Similar to 12DPRpreparationmodule.pdf (20)

SUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPTSUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
 
Jnnurm
JnnurmJnnurm
Jnnurm
 
Report housing.pptx
Report housing.pptxReport housing.pptx
Report housing.pptx
 
Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)Economic and Socialized Housing BP 220 (02)
Economic and Socialized Housing BP 220 (02)
 
Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)
 
JNnURM
JNnURMJNnURM
JNnURM
 
Urban planning for smart cities - Smart tools for Smart Cities
Urban planning for smart cities - Smart tools for Smart CitiesUrban planning for smart cities - Smart tools for Smart Cities
Urban planning for smart cities - Smart tools for Smart Cities
 
Pura presentation
Pura presentationPura presentation
Pura presentation
 
Water Plus presentation by Sikander Zulkarnain
Water Plus presentation by Sikander ZulkarnainWater Plus presentation by Sikander Zulkarnain
Water Plus presentation by Sikander Zulkarnain
 
2cmc to r for sewarage system design
2cmc to r for sewarage system design 2cmc to r for sewarage system design
2cmc to r for sewarage system design
 
Broadway corridor-planning-program-presentation-may-2018
Broadway corridor-planning-program-presentation-may-2018Broadway corridor-planning-program-presentation-may-2018
Broadway corridor-planning-program-presentation-may-2018
 
Community planning.pdf
Community planning.pdfCommunity planning.pdf
Community planning.pdf
 
CIL: Evidence
CIL: EvidenceCIL: Evidence
CIL: Evidence
 
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
 
Presentación ppp casa paulista ingles
Presentación ppp casa paulista inglesPresentación ppp casa paulista ingles
Presentación ppp casa paulista ingles
 
Bottom up budgeting-by_kuki
Bottom up budgeting-by_kukiBottom up budgeting-by_kuki
Bottom up budgeting-by_kuki
 
SMART CITY MISSION.pdf
SMART CITY MISSION.pdfSMART CITY MISSION.pdf
SMART CITY MISSION.pdf
 
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
 
Satellite township1
Satellite township1Satellite township1
Satellite township1
 
Zephyr
ZephyrZephyr
Zephyr
 

Recently uploaded

Office Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
Office Furniture | Furniture Store in Sarasota, Florida | Sarasota CollectionOffice Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
Office Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
The Sarasota Collection Home Store
 
Strategic Analysis of Starbucks Coffee Company - MBA.docx
Strategic Analysis of Starbucks Coffee Company - MBA.docxStrategic Analysis of Starbucks Coffee Company - MBA.docx
Strategic Analysis of Starbucks Coffee Company - MBA.docx
RAJU MAKWANA
 
Showcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdfShowcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdf
MarianAndreaSTana
 
Web Technology LAB MANUAL for Undergraduate Programs
Web Technology  LAB MANUAL for Undergraduate ProgramsWeb Technology  LAB MANUAL for Undergraduate Programs
Web Technology LAB MANUAL for Undergraduate Programs
Chandrakant Divate
 
Best Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to SuccessBest Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to Success
Intelisync
 
How To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine BusinessHow To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine Business
Charlie McDermott
 
Dining Tables and Chairs | Furniture Store in Sarasota, Florida
Dining Tables and Chairs | Furniture Store in Sarasota, FloridaDining Tables and Chairs | Furniture Store in Sarasota, Florida
Dining Tables and Chairs | Furniture Store in Sarasota, Florida
The Sarasota Collection Home Store
 

Recently uploaded (7)

Office Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
Office Furniture | Furniture Store in Sarasota, Florida | Sarasota CollectionOffice Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
Office Furniture | Furniture Store in Sarasota, Florida | Sarasota Collection
 
Strategic Analysis of Starbucks Coffee Company - MBA.docx
Strategic Analysis of Starbucks Coffee Company - MBA.docxStrategic Analysis of Starbucks Coffee Company - MBA.docx
Strategic Analysis of Starbucks Coffee Company - MBA.docx
 
Showcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdfShowcase Portfolio- Marian Andrea Tana.pdf
Showcase Portfolio- Marian Andrea Tana.pdf
 
Web Technology LAB MANUAL for Undergraduate Programs
Web Technology  LAB MANUAL for Undergraduate ProgramsWeb Technology  LAB MANUAL for Undergraduate Programs
Web Technology LAB MANUAL for Undergraduate Programs
 
Best Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to SuccessBest Crypto Marketing Ideas to Lead Your Project to Success
Best Crypto Marketing Ideas to Lead Your Project to Success
 
How To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine BusinessHow To Leak-Proof Your Magazine Business
How To Leak-Proof Your Magazine Business
 
Dining Tables and Chairs | Furniture Store in Sarasota, Florida
Dining Tables and Chairs | Furniture Store in Sarasota, FloridaDining Tables and Chairs | Furniture Store in Sarasota, Florida
Dining Tables and Chairs | Furniture Store in Sarasota, Florida
 

12DPRpreparationmodule.pdf

  • 1. PREPARATION OF DETAILED PROJECT REPORT (MODULE – 5) Ministry of Housing and Urban Poverty Alleviation RAJIV AWAS YOJANA 1
  • 2. INTRODUCTION RAJIV AWAS YOJANA 2 RAY envisages two-step implementation strategy i.e. 1. Preparation of Slum free City Plan of Action (SFCPoA) and 2. Preparation of projects for selected slums. For intervention in the selected slum(s),Detailed Project Reports ( DPRs) are to be prepared on ‘Whole Slum basis’. The presentation outlines : • DPR preparation and submission process • Types of intervention • Admissible components • Steps in DPR preparation • Suggested contents of DPR Ministry of Housing and Urban Poverty Alleviation
  • 3. DPR PREPARATION AND SUBMISSION PROCESS RAJIV AWAS YOJANA 3 • Implementing agencies (States/UTs/ULBs/Parastatals & Central Govt. Agencies) would be required to prepare DPRs covering ‘Whole Slum’ on the basis of prioritisation of slums in SFCPoAs. • States / UTs have the liberty to submit DPRs for sanction, pending the preparation of SFCPoAs only in the first year of launch of the scheme, thereafter implementing agencies are required to prepare SFCPoA first and then DPR for selected slum. • During the pendency of SFCPoA finalisation, cities are expected to list existing slums in the city & give reasons and justification for the selection of slum for intervention. • While selecting slum for preparation of DPR it should be ensured by State / ULB that the slum dwellers are residing in the slum for a period of 5 years Ministry of Housing and Urban Poverty Alleviation
  • 4. DPR PREPARATION AND SUBMISSION PROCESS RAJIV AWAS YOJANA 4 • DPRs are required to be submitted with the executive summary, checklists and undertaking by State / ULB duly filled for facilitating faster approval. • DPRs are to be submitted to the Ministry by the State Level Nodal Agency (SLNA) with the approval of the State Level Sanctioning & Monitoring Committee (SLSMC) for sanction by a Central Sanctioning and Monitoring Committee (CSMC). • DPRs can be submitted to the appraisal agencies also after making entry in the IPoMS. Ministry of Housing and Urban Poverty Alleviation
  • 5. TYPE OF INTERVENTIONS RAJIV AWAS YOJANA 5 Following interventions can be taken up as per requirement of Project: • In-situ re-development (Housing and Infrastructure ) • In-situ up-gradation (Filling gaps in Housing and Infrastructure) • Relocation (Housing & infrastructure). Only in unavoidable cases & after prior consent of slum dwellers. Cluster of slums should be preferred to obtain advantages of integration of connectivity with city wide network of infrastructure and optimum use of land. Execution of Project :  Execution of projects should be taken up by ULBs.  Preference may be given for beneficiaries led execution.  In exceptional cases execution can be taken up by Parastatals after consent of concerned ULB. Ministry of Housing and Urban Poverty Alleviation
  • 6. ADMISSIBLE COMPONENTS RAJIV AWAS YOJANA 6 • Housing : i. New dwelling (single or multi storied) units with 21-27 Sqm carpet area (CA). (2 rooms, kitchen, bath & toilet). ii. Rental dwelling units (single or multi storied) with CA 16-20 Sqm with shared civic infrastructure. ( 21-27 Sqm in exceptional cases) iii. Incremental : Up-gradation of existing DUs by providing additional room, kitchen, toilet ( either or all) limited to 21-27 Sqm CA. • Social Infrastructure : i. Anganwadi, Pre schools, Child care Centres, Livelihood Centre. Multi purpose community Centre. Library cum study center, Training center for computer training with internet provisions ii. Community toilets, Parks and Play equipment. iii. Health centres/ sub Centres ( if funds are not available from other scheme) Ministry of Housing and Urban Poverty Alleviation
  • 7. ADMISSIBLE COMPONENTS ( Cont..) RAJIV AWAS YOJANA 7 • Basic civic Infrastructure : i. Roads ( Internal and approach), Water Supply, Sewerage, Drainage, Solid Waste Management, Street Lights, Internet cables, Rain Water Harvesting. ii. Temporary transit units iii. Retaining wall, fencing and boundary wall ( in exceptional cases) iv. Animal pen, cattle/rickshaw/ work shed v. Site Development i/c leveling & Landscaping • Convergence with ongoing Schemes of: i. Health, Education and Social welfare. ii. Infrastructure Connectivity. • Other Charges* : i. O&M cost, up-to 4% of the project cost (One time). ii. DPR preparation, PM, TPIM, social audit etc. (*By the Centre and State in the same proportion as the funding pattern) Ministry of Housing and Urban Poverty Alleviation
  • 8. ADMISSIBLE COMPONENTS ( Cont..) RAJIV AWAS YOJANA 8 • The upper ceiling of Rs 5 Lakh per DU (i/c cost of civic and social infrastructure) for cities with population more than 5 lakh and for North East & Special category States irrespective of population. • The upper ceiling of Rs 4 Lakh per DU (i/c cost of civic and social infrastructure) for cities with population less than 5 lakh. • Cost of civic infrastructure and social amenities per DU should not exceed 25% of the cost.  Following components are not admissible for GoI funding • Contingencies as percentage considered in DPR • Price Escalation and any percentage above SOR • Tender Premium. • Departmental Charges of Implementing Agency. Ministry of Housing and Urban Poverty Alleviation
  • 9. STEPS IN DPR PREPARATION RAJIV AWAS YOJANA 9 1. Selection of Slum – i. Cities are expected to list existing slums in the city & give reasons and justification for the selection of slum for intervention. ii. DPR is to be prepared for one or more slums based on type of project suitable to tackle the problem faced by selected slum. iii. While deciding type of project it is to be ensured that slum dwellers / communities views are taken into account. 2. Land possession and land use – It is to be ensured that : i. The land is in the possession of ULB and free from encroachment. The land use is residential. ii. The proposal is on tenable land. Ministry of Housing and Urban Poverty Alleviation
  • 10. STEPS IN DPR PREPARATION Cont.. RAJIV AWAS YOJANA 10 3. Survey and Mapping of selected slum – i. Readable Plan ( Scale 1:500) showing physical boundary of slum, roads, lanes, manhole positions, drains, boundary of dwelling units, community property (if any), open space, electric poles, trees, telephone poles etc. ii. Contour Maps indicating ground slope and direction of drainage. Survey should extend to existing nallahs / drains to capture ground and invert elevations. iii. House type, (such as Kutcha / dilapidated, semi Pucca and Pucca, etc.) shall be noted giving an identification number. iv. Infrastructure maps showing existing underground utilities v. Surrounding area up to a reasonable distance, say 100 m to depict adjoining road / property and administrative boundaries. Ministry of Housing and Urban Poverty Alleviation
  • 11. STEPS IN DPR PREPARATION Cont.. RAJIV AWAS YOJANA 11 4. Assessment of deficiencies in slums –  Deficiencies are to be assessed in terms of : i. Housing ii. Basic civic infrastructure. and iii. Social amenities ( Community facilities) Assessment of demand needs to be done to meet the current deficiency and to bridge the gap between the future and the present demand. 5. Integration of social infrastructure – The DPR should aim at integrating social infra as under : i. Education, ii. Health and iii. Social security.  Apart from provisions, it is to be ensured that operationalising these facilities is also taken care of during project preparation and implementation. Ministry of Housing and Urban Poverty Alleviation
  • 12. STEPS IN DPR PREPARATION Cont.. RAJIV AWAS YOJANA 12 6. Establish linkage with citywide network : • For all types of projects, in-slum infrastructure requires to be linked with city-wide infrastructure • It is to be checked whether the city-wide system is capable to deliver the increased demand exerted by development of slum and up- gradation. 7. Statutory Approvals –  Statutory approvals as per bye laws, master plan, fire safety norms, Environmental clearance etc. as applicable for the project are to be taken. These type of approvals are only illustrative and may be vary for different ULBs/Cities .  The stipulations / regulations might undergo change. States / ULBs are expected to get the clearance / approval from appropriate authorities as per amended stipulations / regulations. Ministry of Housing and Urban Poverty Alleviation
  • 13. STEPS IN DPR PREPARATION Cont.. RAJIV AWAS YOJANA 13 8. Preparation of detailed design after assessment of Demand / Gap • The Housing design should be done as per National Building Code, BIS Codes. • The design of Infrastructure components should be done as per CPHEEO Manuals, IRC Codes with amendments and other relevant specifications as applicable. • The design should be finalised after proper geotechnical and hydrological investigation • Conservation of the environment and ecology should be built into the habitat planning. • The DPR should include hazard resistant planning and design, taking into account proper site selection. Ministry of Housing and Urban Poverty Alleviation
  • 14. STEPS IN DPR PREPARATION Cont.. RAJIV AWAS YOJANA 14 9. Estimate Project Cost – • The cost estimates have to be worked out on the basis of Detailed Bill of Quantities ( BOQ), with detailed measurement of L,B,D/H using applicable current Schedule of Rates (SOR). • If the applicable SORs relates to a year which is one or more years prior to ‘current’ year, appropriate cost index may be applied to update such rates, as approved by competent authority. • In addition to permanent works, temporary transit accommodation cost should be also included in the estimate. • The DPR shall be submitted duly authenticated and cost estimates shall be certified by competent technical authority at ULB and State/UT level. Ministry of Housing and Urban Poverty Alleviation
  • 15. STEPS IN DPR PREPARATION Cont.. RAJIV AWAS YOJANA 15 10. Implementation and Management arrangements The arrangement should mention the role of: • State Level Nodal Agency (SLNA) & State Level Technical Cell (SLTC), • City Level Mission & City Level Technical Cell (CLTC), • Project Management Consultants • Third Party Inspection & Monitoring Agency (TPIMA) The DPR should provide a time-bound action plan including : • Tendering, Appointment of Contractors, • Construction Schedule, Post-construction activities. • Measurable milestone through IPoMS. • Quality Assurance and Quality Control • Project Schedule in the form of Gantt chart i. Showing monthly targets. ii. Quarterly Fund requirement. iii. Schedule of slum-wise Project Delivery Ministry of Housing and Urban Poverty Alleviation
  • 16. STEPS IN DPR PREPARATION Cont.. RAJIV AWAS YOJANA 16 11. O&M arrangements of the assets – • O & M cost up-to 4% of the project cost ( One time). (As per applicable ratio for the city i.e. 50:50 for cities with population more than 5 lakh, 75:25 for cities with population less than 5 lakh and 80:20 for cities in NE and special category States). • The maintenance fund should be utilised as corpus fund and placed at the disposal of ULBs to administer involving the communities. Ministry of Housing and Urban Poverty Alleviation
  • 17. SUGGESTED CONTENTS OF DPR RAJIV AWAS YOJANA 17 • Checklist of documents required in the DPR. • Administrative and Technical checklist • Executive Summary • Introduction • Salient features of SFCP & its linkage with the project • Justification of the project ( Prioritisation) • Project Concept and Scope • Description of Project and Planning • Slum Survey i. Socio economic survey and Livelihood survey( Modified NBO format) ii. Physical survey ( TSS) ( House footprints and infrastructure details of the area) iii. Validation of data by competent authority iv. Beneficiaries identification through UIDAI. Ministry of Housing and Urban Poverty Alleviation
  • 18. SUGGESTED CONTENTS OF DPR ( Cont..) RAJIV AWAS YOJANA 18 • Community Participation i. Focus Group Discussions, ii. Beneficiaries consent for relocation, accepting DUs on upper floors in multistoried building and financial contribution, iii. Community involvement from planning stage to allotment, O&M plan, iv. Beneficiaries contribution and mobilization. Photographs of activities. • Provision of Housing i. Planning & Design of Single/ Multistoried building. Type/Area/Cost ii. Disaster Management and Mitigation strategies iii. Adoption of green technology in the project • Provision of Community Facilities • Planning & Design of Anganwadi, Health Centre/sub-Centre, Livelihood Centre, Multi-purpose Community Centre, Community Park, Community Toilet, Informal Education Centre, Informal sector Markets etc. as applicable • Provision of Urban Infrastructure • Planning & Design of Roads, Water Supply, Sewerage, Storm Water Drainage, Solid Waste Management, Rain Water Harvesting and Streetlights Ministry of Housing and Urban Poverty Alleviation
  • 19. SUGGESTED CONTENTS OF DPR ( Cont..) RAJIV AWAS YOJANA 19 • Statutory approvals including Environmental Clearance ( if required) • Project Cost Estimate using current SOR ( Abstract & Detailed Estimate) • Project Implementation & Management Framework i. Institutional Capacity ( Infrastructure, man power etc) ii. Institutional framework ( Creation of Cells) iii. Implementation schedule ( Bar Chart ) iv. Quarterly component wise investment schedule vis-a-vis means of finance (Central/State/ULB/Beneficiaries share) v. Project Management Set-up vi. Monitoring mechanism at State/ULB/Community level vii. Quality Control & Quality Assurance plan • Operation & Maintenance Plan i. Mechanism proposed ii. Fund requirement, creation of corpus fund Ministry of Housing and Urban Poverty Alleviation
  • 20. SUGGESTED CONTENTS OF DPR ( Cont..) RAJIV AWAS YOJANA 20 • Financing Arrangement: Component wise financial statement for each slum indicating cost, Central/State/ULB/Beneficiaries share or/and any other share. One consolidated statement covering all slums should also be furnished. • Drawings – i. Location Plan(s) of City and Slum(s), Land use map ii. Physical survey maps, Contour plans iii. Photographs covering the entire slum and Community participation iv. Slum/Area layout Plan ( Foot prints of existing / proposed houses and infrastructure connectivity) v. On site Infrastructure service plan (water supply, sewerage, roads, drainage etc.) and linkage with city wide infrastructure , vi. Architectural and Structural Drawings of Buildings vii. L section/ Cross section/ Elevation of Roads, SWD, Sewerage, Water Supply, Boundary Wall, Retaining Wall etc. Ministry of Housing and Urban Poverty Alleviation
  • 21. SUGGESTED CONTENTS OF DPR ( Cont..) RAJIV AWAS YOJANA 21 • Annexures to DPR: i. List of Beneficiaries ii. Sample copy of consent of beneficiaries iii. Sample copy of house holds survey. iv. Copy of Act/ Legislation for conferment of tenure rights v. Sample copy of allotment letter indicating ownership / lease rights. vi. Copy of minutes of SLSMC indicating approval of project. vii. Copies of MoA signed between ULB/parastatals, State and MoHUPA. viii. Reforms – Status and Proposals ix. Undertakings of ULB and SLNA x. Details of educational and health facilities for scheme xi. Copies of statutory approvals xii. Photographs covering existing housing and infrastructure of entire slum xiii. Photographs of ‘Micro Planning’ with the community Ministry of Housing and Urban Poverty Alleviation
  • 22. RAJIV AWAS YOJANA 22 Discussion forum on RAY VAARTA available at www.mhupa-ray.gov.in can be used for queries related to DPR preparation Thank You Ministry of Housing and Urban Poverty Alleviation