VISTA B03 SERIES EPON ONU


           INSTALLATION MANUAL




EPON ONU Installation Manual
Product Version:VISTA B03 EPON ONU Release 1.3.1




                          Page 1 of 14 pages
VISTA B03 EPON ONU Installation Manual




Announcement
       Copyright ©2010
       All rights reserved.



No part of this document may be reproduced or transmitted in any form or by any means,
electronic or mechanical, including photocopying, recording, or by any information storage
retrieval system, without prior written consent of Guangdong Donyan Network Technologies
Co., Ltd.

For the reason that the products may be upgrade or other, the contents in this manual will
update at any time. Without other declaration, this manual is used as user guidance.
Guangdong Donyan Network Technologies Co., Ltd. makes no warranty of any kind with
regard to this material, including, but not limited to, the implied warranties of
merchantability and fitness for a particular purpose.




                                      Page 2 of 14 pages
VISTA B03 EPON ONU Installation Manual


                                                     Table of contents
Chapter 1 Pre-installation Preparation......................................................................................... 4
    1.1 Installation Flow............................................................................................................... 4
    1.2 Check Installation Environment..................................................................................... 5
    1.3 Environmental Requirements......................................................................................... 5
         1.3.1 Cleanness Requirements......................................................................................6
         1.3.2 Requirements for anti-disturbance..................................................................... 6
         1.3.3 Safety for using laser........................................................................................... 6
    1.4 Tools................................................................................................................................... 6
    1.5 Safety attentions.............................................................................................................. 6
Chapter 2 Installation..................................................................................................................... 8
    2.1 Preparation confirmation.................................................................................................8
    2.2 Equipment earthing and power cable installation....................................................... 8
         2.2.1 Equipment earthing.............................................................................................. 8
         2.2.2 Power cable installation....................................................................................... 8
    2.3 Interface cable installation............................................................................................. 8
         2.3.1 Category 5 cable connection............................................................................... 8
         2.3.2 Optical fiber installation....................................................................................... 9
    2.4 Routing recommendation in the installation.............................................................. 10
         2.4.1 VISTA B03 ONU installed on the working platform....................................... 10
         2.4.2 VISTA B03 ONU installed in service box......................................................... 10
    2.5 Cable bundling during installation............................................................................... 11
         2.5.1 Correct usage of the sign.................................................................................. 11
         2.5.2 Attentions during cable bundling..................................................................... 11
    2.6 Checking after installation............................................................................................ 13
    2.7 Power-on......................................................................................................................... 13
         2.7.1 Rechecking before power-on.............................................................................13
         2.7.2 Power-on.............................................................................................................. 13
         2.7.3 Equipment running checking............................................................................. 14




                                                                 Page 3 of 14 pages
VISTA B03 EPON ONU Installation Manual

          Chapter 1 Pre-installation Preparation


1.1 Installation Flow



                                 O N U installation begin



                            V erify installation environm ent




                           V erify O N U installation position




       Install in the 1 9 -inch standard                     Install on the w orking
                    cabinet                                          platform




                             P ow er/signal cable installation




                                     R echeck before
                                        pow er - o n



                                           P ow er-o n




                                  C heck running status




                                 O N U installation finish



                             Figure 1-1 ONU installation flow

                                      Page 4 of 14 pages
VISTA B03 EPON ONU Installation Manual

1.2 Check Installation Environment

     VISTA B03 ONU can be used indoor or outdoor. Whether you install the ONU outdoor, in the
service box or on the working platform, the requirements must be as following:
� Make sure there is enough space for ventilating of the ONU equipment, in order to facilitate
     the heat dissipation.
� Make sure the service box or the working platform have the heat dissipation system
     themselves.
� Make sure the service box or the working platform is firm enough to hold the terminal and
     its accessories.
�   Make sure the service box or the working platform is earthed.


1.3 Environmental Requirements

     To ensure that EPON equipment has the normally running and life-span, the environment
for ONU must keep the temperature and humidity. If the humidity for ONU is high chronically,
insulation materials will be not well-insulated or even creepage. Sometimes the mechanic
function of the materials may be changed or the metallic components may rust. If the relative
humidity is low, fastening screw may get loose because the insulation piece will be dry shrinking.
In the dry environment, it will take the static to jeopardize the circuit in the EPON equipment.
The high temperature will cause more dangers. The long-term high temperature will cause
insulation materials to age much more quickly. The outdoor environmental requirements are as
following:
                            Table 1-1 Outdoor environmental requirements
                          Item                                         Range

                      Temperature                                  -40℃~+70℃
                  Relative humidity                                     95%
     (when the temperature doesn’t change much)                        +45℃
                  Relative humidity                                    95%
     (when the temperature changes much: air/air)                   -40℃/+30℃
              Temperature variation: air/air                        -40℃/+30℃

            Temperature variation: air/water                        +40℃/+5℃

                      Air pressure                                    ≥70kPa

                      Rain intensity                                ≤6mm/min

                     Solar radiation                                ≤1120W/m²

                     Heat emission                                  ≤600W/m²

                       Wind speed                                      ≤5m/s




                                         Page 5 of 14 pages
VISTA B03 EPON ONU Installation Manual

1.3.1 Cleanness Requirements

      Dust is a danger for safe-running of the EPON equipment. When dust falls on the equipment,
it will take the static, which will lead to the poor contact of metallic connector or metallic junction.
Especially when the humidity is relatively low, the static is easier to be taken. It will not only
affect the life-span of the equipment, but also will cause the malfunction of the communication.
Besides the dust, requirements for the salt, acid, sulfide in the equipment room are demanding.
These Noxious gases will fasten the erosion of the metal and the aging of some components.
ONU should be put in clean environment.


1.3.2 Requirements for anti-disturbance

    ONU may be disturbed from outside. These disturbances will affect the equipment by
capacitance coupling, inductance coupling, electromagnetic radiation, common impedance
coupling (including grounding system) and transmission modes of the cables (etc. power cable,
signal cable). So the following must be paid attention to:
� AC power system is the TN system. AC power socket must be the single-phase three-cable
    power socket with protection earthing(PE), to make sure the filtering circuit will filter the
    disturbance of the electric network very well.
�   Work location of ONU equipment should be far from super power radio-transmitting station,
    radar-transmitting station and high-frequency high-current equipment.
�   Electromagnetic shielding should be adopted if necessary. For example, interface cable
    must be electromagnetic shielding cable.
�   Interface cables must be routing indoor. Outdoor routing should as covert as possible. This
    is to avoid that the overvoltage and overcurrent of lighting will damage the signal interface
    of the equipment.


1.3.3 Safety for using laser

     VISTA B03 series EPON equipment belongs to Type-1 laser equipment. If the light board of
the VISTA B03 series EPON equipment is still running, please don’t see these light interfaces
directly. The light bundles from the optical fibers contain high power, so they may harm the
retina.


1.4 Tools

�   Straight screwdriver
�   Cross screwdriver




                                           Page 6 of 14 pages
VISTA B03 EPON ONU Installation Manual

1.5 Safety attentions

�   Before cleaning the ONU, you must get out the ONU power plug. Don’t clean the ONU with
    wet cloth. Don’t clean the ONU with liquid.
�   Don’t put the ONU near water or in wet place to prevent water or humid gas to get into the
    ONU.
�   Don’t put the ONU on an unstable box or table. If it falls, the ONU will get damaged
    seriously.
�   Make sure the ventilation condition for the ONU and the equipment room is fine.
�   The ONU can work only with the right voltage. So make sure the running voltage is the
    same as the voltage signed on the ONU.
�   To reduce the danger of electricity strike, don’t open the shell when the ONU is running.
    Even when the equipment is power-off, don’t open the shell arbitrarily.




                                        Page 7 of 14 pages
VISTA B03 EPON ONU Installation Manual

                            Chapter 2 Installation


2.1 Preparation confirmation

�   Make sure you have read the contents in Chapter 1 carefully.
�   The requirements in Chapter One are satisfied.


2.2 Equipment earthing and power cable installation


2.2.1 Equipment earthing

Right earthing of ONU is the guarantee for anti-lighting and anti-disturbance. So customers must
 check whether ONU and the installation environment connect the ground cable correctly.
Step 1: Check whether the ONU equipment and service box have been connected to the ground.
Step 2: Check whether the service box and installation environment have been connected to the
         ground.


2.2.2 Power cable installation

Power input for VISTA B03 ONU is 220V AC or -48V DC.
Step 1: Plug the power cable of ONU into the power socket in the service box.
Step 2: Switch on the power of the service box.


2.3 Interface cable installation


2.3.1 Category 5 cable connection

RJ-45 connector introduction
     It is the service interface of VISTA B03 ONU; 10/100/1000BASE-T port is all RJ-45 connector.
The interface is auto MDI/MDIX crossover and the cable is the category 5 cable in the course of
use. In the following picture, the appearance and pins of RJ-45 connector are shown.




                                  Figure 2-1 RJ-45 connector


                                        Page 8 of 14 pages
VISTA B03 EPON ONU Installation Manual
                              Table 2-1 RJ-45 MDI port pin allocation
                 10/100Base-T        10/100Base-T          1000Base-T         1000Base-T
    Pin number
                    signal             function                signal           function
                                                                         Two-direction data bus
        1            TX+           Transmitting data           BIDA+
                                                                                  A+
                                                                         Two-direction data bus
        2            TX-           Transmitting data           BIDA-
                                                                                   A-
                                                                         Two-direction data bus
        3            RX+            Receiving data             BIDB+
                                                                                  B+
                                                                         Two-direction data bus
        4          Reserved               -                    BIDC+
                                                                                  C+
                                                                         Two-direction data bus
        5          Reserved               -                    BIDC-
                                                                                   C-
                                                                         Two-direction data bus
        6            RX-            Receiving data             BIDB-
                                                                                   B-
                                                                         Two-direction data bus
        7          Reserved               -                    BIDD+
                                                                                  D+
                                                                         Two-direction data bus
        8          Reserved               -                    BIDD-
                                                                                  D-




                             Table 2-2 RJ-45 MDI-X port pin allocation
       Pin       10/100Base-T       10/100Base-T           1000Base-T         1000Base-T
     number         signal             function                signal          Function
                                                                         Two-direction data bus
        1            RX+            Receiving data             BIDB+
                                                                                  B+
                                                                         Two-direction data bus
        2            RX-            Receiving data             BIDB-
                                                                                  B-
                                                                         Two-direction data bus
        3            TX+           Transmitting data           BIDA+
                                                                                  A+
                                                                         Two-direction data bus
        4          Reserved               -                    BIDD+
                                                                                  D+
                                                                         Two-direction data bus
        5          Reserved               -                    BIDD-
                                                                                  D-
                                                                         Two-direction data bus
        6            TX-           Transmitting data           BIDA-
                                                                                  A-
                                                                         Two-direction data bus
        7          Reserved               -                    BIDC+
                                                                                  C+
                                                                         Two-direction data bus
        8          Reserved               -                    BIDC-
                                                                                  C-
Category 5 Cable connection
Step 1: Plug one end of the network cable into Ethernet connector RJ-45 which you
      want to link.
Step 2: Plug the other end of the network cable into Ethernet connector RJ-45 of

                                          Page 9 of 14 pages
VISTA B03 EPON ONU Installation Manual
      the other side equipment.


2.3.2 Optical fiber installation


Optical fiber connector introduction

     When you choose the optical fiber, make sure the type of the chosen optical fiber connector
is the same as the type of the optical interface. Optical fiber connector is the indispensable
passive device in optical fiber communication system. Its usage will make possible dismountable
connection in optical channels. This will facilitate the debugging and maintenance of the optical
system, and make the linking more flexible. There are many types of the optical fiber connector.
We only introduce SC type and LC type.



     SC optical fiber connector




                                  Figure 2-2 SC optical fiber connector

     LC optical fiber connector




                                   Figure 2-3 LC optical fiber connector

Optical fiber installation:
Step 1: Take off the protective cap of the optical fiber. Then clean the fiber endface
Step 2: Take off the protective cap of the ONU optical interface. Then put one side of
      the optical fiber into the optical interface.
Step 3: Connect the other side of the optical fiber with the other side equipment.


2.4 Routing recommendation in the installation


2.4.1 VISTA B03 ONU installed on the working platform

    When the VISTA B03 ONU is installed on the working platform solely, all service cables of

                                          Page 10 of 14 pages
VISTA B03 EPON ONU Installation Manual
interface will be routed in the front of the equipment. The power cable of the equipment will be
routed from the back.


2.4.2 VISTA B03 ONU installed in service box

     When the equipment is installed in the service box, the service cables should be bundled up
in the holder on the left side of the box. Cable routing is according to the environment. All
interfaces of signal cables should be put at the bottom of the service box (They should be put in
some place of the service where making them not possible to be touched). The power cable
should be routed from the right side of the service box. It is according to the environment that
choice the short way to install.


2.5 Cable bundling during installation


2.5.1 Correct usage of the sign

     Before bundling up the cables,please write the sign correctly and then attach it at the
 appropriate place.


2.5.2 Attentions during cable bundling

�   After bundling up, the cables must be lank and tidy in the cabinet. No twisting and bending
    are allowed.




                                 Figure 2-4 Cable bundling (1)
�   The bending radius of the cable should be no less than 2 times of cable diameters. At the
    interface connector, the bending radius shall be no less than 5 times of the diameters.
�   Different types of cables (power cable, signal cable, etc) should be routed and bundled up
    separately. Mixed bundling-up is not allowed. When they are near each other, cross routing
    may be adopted. When parallel routing, the distance between power cable and signal cable
    should be no less than 30 mm.
�   The cabling rack inside and outside the cabinet and the cabling slot should be smooth,
    without sharp edges and corners.


                                        Page 11 of 14 pages
VISTA B03 EPON ONU Installation Manual
�   The metallic hole which the cable will get through should have smooth and rounding surface,
    or have insulated bushing.
�   Proper cable tie should be chosen when bundling up the cables. Two or more than two cable
    tie together for bundling up the cables are not allowed.
�   After bundling up the cables with cable tie, extra should be cut off. The incision should be
    smooth without sharp corner.




                                  Figure 2-5 Cable bundling (2)
�   If the cables will get bending, then bundle the cables before they get bending. The cable tie
    will not appear in the bending point, in order to prevent the cable from breaking because of
    great stress.




                                  Figure 2-6 Cable bundling (3)
�   The cables, which do not need to assemble, or the extra part of the cables should be folded
    and bundled up in appropriate place in the cabinet or the slots. Appropriate place means it
    will not affect the running of the equipment, not damage the equipment or not damage the
    cable.
�   The 220V AC power cable should not be bundled up in the track of removable components.
�   For the power cable of the removable components such as grounding cable of door, some
    extra will be reserved after installing, to prevent the cable from stress. When removable
    component reaches the installation location, make sure the extra cable will not contact heat,
    sharp corner, edges and so on. When avoiding heat is not possible, the cable must be
    high-temperature cable.
�   If the cable connector is fixed by screw, the screw or nut should be firm and some measures
    for anti-loosening will be adopted.

                                        Page 12 of 14 pages
VISTA B03 EPON ONU Installation Manual
�   For some hard power cable, the cable should be fixed near the end point, to prevent the
    stress near the end point.
�   Please don’t use screw which made by yourself to fix the end point.
�   Power cable with the same type and the same routing direction should be bundled up
    together. Then cables in the cable bundle should be clean and lank.
�   No knotting are allowed when bundling up the cables or routing.
�   For the cold-pressing end point (such as air switch), the metallic part of the old-pressing
    end point should not be exposed outside when assembling.


2.6 Checking after installation

    When checking whether the installation is correct, please make sure the power supply is off,
to prevent the damage of human body and the equipment. After installation, please check
according to the items in the following table. The listed items must work normally.
                          Table2-3 Table for checking after installation
                Check item                   Normal                Abnormal Remarks

               Console cable                     -                         -

               Ground cable                      -                         -

                Power cable                      -                         -



2.7 Power-on


2.7.1 Rechecking before power-on

�   Check whether the equipment is installed firmly.
�   Check whether all service cables, optical fibers, power cables and grounding cables are
    installed correctly.
�   Check whether the voltage of power supply is the same with the requirement of the
    equipment.


2.7.2 Power-on

�   Plug power cable of the equipment and switch the power-supply on.




                                        Page 13 of 14 pages
VISTA B03 EPON ONU Installation Manual

2.7.3 Equipment running checking

Check whether the instruction lights in the front panel of the system run normally.

                           Table 2-4 Table for PU202 instruction lights status
                     LED                                               Description
     System status            POWER           The light will be always on (red) if the power works normally.
                             OPT: the         The light is always on (green), which means the connection
                      instruction light for            of physical layer optical link is successful.
                           physical layer     The light is flashing (green), which means the physical layer
                            optical link                      optical link causes an alarm.
      PON status
                             SER: the         The light is always on (green), which means the ONU logging
                      instruction light for                    in the layer-2 is successful.
                      ONU logging in the      The light is flashing (green), which means the ONU logging in
                            data layer                        the layer-2 is not successful.
                                              When 10/100/1000BASE-T interface are connected and are
                                              working in 1000BASE-T mode, the “X1” light is always on and
                                                           flashing when data is transferred.
                                              When 10/100/1000BASE-T interface are connected and are
      Port status             X1、X2           working in 10/100BASE-T mode, the “X1” light is always on
                                                         and flashing when data is transferred.
                                                 When 10/100BASE-T interface are connected and are
                                              working, the “X2” light is always on and flashing when data is
                                                                       transferred.


                           Table 2-5 Table for PU204 instruction lights status
                     LED                                               Description
     System status            POWER           The light will be always on (red) if the power works normally.
                             OPT: the         The light is always on (green), which means the connection
                      instruction light for            of physical layer optical link is successful.
                           physical layer     The light is flashing (green), which means the physical layer
                            optical link                            optical link alarm.
      PON Status
                             SER: the         The light is always on (green), which means the ONU logging
                      instruction light for                    in the layer-2 is successful.
                      ONU logging in the      The light is flashing (green), which means the ONU logging in
                            data layer                        the layer-2 is not successful.
                                                 When 10/100BASE-T interface are connected and are
                            X1、X2、
      Port Status                               working, all the lights from X1 to X4 are always on and
                              X3、X4
                                                           flashing when data is transferred.




                                              Page 14 of 14 pages

More Related Content

What's hot

Manual tx nr808-en
Manual tx nr808-enManual tx nr808-en
Manual tx nr808-enxVx
 
Marantz NA7004 user manual
Marantz NA7004 user manualMarantz NA7004 user manual
Marantz NA7004 user manualAvalonhk Lin
 
Samsung Camcorder MX10 User Manual
Samsung Camcorder MX10 User ManualSamsung Camcorder MX10 User Manual
Samsung Camcorder MX10 User ManualImaging Samsung
 
Ampeg SVT3 PRO 450W Lambalı Bas Gitar Kafa Amfisi gitarpazar.com manual kulla...
Ampeg SVT3 PRO 450W Lambalı Bas Gitar Kafa Amfisi gitarpazar.com manual kulla...Ampeg SVT3 PRO 450W Lambalı Bas Gitar Kafa Amfisi gitarpazar.com manual kulla...
Ampeg SVT3 PRO 450W Lambalı Bas Gitar Kafa Amfisi gitarpazar.com manual kulla...GitarPazar
 
T748 a v surround sound receiver english manual
T748 a v surround sound receiver   english manualT748 a v surround sound receiver   english manual
T748 a v surround sound receiver english manualweerawatplc
 
Ampeg BA108 1x8 Bas Gitar Amfisi gitarpazar.com kullanim klavuzu manual
Ampeg BA108 1x8 Bas Gitar Amfisi gitarpazar.com kullanim klavuzu manualAmpeg BA108 1x8 Bas Gitar Amfisi gitarpazar.com kullanim klavuzu manual
Ampeg BA108 1x8 Bas Gitar Amfisi gitarpazar.com kullanim klavuzu manualGitarPazar
 
gitarpazar.com Ampeg SVT7 PRO 1000W Bas Gitar Amfi Kafası manual kullanim kl...
gitarpazar.com Ampeg SVT7 PRO 1000W Bas Gitar Amfi Kafası  manual kullanim kl...gitarpazar.com Ampeg SVT7 PRO 1000W Bas Gitar Amfi Kafası  manual kullanim kl...
gitarpazar.com Ampeg SVT7 PRO 1000W Bas Gitar Amfi Kafası manual kullanim kl...GitarPazar
 
Sony PMW-350K Operation Manual
Sony PMW-350K Operation ManualSony PMW-350K Operation Manual
Sony PMW-350K Operation ManualAV ProfShop
 
Samsung Camcorder SC-MX20 User Manual
Samsung Camcorder SC-MX20 User ManualSamsung Camcorder SC-MX20 User Manual
Samsung Camcorder SC-MX20 User ManualImaging Samsung
 
CNC Machine Firetrace Presentation
CNC Machine Firetrace PresentationCNC Machine Firetrace Presentation
CNC Machine Firetrace Presentationmichael_mcsweeney
 

What's hot (12)

Manual tx nr808-en
Manual tx nr808-enManual tx nr808-en
Manual tx nr808-en
 
Marantz NA7004 user manual
Marantz NA7004 user manualMarantz NA7004 user manual
Marantz NA7004 user manual
 
Samsung Camcorder MX10 User Manual
Samsung Camcorder MX10 User ManualSamsung Camcorder MX10 User Manual
Samsung Camcorder MX10 User Manual
 
Ampeg SVT3 PRO 450W Lambalı Bas Gitar Kafa Amfisi gitarpazar.com manual kulla...
Ampeg SVT3 PRO 450W Lambalı Bas Gitar Kafa Amfisi gitarpazar.com manual kulla...Ampeg SVT3 PRO 450W Lambalı Bas Gitar Kafa Amfisi gitarpazar.com manual kulla...
Ampeg SVT3 PRO 450W Lambalı Bas Gitar Kafa Amfisi gitarpazar.com manual kulla...
 
T748 a v surround sound receiver english manual
T748 a v surround sound receiver   english manualT748 a v surround sound receiver   english manual
T748 a v surround sound receiver english manual
 
Ampeg BA108 1x8 Bas Gitar Amfisi gitarpazar.com kullanim klavuzu manual
Ampeg BA108 1x8 Bas Gitar Amfisi gitarpazar.com kullanim klavuzu manualAmpeg BA108 1x8 Bas Gitar Amfisi gitarpazar.com kullanim klavuzu manual
Ampeg BA108 1x8 Bas Gitar Amfisi gitarpazar.com kullanim klavuzu manual
 
Thump th 15 a
Thump th 15 aThump th 15 a
Thump th 15 a
 
gitarpazar.com Ampeg SVT7 PRO 1000W Bas Gitar Amfi Kafası manual kullanim kl...
gitarpazar.com Ampeg SVT7 PRO 1000W Bas Gitar Amfi Kafası  manual kullanim kl...gitarpazar.com Ampeg SVT7 PRO 1000W Bas Gitar Amfi Kafası  manual kullanim kl...
gitarpazar.com Ampeg SVT7 PRO 1000W Bas Gitar Amfi Kafası manual kullanim kl...
 
Instrucciones minicadena
Instrucciones minicadenaInstrucciones minicadena
Instrucciones minicadena
 
Sony PMW-350K Operation Manual
Sony PMW-350K Operation ManualSony PMW-350K Operation Manual
Sony PMW-350K Operation Manual
 
Samsung Camcorder SC-MX20 User Manual
Samsung Camcorder SC-MX20 User ManualSamsung Camcorder SC-MX20 User Manual
Samsung Camcorder SC-MX20 User Manual
 
CNC Machine Firetrace Presentation
CNC Machine Firetrace PresentationCNC Machine Firetrace Presentation
CNC Machine Firetrace Presentation
 

Viewers also liked

세바시 15분 김동준 이노캐털리스트 대표 - 스마트 시대, 혁신의 진화
세바시 15분 김동준 이노캐털리스트 대표 - 스마트 시대, 혁신의 진화세바시 15분 김동준 이노캐털리스트 대표 - 스마트 시대, 혁신의 진화
세바시 15분 김동준 이노캐털리스트 대표 - 스마트 시대, 혁신의 진화cbs15min
 
The Hills Kellyville Weekly Bulletin
The Hills Kellyville Weekly BulletinThe Hills Kellyville Weekly Bulletin
The Hills Kellyville Weekly BulletinHaran Ramachandran
 
Webinar: Zing Vision: Answering your toughest production Java performance que...
Webinar: Zing Vision: Answering your toughest production Java performance que...Webinar: Zing Vision: Answering your toughest production Java performance que...
Webinar: Zing Vision: Answering your toughest production Java performance que...Azul Systems Inc.
 
Search Solutions 2011: Successful Enterprise Search By Design
Search Solutions 2011: Successful Enterprise Search By DesignSearch Solutions 2011: Successful Enterprise Search By Design
Search Solutions 2011: Successful Enterprise Search By DesignMarianne Sweeny
 
Comportamientos Digitales
Comportamientos DigitalesComportamientos Digitales
Comportamientos DigitalesTatiLopez25
 
Survivor's Guide to building world class web products
Survivor's Guide to building world class web productsSurvivor's Guide to building world class web products
Survivor's Guide to building world class web productsAmit Ranjan
 
Apps education
Apps educationApps education
Apps educationTodd McKee
 
Simmons.fmct yppt.may.20.2015.1256am
Simmons.fmct yppt.may.20.2015.1256amSimmons.fmct yppt.may.20.2015.1256am
Simmons.fmct yppt.may.20.2015.1256amKaren Simmons
 
Developing Mindfulness in the Mosaic Classroom
Developing Mindfulness in the Mosaic ClassroomDeveloping Mindfulness in the Mosaic Classroom
Developing Mindfulness in the Mosaic ClassroomSusan Bertolino
 
The Last HOPE - Black Hat To A Black Suit
The Last HOPE - Black Hat To A Black SuitThe Last HOPE - Black Hat To A Black Suit
The Last HOPE - Black Hat To A Black SuitJames Arlen
 
Hive marketing client case studies
Hive marketing client case studiesHive marketing client case studies
Hive marketing client case studiesSusan Barry
 
Associated Chambers of Commerce and Industry of India
Associated Chambers of Commerce and Industry of IndiaAssociated Chambers of Commerce and Industry of India
Associated Chambers of Commerce and Industry of IndiaNewslaundry
 
The Energy Industry Update – November 2011
The Energy Industry Update – November 2011The Energy Industry Update – November 2011
The Energy Industry Update – November 2011ScottMadden, Inc.
 
Profil syarikat (myknowledge arena)
Profil syarikat (myknowledge arena)Profil syarikat (myknowledge arena)
Profil syarikat (myknowledge arena)MYKNOWLEDGE ARENA
 
LA5_PL Approach
LA5_PL ApproachLA5_PL Approach
LA5_PL ApproachCma Mohd
 
Orario i isem
Orario i isemOrario i isem
Orario i isememanuelb
 

Viewers also liked (20)

세바시 15분 김동준 이노캐털리스트 대표 - 스마트 시대, 혁신의 진화
세바시 15분 김동준 이노캐털리스트 대표 - 스마트 시대, 혁신의 진화세바시 15분 김동준 이노캐털리스트 대표 - 스마트 시대, 혁신의 진화
세바시 15분 김동준 이노캐털리스트 대표 - 스마트 시대, 혁신의 진화
 
Aruba AP 270 Series Installation Guide
Aruba AP 270 Series Installation GuideAruba AP 270 Series Installation Guide
Aruba AP 270 Series Installation Guide
 
Aruba AP 20X Installation Guide
Aruba AP 20X Installation GuideAruba AP 20X Installation Guide
Aruba AP 20X Installation Guide
 
The Hills Kellyville Weekly Bulletin
The Hills Kellyville Weekly BulletinThe Hills Kellyville Weekly Bulletin
The Hills Kellyville Weekly Bulletin
 
Webinar: Zing Vision: Answering your toughest production Java performance que...
Webinar: Zing Vision: Answering your toughest production Java performance que...Webinar: Zing Vision: Answering your toughest production Java performance que...
Webinar: Zing Vision: Answering your toughest production Java performance que...
 
Globalinvacom
GlobalinvacomGlobalinvacom
Globalinvacom
 
Search Solutions 2011: Successful Enterprise Search By Design
Search Solutions 2011: Successful Enterprise Search By DesignSearch Solutions 2011: Successful Enterprise Search By Design
Search Solutions 2011: Successful Enterprise Search By Design
 
Comportamientos Digitales
Comportamientos DigitalesComportamientos Digitales
Comportamientos Digitales
 
Survivor's Guide to building world class web products
Survivor's Guide to building world class web productsSurvivor's Guide to building world class web products
Survivor's Guide to building world class web products
 
Apps education
Apps educationApps education
Apps education
 
Simmons.fmct yppt.may.20.2015.1256am
Simmons.fmct yppt.may.20.2015.1256amSimmons.fmct yppt.may.20.2015.1256am
Simmons.fmct yppt.may.20.2015.1256am
 
Developing Mindfulness in the Mosaic Classroom
Developing Mindfulness in the Mosaic ClassroomDeveloping Mindfulness in the Mosaic Classroom
Developing Mindfulness in the Mosaic Classroom
 
NWIFC Magazine Fall 2008
NWIFC Magazine Fall 2008NWIFC Magazine Fall 2008
NWIFC Magazine Fall 2008
 
The Last HOPE - Black Hat To A Black Suit
The Last HOPE - Black Hat To A Black SuitThe Last HOPE - Black Hat To A Black Suit
The Last HOPE - Black Hat To A Black Suit
 
Hive marketing client case studies
Hive marketing client case studiesHive marketing client case studies
Hive marketing client case studies
 
Associated Chambers of Commerce and Industry of India
Associated Chambers of Commerce and Industry of IndiaAssociated Chambers of Commerce and Industry of India
Associated Chambers of Commerce and Industry of India
 
The Energy Industry Update – November 2011
The Energy Industry Update – November 2011The Energy Industry Update – November 2011
The Energy Industry Update – November 2011
 
Profil syarikat (myknowledge arena)
Profil syarikat (myknowledge arena)Profil syarikat (myknowledge arena)
Profil syarikat (myknowledge arena)
 
LA5_PL Approach
LA5_PL ApproachLA5_PL Approach
LA5_PL Approach
 
Orario i isem
Orario i isemOrario i isem
Orario i isem
 

Similar to Vista b03 epon onu installation manual(v1.3.1)

Usb dongle en ocean user manual
Usb dongle en ocean user manualUsb dongle en ocean user manual
Usb dongle en ocean user manualDomotica daVinci
 
Bfp a8900x
Bfp a8900xBfp a8900x
Bfp a8900xTan Ngoc
 
Mc100 installation guide
Mc100 installation guideMc100 installation guide
Mc100 installation guideNetPlus
 
C rn melfa basic.bfp-a5992_p
C rn melfa basic.bfp-a5992_pC rn melfa basic.bfp-a5992_p
C rn melfa basic.bfp-a5992_pAbe Paih
 
Catalog FR-D700 instruction manual (basic)-Beeteco.com
Catalog FR-D700 instruction manual (basic)-Beeteco.comCatalog FR-D700 instruction manual (basic)-Beeteco.com
Catalog FR-D700 instruction manual (basic)-Beeteco.comBeeteco
 
Hướng dẫn sử dụng Testo 420
Hướng dẫn sử dụng Testo 420Hướng dẫn sử dụng Testo 420
Hướng dẫn sử dụng Testo 420Tenmars Việt Nam
 
Cambium network ptp 800 series 05 01 user guide
Cambium network ptp 800 series 05 01 user guideCambium network ptp 800 series 05 01 user guide
Cambium network ptp 800 series 05 01 user guideAdvantec Distribution
 
Mitsubishi inverter fr-d700-instruction-manual-basic dienhathe.vn
Mitsubishi inverter fr-d700-instruction-manual-basic dienhathe.vnMitsubishi inverter fr-d700-instruction-manual-basic dienhathe.vn
Mitsubishi inverter fr-d700-instruction-manual-basic dienhathe.vnDien Ha The
 
Ap 5131 access point installation guide
Ap 5131 access point installation guideAp 5131 access point installation guide
Ap 5131 access point installation guideAdvantec Distribution
 
Cr1.cr1 b instruction manual(bfp-a8054j)
Cr1.cr1 b instruction manual(bfp-a8054j)Cr1.cr1 b instruction manual(bfp-a8054j)
Cr1.cr1 b instruction manual(bfp-a8054j)Abe Paih
 
Convection Vacuum Gauge - The Worker Bee
Convection Vacuum Gauge - The Worker BeeConvection Vacuum Gauge - The Worker Bee
Convection Vacuum Gauge - The Worker BeeInstruTech, Inc.
 
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired Living
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired LivingHaier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired Living
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired LivingMeeraSingh59
 
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired Living
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired LivingHaier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired Living
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired LivingMeeraSingh59
 
Ptp800 user guide system release 05 00
Ptp800 user guide system release 05 00Ptp800 user guide system release 05 00
Ptp800 user guide system release 05 00Advantec Distribution
 
Cambium network ptp 800 series 05 00 user guide
Cambium network ptp 800 series 05 00 user guideCambium network ptp 800 series 05 00 user guide
Cambium network ptp 800 series 05 00 user guideAdvantec Distribution
 
Catalog Inverter FR-E700 instruction manual (basic) Mitsubishi-Beeteco.com
Catalog Inverter FR-E700 instruction manual (basic) Mitsubishi-Beeteco.comCatalog Inverter FR-E700 instruction manual (basic) Mitsubishi-Beeteco.com
Catalog Inverter FR-E700 instruction manual (basic) Mitsubishi-Beeteco.comBeeteco
 

Similar to Vista b03 epon onu installation manual(v1.3.1) (20)

Paragon manual
Paragon manualParagon manual
Paragon manual
 
Usb dongle en ocean user manual
Usb dongle en ocean user manualUsb dongle en ocean user manual
Usb dongle en ocean user manual
 
Bfp a8900x
Bfp a8900xBfp a8900x
Bfp a8900x
 
Mitsubshi
MitsubshiMitsubshi
Mitsubshi
 
Mc100 installation guide
Mc100 installation guideMc100 installation guide
Mc100 installation guide
 
C rn melfa basic.bfp-a5992_p
C rn melfa basic.bfp-a5992_pC rn melfa basic.bfp-a5992_p
C rn melfa basic.bfp-a5992_p
 
Catalog FR-D700 instruction manual (basic)-Beeteco.com
Catalog FR-D700 instruction manual (basic)-Beeteco.comCatalog FR-D700 instruction manual (basic)-Beeteco.com
Catalog FR-D700 instruction manual (basic)-Beeteco.com
 
Hướng dẫn sử dụng Testo 420
Hướng dẫn sử dụng Testo 420Hướng dẫn sử dụng Testo 420
Hướng dẫn sử dụng Testo 420
 
Cambium network ptp 800 series 05 01 user guide
Cambium network ptp 800 series 05 01 user guideCambium network ptp 800 series 05 01 user guide
Cambium network ptp 800 series 05 01 user guide
 
Mitsubishi inverter fr-d700-instruction-manual-basic dienhathe.vn
Mitsubishi inverter fr-d700-instruction-manual-basic dienhathe.vnMitsubishi inverter fr-d700-instruction-manual-basic dienhathe.vn
Mitsubishi inverter fr-d700-instruction-manual-basic dienhathe.vn
 
Ap 5131 access point installation guide
Ap 5131 access point installation guideAp 5131 access point installation guide
Ap 5131 access point installation guide
 
Cr1.cr1 b instruction manual(bfp-a8054j)
Cr1.cr1 b instruction manual(bfp-a8054j)Cr1.cr1 b instruction manual(bfp-a8054j)
Cr1.cr1 b instruction manual(bfp-a8054j)
 
Convection Vacuum Gauge - The Worker Bee
Convection Vacuum Gauge - The Worker BeeConvection Vacuum Gauge - The Worker Bee
Convection Vacuum Gauge - The Worker Bee
 
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired Living
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired LivingHaier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired Living
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired Living
 
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired Living
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired LivingHaier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired Living
Haier User Manual |Model LE39B9000 | Haier India's Tv |Haier Inspired Living
 
Ptp800 user guide system release 05 00
Ptp800 user guide system release 05 00Ptp800 user guide system release 05 00
Ptp800 user guide system release 05 00
 
Cambium network ptp 800 series 05 00 user guide
Cambium network ptp 800 series 05 00 user guideCambium network ptp 800 series 05 00 user guide
Cambium network ptp 800 series 05 00 user guide
 
Lanstar
LanstarLanstar
Lanstar
 
Catalog Inverter FR-E700 instruction manual (basic) Mitsubishi-Beeteco.com
Catalog Inverter FR-E700 instruction manual (basic) Mitsubishi-Beeteco.comCatalog Inverter FR-E700 instruction manual (basic) Mitsubishi-Beeteco.com
Catalog Inverter FR-E700 instruction manual (basic) Mitsubishi-Beeteco.com
 
I v5 eng_110526
I v5 eng_110526I v5 eng_110526
I v5 eng_110526
 

More from Shanxi Cai

Epon & eoc total solution for coaxial network
Epon & eoc total solution for coaxial networkEpon & eoc total solution for coaxial network
Epon & eoc total solution for coaxial networkShanxi Cai
 
3RU AOS03 Catv optical transmission platform
3RU AOS03 Catv optical transmission platform3RU AOS03 Catv optical transmission platform
3RU AOS03 Catv optical transmission platformShanxi Cai
 
WOR03-211 Datasheet
WOR03-211 DatasheetWOR03-211 Datasheet
WOR03-211 DatasheetShanxi Cai
 
2012 CCBN Invitation and Map
2012 CCBN Invitation and Map2012 CCBN Invitation and Map
2012 CCBN Invitation and MapShanxi Cai
 
Donyan product catalog 2012
Donyan product catalog 2012Donyan product catalog 2012
Donyan product catalog 2012Shanxi Cai
 
Donyan Introduction 2011
Donyan Introduction 2011Donyan Introduction 2011
Donyan Introduction 2011Shanxi Cai
 
Vista 1600 c epon olt quick start manual(r1.2)
Vista 1600 c epon olt quick start manual(r1.2)Vista 1600 c epon olt quick start manual(r1.2)
Vista 1600 c epon olt quick start manual(r1.2)Shanxi Cai
 
Vista-1600C GEPON OLT
Vista-1600C GEPON OLTVista-1600C GEPON OLT
Vista-1600C GEPON OLTShanxi Cai
 
Aot155 a data sheet
Aot155 a data sheetAot155 a data sheet
Aot155 a data sheetShanxi Cai
 
CATV RF Trunk Amplifier
CATV RF Trunk AmplifierCATV RF Trunk Amplifier
CATV RF Trunk AmplifierShanxi Cai
 
Uv2001 Mini Optical Node for FTTH
Uv2001 Mini Optical Node for FTTHUv2001 Mini Optical Node for FTTH
Uv2001 Mini Optical Node for FTTHShanxi Cai
 
NGB-E Integrated Optical Node include CATV+onu+eoc
NGB-E Integrated Optical Node include CATV+onu+eocNGB-E Integrated Optical Node include CATV+onu+eoc
NGB-E Integrated Optical Node include CATV+onu+eocShanxi Cai
 
2011 New Products
2011 New Products2011 New Products
2011 New ProductsShanxi Cai
 

More from Shanxi Cai (13)

Epon & eoc total solution for coaxial network
Epon & eoc total solution for coaxial networkEpon & eoc total solution for coaxial network
Epon & eoc total solution for coaxial network
 
3RU AOS03 Catv optical transmission platform
3RU AOS03 Catv optical transmission platform3RU AOS03 Catv optical transmission platform
3RU AOS03 Catv optical transmission platform
 
WOR03-211 Datasheet
WOR03-211 DatasheetWOR03-211 Datasheet
WOR03-211 Datasheet
 
2012 CCBN Invitation and Map
2012 CCBN Invitation and Map2012 CCBN Invitation and Map
2012 CCBN Invitation and Map
 
Donyan product catalog 2012
Donyan product catalog 2012Donyan product catalog 2012
Donyan product catalog 2012
 
Donyan Introduction 2011
Donyan Introduction 2011Donyan Introduction 2011
Donyan Introduction 2011
 
Vista 1600 c epon olt quick start manual(r1.2)
Vista 1600 c epon olt quick start manual(r1.2)Vista 1600 c epon olt quick start manual(r1.2)
Vista 1600 c epon olt quick start manual(r1.2)
 
Vista-1600C GEPON OLT
Vista-1600C GEPON OLTVista-1600C GEPON OLT
Vista-1600C GEPON OLT
 
Aot155 a data sheet
Aot155 a data sheetAot155 a data sheet
Aot155 a data sheet
 
CATV RF Trunk Amplifier
CATV RF Trunk AmplifierCATV RF Trunk Amplifier
CATV RF Trunk Amplifier
 
Uv2001 Mini Optical Node for FTTH
Uv2001 Mini Optical Node for FTTHUv2001 Mini Optical Node for FTTH
Uv2001 Mini Optical Node for FTTH
 
NGB-E Integrated Optical Node include CATV+onu+eoc
NGB-E Integrated Optical Node include CATV+onu+eocNGB-E Integrated Optical Node include CATV+onu+eoc
NGB-E Integrated Optical Node include CATV+onu+eoc
 
2011 New Products
2011 New Products2011 New Products
2011 New Products
 

Recently uploaded

(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFOrient Homes
 
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...lizamodels9
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio managementJunaidKhan750825
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherPerry Belcher
 

Recently uploaded (20)

(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDFCATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
CATALOG cáp điện Goldcup (bảng giá) 1.4.2024.PDF
 
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
Call Girls In Kishangarh Delhi ❤️8860477959 Good Looking Escorts In 24/7 Delh...
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Investment analysis and portfolio management
Investment analysis and portfolio managementInvestment analysis and portfolio management
Investment analysis and portfolio management
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry BelcherA.I. Bot Summit 3 Opening Keynote - Perry Belcher
A.I. Bot Summit 3 Opening Keynote - Perry Belcher
 

Vista b03 epon onu installation manual(v1.3.1)

  • 1. VISTA B03 SERIES EPON ONU INSTALLATION MANUAL EPON ONU Installation Manual Product Version:VISTA B03 EPON ONU Release 1.3.1 Page 1 of 14 pages
  • 2. VISTA B03 EPON ONU Installation Manual Announcement Copyright ©2010 All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information storage retrieval system, without prior written consent of Guangdong Donyan Network Technologies Co., Ltd. For the reason that the products may be upgrade or other, the contents in this manual will update at any time. Without other declaration, this manual is used as user guidance. Guangdong Donyan Network Technologies Co., Ltd. makes no warranty of any kind with regard to this material, including, but not limited to, the implied warranties of merchantability and fitness for a particular purpose. Page 2 of 14 pages
  • 3. VISTA B03 EPON ONU Installation Manual Table of contents Chapter 1 Pre-installation Preparation......................................................................................... 4 1.1 Installation Flow............................................................................................................... 4 1.2 Check Installation Environment..................................................................................... 5 1.3 Environmental Requirements......................................................................................... 5 1.3.1 Cleanness Requirements......................................................................................6 1.3.2 Requirements for anti-disturbance..................................................................... 6 1.3.3 Safety for using laser........................................................................................... 6 1.4 Tools................................................................................................................................... 6 1.5 Safety attentions.............................................................................................................. 6 Chapter 2 Installation..................................................................................................................... 8 2.1 Preparation confirmation.................................................................................................8 2.2 Equipment earthing and power cable installation....................................................... 8 2.2.1 Equipment earthing.............................................................................................. 8 2.2.2 Power cable installation....................................................................................... 8 2.3 Interface cable installation............................................................................................. 8 2.3.1 Category 5 cable connection............................................................................... 8 2.3.2 Optical fiber installation....................................................................................... 9 2.4 Routing recommendation in the installation.............................................................. 10 2.4.1 VISTA B03 ONU installed on the working platform....................................... 10 2.4.2 VISTA B03 ONU installed in service box......................................................... 10 2.5 Cable bundling during installation............................................................................... 11 2.5.1 Correct usage of the sign.................................................................................. 11 2.5.2 Attentions during cable bundling..................................................................... 11 2.6 Checking after installation............................................................................................ 13 2.7 Power-on......................................................................................................................... 13 2.7.1 Rechecking before power-on.............................................................................13 2.7.2 Power-on.............................................................................................................. 13 2.7.3 Equipment running checking............................................................................. 14 Page 3 of 14 pages
  • 4. VISTA B03 EPON ONU Installation Manual Chapter 1 Pre-installation Preparation 1.1 Installation Flow O N U installation begin V erify installation environm ent V erify O N U installation position Install in the 1 9 -inch standard Install on the w orking cabinet platform P ow er/signal cable installation R echeck before pow er - o n P ow er-o n C heck running status O N U installation finish Figure 1-1 ONU installation flow Page 4 of 14 pages
  • 5. VISTA B03 EPON ONU Installation Manual 1.2 Check Installation Environment VISTA B03 ONU can be used indoor or outdoor. Whether you install the ONU outdoor, in the service box or on the working platform, the requirements must be as following: � Make sure there is enough space for ventilating of the ONU equipment, in order to facilitate the heat dissipation. � Make sure the service box or the working platform have the heat dissipation system themselves. � Make sure the service box or the working platform is firm enough to hold the terminal and its accessories. � Make sure the service box or the working platform is earthed. 1.3 Environmental Requirements To ensure that EPON equipment has the normally running and life-span, the environment for ONU must keep the temperature and humidity. If the humidity for ONU is high chronically, insulation materials will be not well-insulated or even creepage. Sometimes the mechanic function of the materials may be changed or the metallic components may rust. If the relative humidity is low, fastening screw may get loose because the insulation piece will be dry shrinking. In the dry environment, it will take the static to jeopardize the circuit in the EPON equipment. The high temperature will cause more dangers. The long-term high temperature will cause insulation materials to age much more quickly. The outdoor environmental requirements are as following: Table 1-1 Outdoor environmental requirements Item Range Temperature -40℃~+70℃ Relative humidity 95% (when the temperature doesn’t change much) +45℃ Relative humidity 95% (when the temperature changes much: air/air) -40℃/+30℃ Temperature variation: air/air -40℃/+30℃ Temperature variation: air/water +40℃/+5℃ Air pressure ≥70kPa Rain intensity ≤6mm/min Solar radiation ≤1120W/m² Heat emission ≤600W/m² Wind speed ≤5m/s Page 5 of 14 pages
  • 6. VISTA B03 EPON ONU Installation Manual 1.3.1 Cleanness Requirements Dust is a danger for safe-running of the EPON equipment. When dust falls on the equipment, it will take the static, which will lead to the poor contact of metallic connector or metallic junction. Especially when the humidity is relatively low, the static is easier to be taken. It will not only affect the life-span of the equipment, but also will cause the malfunction of the communication. Besides the dust, requirements for the salt, acid, sulfide in the equipment room are demanding. These Noxious gases will fasten the erosion of the metal and the aging of some components. ONU should be put in clean environment. 1.3.2 Requirements for anti-disturbance ONU may be disturbed from outside. These disturbances will affect the equipment by capacitance coupling, inductance coupling, electromagnetic radiation, common impedance coupling (including grounding system) and transmission modes of the cables (etc. power cable, signal cable). So the following must be paid attention to: � AC power system is the TN system. AC power socket must be the single-phase three-cable power socket with protection earthing(PE), to make sure the filtering circuit will filter the disturbance of the electric network very well. � Work location of ONU equipment should be far from super power radio-transmitting station, radar-transmitting station and high-frequency high-current equipment. � Electromagnetic shielding should be adopted if necessary. For example, interface cable must be electromagnetic shielding cable. � Interface cables must be routing indoor. Outdoor routing should as covert as possible. This is to avoid that the overvoltage and overcurrent of lighting will damage the signal interface of the equipment. 1.3.3 Safety for using laser VISTA B03 series EPON equipment belongs to Type-1 laser equipment. If the light board of the VISTA B03 series EPON equipment is still running, please don’t see these light interfaces directly. The light bundles from the optical fibers contain high power, so they may harm the retina. 1.4 Tools � Straight screwdriver � Cross screwdriver Page 6 of 14 pages
  • 7. VISTA B03 EPON ONU Installation Manual 1.5 Safety attentions � Before cleaning the ONU, you must get out the ONU power plug. Don’t clean the ONU with wet cloth. Don’t clean the ONU with liquid. � Don’t put the ONU near water or in wet place to prevent water or humid gas to get into the ONU. � Don’t put the ONU on an unstable box or table. If it falls, the ONU will get damaged seriously. � Make sure the ventilation condition for the ONU and the equipment room is fine. � The ONU can work only with the right voltage. So make sure the running voltage is the same as the voltage signed on the ONU. � To reduce the danger of electricity strike, don’t open the shell when the ONU is running. Even when the equipment is power-off, don’t open the shell arbitrarily. Page 7 of 14 pages
  • 8. VISTA B03 EPON ONU Installation Manual Chapter 2 Installation 2.1 Preparation confirmation � Make sure you have read the contents in Chapter 1 carefully. � The requirements in Chapter One are satisfied. 2.2 Equipment earthing and power cable installation 2.2.1 Equipment earthing Right earthing of ONU is the guarantee for anti-lighting and anti-disturbance. So customers must check whether ONU and the installation environment connect the ground cable correctly. Step 1: Check whether the ONU equipment and service box have been connected to the ground. Step 2: Check whether the service box and installation environment have been connected to the ground. 2.2.2 Power cable installation Power input for VISTA B03 ONU is 220V AC or -48V DC. Step 1: Plug the power cable of ONU into the power socket in the service box. Step 2: Switch on the power of the service box. 2.3 Interface cable installation 2.3.1 Category 5 cable connection RJ-45 connector introduction It is the service interface of VISTA B03 ONU; 10/100/1000BASE-T port is all RJ-45 connector. The interface is auto MDI/MDIX crossover and the cable is the category 5 cable in the course of use. In the following picture, the appearance and pins of RJ-45 connector are shown. Figure 2-1 RJ-45 connector Page 8 of 14 pages
  • 9. VISTA B03 EPON ONU Installation Manual Table 2-1 RJ-45 MDI port pin allocation 10/100Base-T 10/100Base-T 1000Base-T 1000Base-T Pin number signal function signal function Two-direction data bus 1 TX+ Transmitting data BIDA+ A+ Two-direction data bus 2 TX- Transmitting data BIDA- A- Two-direction data bus 3 RX+ Receiving data BIDB+ B+ Two-direction data bus 4 Reserved - BIDC+ C+ Two-direction data bus 5 Reserved - BIDC- C- Two-direction data bus 6 RX- Receiving data BIDB- B- Two-direction data bus 7 Reserved - BIDD+ D+ Two-direction data bus 8 Reserved - BIDD- D- Table 2-2 RJ-45 MDI-X port pin allocation Pin 10/100Base-T 10/100Base-T 1000Base-T 1000Base-T number signal function signal Function Two-direction data bus 1 RX+ Receiving data BIDB+ B+ Two-direction data bus 2 RX- Receiving data BIDB- B- Two-direction data bus 3 TX+ Transmitting data BIDA+ A+ Two-direction data bus 4 Reserved - BIDD+ D+ Two-direction data bus 5 Reserved - BIDD- D- Two-direction data bus 6 TX- Transmitting data BIDA- A- Two-direction data bus 7 Reserved - BIDC+ C+ Two-direction data bus 8 Reserved - BIDC- C- Category 5 Cable connection Step 1: Plug one end of the network cable into Ethernet connector RJ-45 which you want to link. Step 2: Plug the other end of the network cable into Ethernet connector RJ-45 of Page 9 of 14 pages
  • 10. VISTA B03 EPON ONU Installation Manual the other side equipment. 2.3.2 Optical fiber installation Optical fiber connector introduction When you choose the optical fiber, make sure the type of the chosen optical fiber connector is the same as the type of the optical interface. Optical fiber connector is the indispensable passive device in optical fiber communication system. Its usage will make possible dismountable connection in optical channels. This will facilitate the debugging and maintenance of the optical system, and make the linking more flexible. There are many types of the optical fiber connector. We only introduce SC type and LC type. SC optical fiber connector Figure 2-2 SC optical fiber connector LC optical fiber connector Figure 2-3 LC optical fiber connector Optical fiber installation: Step 1: Take off the protective cap of the optical fiber. Then clean the fiber endface Step 2: Take off the protective cap of the ONU optical interface. Then put one side of the optical fiber into the optical interface. Step 3: Connect the other side of the optical fiber with the other side equipment. 2.4 Routing recommendation in the installation 2.4.1 VISTA B03 ONU installed on the working platform When the VISTA B03 ONU is installed on the working platform solely, all service cables of Page 10 of 14 pages
  • 11. VISTA B03 EPON ONU Installation Manual interface will be routed in the front of the equipment. The power cable of the equipment will be routed from the back. 2.4.2 VISTA B03 ONU installed in service box When the equipment is installed in the service box, the service cables should be bundled up in the holder on the left side of the box. Cable routing is according to the environment. All interfaces of signal cables should be put at the bottom of the service box (They should be put in some place of the service where making them not possible to be touched). The power cable should be routed from the right side of the service box. It is according to the environment that choice the short way to install. 2.5 Cable bundling during installation 2.5.1 Correct usage of the sign Before bundling up the cables,please write the sign correctly and then attach it at the appropriate place. 2.5.2 Attentions during cable bundling � After bundling up, the cables must be lank and tidy in the cabinet. No twisting and bending are allowed. Figure 2-4 Cable bundling (1) � The bending radius of the cable should be no less than 2 times of cable diameters. At the interface connector, the bending radius shall be no less than 5 times of the diameters. � Different types of cables (power cable, signal cable, etc) should be routed and bundled up separately. Mixed bundling-up is not allowed. When they are near each other, cross routing may be adopted. When parallel routing, the distance between power cable and signal cable should be no less than 30 mm. � The cabling rack inside and outside the cabinet and the cabling slot should be smooth, without sharp edges and corners. Page 11 of 14 pages
  • 12. VISTA B03 EPON ONU Installation Manual � The metallic hole which the cable will get through should have smooth and rounding surface, or have insulated bushing. � Proper cable tie should be chosen when bundling up the cables. Two or more than two cable tie together for bundling up the cables are not allowed. � After bundling up the cables with cable tie, extra should be cut off. The incision should be smooth without sharp corner. Figure 2-5 Cable bundling (2) � If the cables will get bending, then bundle the cables before they get bending. The cable tie will not appear in the bending point, in order to prevent the cable from breaking because of great stress. Figure 2-6 Cable bundling (3) � The cables, which do not need to assemble, or the extra part of the cables should be folded and bundled up in appropriate place in the cabinet or the slots. Appropriate place means it will not affect the running of the equipment, not damage the equipment or not damage the cable. � The 220V AC power cable should not be bundled up in the track of removable components. � For the power cable of the removable components such as grounding cable of door, some extra will be reserved after installing, to prevent the cable from stress. When removable component reaches the installation location, make sure the extra cable will not contact heat, sharp corner, edges and so on. When avoiding heat is not possible, the cable must be high-temperature cable. � If the cable connector is fixed by screw, the screw or nut should be firm and some measures for anti-loosening will be adopted. Page 12 of 14 pages
  • 13. VISTA B03 EPON ONU Installation Manual � For some hard power cable, the cable should be fixed near the end point, to prevent the stress near the end point. � Please don’t use screw which made by yourself to fix the end point. � Power cable with the same type and the same routing direction should be bundled up together. Then cables in the cable bundle should be clean and lank. � No knotting are allowed when bundling up the cables or routing. � For the cold-pressing end point (such as air switch), the metallic part of the old-pressing end point should not be exposed outside when assembling. 2.6 Checking after installation When checking whether the installation is correct, please make sure the power supply is off, to prevent the damage of human body and the equipment. After installation, please check according to the items in the following table. The listed items must work normally. Table2-3 Table for checking after installation Check item Normal Abnormal Remarks Console cable - - Ground cable - - Power cable - - 2.7 Power-on 2.7.1 Rechecking before power-on � Check whether the equipment is installed firmly. � Check whether all service cables, optical fibers, power cables and grounding cables are installed correctly. � Check whether the voltage of power supply is the same with the requirement of the equipment. 2.7.2 Power-on � Plug power cable of the equipment and switch the power-supply on. Page 13 of 14 pages
  • 14. VISTA B03 EPON ONU Installation Manual 2.7.3 Equipment running checking Check whether the instruction lights in the front panel of the system run normally. Table 2-4 Table for PU202 instruction lights status LED Description System status POWER The light will be always on (red) if the power works normally. OPT: the The light is always on (green), which means the connection instruction light for of physical layer optical link is successful. physical layer The light is flashing (green), which means the physical layer optical link optical link causes an alarm. PON status SER: the The light is always on (green), which means the ONU logging instruction light for in the layer-2 is successful. ONU logging in the The light is flashing (green), which means the ONU logging in data layer the layer-2 is not successful. When 10/100/1000BASE-T interface are connected and are working in 1000BASE-T mode, the “X1” light is always on and flashing when data is transferred. When 10/100/1000BASE-T interface are connected and are Port status X1、X2 working in 10/100BASE-T mode, the “X1” light is always on and flashing when data is transferred. When 10/100BASE-T interface are connected and are working, the “X2” light is always on and flashing when data is transferred. Table 2-5 Table for PU204 instruction lights status LED Description System status POWER The light will be always on (red) if the power works normally. OPT: the The light is always on (green), which means the connection instruction light for of physical layer optical link is successful. physical layer The light is flashing (green), which means the physical layer optical link optical link alarm. PON Status SER: the The light is always on (green), which means the ONU logging instruction light for in the layer-2 is successful. ONU logging in the The light is flashing (green), which means the ONU logging in data layer the layer-2 is not successful. When 10/100BASE-T interface are connected and are X1、X2、 Port Status working, all the lights from X1 to X4 are always on and X3、X4 flashing when data is transferred. Page 14 of 14 pages