SlideShare a Scribd company logo
1 of 39
Download to read offline
©Copyright Page 1 of 39
Telephone: (612) 9670 1633 101 Quarry Road Email: construction@dincel.com.au
Facsimile: (612) 9670 6744 Erskine Park, NSW 2759 Website: www.dincel.com.au
PO Box 104, St Clair, NSW 2759
A.B.N. 78 083 839 614 AUSTRALIA
DDIINNCCEELL WWAALLLL
FFIIRREE AASSSSEESSSSMMEENNTT
DISCLAIMER
The information contained in this document is intended for the use of suitably qualified and
experienced architects and engineers and other building professionals. This information is not
intended to replace design calculations or analysis normally associated with the design and
specification of buildings and their components. Dincel Construction System Pty Ltd accepts no
liability for any circumstances arising from the failure of a specifier or user of any part of Dincel
Construction System to obtain appropriate professional advice about its use and installation or from
failure to adhere to the requirements of appropriate Standards and Codes of Practice, and relevant
Building Codes.
Revision Date Amendment
A May 2010 Added Non-Combustibility Assessment by CSIRO
B June 2010 Added Hydro Carbon Fire
C January 2017 General Revision
©Copyright Page 2 of 39
SUMMARY
The fire performance of has been assessed by:
1. Fire Resistance Periods
The University of New South Wales’ Certificate and Report (Reference No: 5),
CSIRO Certificate FSV1346 (Reference No: 6) for Fire Resistance Periods.
The letter of assessment by CSIRO FCO-2674 (Reference No: 4) states that
polymer web links of Dincel-Form when concrete filled will not burn or melt away to
create holes when subjected to fire conditions. This means that the presence of
polymer links within the concrete joining each face of the polymer formwork does
not compromise the FRP components of ………./integrity/insulation.
The polymer links of Dincel-Form are maximum 2mm thickness. These polymer
links in some other systems are much thicker (more than 10mm). As proven by
tests, the thicker the polymers, the more fuel to burn. The Certifiers
therefore should require test results for any polymer links particularly
exceeding 2mm thickness.
2. Fire Hazard Properties
Attachments and Liners to the walls must comply with BCA – Specification C.1.10
{Reference No: 3 (A) and 3 (B)} for Flammability and Smoke issues. As shown in
the attached CSIRO certificate, Dincel is a GROUP 1 material (i.e. no limitations
for its use in any place without any protection). Dincel’s smoke criteria is better
than what is allowed by the BCA.
The abovementioned certificates clearly state that Dincel-Polymer has no
limitations on its use for flammability and smoke generation.
3. Non-Combustibility
The BCA requires the use of non-combustible materials to limit the fire load and
fire spread.
It is also important to note that the subject combustibility compliance is only
applicable to façade walls in accordance with the BCA.
The letter of assessment by CSIRO FCO-2800 (Reference No: 8) states that the
Dincel-Polymer is the equivalent of the deemed to non-combustible
materials in Clause C1.12 of the BCA.
The BCA recognises DTS = Performance Solution (previously called Alternative
Solution). REQUEST DINCEL’S COMBUSTIBILITY REPORT if your project
consists of Dincel façade walls to satisfy the non-combustibility
requirement.
4. Bushfire Prone Areas
The letter of assessment by CSIRO FCO-2755 (Reference No: 7) states that when
Dincel Forms are filled with concrete it will comply with AS3959 – 2009 and
allowed to be used in all bushfire conditions, including Bushfire Attack Level of
BAL-FZ (i.e. the worst bushfire level).
©Copyright Page 3 of 39
Readers may refer to the following for further information.
AND FIRE PERFORMANCE
is a permanent polymer formwork for concrete filling.
Dincel-Polymer forms DO NOT provide fire rating but the CONCRETE DOES.
The concrete infill of provides the appropriate provisions. The
requirement is, BCA – Clause A 2.3 – Fire Resistance of Building Elements, Clause 2.d
(ii) – Fire Resistance Period (FRP) of a structural concrete wall shall be determined in
accordance with Australian Standard AS3600 for Concrete Structures as certified by
The University of New South Wales (UNSW) (Reference No: 5).
There are three (3) components that are required to be identified for the FRP.
 Insulation and Integrity – determined in accordance with AS3600 or a Fire
Testing Laboratory.
 Structural Adequacy – determined in accordance with AS3600 for walls subject
to the “deemed to satisfy” condition or a Fire Testing Laboratory can determine
this criterion only up to the limits of the testing facility (i.e. applied load and
eccentricity, wall height). Fire testing results for walls will not cover building
structures of more than 3 to 4 storeys in height and wall heights greater than 3m.
Under these circumstances the certifier should not accept the FRP determined by
test results. Only concrete wall systems that are compliant with AS3600 can be
accepted beyond the test results.
For fire test results to be accepted, the test sample element must be in strict
compliance with AS3600. AS3600 – 2009 – Supplement 1 : 2014 states
“protective coating of concrete is outside the scope of AS3600 – 2009”, which
means that the certifier cannot accept any fire test results for systems that
are reliant on waterproofing.
Refer (download) Dincel Wall Building Code of Australia Compliance, pages 2, 3
and 4 for further explanation.
complies with the Deemed-To-Satisfy condition of the Building Code
of Australia in accordance with the certificate by the UNSW (Reference 5).
The CSIRO Certificate (Reference No: 6) has been organised to validate that Dincel-
Form’s web-links will not burn or melt away to create holes so that the Fire Resistance
Period of for ………./integrity/insulation are not affected (Reference
No: 4).
The Dincel-Polymer formwork holds the wet concrete until it sets. If for some reason
Dincel-Polymer is required to be removed or even burns during a fire event, the
remaining core component is ordinary concrete which provides the required Fire
Resistance Period for structural adequacy/integrity/insulation. Therefore, the presence
of Dincel-Polymer remaining at the face of the concrete wall can be considered as
nothing more than a lining or wall cladding material.
©Copyright Page 4 of 39
Summary of FRP’s for 275mm Dincel, 200mm Dincel, 155mm Dincel and 110mm
Dincel Walls (i.e. Concrete Walls) is as follows:
Insulation (AS3600 – Concrete Structures Code – Table 5.7.1 – Fire Resistance
Periods for Walls for Insulation):
 275mm Dincel has concrete thickness of 270mm. Therefore, Fire Resistance
Period for Insulation = 240 minutes (minimum concrete thickness of 175mm is
required for 240 minutes).
 200mm Dincel has concrete thickness of 187mm. Therefore, Fire Resistance
Period for Insulation = 240 minutes (minimum concrete thickness of 175mm is
required for 240 minutes).
 155mm Dincel has concrete thickness of 150mm. Therefore, Fire Resistance
Period for Insulation = 180 minutes (minimum concrete thickness of 150mm is
required for 180 minutes).
 110mm Dincel has concrete thickness of 105mm. Therefore, Fire Resistance
Period for Insulation = 90 minutes (minimum concrete thickness of 100mm is
required for 90 minutes).
Integrity:
If both Insulation and Structural Adequacy is satisfied, AS3600 states that this condition
is satisfied as well.
Structural Adequacy:
The FRP for Structural Adequacy is NO LONGER determined by the concrete thickness
alone, in accordance with AS3600-2009. The FRP for structural adequacy must be
calculated by a Structural Engineer, giving consideration to the wall thickness, wall
height, load on the wall, loading eccentricity on the wall and concrete grade.
Therefore, the following FRP’s could be achieved:
 275mm Dincel Wall – 240/240/240.
 200mm Dincel Wall – 240/240/240.
 155mm Dincel Wall – 180/180/180.
 110mm Dincel Wall – 90/90/90.
The “Structural Adequacy” component of the FRP is to be calculated and
confirmed by the project Structural Engineer.
The Non-Combustibility of
consists of concrete infill and permanent polymer formwork. The
concrete infill material is non-combustible. The question that must be answered is: –
If Dincel-Polymer is used without any protection (i.e. sprinklers and/or non-
combustible materials such as plasterboard, fibre cement sheets, etc.), does the BCA
prohibit or limit the use of as a building product? In other
words, in accordance with Reference 1, BCA is looking for the non-combustibility
conditions if the presence of Dincel-Polymer increases fire load, smoke and fire spread.
©Copyright Page 5 of 39
A combustibility performance solution in accordance with the BCA has been
carried out for the Dincel Wall. This performance solution determines that the
Dincel Wall when assessed in accordance with the requirements of the BCA is
deemed to be non-combustible. A COPY OF THE COMBUSTIBILITY
PERFORMANCE SOLUTION REPORT IS AVAILABLE UPON REQUEST BY
PRINCIPAL CERTIFIERS.
References
(1) Non-Combustibility in the Building Code of Australia (BCA) Implications FOR A
NEW GLOBAL STANDARD
Jane Blackmore – Fire Science and Technology Laboratory (FSTL), CSIRO,
Australia.
(2) Fire Code Research Program – Project 2 – Fire Performance of Materials
(Technical Report FCRC – TR 95-01) prepared by V.P. Dowling and C Caird
Ramsay CSIRO Division of Building, Construction and Engineering.
(3) CSIRO Certificate (HF07ANK4245 and No: 439) and Report Number FNK
0065. The Certificate for the report is attached to this assessment. If required
the full report can be provided.
(4) CSIRO Letter of Assessment of FCO-2674 for fire performance.
(5) Certificate and Report by the University of New South Wales Consulting
Services. Download – Structural Engineering Design Certification
(6) Certificate of Test by CSIRO, Report No: FSV1346 and Appendix 5. (Refer
attached document to this assessment).
(7) CSIRO Letter of Assessment FCO-2755 for Bushfire Prone Areas.
(8) CSIRO Letter of Assessment FCO-2800 for Non-Combustibility.
©Copyright Page 6 of 39
REFERENCE NO: 3
BBCCAA SSPPEECCIIFFIICCAATTIIOONN CC11..1100 –– TTaabbllee 33
WWAALLLL LLIINNIINNGG MMAATTEERRIIAALLSS ((MMaatteerriiaall GGrroouuppss PPeerrmmiitttteedd))
BCA Building Class Fire isolated
exits
Public corridors Specific areas Other areas
Wall Wall Wall Wall
Class 2 & 3
Excluding accommodation for the aged, people with disabilities and children
Unsprinklered
Sprinklered
1
1
1, 2
1, 2, 3
1, 2, 3
1, 2, 3
1, 2, 3
1, 2, 3
Class 3 & 9a
Accommodation for the aged, people with disabilities, children and Health-care buildings
Unsprinklered
Sprinklered
1
1
1
1, 2
1, 2
1, 2, 3
1, 2, 3
1, 2, 3
Class 5, 6, 7, 8 & 9b Schools
Unsprinklered
Sprinklered
1
1
1, 2
1, 2, 3
1, 2, 3
1, 2, 3
1, 2, 3
1, 2, 3
Class 9b – other than schools
Unsprinklered
Sprinklered
1
1
1
1, 2
1, 2
1, 2, 3
1, 2, 3
1, 2, 3
Class 9c
Sprinklered 1 1.2 1, 2, 3 1, 2, 3
Notes:
1. “Sprinklered” refers to a building fitted with a sprinkler system complying with Specification
E1.5.
2. “Specific areas” means within –
(a) for Class 2 and 3 buildings, a sole-occupancy unit; and
(b) for Class 5, open-plan offices with a minimum floor dimension/floor to ceiling height
ratio > 5; and
(c) for Class 6, shops with a minimum floor dimension/floor to ceiling height ratio > 5; and
(d) for Class 9a health care buildings, patient care areas; and
(e) for Class 9b theatres and hall etc., an auditorium; and
(f) for Class 9b schools, a classroom; and
(g) for Class 9c aged care buildings, resident use areas.
CCSSIIRROO ffiirree tteessttiinngg rreessuullttss iinn aaccccoorrddaannccee wwiitthh AASS 33883377 ccoonnffiirrmmss tthhaatt
ccoonnssiissttss ooff GGrroouupp 11 mmaatteerriiaall aanndd iittss SSppeecciiffiicc EExxttiinnccttiioonn AArreeaa ((SSEEAA)) iiss lleessss tthhaann
225500mm22
//kkgg ttoo ccoommppllyy wwiitthh tthhee rreeqquuiirreemmeennttss ooff tthhee BBuuiillddiinngg CCooddee ooff AAuussttrraalliiaa
ssppeecciiffiiccaattiioonn CC11..1100 CCllaauussee 44 FFiirree HHaazzaarrdd PPrrooppeerrttiieess ffoorr wwaallllss.. ((RReeffeerr ttoo ffoolllloowwiinngg
cceerrttiiffiiccaattee bbyy CCSSIIRROO))
GGrroouupp 11 mmaatteerriiaall CCllaassssiiffiiccaattiioonn rreeffeerrss ttoo ccoommpplliiaannccee wwiitthh tthhee aabboovvee ttaabbllee ooff
BBuuiillddiinngg CCooddee ooff AAuussttrraalliiaa tthhaatt tthhee pprroodduucctt ccaann bbee uusseedd iinn aannyy llooccaattiioonn ffoorr aannyy
sspprriinnkklleerreedd oorr uunnsspprriinnkklleerreedd bbuuiillddiinngg aanndd wwiillll mmeeeett tthhee rreeqquuiirreemmeennttss ooff
SSppeecciiffiiccaattiioonn CC11..1100 –– CCllaauussee 44 ooff ccuurrrreenntt BBCCAA..
TThhee ffoolllloowwiinngg cceerrttiiffiiccaattee bbyy CCSSIIRROO ccoonnffiirrmmss tthhaatt DDiinncceell ppeerrmmaanneenntt ffoorrmmwwoorrkk
pprroodduucctt mmaatteerriiaall iiss ccllaassssiiffiieedd aass GGrroouupp 11..
©Copyright Page 7 of 39
REFERENCE NO: 3 (A) – 1.5MM MATERIAL THICKNESS
©Copyright Page 8 of 39
REFERENCE NO: 3 (B) – 2.6MM MATERIAL THICKNESS
©Copyright Page 9 of 39
REFERENCE NO: 4 – 08 DECEMBER, 2014
©Copyright Page 10 of 39
REFERENCE NO: 4 – 08 DECEMBER, 2014
©Copyright Page 11 of 39
REFERENCE NO: 4 – 08 DECEMBER, 2014
©Copyright Page 12 of 39
REFERENCE NO: 4 – 08 DECEMBER, 2014
©Copyright Page 13 of 39
REFERENCE NO: 4 – 08 DECEMBER, 2014
©Copyright Page 14 of 39
REFERENCE NO: 4 – 08 DECEMBER, 2014
©Copyright Page 15 of 39
REFERENCE NO: 4 – 08 DECEMBER, 2014
©Copyright Page 16 of 39
REFERENCE NO: 4 – 08 DECEMBER, 2014
©Copyright Page 17 of 39
REFERENCE NO: 5
©Copyright Page 18 of 39
REFERENCE NO: 6
©Copyright Page 19 of 39
REFERENCE NO: 6
©Copyright Page 20 of 39
REFERENCE NO: 7 – 23 FEBRUARY, 2015
©Copyright Page 21 of 39
REFERENCE NO: 7 – 23 FEBRUARY, 2015
©Copyright Page 22 of 39
REFERENCE NO: 7 – 23 FEBRUARY, 2015
©Copyright Page 23 of 39
REFERENCE NO: 7 – 23 FEBRUARY, 2015
©Copyright Page 24 of 39
REFERENCE NO: 7 – 23 FEBRUARY, 2015
©Copyright Page 25 of 39
REFERENCE NO: 7 – 23 FEBRUARY, 2015
©Copyright Page 26 of 39
REFERENCE NO: 7 – 23 FEBRUARY, 2015
©Copyright Page 27 of 39
REFERENCE NO: 7 – 23 FEBRUARY, 2015
©Copyright Page 28 of 39
REFERENCE NO: 7 – 23 FEBRUARY, 2015
©Copyright Page 29 of 39
REFERENCE NO: 8 – 20 OCTOBER, 2016
©Copyright Page 30 of 39
REFERENCE NO: 8 – 20 OCTOBER, 2016
©Copyright Page 31 of 39
REFERENCE NO: 8 – 20 OCTOBER, 2016
©Copyright Page 32 of 39
REFERENCE NO: 8 – 20 OCTOBER, 2016
©Copyright Page 33 of 39
REFERENCE NO: 8 – 20 OCTOBER, 2016
©Copyright Page 34 of 39
REFERENCE NO: 8 – 20 OCTOBER, 2016
©Copyright Page 35 of 39
REFERENCE NO: 8 – 20 OCTOBER, 2016
©Copyright Page 36 of 39
REFERENCE NO: 8 – 20 OCTOBER, 2016
©Copyright Page 37 of 39
REFERENCE NO: 8 – 20 OCTOBER, 2016
©Copyright Page 38 of 39
REFERENCE NO: 8 – 20 OCTOBER, 2016
©Copyright Page 39 of 39
REFERENCE NO: 8 – 20 OCTOBER, 2016

More Related Content

What's hot

FSBP Masonry Magazine January 2015
FSBP Masonry Magazine January 2015FSBP Masonry Magazine January 2015
FSBP Masonry Magazine January 2015Carrie Frillman
 
Wintech provide Dow Corning with Facade Consultancy
Wintech provide Dow Corning with Facade ConsultancyWintech provide Dow Corning with Facade Consultancy
Wintech provide Dow Corning with Facade ConsultancyWintech
 
Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study Jonathan Flanagan
 
Thermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 DThermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 DGary Haydon
 
Masterduct Sales Presentation
Masterduct Sales  PresentationMasterduct Sales  Presentation
Masterduct Sales PresentationDBJorgensen
 
IRJET- Translucent Light Weight Concrete Blocks for Green Buildings
IRJET-  	  Translucent Light Weight Concrete Blocks for Green BuildingsIRJET-  	  Translucent Light Weight Concrete Blocks for Green Buildings
IRJET- Translucent Light Weight Concrete Blocks for Green BuildingsIRJET Journal
 
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-silver-20-spec...
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-silver-20-spec...Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-silver-20-spec...
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-silver-20-spec...GreenLightWindowFilmsCOSprings
 
Durisol Brochure
Durisol BrochureDurisol Brochure
Durisol Brochureruperio
 
50mm Duct Seal - Fire Rated (DSEAR ATEX) Cable & Pipe Seals - CSD RISE DUCT 50F
50mm Duct Seal - Fire Rated (DSEAR ATEX) Cable & Pipe Seals - CSD RISE DUCT 50F50mm Duct Seal - Fire Rated (DSEAR ATEX) Cable & Pipe Seals - CSD RISE DUCT 50F
50mm Duct Seal - Fire Rated (DSEAR ATEX) Cable & Pipe Seals - CSD RISE DUCT 50FThorne & Derrick International
 
Basis corrosion coating &CP system for pipeline in Oil & Gas Sector
Basis corrosion coating &CP system for pipeline in Oil & Gas SectorBasis corrosion coating &CP system for pipeline in Oil & Gas Sector
Basis corrosion coating &CP system for pipeline in Oil & Gas SectorQuan Phan Hong
 

What's hot (19)

Coating presentation tp bangkok 23 jan 2014
Coating presentation tp bangkok   23 jan 2014Coating presentation tp bangkok   23 jan 2014
Coating presentation tp bangkok 23 jan 2014
 
Masonry for sustainability
Masonry for sustainabilityMasonry for sustainability
Masonry for sustainability
 
CSL Silicones Building Construction Brochure 2014
CSL Silicones Building  Construction Brochure 2014CSL Silicones Building  Construction Brochure 2014
CSL Silicones Building Construction Brochure 2014
 
FSBP Masonry Magazine January 2015
FSBP Masonry Magazine January 2015FSBP Masonry Magazine January 2015
FSBP Masonry Magazine January 2015
 
Wintech provide Dow Corning with Facade Consultancy
Wintech provide Dow Corning with Facade ConsultancyWintech provide Dow Corning with Facade Consultancy
Wintech provide Dow Corning with Facade Consultancy
 
3M Fire Barrier Intumescent Moldable Putty
3M Fire Barrier Intumescent Moldable Putty3M Fire Barrier Intumescent Moldable Putty
3M Fire Barrier Intumescent Moldable Putty
 
E flex - Airex Manufacturing Inc
E flex - Airex Manufacturing IncE flex - Airex Manufacturing Inc
E flex - Airex Manufacturing Inc
 
Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study Insulation & Airtightness Continuity Report with Shadow Study
Insulation & Airtightness Continuity Report with Shadow Study
 
Michael badding corning
Michael badding   corningMichael badding   corning
Michael badding corning
 
Thermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 DThermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 D
 
Masterduct Sales Presentation
Masterduct Sales  PresentationMasterduct Sales  Presentation
Masterduct Sales Presentation
 
IRJET- Translucent Light Weight Concrete Blocks for Green Buildings
IRJET-  	  Translucent Light Weight Concrete Blocks for Green BuildingsIRJET-  	  Translucent Light Weight Concrete Blocks for Green Buildings
IRJET- Translucent Light Weight Concrete Blocks for Green Buildings
 
3M Fire Barrier Intumescent Wrap - 3M FS195+
3M Fire Barrier Intumescent Wrap - 3M FS195+3M Fire Barrier Intumescent Wrap - 3M FS195+
3M Fire Barrier Intumescent Wrap - 3M FS195+
 
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-silver-20-spec...
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-silver-20-spec...Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-silver-20-spec...
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-silver-20-spec...
 
Barrier Bac Architects Binder
Barrier Bac Architects BinderBarrier Bac Architects Binder
Barrier Bac Architects Binder
 
Wrapping coating
Wrapping coatingWrapping coating
Wrapping coating
 
Durisol Brochure
Durisol BrochureDurisol Brochure
Durisol Brochure
 
50mm Duct Seal - Fire Rated (DSEAR ATEX) Cable & Pipe Seals - CSD RISE DUCT 50F
50mm Duct Seal - Fire Rated (DSEAR ATEX) Cable & Pipe Seals - CSD RISE DUCT 50F50mm Duct Seal - Fire Rated (DSEAR ATEX) Cable & Pipe Seals - CSD RISE DUCT 50F
50mm Duct Seal - Fire Rated (DSEAR ATEX) Cable & Pipe Seals - CSD RISE DUCT 50F
 
Basis corrosion coating &CP system for pipeline in Oil & Gas Sector
Basis corrosion coating &CP system for pipeline in Oil & Gas SectorBasis corrosion coating &CP system for pipeline in Oil & Gas Sector
Basis corrosion coating &CP system for pipeline in Oil & Gas Sector
 

Similar to Dincel Wall Fire Assessment Summary

EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEduardo H. Pare
 
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSSPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEduardo H. Pare
 
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEduardo H. Pare
 
Certificado BBA - Aislamiento con productos Synthesia para rehabilitación de ...
Certificado BBA - Aislamiento con productos Synthesia para rehabilitación de ...Certificado BBA - Aislamiento con productos Synthesia para rehabilitación de ...
Certificado BBA - Aislamiento con productos Synthesia para rehabilitación de ...Synthesia Technology
 
Do all insulations perform the same tc 2017 atlanta
Do all insulations perform the same tc 2017   atlantaDo all insulations perform the same tc 2017   atlanta
Do all insulations perform the same tc 2017 atlantaROCKWOOL
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestationYousef Riad
 
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-stainless-stee...
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-stainless-stee...Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-stainless-stee...
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-stainless-stee...GreenLightWindowFilmsCOSprings
 
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-35...
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-35...Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-35...
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-35...CustomTintSolutionsSanAntonio
 
Water Based Intumescent Steel Coating - Fireproofing Steel Canada | Fireproof...
Water Based Intumescent Steel Coating - Fireproofing Steel Canada | Fireproof...Water Based Intumescent Steel Coating - Fireproofing Steel Canada | Fireproof...
Water Based Intumescent Steel Coating - Fireproofing Steel Canada | Fireproof...Fire Security System
 
Thermobreak Sheet - Brochure 020914 D
Thermobreak Sheet - Brochure 020914 DThermobreak Sheet - Brochure 020914 D
Thermobreak Sheet - Brochure 020914 DGary Haydon
 
Cost Comparison of BlazeMaster CPVC vs Generic Steel for new build construction
Cost Comparison of BlazeMaster CPVC vs Generic Steel for new build constructionCost Comparison of BlazeMaster CPVC vs Generic Steel for new build construction
Cost Comparison of BlazeMaster CPVC vs Generic Steel for new build constructionWillRobinsonMCIM
 
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-50...
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-50...Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-50...
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-50...CustomTintSolutionsSanAntonio
 
Kingsmill - Copper Earthing, Surge Protection & Lightning Protection
Kingsmill - Copper Earthing, Surge Protection & Lightning ProtectionKingsmill - Copper Earthing, Surge Protection & Lightning Protection
Kingsmill - Copper Earthing, Surge Protection & Lightning ProtectionThorne & Derrick International
 
4.0 Standards, Regulations and Codes.pdf
4.0 Standards, Regulations and Codes.pdf4.0 Standards, Regulations and Codes.pdf
4.0 Standards, Regulations and Codes.pdfInsulation2
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)Yousef Riad
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDFWorldofAllLyrics
 

Similar to Dincel Wall Fire Assessment Summary (20)

EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
 
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSSPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
 
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
 
Certificado BBA - Aislamiento con productos Synthesia para rehabilitación de ...
Certificado BBA - Aislamiento con productos Synthesia para rehabilitación de ...Certificado BBA - Aislamiento con productos Synthesia para rehabilitación de ...
Certificado BBA - Aislamiento con productos Synthesia para rehabilitación de ...
 
RUREDIL X Mesh C10 for Masonry
RUREDIL X Mesh C10 for MasonryRUREDIL X Mesh C10 for Masonry
RUREDIL X Mesh C10 for Masonry
 
Do all insulations perform the same tc 2017 atlanta
Do all insulations perform the same tc 2017   atlantaDo all insulations perform the same tc 2017   atlanta
Do all insulations perform the same tc 2017 atlanta
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
 
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-stainless-stee...
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-stainless-stee...Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-stainless-stee...
Custom tint-solutions-austin-san-antonio-window-tinting-10-mil-stainless-stee...
 
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-35...
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-35...Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-35...
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-35...
 
Water Based Intumescent Steel Coating - Fireproofing Steel Canada | Fireproof...
Water Based Intumescent Steel Coating - Fireproofing Steel Canada | Fireproof...Water Based Intumescent Steel Coating - Fireproofing Steel Canada | Fireproof...
Water Based Intumescent Steel Coating - Fireproofing Steel Canada | Fireproof...
 
205
205205
205
 
Ay126
Ay126Ay126
Ay126
 
Thermobreak Sheet - Brochure 020914 D
Thermobreak Sheet - Brochure 020914 DThermobreak Sheet - Brochure 020914 D
Thermobreak Sheet - Brochure 020914 D
 
Cost Comparison of BlazeMaster CPVC vs Generic Steel for new build construction
Cost Comparison of BlazeMaster CPVC vs Generic Steel for new build constructionCost Comparison of BlazeMaster CPVC vs Generic Steel for new build construction
Cost Comparison of BlazeMaster CPVC vs Generic Steel for new build construction
 
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-50...
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-50...Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-50...
Custom tint-solutions-austin-san-antonio-window-film-4-mil-stainless-steel-50...
 
Kingsmill - Copper Earthing, Surge Protection & Lightning Protection
Kingsmill - Copper Earthing, Surge Protection & Lightning ProtectionKingsmill - Copper Earthing, Surge Protection & Lightning Protection
Kingsmill - Copper Earthing, Surge Protection & Lightning Protection
 
4.0 Standards, Regulations and Codes.pdf
4.0 Standards, Regulations and Codes.pdf4.0 Standards, Regulations and Codes.pdf
4.0 Standards, Regulations and Codes.pdf
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)
 
Tips for optimizing structural masonry
Tips for optimizing structural masonryTips for optimizing structural masonry
Tips for optimizing structural masonry
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
 

Recently uploaded

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 

Recently uploaded (20)

(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 

Dincel Wall Fire Assessment Summary

  • 1. ©Copyright Page 1 of 39 Telephone: (612) 9670 1633 101 Quarry Road Email: construction@dincel.com.au Facsimile: (612) 9670 6744 Erskine Park, NSW 2759 Website: www.dincel.com.au PO Box 104, St Clair, NSW 2759 A.B.N. 78 083 839 614 AUSTRALIA DDIINNCCEELL WWAALLLL FFIIRREE AASSSSEESSSSMMEENNTT DISCLAIMER The information contained in this document is intended for the use of suitably qualified and experienced architects and engineers and other building professionals. This information is not intended to replace design calculations or analysis normally associated with the design and specification of buildings and their components. Dincel Construction System Pty Ltd accepts no liability for any circumstances arising from the failure of a specifier or user of any part of Dincel Construction System to obtain appropriate professional advice about its use and installation or from failure to adhere to the requirements of appropriate Standards and Codes of Practice, and relevant Building Codes. Revision Date Amendment A May 2010 Added Non-Combustibility Assessment by CSIRO B June 2010 Added Hydro Carbon Fire C January 2017 General Revision
  • 2. ©Copyright Page 2 of 39 SUMMARY The fire performance of has been assessed by: 1. Fire Resistance Periods The University of New South Wales’ Certificate and Report (Reference No: 5), CSIRO Certificate FSV1346 (Reference No: 6) for Fire Resistance Periods. The letter of assessment by CSIRO FCO-2674 (Reference No: 4) states that polymer web links of Dincel-Form when concrete filled will not burn or melt away to create holes when subjected to fire conditions. This means that the presence of polymer links within the concrete joining each face of the polymer formwork does not compromise the FRP components of ………./integrity/insulation. The polymer links of Dincel-Form are maximum 2mm thickness. These polymer links in some other systems are much thicker (more than 10mm). As proven by tests, the thicker the polymers, the more fuel to burn. The Certifiers therefore should require test results for any polymer links particularly exceeding 2mm thickness. 2. Fire Hazard Properties Attachments and Liners to the walls must comply with BCA – Specification C.1.10 {Reference No: 3 (A) and 3 (B)} for Flammability and Smoke issues. As shown in the attached CSIRO certificate, Dincel is a GROUP 1 material (i.e. no limitations for its use in any place without any protection). Dincel’s smoke criteria is better than what is allowed by the BCA. The abovementioned certificates clearly state that Dincel-Polymer has no limitations on its use for flammability and smoke generation. 3. Non-Combustibility The BCA requires the use of non-combustible materials to limit the fire load and fire spread. It is also important to note that the subject combustibility compliance is only applicable to façade walls in accordance with the BCA. The letter of assessment by CSIRO FCO-2800 (Reference No: 8) states that the Dincel-Polymer is the equivalent of the deemed to non-combustible materials in Clause C1.12 of the BCA. The BCA recognises DTS = Performance Solution (previously called Alternative Solution). REQUEST DINCEL’S COMBUSTIBILITY REPORT if your project consists of Dincel façade walls to satisfy the non-combustibility requirement. 4. Bushfire Prone Areas The letter of assessment by CSIRO FCO-2755 (Reference No: 7) states that when Dincel Forms are filled with concrete it will comply with AS3959 – 2009 and allowed to be used in all bushfire conditions, including Bushfire Attack Level of BAL-FZ (i.e. the worst bushfire level).
  • 3. ©Copyright Page 3 of 39 Readers may refer to the following for further information. AND FIRE PERFORMANCE is a permanent polymer formwork for concrete filling. Dincel-Polymer forms DO NOT provide fire rating but the CONCRETE DOES. The concrete infill of provides the appropriate provisions. The requirement is, BCA – Clause A 2.3 – Fire Resistance of Building Elements, Clause 2.d (ii) – Fire Resistance Period (FRP) of a structural concrete wall shall be determined in accordance with Australian Standard AS3600 for Concrete Structures as certified by The University of New South Wales (UNSW) (Reference No: 5). There are three (3) components that are required to be identified for the FRP.  Insulation and Integrity – determined in accordance with AS3600 or a Fire Testing Laboratory.  Structural Adequacy – determined in accordance with AS3600 for walls subject to the “deemed to satisfy” condition or a Fire Testing Laboratory can determine this criterion only up to the limits of the testing facility (i.e. applied load and eccentricity, wall height). Fire testing results for walls will not cover building structures of more than 3 to 4 storeys in height and wall heights greater than 3m. Under these circumstances the certifier should not accept the FRP determined by test results. Only concrete wall systems that are compliant with AS3600 can be accepted beyond the test results. For fire test results to be accepted, the test sample element must be in strict compliance with AS3600. AS3600 – 2009 – Supplement 1 : 2014 states “protective coating of concrete is outside the scope of AS3600 – 2009”, which means that the certifier cannot accept any fire test results for systems that are reliant on waterproofing. Refer (download) Dincel Wall Building Code of Australia Compliance, pages 2, 3 and 4 for further explanation. complies with the Deemed-To-Satisfy condition of the Building Code of Australia in accordance with the certificate by the UNSW (Reference 5). The CSIRO Certificate (Reference No: 6) has been organised to validate that Dincel- Form’s web-links will not burn or melt away to create holes so that the Fire Resistance Period of for ………./integrity/insulation are not affected (Reference No: 4). The Dincel-Polymer formwork holds the wet concrete until it sets. If for some reason Dincel-Polymer is required to be removed or even burns during a fire event, the remaining core component is ordinary concrete which provides the required Fire Resistance Period for structural adequacy/integrity/insulation. Therefore, the presence of Dincel-Polymer remaining at the face of the concrete wall can be considered as nothing more than a lining or wall cladding material.
  • 4. ©Copyright Page 4 of 39 Summary of FRP’s for 275mm Dincel, 200mm Dincel, 155mm Dincel and 110mm Dincel Walls (i.e. Concrete Walls) is as follows: Insulation (AS3600 – Concrete Structures Code – Table 5.7.1 – Fire Resistance Periods for Walls for Insulation):  275mm Dincel has concrete thickness of 270mm. Therefore, Fire Resistance Period for Insulation = 240 minutes (minimum concrete thickness of 175mm is required for 240 minutes).  200mm Dincel has concrete thickness of 187mm. Therefore, Fire Resistance Period for Insulation = 240 minutes (minimum concrete thickness of 175mm is required for 240 minutes).  155mm Dincel has concrete thickness of 150mm. Therefore, Fire Resistance Period for Insulation = 180 minutes (minimum concrete thickness of 150mm is required for 180 minutes).  110mm Dincel has concrete thickness of 105mm. Therefore, Fire Resistance Period for Insulation = 90 minutes (minimum concrete thickness of 100mm is required for 90 minutes). Integrity: If both Insulation and Structural Adequacy is satisfied, AS3600 states that this condition is satisfied as well. Structural Adequacy: The FRP for Structural Adequacy is NO LONGER determined by the concrete thickness alone, in accordance with AS3600-2009. The FRP for structural adequacy must be calculated by a Structural Engineer, giving consideration to the wall thickness, wall height, load on the wall, loading eccentricity on the wall and concrete grade. Therefore, the following FRP’s could be achieved:  275mm Dincel Wall – 240/240/240.  200mm Dincel Wall – 240/240/240.  155mm Dincel Wall – 180/180/180.  110mm Dincel Wall – 90/90/90. The “Structural Adequacy” component of the FRP is to be calculated and confirmed by the project Structural Engineer. The Non-Combustibility of consists of concrete infill and permanent polymer formwork. The concrete infill material is non-combustible. The question that must be answered is: – If Dincel-Polymer is used without any protection (i.e. sprinklers and/or non- combustible materials such as plasterboard, fibre cement sheets, etc.), does the BCA prohibit or limit the use of as a building product? In other words, in accordance with Reference 1, BCA is looking for the non-combustibility conditions if the presence of Dincel-Polymer increases fire load, smoke and fire spread.
  • 5. ©Copyright Page 5 of 39 A combustibility performance solution in accordance with the BCA has been carried out for the Dincel Wall. This performance solution determines that the Dincel Wall when assessed in accordance with the requirements of the BCA is deemed to be non-combustible. A COPY OF THE COMBUSTIBILITY PERFORMANCE SOLUTION REPORT IS AVAILABLE UPON REQUEST BY PRINCIPAL CERTIFIERS. References (1) Non-Combustibility in the Building Code of Australia (BCA) Implications FOR A NEW GLOBAL STANDARD Jane Blackmore – Fire Science and Technology Laboratory (FSTL), CSIRO, Australia. (2) Fire Code Research Program – Project 2 – Fire Performance of Materials (Technical Report FCRC – TR 95-01) prepared by V.P. Dowling and C Caird Ramsay CSIRO Division of Building, Construction and Engineering. (3) CSIRO Certificate (HF07ANK4245 and No: 439) and Report Number FNK 0065. The Certificate for the report is attached to this assessment. If required the full report can be provided. (4) CSIRO Letter of Assessment of FCO-2674 for fire performance. (5) Certificate and Report by the University of New South Wales Consulting Services. Download – Structural Engineering Design Certification (6) Certificate of Test by CSIRO, Report No: FSV1346 and Appendix 5. (Refer attached document to this assessment). (7) CSIRO Letter of Assessment FCO-2755 for Bushfire Prone Areas. (8) CSIRO Letter of Assessment FCO-2800 for Non-Combustibility.
  • 6. ©Copyright Page 6 of 39 REFERENCE NO: 3 BBCCAA SSPPEECCIIFFIICCAATTIIOONN CC11..1100 –– TTaabbllee 33 WWAALLLL LLIINNIINNGG MMAATTEERRIIAALLSS ((MMaatteerriiaall GGrroouuppss PPeerrmmiitttteedd)) BCA Building Class Fire isolated exits Public corridors Specific areas Other areas Wall Wall Wall Wall Class 2 & 3 Excluding accommodation for the aged, people with disabilities and children Unsprinklered Sprinklered 1 1 1, 2 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 Class 3 & 9a Accommodation for the aged, people with disabilities, children and Health-care buildings Unsprinklered Sprinklered 1 1 1 1, 2 1, 2 1, 2, 3 1, 2, 3 1, 2, 3 Class 5, 6, 7, 8 & 9b Schools Unsprinklered Sprinklered 1 1 1, 2 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 1, 2, 3 Class 9b – other than schools Unsprinklered Sprinklered 1 1 1 1, 2 1, 2 1, 2, 3 1, 2, 3 1, 2, 3 Class 9c Sprinklered 1 1.2 1, 2, 3 1, 2, 3 Notes: 1. “Sprinklered” refers to a building fitted with a sprinkler system complying with Specification E1.5. 2. “Specific areas” means within – (a) for Class 2 and 3 buildings, a sole-occupancy unit; and (b) for Class 5, open-plan offices with a minimum floor dimension/floor to ceiling height ratio > 5; and (c) for Class 6, shops with a minimum floor dimension/floor to ceiling height ratio > 5; and (d) for Class 9a health care buildings, patient care areas; and (e) for Class 9b theatres and hall etc., an auditorium; and (f) for Class 9b schools, a classroom; and (g) for Class 9c aged care buildings, resident use areas. CCSSIIRROO ffiirree tteessttiinngg rreessuullttss iinn aaccccoorrddaannccee wwiitthh AASS 33883377 ccoonnffiirrmmss tthhaatt ccoonnssiissttss ooff GGrroouupp 11 mmaatteerriiaall aanndd iittss SSppeecciiffiicc EExxttiinnccttiioonn AArreeaa ((SSEEAA)) iiss lleessss tthhaann 225500mm22 //kkgg ttoo ccoommppllyy wwiitthh tthhee rreeqquuiirreemmeennttss ooff tthhee BBuuiillddiinngg CCooddee ooff AAuussttrraalliiaa ssppeecciiffiiccaattiioonn CC11..1100 CCllaauussee 44 FFiirree HHaazzaarrdd PPrrooppeerrttiieess ffoorr wwaallllss.. ((RReeffeerr ttoo ffoolllloowwiinngg cceerrttiiffiiccaattee bbyy CCSSIIRROO)) GGrroouupp 11 mmaatteerriiaall CCllaassssiiffiiccaattiioonn rreeffeerrss ttoo ccoommpplliiaannccee wwiitthh tthhee aabboovvee ttaabbllee ooff BBuuiillddiinngg CCooddee ooff AAuussttrraalliiaa tthhaatt tthhee pprroodduucctt ccaann bbee uusseedd iinn aannyy llooccaattiioonn ffoorr aannyy sspprriinnkklleerreedd oorr uunnsspprriinnkklleerreedd bbuuiillddiinngg aanndd wwiillll mmeeeett tthhee rreeqquuiirreemmeennttss ooff SSppeecciiffiiccaattiioonn CC11..1100 –– CCllaauussee 44 ooff ccuurrrreenntt BBCCAA.. TThhee ffoolllloowwiinngg cceerrttiiffiiccaattee bbyy CCSSIIRROO ccoonnffiirrmmss tthhaatt DDiinncceell ppeerrmmaanneenntt ffoorrmmwwoorrkk pprroodduucctt mmaatteerriiaall iiss ccllaassssiiffiieedd aass GGrroouupp 11..
  • 7. ©Copyright Page 7 of 39 REFERENCE NO: 3 (A) – 1.5MM MATERIAL THICKNESS
  • 8. ©Copyright Page 8 of 39 REFERENCE NO: 3 (B) – 2.6MM MATERIAL THICKNESS
  • 9. ©Copyright Page 9 of 39 REFERENCE NO: 4 – 08 DECEMBER, 2014
  • 10. ©Copyright Page 10 of 39 REFERENCE NO: 4 – 08 DECEMBER, 2014
  • 11. ©Copyright Page 11 of 39 REFERENCE NO: 4 – 08 DECEMBER, 2014
  • 12. ©Copyright Page 12 of 39 REFERENCE NO: 4 – 08 DECEMBER, 2014
  • 13. ©Copyright Page 13 of 39 REFERENCE NO: 4 – 08 DECEMBER, 2014
  • 14. ©Copyright Page 14 of 39 REFERENCE NO: 4 – 08 DECEMBER, 2014
  • 15. ©Copyright Page 15 of 39 REFERENCE NO: 4 – 08 DECEMBER, 2014
  • 16. ©Copyright Page 16 of 39 REFERENCE NO: 4 – 08 DECEMBER, 2014
  • 17. ©Copyright Page 17 of 39 REFERENCE NO: 5
  • 18. ©Copyright Page 18 of 39 REFERENCE NO: 6
  • 19. ©Copyright Page 19 of 39 REFERENCE NO: 6
  • 20. ©Copyright Page 20 of 39 REFERENCE NO: 7 – 23 FEBRUARY, 2015
  • 21. ©Copyright Page 21 of 39 REFERENCE NO: 7 – 23 FEBRUARY, 2015
  • 22. ©Copyright Page 22 of 39 REFERENCE NO: 7 – 23 FEBRUARY, 2015
  • 23. ©Copyright Page 23 of 39 REFERENCE NO: 7 – 23 FEBRUARY, 2015
  • 24. ©Copyright Page 24 of 39 REFERENCE NO: 7 – 23 FEBRUARY, 2015
  • 25. ©Copyright Page 25 of 39 REFERENCE NO: 7 – 23 FEBRUARY, 2015
  • 26. ©Copyright Page 26 of 39 REFERENCE NO: 7 – 23 FEBRUARY, 2015
  • 27. ©Copyright Page 27 of 39 REFERENCE NO: 7 – 23 FEBRUARY, 2015
  • 28. ©Copyright Page 28 of 39 REFERENCE NO: 7 – 23 FEBRUARY, 2015
  • 29. ©Copyright Page 29 of 39 REFERENCE NO: 8 – 20 OCTOBER, 2016
  • 30. ©Copyright Page 30 of 39 REFERENCE NO: 8 – 20 OCTOBER, 2016
  • 31. ©Copyright Page 31 of 39 REFERENCE NO: 8 – 20 OCTOBER, 2016
  • 32. ©Copyright Page 32 of 39 REFERENCE NO: 8 – 20 OCTOBER, 2016
  • 33. ©Copyright Page 33 of 39 REFERENCE NO: 8 – 20 OCTOBER, 2016
  • 34. ©Copyright Page 34 of 39 REFERENCE NO: 8 – 20 OCTOBER, 2016
  • 35. ©Copyright Page 35 of 39 REFERENCE NO: 8 – 20 OCTOBER, 2016
  • 36. ©Copyright Page 36 of 39 REFERENCE NO: 8 – 20 OCTOBER, 2016
  • 37. ©Copyright Page 37 of 39 REFERENCE NO: 8 – 20 OCTOBER, 2016
  • 38. ©Copyright Page 38 of 39 REFERENCE NO: 8 – 20 OCTOBER, 2016
  • 39. ©Copyright Page 39 of 39 REFERENCE NO: 8 – 20 OCTOBER, 2016