SlideShare a Scribd company logo
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
 Don’t over work this issue, you already have the information
 Inspection criteria requirements
 How much in the way of supplies are you required to have
 Software to Automate your Mechanical Integrity Program & Pre
startup review
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
Introduction
Brady Austin – Webinar Presenter
SEMS and Regulatory Compliance Expert
Ken Smith- Panelist
CEO – SEMS Services
Ed Sattar - Panelist
CEO, 360Factors.com
George Bunker- Panelist
Drilling EHS Professional
Ron White - Panelist
VP Operaions, I3P, LLC – SEMS Audit Service Provider (ASP)
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
 Don’t over work this issue, you already have the information
 Inspection criteria requirements
 How much in the way of supplies are you required to have
 Software to Automate your Mechanical Integrity Program & Pre
startup review
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
Don’t over work this issue, you already
have the information
 You must develop and implement written procedures that provide
instructions to ensure the mechanical integrity and safe operation of critical
equipment through inspection, testing, and quality assurance.
 Your mechanical integrity program must encompass all equipment and
systems used to prevent or mitigate uncontrolled releases of
hydrocarbons, toxic substances, or other materials that may cause
environmental or safety consequences.
 Your procedures must address the
design, procurement, fabrication, installation, calibration, and maintenance
of your equipment and systems in accordance with the manufacturer’s
design and material specifications.
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
 Don’t over work this issue, you already have the information
 Inspection criteria requirements
 How much in the way of supplies are you required to have
 Software and Tools to Scale and Automate your SEMs Compliance
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
Is compliance risk?
Inspection criteria requirements
The frequency of inspections and tests must be in accordance with BSEE
regulations and meet the manufacturer’s recommendations.
Inspections and tests can be performed more frequently if determined to be
necessary by prior operating experience.
Documentation must identify the individual who performed the inspection or
test; include a description of the inspection or test performed and the results of
the inspection test.
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
Your SEMS program must require that the commissioning process include
a pre-startup safety and environmental review.
Below are a few of the criteria that should be met:
a) Construction and equipment are in accordance with applicable specifications.
b) Safety, environmental, operating, maintenance, and emergency procedures are
in place and are adequate.
c) Safety and environmental information is current.
d) Hazards analysis recommendations have been implemented as appropriate.
e) Training of operating personnel has been completed.
f) Programs to address management of change and other elements of this
subpart are in place.
g) Safe work practices are in place.
Pre-Start Up Review
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
 Don’t over work this issue, you already have the information
 Inspection criteria requirements
 How much in the way of supplies are you required to have
 Software and Tools to Scale and Automate your SEMs Compliance
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
How much in the way of supplies are you
required to have?
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity & Pre-Startup Review
 Don’t over work this issue, you already have the information
 Inspection criteria requirements
 How much in the way of supplies are you required to have
 Software to Automate your Mechanical Integrity Program & Pre
startup review
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
Mechanical Integrity Automation through Software
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
Policy and Procedure Automation
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
Automate Your Mechanical Integrity Program
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
Continuous Third Party Audits..
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
Thank You for Attending 10 SEMSinar™
Series, Part 7,
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
Thank You for Attending 10 SEMSinar™
Series, Part 6,
Contact Information
Steve Patterson
VP of Sales
steve.patterson@360factors.com
Corporate Headquarters
360Factors, Inc
13801 Burnet Road Suite 100
Austin Texas, 78727
Phone: 866-385-2341
10 SEMSinar™ Series, Part 7,
Elements 8 & 9- Mechanical Integrity
& Pre-Startup Review
To Be Continued...
• Semptember SEMSinar™ Part 8 Element 10 - Emergency
Response & Control
Date & Time will be sent to you

More Related Content

Similar to 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

Ingenico Technologies _ppt
Ingenico Technologies _pptIngenico Technologies _ppt
Ingenico Technologies _ppt
Jaydeep Chhatrapati
 
User Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of ExcellenceUser Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of Excellence
TechWell
 
10 SEMS Webinar Series: Part 2, Element 1 - You Through Your Management
10 SEMS Webinar Series: Part 2, Element 1 - You Through Your Management10 SEMS Webinar Series: Part 2, Element 1 - You Through Your Management
10 SEMS Webinar Series: Part 2, Element 1 - You Through Your Management
360factors
 
How to find defects early and increase the reliability of software systems
How to find defects early and increase the reliability of software systemsHow to find defects early and increase the reliability of software systems
How to find defects early and increase the reliability of software systems
RAKESH RANA
 
Monitoring for Operational Outcomes and Application Insights: Best Practices ...
Monitoring for Operational Outcomes and Application Insights: Best Practices ...Monitoring for Operational Outcomes and Application Insights: Best Practices ...
Monitoring for Operational Outcomes and Application Insights: Best Practices ...
Amazon Web Services
 
Case Study: Learn How Expeditors Uses APM as Both a Technology and Process T...
Case Study:  Learn How Expeditors Uses APM as Both a Technology and Process T...Case Study:  Learn How Expeditors Uses APM as Both a Technology and Process T...
Case Study: Learn How Expeditors Uses APM as Both a Technology and Process T...
CA Technologies
 
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...
Emtec Inc.
 
Optimizing API Performance Testing A Comprehensive Guide
Optimizing API Performance Testing A Comprehensive GuideOptimizing API Performance Testing A Comprehensive Guide
Optimizing API Performance Testing A Comprehensive Guide
Testrig Technologies
 
Get Greater Monitoring Coverage with APM Essentials
Get Greater Monitoring Coverage with APM EssentialsGet Greater Monitoring Coverage with APM Essentials
Get Greater Monitoring Coverage with APM Essentials
New Relic
 
The quality assurance checklist for progressive testing
The quality assurance checklist for progressive testingThe quality assurance checklist for progressive testing
The quality assurance checklist for progressive testing
Maitrikpaida
 
The Quality Assurance Checklist for Progressive Testing
The Quality Assurance Checklist for Progressive TestingThe Quality Assurance Checklist for Progressive Testing
The Quality Assurance Checklist for Progressive Testing
Cygnet Infotech
 
Automation testing strategy, approach & planning
Automation testing  strategy, approach & planningAutomation testing  strategy, approach & planning
Automation testing strategy, approach & planning
SivaprasanthRentala1975
 
Bangalore based Test automation and Testing service Company - Oak Systems Pvt...
Bangalore based Test automation and Testing service Company - Oak Systems Pvt...Bangalore based Test automation and Testing service Company - Oak Systems Pvt...
Bangalore based Test automation and Testing service Company - Oak Systems Pvt...
OAK Systems Pvt Ltd
 
Continuous Delivery Testing @HiQ
Continuous Delivery Testing @HiQContinuous Delivery Testing @HiQ
Continuous Delivery Testing @HiQ
Tomas Riha
 
Best Practices in Testing Force.com Application
Best Practices in Testing Force.com ApplicationBest Practices in Testing Force.com Application
Best Practices in Testing Force.com Application
Emtec Inc.
 
ApexUnit: Open source test framework for apex
ApexUnit: Open source test framework for apexApexUnit: Open source test framework for apex
ApexUnit: Open source test framework for apex
Vamshidhar Gandham
 
LMS TESTING SERVICES
LMS TESTING SERVICESLMS TESTING SERVICES
LMS TESTING SERVICES
LMS Solutions (India) Pvt.Ltd.
 
Continuous Performance Testing: The New Standard
Continuous Performance Testing: The New StandardContinuous Performance Testing: The New Standard
Continuous Performance Testing: The New Standard
TechWell
 
Keyword Driven Automation
Keyword Driven AutomationKeyword Driven Automation
Keyword Driven Automation
Pankaj Goel
 
Software requirements engineering lecture 01
Software requirements engineering   lecture 01Software requirements engineering   lecture 01
Software requirements engineering lecture 01
Abdul Basit
 

Similar to 10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review (20)

Ingenico Technologies _ppt
Ingenico Technologies _pptIngenico Technologies _ppt
Ingenico Technologies _ppt
 
User Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of ExcellenceUser Acceptance Testing in the Testing Center of Excellence
User Acceptance Testing in the Testing Center of Excellence
 
10 SEMS Webinar Series: Part 2, Element 1 - You Through Your Management
10 SEMS Webinar Series: Part 2, Element 1 - You Through Your Management10 SEMS Webinar Series: Part 2, Element 1 - You Through Your Management
10 SEMS Webinar Series: Part 2, Element 1 - You Through Your Management
 
How to find defects early and increase the reliability of software systems
How to find defects early and increase the reliability of software systemsHow to find defects early and increase the reliability of software systems
How to find defects early and increase the reliability of software systems
 
Monitoring for Operational Outcomes and Application Insights: Best Practices ...
Monitoring for Operational Outcomes and Application Insights: Best Practices ...Monitoring for Operational Outcomes and Application Insights: Best Practices ...
Monitoring for Operational Outcomes and Application Insights: Best Practices ...
 
Case Study: Learn How Expeditors Uses APM as Both a Technology and Process T...
Case Study:  Learn How Expeditors Uses APM as Both a Technology and Process T...Case Study:  Learn How Expeditors Uses APM as Both a Technology and Process T...
Case Study: Learn How Expeditors Uses APM as Both a Technology and Process T...
 
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...
Webinar Presentation: Best Practices in QA Testing - Leveraging Open Source T...
 
Optimizing API Performance Testing A Comprehensive Guide
Optimizing API Performance Testing A Comprehensive GuideOptimizing API Performance Testing A Comprehensive Guide
Optimizing API Performance Testing A Comprehensive Guide
 
Get Greater Monitoring Coverage with APM Essentials
Get Greater Monitoring Coverage with APM EssentialsGet Greater Monitoring Coverage with APM Essentials
Get Greater Monitoring Coverage with APM Essentials
 
The quality assurance checklist for progressive testing
The quality assurance checklist for progressive testingThe quality assurance checklist for progressive testing
The quality assurance checklist for progressive testing
 
The Quality Assurance Checklist for Progressive Testing
The Quality Assurance Checklist for Progressive TestingThe Quality Assurance Checklist for Progressive Testing
The Quality Assurance Checklist for Progressive Testing
 
Automation testing strategy, approach & planning
Automation testing  strategy, approach & planningAutomation testing  strategy, approach & planning
Automation testing strategy, approach & planning
 
Bangalore based Test automation and Testing service Company - Oak Systems Pvt...
Bangalore based Test automation and Testing service Company - Oak Systems Pvt...Bangalore based Test automation and Testing service Company - Oak Systems Pvt...
Bangalore based Test automation and Testing service Company - Oak Systems Pvt...
 
Continuous Delivery Testing @HiQ
Continuous Delivery Testing @HiQContinuous Delivery Testing @HiQ
Continuous Delivery Testing @HiQ
 
Best Practices in Testing Force.com Application
Best Practices in Testing Force.com ApplicationBest Practices in Testing Force.com Application
Best Practices in Testing Force.com Application
 
ApexUnit: Open source test framework for apex
ApexUnit: Open source test framework for apexApexUnit: Open source test framework for apex
ApexUnit: Open source test framework for apex
 
LMS TESTING SERVICES
LMS TESTING SERVICESLMS TESTING SERVICES
LMS TESTING SERVICES
 
Continuous Performance Testing: The New Standard
Continuous Performance Testing: The New StandardContinuous Performance Testing: The New Standard
Continuous Performance Testing: The New Standard
 
Keyword Driven Automation
Keyword Driven AutomationKeyword Driven Automation
Keyword Driven Automation
 
Software requirements engineering lecture 01
Software requirements engineering   lecture 01Software requirements engineering   lecture 01
Software requirements engineering lecture 01
 

Recently uploaded

Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
Edge AI and Vision Alliance
 
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
Neo4j
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
innovationoecd
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Speck&Tech
 
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Zilliz
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website
Pixlogix Infotech
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
SOFTTECHHUB
 

Recently uploaded (20)

Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
 
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
Presentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of GermanyPresentation of the OECD Artificial Intelligence Review of Germany
Presentation of the OECD Artificial Intelligence Review of Germany
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
 
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
Introducing Milvus Lite: Easy-to-Install, Easy-to-Use vector database for you...
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website20 Comprehensive Checklist of Designing and Developing a Website
20 Comprehensive Checklist of Designing and Developing a Website
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
Why You Should Replace Windows 11 with Nitrux Linux 3.5.0 for enhanced perfor...
 

10 SEMSinar™ Series, Part 7: Elements 8 & 9 Mechanical Integrity & Pre Startup Review

  • 1. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review  Don’t over work this issue, you already have the information  Inspection criteria requirements  How much in the way of supplies are you required to have  Software to Automate your Mechanical Integrity Program & Pre startup review
  • 2. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review Introduction Brady Austin – Webinar Presenter SEMS and Regulatory Compliance Expert Ken Smith- Panelist CEO – SEMS Services Ed Sattar - Panelist CEO, 360Factors.com George Bunker- Panelist Drilling EHS Professional Ron White - Panelist VP Operaions, I3P, LLC – SEMS Audit Service Provider (ASP)
  • 3. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review  Don’t over work this issue, you already have the information  Inspection criteria requirements  How much in the way of supplies are you required to have  Software to Automate your Mechanical Integrity Program & Pre startup review
  • 4. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review Don’t over work this issue, you already have the information  You must develop and implement written procedures that provide instructions to ensure the mechanical integrity and safe operation of critical equipment through inspection, testing, and quality assurance.  Your mechanical integrity program must encompass all equipment and systems used to prevent or mitigate uncontrolled releases of hydrocarbons, toxic substances, or other materials that may cause environmental or safety consequences.  Your procedures must address the design, procurement, fabrication, installation, calibration, and maintenance of your equipment and systems in accordance with the manufacturer’s design and material specifications.
  • 5. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review  Don’t over work this issue, you already have the information  Inspection criteria requirements  How much in the way of supplies are you required to have  Software and Tools to Scale and Automate your SEMs Compliance
  • 6. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review Is compliance risk? Inspection criteria requirements The frequency of inspections and tests must be in accordance with BSEE regulations and meet the manufacturer’s recommendations. Inspections and tests can be performed more frequently if determined to be necessary by prior operating experience. Documentation must identify the individual who performed the inspection or test; include a description of the inspection or test performed and the results of the inspection test.
  • 7. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review Your SEMS program must require that the commissioning process include a pre-startup safety and environmental review. Below are a few of the criteria that should be met: a) Construction and equipment are in accordance with applicable specifications. b) Safety, environmental, operating, maintenance, and emergency procedures are in place and are adequate. c) Safety and environmental information is current. d) Hazards analysis recommendations have been implemented as appropriate. e) Training of operating personnel has been completed. f) Programs to address management of change and other elements of this subpart are in place. g) Safe work practices are in place. Pre-Start Up Review
  • 8. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review  Don’t over work this issue, you already have the information  Inspection criteria requirements  How much in the way of supplies are you required to have  Software and Tools to Scale and Automate your SEMs Compliance
  • 9. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review How much in the way of supplies are you required to have?
  • 10. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review  Don’t over work this issue, you already have the information  Inspection criteria requirements  How much in the way of supplies are you required to have  Software to Automate your Mechanical Integrity Program & Pre startup review
  • 11. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review Mechanical Integrity Automation through Software
  • 12. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review Policy and Procedure Automation
  • 13. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review Automate Your Mechanical Integrity Program
  • 14. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review Continuous Third Party Audits..
  • 15. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review Thank You for Attending 10 SEMSinar™ Series, Part 7,
  • 16. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review Thank You for Attending 10 SEMSinar™ Series, Part 6, Contact Information Steve Patterson VP of Sales steve.patterson@360factors.com Corporate Headquarters 360Factors, Inc 13801 Burnet Road Suite 100 Austin Texas, 78727 Phone: 866-385-2341
  • 17. 10 SEMSinar™ Series, Part 7, Elements 8 & 9- Mechanical Integrity & Pre-Startup Review To Be Continued... • Semptember SEMSinar™ Part 8 Element 10 - Emergency Response & Control Date & Time will be sent to you

Editor's Notes

  1. Ed Sattar- I am the CEO of 360factors, which is Regulatory Compliance Software and Advisory Services company. I’ve spent the past 15 years in the Regulatory Compliance policy making and workflow automation space, which essentially involved in building regulatory intelligence models and developing Software to scale and stream line compliance for corporations, agencies, consulting firms and regulators…. And glad to contribute
  2.  
  3. The assurance that maintenance materials, spare parts, and equipment are suitable for the applications for which they will be used.If you are changing like kind equipment, then the process is very straight forward as theexisting safety, environmental, operating, maintenance and emergency procedures willbe the same as what you are already using. However, if the equipment doesn’t have thesame operating parameters or is a different manufacturer, then you will have to reevaluate everything.
  4. § 250.1916 touches on the criteria for mechanical integrity that your SEMS program must meet?You must develop and implement written procedures that provide instructions to ensure the mechanical integrity and safe operation of equipment through inspection, testing, and quality assurance. Mechanical integrity is about business continuity and process automation issue to increase accuracy Software can help you track your evidence, ensure competency, define inspection methods and even notify you when things are overdue or simply out of operating limits. Continuous auditing of this area of operations can provide you valuable leading indicators before a dreaded lagging indicator occurs he results of these audits will help you develop the needed quality assurance, procedures, processes and management of change process that will need to be intertwined into this area of operations.
  5. These procedures must have some components that these procedures. As covered in our previous SEMSINAR, there has to be a structure, style guide , consistency , review, approval process and management of change……..most of the problems happen and safety is jeopardized when the policies are not understood or a way to track that the policies were read and understood.
  6. You can use a configurable workflow engine to automate your mechanical integrity program must encompass all equipment and systems used to prevent or mitigate uncontrolled releases of hydrocarbons, toxic substances, or other materials that may cause environmental or safety consequences…
  7. Continuous third party audits is highly recommended. This will provide the most bang for your buck and give your personnel the increased competency required in these areas. I was talking one of the majors and they said, we have approximately 30-50K contractor resources at our premises and every time they’ve done contractor audits, they are about 70% out of compliance …so frequency of the audits and inspection