SlideShare a Scribd company logo
1 of 45
PRESENTATION
BATAM URBAN TRANSPORT
DRS. ZULHENDRI , Msi
HEAD OF BATAM TRANSPORT AGENCY
BATAM, AUGUST 2015
I. PROFILE OF BATAM
Batam City as a main ”Free Trade Zone”, is developing rapidly. Especially in industrial
and tourism areas in Riau Islands. As a center of development among its surrounding areas,
Batam City needs to be prepared, and becomes a convinient place, attracted investors and
tourists both foreign and domestic.
Program in transportation sector in the batam is expected to make use of public transport
and non-motorized transport becomes the main choice for most of the road users. Therefore,
could make Batam to be environmentally friendly city, beautiful, convenient fresh, and green
Geographically, Batam City has strategic
position since it lays on international
shipping line and only 12.5 sea miles
separated to Singapore.
With area of 426.563 Ha which is divided
into 318.298 Ha of sea and 108.265 Ha of
land
Batam City Borderline:
North : Singapura and Malaysia
South : Lingga
West : Karimun
East : Bintan danTanjungpinang
Consisted of more than 370
islands, which are some of them
are small islands and adjacent to
Singapore and Malaysia
Riau Islands Territory
Sumber : Batam dalam Angka 2014
YEAR MALE FEMALE TOTAL
2004 281,807 309,446 591,253
2005 332,720 353,067 685,787
2006 347,575 366,385 713,960
2007 355,692 368,623 724,315
2008 450,936 441,533 892,469
2009 506,758 481,797 988,555
2010 545,189 511,512 1,056,701
2011 588,556 549,338 1,137,894
2012 614,085 573,489 1,187,574
2013 591,180 544,232 1,135,412
2014 614,348 566,329 1,180,677
-
100,000
200,000
300,000
400,000
500,000
600,000
700,000
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
POPULATION
Male
Female
USD 5,754 Juta
(Local Investment)
USD 6,161 Juta
(Foreign Investment)
USD 2.7 Juta
(Government)
Year
Investment in Batam City(in million US $)
Total
Government Local
Investment
Foreign
Investment
2005
2006
2007
2008
2009
2010
2011
2,340
2,450
2,606
2,770
2,792
2,792
3,000
5,470
5,500
5,710
5,710
5,710
5,710
5,754
4,080
4,470
4,765
5,180
5,270
5,359
6,161
11,890
12,420
13,082
13,660
13,772
13,861
14,915
Sumber : Batam dalam Angka 2012
Industrial Origin
GRDP (Million Rupiahs) Percentage
2008 2009 2210 2011 2008 2009 2010 2011
1. Agriculture 446,620.26 476,410.95 534,638.29 599,955.60 1.17 1.17 1.13 1.14
2. Mining and quarrying 48,219.55 50,389.17 55,101.35 57,337.00 0.13 0.12 0.12 0.11
3. Manufacturing industry 23,263,235.61 24,253,904.43 27.812,382.39 30,445,651.00 60.80 59.20 58.80 57.85
4. Electricity, gas and
water
151,463.45 320,181.97 363,926.89 415,236.21 0.40 0.78 0.77 0.79
5. Construction 778,747.56 945,065.83 1,287,652.41 1,494,616.45 2.04 2.48 2.72 2.84
6. Trade, hotel and
Restaurant
9,602,820.01 10,622,143.70 12,551,757.96 14,490,528.41 25.10 25.93 26.54 27.54
7. Transportation and
Communication
1,113,560.69 1,146,204.59 1,282,976.51 1,421,254.34 2.91 2.81 2.71 2.70
8. Finance, rental and
corporate service
2,306,525.93 2,451,023.22 2,713,620.38 2,936,833.39 6.03 5.98 5.74 5.58
9. Services 553,024.88 626,966.88 695,578.30 763,004.07 1.45 1.53 1.47 1.45
PDRB / GRDP 38,264,217.84 40,892,290.73 38,264,217.84 40,892,290.73 100.00 100.00 100.00 100.00
YEAR NUMBERS
2002 1.101.048
2003 1.277.098
2004 1.527.131
2005 1.024.733
2006 1.012.711
2007 1.077.306
2008 1.061.390
2009 951.384
2010 1.007.446
2011 1. 186.773
2012 1.212.775
2013 1.336.430
Sumber : Batam dalam Angka 2014
II.
In general, transportation services system in Batam are directed to intergrated
mode, which are conjoined air with land mode and sea with land mode yet stil
need to be developed. Therefore, accessibility of services will become more
convinient and safer.
For land transportation, in regard of rapid growth of economic and population
which induce the increase of motor-vehicles ownership, transportation facilities
development plan, especially public transport will be much focused in
developing mass-rapid transport which are reliable and fast, better
management and control system, which at the end will be reducing traffic
congestion in the city.
LONG TERM DEVELOPMENT PLANNING OF BATAM CITY 2005-2025
TRANSPORTATION DEVELOPMENT OF BATAM CITY
BATAM REGION DECREE NO. 2 YEAR 2013
LAND TRANSPORT DEVELOPMENT STRATEGIES IN RPJM 2011-2016
STRATEGIES AND
POLICIES
PERFORMANCE
INDICATOR
EXISTING RESULT
Building an integrated
transportation to
supports the
structure of urban
space
- ATCS
- shelters
19 intersections
121 units
21 intersections
173 units
Improving facilities
and utilities
Pedestrian 7.250 m 36.000 m
Improving air quality The numbers of
vehicles that pass
emission test
70% 85%
Penyelenggaraan RTH Maintaining the roads
median and city parks
50 locations/ year 60 locations/ year
NO ACTIONS
BUDGET
TOTAL
YEAR 2012 YEAR 2013 YEAR 2014 YEAR 2015 YEAR 2016
IDR IDR IDR IDR IDR
1. Developing transport facilities
(ATCS, road signs, road studs, etc) 2,008,612,000 2,809,750,000 2,935,588,000 2,895,977,000 2,271,722,000 12,921,649,000
2. Road Marks
1,678,827,000 1,876,293,000 1,742,892,000 2,787,900,000 3,317,880,000 11,403,792,000
3. Building Bus Shelters
411,415,750 215,993,269 226,792,932 620,000,000 682,000,000 2,156,201,951
4. Building pedestrian bridge, 1 unit
1,500,000,000 1,500,000,000
5. BRT
3,867,779,217 4,061,168,178 4,264,226,587 4,477,437,916 4,701,309,812 21,371,921,709
6. Socializing Transport Regulations
444,750,200 466,987,710 490,337,096 514,853,950 540,596,648 2,457,525,604
7. Maintaining transport facilities
(ATCS, road signs, road studs, etc) 918,751,000 1,184,688,000 1,284,542,000 1,343,004,000 1,313,075,000 6,044,060,000
TOTAL 9,330,135,167 10,614,880,157 12,444,378,614 12,639,172,866 12,826,583,460 57,855,150,264
BATAM TRANSPORT AUTHORITY
STRATEGIC PLANS YEAR 2012 - 2016
In order to accelerate realization of
national road network, it has been
planned the development of inner
road toll in Batam city which will
cover:
• Batu Ampar- Muka Kuning Industrial
Estate;
• Muka Kuning Intersection - Hang
Nadim Airport;
• Kabil Roundabout – Batam Bridge -
Tanjung Sauh – Bintan Island;
• Muka Kuning Industrial Estate –
Galang Island.
The development of this road toll
will connect aiport transportation
and seaport nodes which serve
internationally and nationally.
Ministry of Transportation has studied on
Urban Rail System in Batam City. According to
the study, Batam may develop rail system in:
• Batu Aji-Batam Centre corridor, 17,7 km
• Batu Ampar-Nongsa corridor, 19,6 km
• Sekupang-Batam Centre corridor, 16,5 km
Development of Bicycle
Lanes in areas:
 Transit Oriented
Development Batam
Centre
 Nagoya-Jodoh area
 TOD Sekupang
 Muka Kuning
 Bengkong
 Batu Aji
 Sagulung
 Nongsa
 Rempang-Galang
 P. Belakang Padang
Pedestrian facilities were be built in 2014 in Batam Center Area
from APBD Kota Batam for cost of IDR 6,000,000,000
II.
PUBLIC TRANSPORT IN BATAM CITY
No Types Capacity Numbers
1.
BUS TRANS BATAM
(BRT)
27 Seat 27 Units
2. TRUNK LINES 14 Seat 673 Units
3. FEEDER LINES 9 Seat 1772 Units
4. TAXI 4 Seat 1195 Units
5. EMPLOYEES BUS 24 s/d 50 Seat 313 Units
Note;
“60% of vehicles are in age condition that need to be restored”
TANJUNG
UNCANG
JOD
OH
Simp
Kabil
BATAM
CENTRE
SimpJA
M
Simp
Panbil
Simp Bs
Camp
NONG
SA
BATU
AMPAR
BATU
MERAH
BATU
BESAR
TLG
PUNGGUR
TJG
PIAYU
BATU
AJI
MAIN AND BRANCH ROUTES
EXISTING CONDITION (SK. WALIKOTA NO. 04 TAHUN 2003
Simp Kompi
134
MUKA
KUNING
SEKUPA
NG
NAGO
YA
SEI
PANAS
MARIN
A
TG
RIAU
TJG
SENGKUAN
G
DAPUR 12
Terminal
Muka
Kuning
BAND
ARA
BENGK
ONG
MAIN
1. Jodoh - Sekupang via
Tiban
2. Jodoh - Sekupang via Mk
Kuning
3. Jodoh – Tanjung Uncang
4. Jodoh – Muka Kuning
5. Jodoh – Telaga Punggur
6. Jodoh – Nongsa
7. Jodoh – Sembulang
8. Jodoh – Galang Baru
9. Jodoh – Dapur 12
10. Sekupang – Telaga
Punggur
Patas AC.
11. Jodoh - Marina City
12. Sekupang – Bandara
13. Nagoya – Bandara
BPP
14. Sekupang – Btm Centre
15. Batu Aji – Btm Centre
BRANCH
1. Muka Kuning – Tanjung
Piayu.
2. Muka Kuning – Batu Aji
bagian sebelah kiri
3. Muka Kuning – Batu Aji
bagian sebelah kanan
4. Batu Aji – Tanjung Uncang
5. Batu Aji – Sei Harapan via
Tanjung Riau
6. Jodoh – Batu Merah
7. Jodoh – Tanjung
Sengkuang
8. Bengkong – Jodoh via
Kodim
9. Bengkong Jodoh via Pelita
10.Sei Harapan–SMKTA
Kartini
11.Sei Harapan – Tiban
12.Muka Kuning - Bengkong
Since December 2013, Trans Batam was managed by
UPT Transportation Services, based on Batam Mayor
Decree Number 30 Year 2013, dated 22 May 2013
about Forming UPT Transportation Services in Batam
Municipality Transport Agency.
In the future, the management will be upgraded to
BLUD as the demand of the services increases
significantly.
TRANS BATAM MANAGEMENT OPERATIONAL
THE HUMAN RESOUIRCES OF
UPT TRANSPORTATION SERVICES
T.A 2014
Jobs Numbers
Drivers 25
Mechanics 4
Boat Guards 1
Ticketing Man 20
Field Supervisors 5
Timer 5
Administrator 5
T.A 2015
Posisi Jumlah
Drivers 12
Mechanics 4
Boat Guards 1
Ticketing Man 28
Field Supervisor 9
Timer 7
Administrator 7
Cleaning Servces 2
• UPT Transportation Services is
responsible for managing:
– BRT Operational
– Boat Hinterland Operations
– School Buses Operations
Th. 2014
• In 2015 the BRT operational is
divided into :
• Corridor I and II were
tendered with 20 fleets
• Corridor III was self-operated
by UPT Transportation
Services with 7 fleets
• School Bus for Rempang-
Galang region was self-
operated as well with 5
fleets.
• Boat Renting in Galang region
with 2 fleet was operated
using tendering system
Year 2015
SKP - BTC TJU - BTC
Distance 22.5 22
Number of Fleet 10 10
Number of rit/day 64 64
Operational Hour 06.00 s/d 18.00
Fees
General Rp. 4.000,-
Student Rp. 2.000,-
Load Factor 84.57% 43.14%
Headway
10-15 mnt (peak hour) 15-20 mnt (peak hour)
25 mnt 30 mnt
• 7 fleet (10 years) or 620.500 kms
• 12 fleet (9 years) or 558.450 kms
• 3 fleet (7 years) or 434.350 kms
• Year 2014, bought 5 buses;
• Year 2015, bought 5 buses from
local government, 15 buses from
HR Agency and 10 buses from
Transport Ministry
APBD APBN Total
2004 7 7
2005 6 6 12
2007 3 3
2014 5 5
2015
5
(APBD)
& 15
(BPJS)
10 30
Total 36 16 57
Pengadaan Bus Trans Batam TA. 2014
No Corridor
Halte/ Bus Stop
Total
APBD
Other
Sources
1 SKP – BTC 32 4 36
2 TJU – BTC 36 1 37
3 SKP – TMJ 30 6 36
4 TJU – SKP 25 6 31
5 TMJ - BTC 10 2 12
Total 133 19 152
N
o
Corridor Distances
Fleet
Needed
Targets
1 Sekupang – Batam Centre 22.5 12 2005 (realisation: 10 units)
2 TJ. Uncang – Batam Centre 22 12 2006 (realisation: 10 units
3 Sekupang – Jodoh 18 8 January 2015
4 Tanjung Uncang – Sekupang 20 8 Januariy 2016
5 TM.Jodoh – Batam Centre 15 8 August 2015 (BPJS)
6 TJ.Piayu – TM.Muka Kuning 14 7 August 2015 (BPJS)
7 TM. Jodoh – TL.Punggur 29 10 2018
8 Batam Centre – Nongsa 25 10 2017
9 Jodoh - Nongsa 30 12 2018
10 Tembesi – Galang 60 10 2019
Total 255.5 97
CORRIDOR IX DESIGN
37
No CORRIDORS ROUTES STATUS
I Sekupang – Batam centre
Pel.Sekupang –Tiban – RSAB –Mymart -
K.Walikota - Mega Mall
Operasi
II Batu Aji – Batam Centre
Fanindo – Basecamp – Tembesi - Kepri
Mall -K.Walikota - Mega Mall
Operasi
III Sekupang – Jodoh
Pel.Sekupang – Tiban – UIB –Penuin -
Nagoya Hill – Jodoh
Operasi
IV Tj. Uncang – Sekupang
Pool Damri – Basecamp –Marina - Tj.
Riau - Sei Harapan - Pel.Sekupang
2016
V Jodoh- Batam Centre
Jodoh – HarbourBay –Batu Ampar - Sei
Panas – MyMart -K.Walikota - Megamall
2016
NO CORRIDORS ROUTES STATUS
VI Jodoh – Nongsa
Jodoh - Nagoya Hill –Raden Patah –
Sudirman – BatuBesar – Nongsa
2018
VII Jodoh-Tl Punggur
Jodoh – DC Mall – BCS –Sudirman -
Tl.Punggur
2018
VIII Batam Centre – nongsa
Mega mall – Tunas – KDA –UNIBA -
Botania II - Botania I -SMA3 - Simpang
Bandara - Batu Besar - Polda
2016
IX MK. Kuning – Tj.Piayu Panbil – Mk. Kuning – Tj.Piayu Laut 2016
X Tembesi -Galang Tembesi Jemb I - VI 2019
Pendapatan
1 2 3 4 5 6 7 8
2007 2008 2009 2010 2011 2012 2013 2014
934,929,999
1,387,513,500 1,374,717,000 1,400,002,500
1,319,521,000
1,417,112,500
1,641,164,000
1,980,000
BRT REVENUE
PERIODE Th. 2007 S/D 2014
TAHUN PENDAPATAN
c. Jumlah Penumpang
0
100000
200000
300000
400000
500000
600000
1 2 3 4 5 6 7 8
TAHUN 2007 2008 2009 2010 2011 2012 2013 2014
PENUMPANG 352,500 528,220 509,120 518,140 485,860 544,400 515,898 364,317
AxisTitle
JUMLAH PENUMPANG BUS TRANS BATAM
PERIODE Th. 2007 s/d 2014
0
50,000,000
100,000,000
150,000,000
200,000,000
250,000,000
JANUARI FEBRUARI MARET APRIL MAY JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER
Umum 39,133 42,565 48,428 48,169 46,656
Pelajar 12,755 12,961 16,696 14,033 11,098
Total Pendapatan 182,042,000 196,182,000 227,104,000 220,536,000 208,820,000
PENDAPATAN
CHART PENDAPATAN TRANS BATAM PERIODE JANUARI S/D MEI 2015
ROUTES SCHOOLS
I
( 5.20 Wib)
Pool Dishub – Tembesi – Sijantung – P. Nguan – Air
Lingka – Tg Kertang (standby) – Sijantung – Air Lingka –
P. Guan - Pool
SD 024, SMP 22
II
(5.30 Wib)
Pool Dishub – Tembesi – Tg Kertang (StandBy) – Kp. Baru
– Tembesi – Pool
SD 024,SMP 22
III
(5.30 Wib)
Pool Dishub – Tg. Kertang – Sembulang – Sijantung
(standBy) – Sembulang – Tg Kertang – Tembesi – Pool
SD 18, SMP 10,
MTs
IV
(5.45 Wib)
Pool Dishub – Tembesi – Tg Kertang – Cate – Tg Kertang
(stnadBy)- tembesi pool
V
(6.00 Wib)
Pool Dishub – Setokok(StandBy) – Setokok – Tembesi -
Pool
MAIN AND BRANCH SYSTEM
PUBLIC TRANSPORTS
TAXI
Batam Urban Transport Development

More Related Content

Similar to Batam Urban Transport Development

MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1Norma Nun
 
Bes present english-61215
Bes present english-61215Bes present english-61215
Bes present english-61215tedy2629
 
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdfJPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdfSaidrashedHosayni
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory AdministrationTransformNG
 
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...Nigeria Centenary
 
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...FMINigeria
 
Active mobility sharing in malaysia deployment of bike ebike escooter shari...
Active mobility sharing in malaysia   deployment of bike ebike escooter shari...Active mobility sharing in malaysia   deployment of bike ebike escooter shari...
Active mobility sharing in malaysia deployment of bike ebike escooter shari...Johan Sammy
 
Vibrant Gujarat Summit on Road Transportation
Vibrant Gujarat Summit on Road TransportationVibrant Gujarat Summit on Road Transportation
Vibrant Gujarat Summit on Road TransportationVibrant Gujarat
 
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)Desi Waluyanti
 
Training report on JMRC
Training report on JMRCTraining report on JMRC
Training report on JMRCtushar garg
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADNorma Nun
 
Transport Infrastructure Planning development and Non Motorised Transport
Transport Infrastructure Planning development and Non Motorised TransportTransport Infrastructure Planning development and Non Motorised Transport
Transport Infrastructure Planning development and Non Motorised TransportTristan Wiggill
 
[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang perai[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang peraishrdcinfo
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.docSuryadev Maity
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTSatyam Anand
 
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : East Kalimantan
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : East Kalimantan[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : East Kalimantan
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : East Kalimantanshrdcinfo
 

Similar to Batam Urban Transport Development (20)

land transport master plan.pptx
land transport master plan.pptxland transport master plan.pptx
land transport master plan.pptx
 
MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1MBPJ_GKLKV_Nov2013_SPAD_Part1
MBPJ_GKLKV_Nov2013_SPAD_Part1
 
Bes present english-61215
Bes present english-61215Bes present english-61215
Bes present english-61215
 
RDP Chapter 19
RDP Chapter 19RDP Chapter 19
RDP Chapter 19
 
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdfJPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
JPTP-Metro Lines Project_Korean Embassy WS_Sun Dec 2 2018 (1).pdf
 
Federal Capital Territory Administration
Federal  Capital Territory AdministrationFederal  Capital Territory Administration
Federal Capital Territory Administration
 
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...THE 2013 MINISTERIAL PLATFORM  MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
THE 2013 MINISTERIAL PLATFORM MID-TERM REPORT OF PRESIDENT GOODLUCK JONATHAN...
 
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
#MP2013 Presentation of the Minister of the Federal Capital Territory Adminis...
 
Active mobility sharing in malaysia deployment of bike ebike escooter shari...
Active mobility sharing in malaysia   deployment of bike ebike escooter shari...Active mobility sharing in malaysia   deployment of bike ebike escooter shari...
Active mobility sharing in malaysia deployment of bike ebike escooter shari...
 
Vibrant Gujarat Summit on Road Transportation
Vibrant Gujarat Summit on Road TransportationVibrant Gujarat Summit on Road Transportation
Vibrant Gujarat Summit on Road Transportation
 
Adani
AdaniAdani
Adani
 
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
Indonesia towards becoming the sustainable mobility country in ASEAN 2015 (1)
 
Training report on JMRC
Training report on JMRCTraining report on JMRC
Training report on JMRC
 
CCR DAY 11_Eng
CCR DAY 11_EngCCR DAY 11_Eng
CCR DAY 11_Eng
 
CIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPADCIMB_Construction&Infrastructure_2016_SPAD
CIMB_Construction&Infrastructure_2016_SPAD
 
Transport Infrastructure Planning development and Non Motorised Transport
Transport Infrastructure Planning development and Non Motorised TransportTransport Infrastructure Planning development and Non Motorised Transport
Transport Infrastructure Planning development and Non Motorised Transport
 
[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang perai[Urban transportation policy program]city paper presentation sebrang perai
[Urban transportation policy program]city paper presentation sebrang perai
 
Kochi Metro Rail Project.doc
Kochi Metro Rail Project.docKochi Metro Rail Project.doc
Kochi Metro Rail Project.doc
 
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORTPWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
 
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : East Kalimantan
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : East Kalimantan[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : East Kalimantan
[Sustainable Mobility Workshop with UCLG-ASPAC] City Paper : East Kalimantan
 

More from shrdcinfo

[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentation[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentationshrdcinfo
 
[Urban management policy training] tegucigalpa city presentation
[Urban management policy training] tegucigalpa city presentation[Urban management policy training] tegucigalpa city presentation
[Urban management policy training] tegucigalpa city presentationshrdcinfo
 
[Urban management policy training] macala city presentation
[Urban management policy training] macala city presentation[Urban management policy training] macala city presentation
[Urban management policy training] macala city presentationshrdcinfo
 
[Urban management policy training] hanoi city presentation 2
[Urban management policy training] hanoi city presentation 2[Urban management policy training] hanoi city presentation 2
[Urban management policy training] hanoi city presentation 2shrdcinfo
 
[Urban management policy training] hanoi city presentation
[Urban management policy training] hanoi city presentation[Urban management policy training] hanoi city presentation
[Urban management policy training] hanoi city presentationshrdcinfo
 
[Urban management policy training] Water Planning and Construction in Guangzhou
[Urban management policy training] Water Planning and Construction in Guangzhou[Urban management policy training] Water Planning and Construction in Guangzhou
[Urban management policy training] Water Planning and Construction in Guangzhoushrdcinfo
 
[Urban management policy training] guangzhou city presentation
[Urban management policy training] guangzhou city presentation[Urban management policy training] guangzhou city presentation
[Urban management policy training] guangzhou city presentationshrdcinfo
 
[Urban management policy training] beijing city presentation
[Urban management policy training] beijing city presentation[Urban management policy training] beijing city presentation
[Urban management policy training] beijing city presentationshrdcinfo
 
[Urban management policy training] bangkok city presentation
[Urban management policy training] bangkok city presentation[Urban management policy training] bangkok city presentation
[Urban management policy training] bangkok city presentationshrdcinfo
 
[Urban management policy training] ambato city presentation
[Urban management policy training]  ambato city presentation[Urban management policy training]  ambato city presentation
[Urban management policy training] ambato city presentationshrdcinfo
 
[E government policy training] shiraz city presentation
[E government policy training] shiraz city presentation[E government policy training] shiraz city presentation
[E government policy training] shiraz city presentationshrdcinfo
 
[E government policy training] shanghai city presentation
[E government policy training] shanghai city presentation[E government policy training] shanghai city presentation
[E government policy training] shanghai city presentationshrdcinfo
 
[E government policy training] quito city presentation
[E government policy training] quito city presentation[E government policy training] quito city presentation
[E government policy training] quito city presentationshrdcinfo
 
[E government policy training] medellin city presentation
[E government policy training] medellin city presentation[E government policy training] medellin city presentation
[E government policy training] medellin city presentationshrdcinfo
 
[E government policy training] taipei city presentation
[E government policy training] taipei city presentation[E government policy training] taipei city presentation
[E government policy training] taipei city presentationshrdcinfo
 
[E government policy training] jakarta city presentation
[E government policy training] jakarta city presentation[E government policy training] jakarta city presentation
[E government policy training] jakarta city presentationshrdcinfo
 
[E government policy training] hanoi city presentation
[E government policy training] hanoi city presentation[E government policy training] hanoi city presentation
[E government policy training] hanoi city presentationshrdcinfo
 
[E government policy training] guangzhou city presentation
[E government policy training] guangzhou city presentation[E government policy training] guangzhou city presentation
[E government policy training] guangzhou city presentationshrdcinfo
 
[Seoul e government] seoul map geospatial information platform
[Seoul e government] seoul map geospatial information platform[Seoul e government] seoul map geospatial information platform
[Seoul e government] seoul map geospatial information platformshrdcinfo
 
[Urban transportation policy program]action plan guzangzhou
[Urban transportation policy program]action plan guzangzhou[Urban transportation policy program]action plan guzangzhou
[Urban transportation policy program]action plan guzangzhoushrdcinfo
 

More from shrdcinfo (20)

[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentation[Urban management policy training] ulaanbaatar city presentation
[Urban management policy training] ulaanbaatar city presentation
 
[Urban management policy training] tegucigalpa city presentation
[Urban management policy training] tegucigalpa city presentation[Urban management policy training] tegucigalpa city presentation
[Urban management policy training] tegucigalpa city presentation
 
[Urban management policy training] macala city presentation
[Urban management policy training] macala city presentation[Urban management policy training] macala city presentation
[Urban management policy training] macala city presentation
 
[Urban management policy training] hanoi city presentation 2
[Urban management policy training] hanoi city presentation 2[Urban management policy training] hanoi city presentation 2
[Urban management policy training] hanoi city presentation 2
 
[Urban management policy training] hanoi city presentation
[Urban management policy training] hanoi city presentation[Urban management policy training] hanoi city presentation
[Urban management policy training] hanoi city presentation
 
[Urban management policy training] Water Planning and Construction in Guangzhou
[Urban management policy training] Water Planning and Construction in Guangzhou[Urban management policy training] Water Planning and Construction in Guangzhou
[Urban management policy training] Water Planning and Construction in Guangzhou
 
[Urban management policy training] guangzhou city presentation
[Urban management policy training] guangzhou city presentation[Urban management policy training] guangzhou city presentation
[Urban management policy training] guangzhou city presentation
 
[Urban management policy training] beijing city presentation
[Urban management policy training] beijing city presentation[Urban management policy training] beijing city presentation
[Urban management policy training] beijing city presentation
 
[Urban management policy training] bangkok city presentation
[Urban management policy training] bangkok city presentation[Urban management policy training] bangkok city presentation
[Urban management policy training] bangkok city presentation
 
[Urban management policy training] ambato city presentation
[Urban management policy training]  ambato city presentation[Urban management policy training]  ambato city presentation
[Urban management policy training] ambato city presentation
 
[E government policy training] shiraz city presentation
[E government policy training] shiraz city presentation[E government policy training] shiraz city presentation
[E government policy training] shiraz city presentation
 
[E government policy training] shanghai city presentation
[E government policy training] shanghai city presentation[E government policy training] shanghai city presentation
[E government policy training] shanghai city presentation
 
[E government policy training] quito city presentation
[E government policy training] quito city presentation[E government policy training] quito city presentation
[E government policy training] quito city presentation
 
[E government policy training] medellin city presentation
[E government policy training] medellin city presentation[E government policy training] medellin city presentation
[E government policy training] medellin city presentation
 
[E government policy training] taipei city presentation
[E government policy training] taipei city presentation[E government policy training] taipei city presentation
[E government policy training] taipei city presentation
 
[E government policy training] jakarta city presentation
[E government policy training] jakarta city presentation[E government policy training] jakarta city presentation
[E government policy training] jakarta city presentation
 
[E government policy training] hanoi city presentation
[E government policy training] hanoi city presentation[E government policy training] hanoi city presentation
[E government policy training] hanoi city presentation
 
[E government policy training] guangzhou city presentation
[E government policy training] guangzhou city presentation[E government policy training] guangzhou city presentation
[E government policy training] guangzhou city presentation
 
[Seoul e government] seoul map geospatial information platform
[Seoul e government] seoul map geospatial information platform[Seoul e government] seoul map geospatial information platform
[Seoul e government] seoul map geospatial information platform
 
[Urban transportation policy program]action plan guzangzhou
[Urban transportation policy program]action plan guzangzhou[Urban transportation policy program]action plan guzangzhou
[Urban transportation policy program]action plan guzangzhou
 

Recently uploaded

##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...narwatsonia7
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...Christina Parmionova
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginningsinfo695895
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024Energy for One World
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...Suhani Kapoor
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalorenarwatsonia7
 

Recently uploaded (20)

##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
 
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
High Class Call Girls Bangalore Komal 7001305949 Independent Escort Service B...
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024
 
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
VIP High Profile Call Girls Gorakhpur Aarushi 8250192130 Independent Escort S...
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
(PRIYA) Call Girls Rajgurunagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service BangaloreCall Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
Call Girls Bangalore Saanvi 7001305949 Independent Escort Service Bangalore
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 

Batam Urban Transport Development

  • 1. PRESENTATION BATAM URBAN TRANSPORT DRS. ZULHENDRI , Msi HEAD OF BATAM TRANSPORT AGENCY BATAM, AUGUST 2015
  • 2. I. PROFILE OF BATAM Batam City as a main ”Free Trade Zone”, is developing rapidly. Especially in industrial and tourism areas in Riau Islands. As a center of development among its surrounding areas, Batam City needs to be prepared, and becomes a convinient place, attracted investors and tourists both foreign and domestic. Program in transportation sector in the batam is expected to make use of public transport and non-motorized transport becomes the main choice for most of the road users. Therefore, could make Batam to be environmentally friendly city, beautiful, convenient fresh, and green
  • 3.
  • 4.
  • 5. Geographically, Batam City has strategic position since it lays on international shipping line and only 12.5 sea miles separated to Singapore. With area of 426.563 Ha which is divided into 318.298 Ha of sea and 108.265 Ha of land Batam City Borderline: North : Singapura and Malaysia South : Lingga West : Karimun East : Bintan danTanjungpinang Consisted of more than 370 islands, which are some of them are small islands and adjacent to Singapore and Malaysia Riau Islands Territory
  • 6. Sumber : Batam dalam Angka 2014 YEAR MALE FEMALE TOTAL 2004 281,807 309,446 591,253 2005 332,720 353,067 685,787 2006 347,575 366,385 713,960 2007 355,692 368,623 724,315 2008 450,936 441,533 892,469 2009 506,758 481,797 988,555 2010 545,189 511,512 1,056,701 2011 588,556 549,338 1,137,894 2012 614,085 573,489 1,187,574 2013 591,180 544,232 1,135,412 2014 614,348 566,329 1,180,677 - 100,000 200,000 300,000 400,000 500,000 600,000 700,000 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 POPULATION Male Female
  • 7. USD 5,754 Juta (Local Investment) USD 6,161 Juta (Foreign Investment) USD 2.7 Juta (Government) Year Investment in Batam City(in million US $) Total Government Local Investment Foreign Investment 2005 2006 2007 2008 2009 2010 2011 2,340 2,450 2,606 2,770 2,792 2,792 3,000 5,470 5,500 5,710 5,710 5,710 5,710 5,754 4,080 4,470 4,765 5,180 5,270 5,359 6,161 11,890 12,420 13,082 13,660 13,772 13,861 14,915 Sumber : Batam dalam Angka 2012
  • 8. Industrial Origin GRDP (Million Rupiahs) Percentage 2008 2009 2210 2011 2008 2009 2010 2011 1. Agriculture 446,620.26 476,410.95 534,638.29 599,955.60 1.17 1.17 1.13 1.14 2. Mining and quarrying 48,219.55 50,389.17 55,101.35 57,337.00 0.13 0.12 0.12 0.11 3. Manufacturing industry 23,263,235.61 24,253,904.43 27.812,382.39 30,445,651.00 60.80 59.20 58.80 57.85 4. Electricity, gas and water 151,463.45 320,181.97 363,926.89 415,236.21 0.40 0.78 0.77 0.79 5. Construction 778,747.56 945,065.83 1,287,652.41 1,494,616.45 2.04 2.48 2.72 2.84 6. Trade, hotel and Restaurant 9,602,820.01 10,622,143.70 12,551,757.96 14,490,528.41 25.10 25.93 26.54 27.54 7. Transportation and Communication 1,113,560.69 1,146,204.59 1,282,976.51 1,421,254.34 2.91 2.81 2.71 2.70 8. Finance, rental and corporate service 2,306,525.93 2,451,023.22 2,713,620.38 2,936,833.39 6.03 5.98 5.74 5.58 9. Services 553,024.88 626,966.88 695,578.30 763,004.07 1.45 1.53 1.47 1.45 PDRB / GRDP 38,264,217.84 40,892,290.73 38,264,217.84 40,892,290.73 100.00 100.00 100.00 100.00
  • 9. YEAR NUMBERS 2002 1.101.048 2003 1.277.098 2004 1.527.131 2005 1.024.733 2006 1.012.711 2007 1.077.306 2008 1.061.390 2009 951.384 2010 1.007.446 2011 1. 186.773 2012 1.212.775 2013 1.336.430 Sumber : Batam dalam Angka 2014
  • 10. II.
  • 11. In general, transportation services system in Batam are directed to intergrated mode, which are conjoined air with land mode and sea with land mode yet stil need to be developed. Therefore, accessibility of services will become more convinient and safer. For land transportation, in regard of rapid growth of economic and population which induce the increase of motor-vehicles ownership, transportation facilities development plan, especially public transport will be much focused in developing mass-rapid transport which are reliable and fast, better management and control system, which at the end will be reducing traffic congestion in the city. LONG TERM DEVELOPMENT PLANNING OF BATAM CITY 2005-2025 TRANSPORTATION DEVELOPMENT OF BATAM CITY BATAM REGION DECREE NO. 2 YEAR 2013
  • 12. LAND TRANSPORT DEVELOPMENT STRATEGIES IN RPJM 2011-2016 STRATEGIES AND POLICIES PERFORMANCE INDICATOR EXISTING RESULT Building an integrated transportation to supports the structure of urban space - ATCS - shelters 19 intersections 121 units 21 intersections 173 units Improving facilities and utilities Pedestrian 7.250 m 36.000 m Improving air quality The numbers of vehicles that pass emission test 70% 85% Penyelenggaraan RTH Maintaining the roads median and city parks 50 locations/ year 60 locations/ year
  • 13. NO ACTIONS BUDGET TOTAL YEAR 2012 YEAR 2013 YEAR 2014 YEAR 2015 YEAR 2016 IDR IDR IDR IDR IDR 1. Developing transport facilities (ATCS, road signs, road studs, etc) 2,008,612,000 2,809,750,000 2,935,588,000 2,895,977,000 2,271,722,000 12,921,649,000 2. Road Marks 1,678,827,000 1,876,293,000 1,742,892,000 2,787,900,000 3,317,880,000 11,403,792,000 3. Building Bus Shelters 411,415,750 215,993,269 226,792,932 620,000,000 682,000,000 2,156,201,951 4. Building pedestrian bridge, 1 unit 1,500,000,000 1,500,000,000 5. BRT 3,867,779,217 4,061,168,178 4,264,226,587 4,477,437,916 4,701,309,812 21,371,921,709 6. Socializing Transport Regulations 444,750,200 466,987,710 490,337,096 514,853,950 540,596,648 2,457,525,604 7. Maintaining transport facilities (ATCS, road signs, road studs, etc) 918,751,000 1,184,688,000 1,284,542,000 1,343,004,000 1,313,075,000 6,044,060,000 TOTAL 9,330,135,167 10,614,880,157 12,444,378,614 12,639,172,866 12,826,583,460 57,855,150,264 BATAM TRANSPORT AUTHORITY STRATEGIC PLANS YEAR 2012 - 2016
  • 14.
  • 15.
  • 16.
  • 17. In order to accelerate realization of national road network, it has been planned the development of inner road toll in Batam city which will cover: • Batu Ampar- Muka Kuning Industrial Estate; • Muka Kuning Intersection - Hang Nadim Airport; • Kabil Roundabout – Batam Bridge - Tanjung Sauh – Bintan Island; • Muka Kuning Industrial Estate – Galang Island. The development of this road toll will connect aiport transportation and seaport nodes which serve internationally and nationally.
  • 18. Ministry of Transportation has studied on Urban Rail System in Batam City. According to the study, Batam may develop rail system in: • Batu Aji-Batam Centre corridor, 17,7 km • Batu Ampar-Nongsa corridor, 19,6 km • Sekupang-Batam Centre corridor, 16,5 km
  • 19. Development of Bicycle Lanes in areas:  Transit Oriented Development Batam Centre  Nagoya-Jodoh area  TOD Sekupang  Muka Kuning  Bengkong  Batu Aji  Sagulung  Nongsa  Rempang-Galang  P. Belakang Padang
  • 20.
  • 21. Pedestrian facilities were be built in 2014 in Batam Center Area from APBD Kota Batam for cost of IDR 6,000,000,000
  • 22. II.
  • 23.
  • 24. PUBLIC TRANSPORT IN BATAM CITY No Types Capacity Numbers 1. BUS TRANS BATAM (BRT) 27 Seat 27 Units 2. TRUNK LINES 14 Seat 673 Units 3. FEEDER LINES 9 Seat 1772 Units 4. TAXI 4 Seat 1195 Units 5. EMPLOYEES BUS 24 s/d 50 Seat 313 Units Note; “60% of vehicles are in age condition that need to be restored”
  • 25. TANJUNG UNCANG JOD OH Simp Kabil BATAM CENTRE SimpJA M Simp Panbil Simp Bs Camp NONG SA BATU AMPAR BATU MERAH BATU BESAR TLG PUNGGUR TJG PIAYU BATU AJI MAIN AND BRANCH ROUTES EXISTING CONDITION (SK. WALIKOTA NO. 04 TAHUN 2003 Simp Kompi 134 MUKA KUNING SEKUPA NG NAGO YA SEI PANAS MARIN A TG RIAU TJG SENGKUAN G DAPUR 12 Terminal Muka Kuning BAND ARA BENGK ONG MAIN 1. Jodoh - Sekupang via Tiban 2. Jodoh - Sekupang via Mk Kuning 3. Jodoh – Tanjung Uncang 4. Jodoh – Muka Kuning 5. Jodoh – Telaga Punggur 6. Jodoh – Nongsa 7. Jodoh – Sembulang 8. Jodoh – Galang Baru 9. Jodoh – Dapur 12 10. Sekupang – Telaga Punggur Patas AC. 11. Jodoh - Marina City 12. Sekupang – Bandara 13. Nagoya – Bandara BPP 14. Sekupang – Btm Centre 15. Batu Aji – Btm Centre BRANCH 1. Muka Kuning – Tanjung Piayu. 2. Muka Kuning – Batu Aji bagian sebelah kiri 3. Muka Kuning – Batu Aji bagian sebelah kanan 4. Batu Aji – Tanjung Uncang 5. Batu Aji – Sei Harapan via Tanjung Riau 6. Jodoh – Batu Merah 7. Jodoh – Tanjung Sengkuang 8. Bengkong – Jodoh via Kodim 9. Bengkong Jodoh via Pelita 10.Sei Harapan–SMKTA Kartini 11.Sei Harapan – Tiban 12.Muka Kuning - Bengkong
  • 26.
  • 27.
  • 28. Since December 2013, Trans Batam was managed by UPT Transportation Services, based on Batam Mayor Decree Number 30 Year 2013, dated 22 May 2013 about Forming UPT Transportation Services in Batam Municipality Transport Agency. In the future, the management will be upgraded to BLUD as the demand of the services increases significantly. TRANS BATAM MANAGEMENT OPERATIONAL
  • 29. THE HUMAN RESOUIRCES OF UPT TRANSPORTATION SERVICES T.A 2014 Jobs Numbers Drivers 25 Mechanics 4 Boat Guards 1 Ticketing Man 20 Field Supervisors 5 Timer 5 Administrator 5 T.A 2015 Posisi Jumlah Drivers 12 Mechanics 4 Boat Guards 1 Ticketing Man 28 Field Supervisor 9 Timer 7 Administrator 7 Cleaning Servces 2
  • 30. • UPT Transportation Services is responsible for managing: – BRT Operational – Boat Hinterland Operations – School Buses Operations Th. 2014
  • 31.
  • 32. • In 2015 the BRT operational is divided into : • Corridor I and II were tendered with 20 fleets • Corridor III was self-operated by UPT Transportation Services with 7 fleets • School Bus for Rempang- Galang region was self- operated as well with 5 fleets. • Boat Renting in Galang region with 2 fleet was operated using tendering system Year 2015
  • 33. SKP - BTC TJU - BTC Distance 22.5 22 Number of Fleet 10 10 Number of rit/day 64 64 Operational Hour 06.00 s/d 18.00 Fees General Rp. 4.000,- Student Rp. 2.000,- Load Factor 84.57% 43.14% Headway 10-15 mnt (peak hour) 15-20 mnt (peak hour) 25 mnt 30 mnt
  • 34. • 7 fleet (10 years) or 620.500 kms • 12 fleet (9 years) or 558.450 kms • 3 fleet (7 years) or 434.350 kms • Year 2014, bought 5 buses; • Year 2015, bought 5 buses from local government, 15 buses from HR Agency and 10 buses from Transport Ministry APBD APBN Total 2004 7 7 2005 6 6 12 2007 3 3 2014 5 5 2015 5 (APBD) & 15 (BPJS) 10 30 Total 36 16 57 Pengadaan Bus Trans Batam TA. 2014
  • 35. No Corridor Halte/ Bus Stop Total APBD Other Sources 1 SKP – BTC 32 4 36 2 TJU – BTC 36 1 37 3 SKP – TMJ 30 6 36 4 TJU – SKP 25 6 31 5 TMJ - BTC 10 2 12 Total 133 19 152
  • 36. N o Corridor Distances Fleet Needed Targets 1 Sekupang – Batam Centre 22.5 12 2005 (realisation: 10 units) 2 TJ. Uncang – Batam Centre 22 12 2006 (realisation: 10 units 3 Sekupang – Jodoh 18 8 January 2015 4 Tanjung Uncang – Sekupang 20 8 Januariy 2016 5 TM.Jodoh – Batam Centre 15 8 August 2015 (BPJS) 6 TJ.Piayu – TM.Muka Kuning 14 7 August 2015 (BPJS) 7 TM. Jodoh – TL.Punggur 29 10 2018 8 Batam Centre – Nongsa 25 10 2017 9 Jodoh - Nongsa 30 12 2018 10 Tembesi – Galang 60 10 2019 Total 255.5 97
  • 38. No CORRIDORS ROUTES STATUS I Sekupang – Batam centre Pel.Sekupang –Tiban – RSAB –Mymart - K.Walikota - Mega Mall Operasi II Batu Aji – Batam Centre Fanindo – Basecamp – Tembesi - Kepri Mall -K.Walikota - Mega Mall Operasi III Sekupang – Jodoh Pel.Sekupang – Tiban – UIB –Penuin - Nagoya Hill – Jodoh Operasi IV Tj. Uncang – Sekupang Pool Damri – Basecamp –Marina - Tj. Riau - Sei Harapan - Pel.Sekupang 2016 V Jodoh- Batam Centre Jodoh – HarbourBay –Batu Ampar - Sei Panas – MyMart -K.Walikota - Megamall 2016
  • 39. NO CORRIDORS ROUTES STATUS VI Jodoh – Nongsa Jodoh - Nagoya Hill –Raden Patah – Sudirman – BatuBesar – Nongsa 2018 VII Jodoh-Tl Punggur Jodoh – DC Mall – BCS –Sudirman - Tl.Punggur 2018 VIII Batam Centre – nongsa Mega mall – Tunas – KDA –UNIBA - Botania II - Botania I -SMA3 - Simpang Bandara - Batu Besar - Polda 2016 IX MK. Kuning – Tj.Piayu Panbil – Mk. Kuning – Tj.Piayu Laut 2016 X Tembesi -Galang Tembesi Jemb I - VI 2019
  • 40. Pendapatan 1 2 3 4 5 6 7 8 2007 2008 2009 2010 2011 2012 2013 2014 934,929,999 1,387,513,500 1,374,717,000 1,400,002,500 1,319,521,000 1,417,112,500 1,641,164,000 1,980,000 BRT REVENUE PERIODE Th. 2007 S/D 2014 TAHUN PENDAPATAN
  • 41. c. Jumlah Penumpang 0 100000 200000 300000 400000 500000 600000 1 2 3 4 5 6 7 8 TAHUN 2007 2008 2009 2010 2011 2012 2013 2014 PENUMPANG 352,500 528,220 509,120 518,140 485,860 544,400 515,898 364,317 AxisTitle JUMLAH PENUMPANG BUS TRANS BATAM PERIODE Th. 2007 s/d 2014
  • 42. 0 50,000,000 100,000,000 150,000,000 200,000,000 250,000,000 JANUARI FEBRUARI MARET APRIL MAY JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER DESEMBER Umum 39,133 42,565 48,428 48,169 46,656 Pelajar 12,755 12,961 16,696 14,033 11,098 Total Pendapatan 182,042,000 196,182,000 227,104,000 220,536,000 208,820,000 PENDAPATAN CHART PENDAPATAN TRANS BATAM PERIODE JANUARI S/D MEI 2015
  • 43. ROUTES SCHOOLS I ( 5.20 Wib) Pool Dishub – Tembesi – Sijantung – P. Nguan – Air Lingka – Tg Kertang (standby) – Sijantung – Air Lingka – P. Guan - Pool SD 024, SMP 22 II (5.30 Wib) Pool Dishub – Tembesi – Tg Kertang (StandBy) – Kp. Baru – Tembesi – Pool SD 024,SMP 22 III (5.30 Wib) Pool Dishub – Tg. Kertang – Sembulang – Sijantung (standBy) – Sembulang – Tg Kertang – Tembesi – Pool SD 18, SMP 10, MTs IV (5.45 Wib) Pool Dishub – Tembesi – Tg Kertang – Cate – Tg Kertang (stnadBy)- tembesi pool V (6.00 Wib) Pool Dishub – Setokok(StandBy) – Setokok – Tembesi - Pool
  • 44. MAIN AND BRANCH SYSTEM PUBLIC TRANSPORTS TAXI

Editor's Notes