• Based on the given input data file we will add LID (Low Impact Development)
options for subcatchments
2
• EPA’s SWMM 5.1 has been extended to model the hydrologic performance
of specific types of low impact development (LID) controls.
• LID controls that you can choose include 7 green infrastructure practices
1. Permeable pavement
2. Rain gardens
3. Green roofs
4. Street planters
5. Rain barrels
6. Infiltration trenches
7. Vegetative swales (not optional in WMAM)
• You will edit 6 types of LID structures by using the LID control option of
EPA SWMM5.1
• Follow the instructions (step 1 to step 7) to enter all values
• The following tables are information of the LID control you will edit
3
Control name LID type Layer Parameter Value
GR_your initial Green Roof
Surface
Berm Height 3
Vegetation Volume Fraction 0.2
Surface Roughness 0.1
Surface Slope 1.0
Soil
Thickness 6
Porosity 0.5
Field Capacity 0.2
Wilting Point 0.1
Conductivity 0.5
Conductivity Slope 10
Suction Head 3.5
Drainage Mat
Thickness 1
Void Fraction 0.5
Roughness 0
<Table 1> Information of green roof
4
<Table 2> Information of permeable pavement
Control name LID type Layer Parameter Value
PP_your initial Permeable Pavement
Surface
Berm Height 1
Vegetation Volume Fraction 0.1
Surface Roughness 0.02
Surface Slope 2
Pavement
Thickness 8
Void Ratio 0.15
Impervious Surface Fraction 0
Permeability 100
Clogging Factor 0
Storage
Thickness 12
Void Ratio 0.75
Seepage Rate 0.2
Clogging Factor 0
Underdrain
Flow Coefficient 0
Flow Exponent 0.5
Offset Height 0
5
<Table 3> Information of bio-retention cell
Control name LID type Layer Parameter Value
BC_your initial Bio-Retention Cell
Surface
Berm Height 6
Vegetation Volume Fraction 0.0
Surface Roughness 0.2
Surface Slope 0
Soil
Thickness 12
Porosity 0.5
Field Capacity 0.2
Wilting Point 0.1
Conductivity 0.5
Conductivity Slope 10
Suction Head 3.5
Storage
Thickness 12
Void Ratio 0.5
Seepage Rate 0.5
Clogging Factor 0.2
Underdrain
Flow Coefficient 0
Flow Exponent 1
Offset Height 0.5
6
<Table 4> Information of infiltration trench
Control name LID type Layer Parameter Value
IT_your initial Infiltration Trench
Surface
Berm Height 0.0
Vegetation Volume Fraction 0.0
Surface Roughness 0.24
Surface Slope 0.4
Storage
Thickness 36
Void Ratio 0.4
Seepage Rate 0.2
Clogging Factor 0
Underdrain
Flow Coefficient 0
Flow Exponent 0.5
Offset Height 0
7
<Table 5> Information of rain barrel
Control name LID type Layer Parameter Value
RB_your initial Rain Barrels
Storage Berm Height 48
Underdrain
Flow Coefficient 1
Flow Exponent 0.5
Offset Height 0
Drain Delay 6
8
<Table 6> Information of rain garden
Control name LID type Layer Parameter Value
RG_your initial Rain Garden
Surface
Berm Height 6
Vegetation Volume Fraction 0.0
Surface Roughness 0.0
Surface Slope 0.0
Soil
Thickness 12
Porosity 0.5
Field Capacity 0.2
Wilting Point 0.1
Conductivity 0.5
Conductivity Slope 10
Suction Head 2.5
9
• Select LID Controls from the project browser (under Hydrology)
Step 1
10
• Left click the add button or select Project -> Add a new LID Control
from the main menu
Step 2
11
• Enter the Control Name for the LID structure
Step 3
12
• Choose the type of the LID structure
Step 4
13
• Enter the parameter values of the surface layer
Step 5
14
• To enter the parameter values of the Soil, Storage, and Underdrain layer
click the tab of the layer
Step 6
15
• Follow step 1~6 and use the information in table 1~6 to edit the LID control
• After you have entered all the values, you can find your designed LID controls
• Now you will plan the subcatchment area with the designed LID structures
• Step 7 to step 11 shows how to edit the LID Usage Editor
• Follow the instructions from (step 7 ~ 11) and use the following information to
complete the editing process
16
Subcatchment LID Process
S1 Infiltration trench
S1 Rain barrel
S4 Bio-retention cell
S5 Permeable pavement
S5 Green roof
S6 Rain garden
<Table 7> LID controls for subcatchments
17
Subcatchment LID Process
Area of
Each Unit
Numb
of Unit
Surface
Width
per Unit
% Initially
Saturated
% of
Imperv
Area
Treated
Return
all
outflow
to perv
S1 Infiltration trench 2320000 4 133 0 40 -
S1 Rain barrel 100 32 0 0 17 Check
S4 Bio-retention cell 47500 500 0 10 50 -
S5 Permeable pavement 3828720 1 683 0 0 -
S5 Green roof 1840000 12 136 0 0 -
S6 Rain garden 1650000 1 0 15 5 -
<Table 8> LID planning parameters for each structure
18
• Open the editing window (properties) of one of the subcatchments
Step 7
19
• Left click on the box in LID controls
Step 8
20
• Left click Add to open the LID usage editor
Step 9
21
• Select the LID control name
• Enter the planning parameter values for the selected LID structure
Step 10
22
• If you check the LID Occupies Full Subcatchment, the LID structure will
automatically calculate the Area of each unit as it is designed
Step 11
23
Training SWMM LID control

More Related Content

What's hot

Rapidly variying flow
Rapidly variying flowRapidly variying flow
Rapidly variying flowMilan Sheta
 
Water Supply - Design Approach And Methodologies
Water  Supply - Design Approach And MethodologiesWater  Supply - Design Approach And Methodologies
Water Supply - Design Approach And MethodologiesIr. Abdul Aziz Abas
 
Water distribution network design and analysis
Water distribution network design and analysisWater distribution network design and analysis
Water distribution network design and analysisAna Debbarma
 
A presentation engineering hydrology
A presentation engineering hydrologyA presentation engineering hydrology
A presentation engineering hydrologyverma shashikant
 
Workshop on Storm Water Modeling Approaches
Workshop on Storm Water Modeling ApproachesWorkshop on Storm Water Modeling Approaches
Workshop on Storm Water Modeling ApproachesM. Damon Weiss
 
Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacityonyx3
 
Assignment applied hydrology
Assignment applied hydrologyAssignment applied hydrology
Assignment applied hydrologyAtif Satti
 
Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)Latif Hyder Wadho
 
Introduction, hydrologic cycle, climate and water m1
Introduction, hydrologic cycle, climate and water m1Introduction, hydrologic cycle, climate and water m1
Introduction, hydrologic cycle, climate and water m1Bibhabasu Mohanty
 
Planning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad cityPlanning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad cityMona Prajapati
 
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13World University of Bangladesh
 
Chapter 7 spillway and energy dissipators
Chapter 7 spillway and energy dissipatorsChapter 7 spillway and energy dissipators
Chapter 7 spillway and energy dissipatorsMohsin Siddique
 
Langkah perancangan intensitas hujan kriteria perancangan
Langkah perancangan intensitas hujan kriteria perancanganLangkah perancangan intensitas hujan kriteria perancangan
Langkah perancangan intensitas hujan kriteria perancanganMartheana Kencanawati
 
Determination of reservoir storage capacity
Determination of reservoir storage capacityDetermination of reservoir storage capacity
Determination of reservoir storage capacitychingtony mbuma
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningRamanuj Jaldhari
 
Reservoir capacity, Reservoir sedimentation and control
Reservoir capacity, Reservoir sedimentation  and controlReservoir capacity, Reservoir sedimentation  and control
Reservoir capacity, Reservoir sedimentation and controldeep shah
 

What's hot (20)

Rapidly variying flow
Rapidly variying flowRapidly variying flow
Rapidly variying flow
 
Water Supply - Design Approach And Methodologies
Water  Supply - Design Approach And MethodologiesWater  Supply - Design Approach And Methodologies
Water Supply - Design Approach And Methodologies
 
Water distribution network design and analysis
Water distribution network design and analysisWater distribution network design and analysis
Water distribution network design and analysis
 
A presentation engineering hydrology
A presentation engineering hydrologyA presentation engineering hydrology
A presentation engineering hydrology
 
Workshop on Storm Water Modeling Approaches
Workshop on Storm Water Modeling ApproachesWorkshop on Storm Water Modeling Approaches
Workshop on Storm Water Modeling Approaches
 
Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacity
 
Assignment applied hydrology
Assignment applied hydrologyAssignment applied hydrology
Assignment applied hydrology
 
Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)Hydrology introduction ( catchment area)
Hydrology introduction ( catchment area)
 
Introduction, hydrologic cycle, climate and water m1
Introduction, hydrologic cycle, climate and water m1Introduction, hydrologic cycle, climate and water m1
Introduction, hydrologic cycle, climate and water m1
 
CE-235 EH Lec 3
CE-235 EH Lec 3CE-235 EH Lec 3
CE-235 EH Lec 3
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Sewerage design
Sewerage designSewerage design
Sewerage design
 
Planning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad cityPlanning & Design of Storm water Drainage system for Valsad city
Planning & Design of Storm water Drainage system for Valsad city
 
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13
Class lecture on Hydrology by Rabindra Ranjan saha Lecture 13
 
Chapter 7 spillway and energy dissipators
Chapter 7 spillway and energy dissipatorsChapter 7 spillway and energy dissipators
Chapter 7 spillway and energy dissipators
 
Langkah perancangan intensitas hujan kriteria perancangan
Langkah perancangan intensitas hujan kriteria perancanganLangkah perancangan intensitas hujan kriteria perancangan
Langkah perancangan intensitas hujan kriteria perancangan
 
Determination of reservoir storage capacity
Determination of reservoir storage capacityDetermination of reservoir storage capacity
Determination of reservoir storage capacity
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal Lining
 
Chapter 4 embankment dams
Chapter 4 embankment damsChapter 4 embankment dams
Chapter 4 embankment dams
 
Reservoir capacity, Reservoir sedimentation and control
Reservoir capacity, Reservoir sedimentation  and controlReservoir capacity, Reservoir sedimentation  and control
Reservoir capacity, Reservoir sedimentation and control
 

Similar to Training SWMM LID control

Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Asadullah Malik
 
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM Tushar Dholakia
 
Ramanujan IT City, Chennai - 100 % recycled water used for cooling tower
Ramanujan IT City, Chennai - 100 % recycled water used for cooling towerRamanujan IT City, Chennai - 100 % recycled water used for cooling tower
Ramanujan IT City, Chennai - 100 % recycled water used for cooling towerDanfoss India
 
Parametric study of surface roughness in turning of az31 b mg alloy under dif...
Parametric study of surface roughness in turning of az31 b mg alloy under dif...Parametric study of surface roughness in turning of az31 b mg alloy under dif...
Parametric study of surface roughness in turning of az31 b mg alloy under dif...Imran Sarker
 
db2dart and inspect
db2dart and inspectdb2dart and inspect
db2dart and inspectdbawork
 
Charleston presentation final
Charleston presentation finalCharleston presentation final
Charleston presentation finalkcreswell
 
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docxEHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docxjack60216
 

Similar to Training SWMM LID control (7)

Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...Sustainable Modifications and Innovations using LEED of a Women University in...
Sustainable Modifications and Innovations using LEED of a Women University in...
 
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
LARGE SCALE INSTALLATION OF SUBSURFACE DRAINAGE SYSTEM
 
Ramanujan IT City, Chennai - 100 % recycled water used for cooling tower
Ramanujan IT City, Chennai - 100 % recycled water used for cooling towerRamanujan IT City, Chennai - 100 % recycled water used for cooling tower
Ramanujan IT City, Chennai - 100 % recycled water used for cooling tower
 
Parametric study of surface roughness in turning of az31 b mg alloy under dif...
Parametric study of surface roughness in turning of az31 b mg alloy under dif...Parametric study of surface roughness in turning of az31 b mg alloy under dif...
Parametric study of surface roughness in turning of az31 b mg alloy under dif...
 
db2dart and inspect
db2dart and inspectdb2dart and inspect
db2dart and inspect
 
Charleston presentation final
Charleston presentation finalCharleston presentation final
Charleston presentation final
 
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docxEHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
EHST 3370 Exam 1 Study GuideHomework (Due 12816)1) What are t.docx
 

Recently uploaded

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 

Recently uploaded (20)

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 

Training SWMM LID control

  • 1.
  • 2. • Based on the given input data file we will add LID (Low Impact Development) options for subcatchments 2
  • 3. • EPA’s SWMM 5.1 has been extended to model the hydrologic performance of specific types of low impact development (LID) controls. • LID controls that you can choose include 7 green infrastructure practices 1. Permeable pavement 2. Rain gardens 3. Green roofs 4. Street planters 5. Rain barrels 6. Infiltration trenches 7. Vegetative swales (not optional in WMAM) • You will edit 6 types of LID structures by using the LID control option of EPA SWMM5.1 • Follow the instructions (step 1 to step 7) to enter all values • The following tables are information of the LID control you will edit 3
  • 4. Control name LID type Layer Parameter Value GR_your initial Green Roof Surface Berm Height 3 Vegetation Volume Fraction 0.2 Surface Roughness 0.1 Surface Slope 1.0 Soil Thickness 6 Porosity 0.5 Field Capacity 0.2 Wilting Point 0.1 Conductivity 0.5 Conductivity Slope 10 Suction Head 3.5 Drainage Mat Thickness 1 Void Fraction 0.5 Roughness 0 <Table 1> Information of green roof 4
  • 5. <Table 2> Information of permeable pavement Control name LID type Layer Parameter Value PP_your initial Permeable Pavement Surface Berm Height 1 Vegetation Volume Fraction 0.1 Surface Roughness 0.02 Surface Slope 2 Pavement Thickness 8 Void Ratio 0.15 Impervious Surface Fraction 0 Permeability 100 Clogging Factor 0 Storage Thickness 12 Void Ratio 0.75 Seepage Rate 0.2 Clogging Factor 0 Underdrain Flow Coefficient 0 Flow Exponent 0.5 Offset Height 0 5
  • 6. <Table 3> Information of bio-retention cell Control name LID type Layer Parameter Value BC_your initial Bio-Retention Cell Surface Berm Height 6 Vegetation Volume Fraction 0.0 Surface Roughness 0.2 Surface Slope 0 Soil Thickness 12 Porosity 0.5 Field Capacity 0.2 Wilting Point 0.1 Conductivity 0.5 Conductivity Slope 10 Suction Head 3.5 Storage Thickness 12 Void Ratio 0.5 Seepage Rate 0.5 Clogging Factor 0.2 Underdrain Flow Coefficient 0 Flow Exponent 1 Offset Height 0.5 6
  • 7. <Table 4> Information of infiltration trench Control name LID type Layer Parameter Value IT_your initial Infiltration Trench Surface Berm Height 0.0 Vegetation Volume Fraction 0.0 Surface Roughness 0.24 Surface Slope 0.4 Storage Thickness 36 Void Ratio 0.4 Seepage Rate 0.2 Clogging Factor 0 Underdrain Flow Coefficient 0 Flow Exponent 0.5 Offset Height 0 7
  • 8. <Table 5> Information of rain barrel Control name LID type Layer Parameter Value RB_your initial Rain Barrels Storage Berm Height 48 Underdrain Flow Coefficient 1 Flow Exponent 0.5 Offset Height 0 Drain Delay 6 8
  • 9. <Table 6> Information of rain garden Control name LID type Layer Parameter Value RG_your initial Rain Garden Surface Berm Height 6 Vegetation Volume Fraction 0.0 Surface Roughness 0.0 Surface Slope 0.0 Soil Thickness 12 Porosity 0.5 Field Capacity 0.2 Wilting Point 0.1 Conductivity 0.5 Conductivity Slope 10 Suction Head 2.5 9
  • 10. • Select LID Controls from the project browser (under Hydrology) Step 1 10
  • 11. • Left click the add button or select Project -> Add a new LID Control from the main menu Step 2 11
  • 12. • Enter the Control Name for the LID structure Step 3 12
  • 13. • Choose the type of the LID structure Step 4 13
  • 14. • Enter the parameter values of the surface layer Step 5 14
  • 15. • To enter the parameter values of the Soil, Storage, and Underdrain layer click the tab of the layer Step 6 15
  • 16. • Follow step 1~6 and use the information in table 1~6 to edit the LID control • After you have entered all the values, you can find your designed LID controls • Now you will plan the subcatchment area with the designed LID structures • Step 7 to step 11 shows how to edit the LID Usage Editor • Follow the instructions from (step 7 ~ 11) and use the following information to complete the editing process 16
  • 17. Subcatchment LID Process S1 Infiltration trench S1 Rain barrel S4 Bio-retention cell S5 Permeable pavement S5 Green roof S6 Rain garden <Table 7> LID controls for subcatchments 17
  • 18. Subcatchment LID Process Area of Each Unit Numb of Unit Surface Width per Unit % Initially Saturated % of Imperv Area Treated Return all outflow to perv S1 Infiltration trench 2320000 4 133 0 40 - S1 Rain barrel 100 32 0 0 17 Check S4 Bio-retention cell 47500 500 0 10 50 - S5 Permeable pavement 3828720 1 683 0 0 - S5 Green roof 1840000 12 136 0 0 - S6 Rain garden 1650000 1 0 15 5 - <Table 8> LID planning parameters for each structure 18
  • 19. • Open the editing window (properties) of one of the subcatchments Step 7 19
  • 20. • Left click on the box in LID controls Step 8 20
  • 21. • Left click Add to open the LID usage editor Step 9 21
  • 22. • Select the LID control name • Enter the planning parameter values for the selected LID structure Step 10 22
  • 23. • If you check the LID Occupies Full Subcatchment, the LID structure will automatically calculate the Area of each unit as it is designed Step 11 23