SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL
SANDESH KAKDE
EMAIL:sandeshkakde@live.com
SAP CUSTOMIZING TABLE OF CONTENTS:
SR. SUB. OBJECTS TCODE EXAMPLE
1 INTRODUCTION & SCENARIO
2 MAINTAIN BUDGET PROFILE IN ORDER TYPE OKOB “000001” STANDARD
3 MAINATAIN NUMBER RANGE FOR BUDGETING OK11 “04”
4 DEFINE TOLERANCE LIMIT FOR AVIALABILITY
CONTROL
OKOC MAINTAIN 3 SCENARIOS
5 SPECIFY EXEMPT COST ELEMENT FROM
AVAILABILITY CONTROL
OPTK “400100”
6 MAINTAIN BUDGET MANAGER OK14 “USER935”
7 TEST
SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL
INTRODUTION:
BUDGETING AND AVAILABILITY CONTROL
Planning Budgeting
We can plant cost element wise in the order Budgeting will be done order wise
We can do planning period wise in a year
(Month wise)
Budgeting should be done year wise
Micro level (Lower level) Marco level (High level)
For budgeting SAP has given availability control
Scenario:
Order no. MH431111 (Vehicle No.)
Budget amount 50000
Options:
1) Give warning to the user
2) Give Warning Error to the user and inform to Budget manager
3) Give an Error
If actual amount exceeds 85% of budget 42500
Or
If the variance is above 10000 i.e. actual 60000
Or
Both Whichever activities comes first
Or
If a actual amount exceeds 70% of budget go for option1
If actual amount exceeds 85% of budget go for option 2
If actual amount exceeds 100% of budget go for option 3
When we do budget, it generates a document –We have to give budgeting –No. range
interval only for 04 (Hard coded by SAP)
This is given at client level and not at controlling area level – it is not year specify.
Note: Order E.g. Vehicle Expenses
Cost element E.g. Vehicle Petrol, Repairs, Driver Salary, etc.
SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL
Step 1: MAINTAIN BUDGET PROFILE IN ORDER TYPES
OKOB
ASSIGN BUDGET PROFILE TO ORDER TYPES
IN CURRENT SCENARIO WE HAVE SRKT AND SRKV ORDER TYPES.
Step 2: MAINTAIN NUMBER RANGE FOR BUDGETING:
OK11
SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL
STEP 3: DEFINE TOLERANCE LIMITS FOR AVIALABILITY CONTROL:
OKOC
AS PER THE REQUIREMNT MAINTAIN THE TOLERANCE LIMITS FOR AVAILABILITY CONTROL
IN CURRENT SCENARIO I HAVE MANITAINED 3 LIMITS.
70% USAGE JUST WARNING
85% USAGE WARNING WITH EMAIL TO MANAGER
100% USAGE NO POSTING POSSIBLE
STEP 4: SPECIFY EXEMPT COST ELEMENTS FROM AVIALABLITLITY CONTROL:
OPTK
WHEN WE POST A DRIVERS SALRY DOCUMENT IN RELATION TO ORDER MH431111. IT WILL GET
POSTED WITHOUT ANY WARNING, SINCE WE HAVE MENTION THIS IN EXEMPT LIST.
JUST FOR TESTING PURPOSE I HAVE MAINTAINED ON COST ELEMENT.
SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL
STEP 5: MAINTAIN BUDGET MANAGER:
OK14
MAINATIN THE MANAGER PROFILE HERE.
TEST:
SCENARIO 1 - BUDGETING ORDERWISE
CREATE A BUDGET FOR ORDER “90023”
SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL
THEN ACTIAVTE TH AVAILABILITY CONTROL AS SHOWN BELOW
Save
F-02 Post FI document.
SINCE OUR BUDGET IS Rs.1000000 AND AND AMOUNT AVAILABLE TO POST WAS JUST Rs.300000.
I TRIED PODTING A DOCUMENT OF Rs. 800000 … BUT SAP GAVE ME ERROR AND DIDN’T ALLOW ME
TO POST THE DOCUMENT.
SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL
KO2B:
END BUDGET & AVAILABILITY CONTROL

More Related Content

What's hot

Document splitting in New GL in SAP
Document splitting in New GL in SAPDocument splitting in New GL in SAP
Document splitting in New GL in SAP
Rajesh Shanbhag
 
Reports in SAP Using Report Painter / Drill Down Reporting
Reports in SAP Using Report Painter / Drill Down ReportingReports in SAP Using Report Painter / Drill Down Reporting
Reports in SAP Using Report Painter / Drill Down Reporting
Ragothaman Srinivasan
 
sap-co-configuration
sap-co-configurationsap-co-configuration
sap-co-configuration
Mohd Rehan
 
Fi implementation
Fi implementationFi implementation
Fi implementation
K K
 
New gl documentsplitting_guidebook
New gl documentsplitting_guidebookNew gl documentsplitting_guidebook
New gl documentsplitting_guidebook
Prashant Aiwale
 
SAP Asset accounting configuration steps as a subledger
SAP Asset accounting configuration steps as a subledgerSAP Asset accounting configuration steps as a subledger
SAP Asset accounting configuration steps as a subledger
cecileekove
 

What's hot (19)

SAP FICO-Profit center accounting
SAP FICO-Profit center accountingSAP FICO-Profit center accounting
SAP FICO-Profit center accounting
 
Master data tool lsmw
Master data tool   lsmwMaster data tool   lsmw
Master data tool lsmw
 
Sap fico t code
Sap fico t codeSap fico t code
Sap fico t code
 
SAP FICO T CODES T KONDAIAH
SAP FICO T CODES T KONDAIAHSAP FICO T CODES T KONDAIAH
SAP FICO T CODES T KONDAIAH
 
Document splitting in New GL in SAP
Document splitting in New GL in SAPDocument splitting in New GL in SAP
Document splitting in New GL in SAP
 
Segment Reporting and SAP New GL - ECC 6
Segment Reporting and SAP New GL - ECC 6Segment Reporting and SAP New GL - ECC 6
Segment Reporting and SAP New GL - ECC 6
 
Sap fi configuration
Sap fi configurationSap fi configuration
Sap fi configuration
 
SAP FICO Training Material PPT
 SAP FICO Training Material PPT SAP FICO Training Material PPT
SAP FICO Training Material PPT
 
Reports in SAP Using Report Painter / Drill Down Reporting
Reports in SAP Using Report Painter / Drill Down ReportingReports in SAP Using Report Painter / Drill Down Reporting
Reports in SAP Using Report Painter / Drill Down Reporting
 
sap-co-configuration
sap-co-configurationsap-co-configuration
sap-co-configuration
 
SAP Asset Accounting
SAP Asset Accounting SAP Asset Accounting
SAP Asset Accounting
 
Fi implementation
Fi implementationFi implementation
Fi implementation
 
New gl documentsplitting_guidebook
New gl documentsplitting_guidebookNew gl documentsplitting_guidebook
New gl documentsplitting_guidebook
 
Account Recievable and Account Payable
Account Recievable and Account PayableAccount Recievable and Account Payable
Account Recievable and Account Payable
 
Document splitting-in-new-general-ledger
Document splitting-in-new-general-ledgerDocument splitting-in-new-general-ledger
Document splitting-in-new-general-ledger
 
SAP FICO Online Training
SAP FICO Online Training SAP FICO Online Training
SAP FICO Online Training
 
Sap fico-fi-notes
Sap fico-fi-notesSap fico-fi-notes
Sap fico-fi-notes
 
SAP Asset accounting configuration steps as a subledger
SAP Asset accounting configuration steps as a subledgerSAP Asset accounting configuration steps as a subledger
SAP Asset accounting configuration steps as a subledger
 
Presenting Closing The Year with SAP's Project System & Investment Management
Presenting Closing The Year with SAP's Project System & Investment ManagementPresenting Closing The Year with SAP's Project System & Investment Management
Presenting Closing The Year with SAP's Project System & Investment Management
 

Similar to Sap co budgeting & avalability control

Product costing343411327309984
Product costing343411327309984Product costing343411327309984
Product costing343411327309984
shivaprakash
 

Similar to Sap co budgeting & avalability control (20)

SAP S4 HANA.pptx
SAP S4 HANA.pptxSAP S4 HANA.pptx
SAP S4 HANA.pptx
 
Mro spare parts optimisation and inventory reduction uk 2017 11
Mro spare parts optimisation and inventory reduction uk 2017 11Mro spare parts optimisation and inventory reduction uk 2017 11
Mro spare parts optimisation and inventory reduction uk 2017 11
 
Randall Saenz Aguero - GROUND HANDLING WORKSHOP - PANEL 2: Benefits of standa...
Randall Saenz Aguero - GROUND HANDLING WORKSHOP - PANEL 2: Benefits of standa...Randall Saenz Aguero - GROUND HANDLING WORKSHOP - PANEL 2: Benefits of standa...
Randall Saenz Aguero - GROUND HANDLING WORKSHOP - PANEL 2: Benefits of standa...
 
sales and distribution process Business blue print of Auto Spares n Accessori...
sales and distribution process Business blue print of Auto Spares n Accessori...sales and distribution process Business blue print of Auto Spares n Accessori...
sales and distribution process Business blue print of Auto Spares n Accessori...
 
Using Technical Performance Progress
Using Technical Performance ProgressUsing Technical Performance Progress
Using Technical Performance Progress
 
Requirements streamlining
Requirements streamliningRequirements streamlining
Requirements streamlining
 
New Maturity Model Can Fire Up Restaurant Operations
New Maturity Model Can Fire Up Restaurant OperationsNew Maturity Model Can Fire Up Restaurant Operations
New Maturity Model Can Fire Up Restaurant Operations
 
New maturity-model-can-fire-up-restaurant-operations
New maturity-model-can-fire-up-restaurant-operationsNew maturity-model-can-fire-up-restaurant-operations
New maturity-model-can-fire-up-restaurant-operations
 
New Maturity Model Can Fire Up Restaurant Operations
New Maturity Model Can Fire Up Restaurant OperationsNew Maturity Model Can Fire Up Restaurant Operations
New Maturity Model Can Fire Up Restaurant Operations
 
New Maturity Model Can Fire Up Restaurant Operations
New Maturity Model Can Fire Up Restaurant OperationsNew Maturity Model Can Fire Up Restaurant Operations
New Maturity Model Can Fire Up Restaurant Operations
 
New Maturity Model by Wipro Ecoenergy Can Fire Up Restaurant Operations
New Maturity Model by Wipro Ecoenergy Can Fire Up Restaurant OperationsNew Maturity Model by Wipro Ecoenergy Can Fire Up Restaurant Operations
New Maturity Model by Wipro Ecoenergy Can Fire Up Restaurant Operations
 
New maturity-model-can-fire-up-restaurant-operations
New maturity-model-can-fire-up-restaurant-operationsNew maturity-model-can-fire-up-restaurant-operations
New maturity-model-can-fire-up-restaurant-operations
 
Product costing343411327309984
Product costing343411327309984Product costing343411327309984
Product costing343411327309984
 
Smu mba sem 4 om winter 2016 assignments
Smu mba sem 4 om winter 2016 assignmentsSmu mba sem 4 om winter 2016 assignments
Smu mba sem 4 om winter 2016 assignments
 
smu mba 4th sem OM winter 2017 april/may 2018 exam solved assignment
smu mba 4th sem OM winter 2017 april/may 2018 exam solved assignment smu mba 4th sem OM winter 2017 april/may 2018 exam solved assignment
smu mba 4th sem OM winter 2017 april/may 2018 exam solved assignment
 
Six ½ Day Sessions on the Road To Becoming a CAM
Six ½ Day Sessions on the Road To Becoming a CAMSix ½ Day Sessions on the Road To Becoming a CAM
Six ½ Day Sessions on the Road To Becoming a CAM
 
SEM 4 MBA SUMMER DRIVE ASSIGNMENTS
SEM 4 MBA SUMMER DRIVE ASSIGNMENTSSEM 4 MBA SUMMER DRIVE ASSIGNMENTS
SEM 4 MBA SUMMER DRIVE ASSIGNMENTS
 
Master review Dept performance.pptx
Master review Dept performance.pptxMaster review Dept performance.pptx
Master review Dept performance.pptx
 
R12 New Features In Order Management
R12 New Features In Order ManagementR12 New Features In Order Management
R12 New Features In Order Management
 
Managing Third-Party Royalties
Managing Third-Party RoyaltiesManaging Third-Party Royalties
Managing Third-Party Royalties
 

Recently uploaded

TECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providerTECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service provider
mohitmore19
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
Health
 
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online ☂️
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online  ☂️CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online  ☂️
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online ☂️
anilsa9823
 

Recently uploaded (20)

Unveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time ApplicationsUnveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
 
Right Money Management App For Your Financial Goals
Right Money Management App For Your Financial GoalsRight Money Management App For Your Financial Goals
Right Money Management App For Your Financial Goals
 
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language ModelsUnlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Models
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
 
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
 
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
 
Diamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with PrecisionDiamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with Precision
 
TECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providerTECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service provider
 
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
 
Software Quality Assurance Interview Questions
Software Quality Assurance Interview QuestionsSoftware Quality Assurance Interview Questions
Software Quality Assurance Interview Questions
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
 
Microsoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdfMicrosoft AI Transformation Partner Playbook.pdf
Microsoft AI Transformation Partner Playbook.pdf
 
A Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxA Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docx
 
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdfLearn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
 
Vip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Noida ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
How To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.jsHow To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.js
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online ☂️
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online  ☂️CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online  ☂️
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online ☂️
 
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf
 
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
Reassessing the Bedrock of Clinical Function Models: An Examination of Large ...
 

Sap co budgeting & avalability control

  • 1. SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL SANDESH KAKDE EMAIL:sandeshkakde@live.com SAP CUSTOMIZING TABLE OF CONTENTS: SR. SUB. OBJECTS TCODE EXAMPLE 1 INTRODUCTION & SCENARIO 2 MAINTAIN BUDGET PROFILE IN ORDER TYPE OKOB “000001” STANDARD 3 MAINATAIN NUMBER RANGE FOR BUDGETING OK11 “04” 4 DEFINE TOLERANCE LIMIT FOR AVIALABILITY CONTROL OKOC MAINTAIN 3 SCENARIOS 5 SPECIFY EXEMPT COST ELEMENT FROM AVAILABILITY CONTROL OPTK “400100” 6 MAINTAIN BUDGET MANAGER OK14 “USER935” 7 TEST
  • 2. SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL INTRODUTION: BUDGETING AND AVAILABILITY CONTROL Planning Budgeting We can plant cost element wise in the order Budgeting will be done order wise We can do planning period wise in a year (Month wise) Budgeting should be done year wise Micro level (Lower level) Marco level (High level) For budgeting SAP has given availability control Scenario: Order no. MH431111 (Vehicle No.) Budget amount 50000 Options: 1) Give warning to the user 2) Give Warning Error to the user and inform to Budget manager 3) Give an Error If actual amount exceeds 85% of budget 42500 Or If the variance is above 10000 i.e. actual 60000 Or Both Whichever activities comes first Or If a actual amount exceeds 70% of budget go for option1 If actual amount exceeds 85% of budget go for option 2 If actual amount exceeds 100% of budget go for option 3 When we do budget, it generates a document –We have to give budgeting –No. range interval only for 04 (Hard coded by SAP) This is given at client level and not at controlling area level – it is not year specify. Note: Order E.g. Vehicle Expenses Cost element E.g. Vehicle Petrol, Repairs, Driver Salary, etc.
  • 3. SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL Step 1: MAINTAIN BUDGET PROFILE IN ORDER TYPES OKOB ASSIGN BUDGET PROFILE TO ORDER TYPES IN CURRENT SCENARIO WE HAVE SRKT AND SRKV ORDER TYPES. Step 2: MAINTAIN NUMBER RANGE FOR BUDGETING: OK11
  • 4. SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL STEP 3: DEFINE TOLERANCE LIMITS FOR AVIALABILITY CONTROL: OKOC AS PER THE REQUIREMNT MAINTAIN THE TOLERANCE LIMITS FOR AVAILABILITY CONTROL IN CURRENT SCENARIO I HAVE MANITAINED 3 LIMITS. 70% USAGE JUST WARNING 85% USAGE WARNING WITH EMAIL TO MANAGER 100% USAGE NO POSTING POSSIBLE STEP 4: SPECIFY EXEMPT COST ELEMENTS FROM AVIALABLITLITY CONTROL: OPTK WHEN WE POST A DRIVERS SALRY DOCUMENT IN RELATION TO ORDER MH431111. IT WILL GET POSTED WITHOUT ANY WARNING, SINCE WE HAVE MENTION THIS IN EXEMPT LIST. JUST FOR TESTING PURPOSE I HAVE MAINTAINED ON COST ELEMENT.
  • 5. SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL STEP 5: MAINTAIN BUDGET MANAGER: OK14 MAINATIN THE MANAGER PROFILE HERE. TEST: SCENARIO 1 - BUDGETING ORDERWISE CREATE A BUDGET FOR ORDER “90023”
  • 6. SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL THEN ACTIAVTE TH AVAILABILITY CONTROL AS SHOWN BELOW Save F-02 Post FI document. SINCE OUR BUDGET IS Rs.1000000 AND AND AMOUNT AVAILABLE TO POST WAS JUST Rs.300000. I TRIED PODTING A DOCUMENT OF Rs. 800000 … BUT SAP GAVE ME ERROR AND DIDN’T ALLOW ME TO POST THE DOCUMENT.
  • 7. SAP – CO CUSTOMIZING GUIDE 5 BUDGETING & AVAILIBILITY CONTROL KO2B: END BUDGET & AVAILABILITY CONTROL