      •DESIGN OF DORMITORY (using STAAD.Pro )

      • QUALITY CONTROL (QA/QC)
INTRODUCTION TO DORMITORY:

    The word dormi means: sleep. So technically
    any "room" or space used for the purposes of
    "sleeping" can be called a dormitory.
Buildup Area = 311 Sq.M

Type = G+1

Designed For 80 People

 Dormitory Room Size = 6.50x5.54 M

Loads Considered As Per IS : 875 (II)

Floor Height = 3.35m (10’6”)
PLAN OF GROUND FLOOR
PLAN OF FIRST FLOOR
Isometric view




                 Elevation
REQUIREMENTS PROVIDED:

    Area Allotted = 3 Sq. M Per Person

    Water Closet = 1 Per 6 Persons

    Bath Room + urinal = 1 Per 6 Persons

    Wash Basin = 1 Per 4 Persons

    Store Room = 1.69x1.5 M.

    Corridor = 1.8 M
DESIGN OF FOOTING:


     Load From Column = 946 KN

     Factored Load   = 1419 KN

     Column Size     = 0.23x0.45 M

     Footing Size    = 2.0x2.2 M
DESIGN OF BEAM:


Plinth Beams = 0.3x 0.15m At Sunken Portion

              = 0.3x0.23m At Other Portions

Roof Beams = 0.3x0.23m At Sunken Portion

              = 0.38x0.23m At Other Portion
DESIGN OF COLUMN

Columns       = 0.45x0.23m




Circular column provided for portico columns of size
              = 0.3ø m.
DEAD LOAD:
LIVE LOAD:
INTRODUCTION TO QUALITY CONTROL:


  Quality:

  •A Product Should Meet Its Specification.


   Quality Control:

  • Checking The Quality & Strength Of The Material Which Are Used In The
  Field.

  • Laboratory
  Quality Assurance :

  •Field
SPECIFIC DUTIES OF QUALITY ENGINEER:-

  • Conduct The Test For Aggregates, Sand Barrow Material
    Etc.
  • To Check The Performance Of The Batching Plant
    Cement.
  • Rectification Of Failure Of Any Structure.
  • Monitoring Construction Methods With Respect To
    Environmental Changes.
  • Maintaining Records Of All Test Results And Approvals Or
    Rejection Of Completed Works.
INFRASTRUCTURE:




• Accommodation     For The Testing Laboratory
& Office

• Technical Library

• Communication Facility

• Office Equipment
TESTS:

 • Sieve Analysis

 •Specific Gravity
 •Flakiness Index And Elongation Index
 •Water Absorption Test
 •Compressive Strength Test
 •Slump Test
 •Core Cutting Test
 •Test On Cement
QUESTIONS/COMMENTS



            PRESENTED
                BY
            08UF1A0116
            09UF5A0145
            08UF1A0160

More Related Content

What's hot

Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Abhishek Gupta
 
Quality control lab
Quality control labQuality control lab
Quality control labRaja Katoch
 
Compressive strength of concrete cubs
Compressive strength of concrete cubsCompressive strength of concrete cubs
Compressive strength of concrete cubsMuhammad Saleem
 
Non Destructive Test
Non Destructive TestNon Destructive Test
Non Destructive TestParth Desani
 
California bearingratio test
California bearingratio testCalifornia bearingratio test
California bearingratio testAsok999
 
Penetration resistance test
Penetration resistance testPenetration resistance test
Penetration resistance testAyaz khan
 
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...Hossam Shafiq I
 
Material Testing Lab Equipments
Material Testing Lab EquipmentsMaterial Testing Lab Equipments
Material Testing Lab EquipmentsNaveed Hussain
 
California bearing ratio test (CBR TEST)
California bearing ratio test (CBR TEST)California bearing ratio test (CBR TEST)
California bearing ratio test (CBR TEST)Ujas Patel
 
Tests on fresh concrete SLUMP TEST VEE BEE TEST COMPACTION FACTOR TEST
Tests on fresh concrete SLUMP TEST VEE BEE TEST COMPACTION FACTOR TESTTests on fresh concrete SLUMP TEST VEE BEE TEST COMPACTION FACTOR TEST
Tests on fresh concrete SLUMP TEST VEE BEE TEST COMPACTION FACTOR TESTNisarg Mistry
 
Determining the ductility of bitumen
Determining the ductility of bitumenDetermining the ductility of bitumen
Determining the ductility of bitumenpradeep tiwari
 
Soundness of Hydraulic Cement Paste | Jameel Academy
Soundness of Hydraulic Cement Paste | Jameel AcademySoundness of Hydraulic Cement Paste | Jameel Academy
Soundness of Hydraulic Cement Paste | Jameel AcademyJameel Academy
 

What's hot (20)

Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)Non destructive test on concrete (ndt)
Non destructive test on concrete (ndt)
 
Quality control lab
Quality control labQuality control lab
Quality control lab
 
Slump cone test
Slump cone testSlump cone test
Slump cone test
 
Compressive strength of concrete cubs
Compressive strength of concrete cubsCompressive strength of concrete cubs
Compressive strength of concrete cubs
 
Lab 3 CE 3700
Lab 3 CE 3700Lab 3 CE 3700
Lab 3 CE 3700
 
Cbr test
Cbr testCbr test
Cbr test
 
Non Destructive Test
Non Destructive TestNon Destructive Test
Non Destructive Test
 
Viscosity test 3
Viscosity test 3Viscosity test 3
Viscosity test 3
 
California bearingratio test
California bearingratio testCalifornia bearingratio test
California bearingratio test
 
Penetration resistance test
Penetration resistance testPenetration resistance test
Penetration resistance test
 
Penetration test
Penetration testPenetration test
Penetration test
 
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...
03-Properties of Asphalt Traditional ( Highway and Airport Engineering Dr. Sh...
 
Material Testing Lab Equipments
Material Testing Lab EquipmentsMaterial Testing Lab Equipments
Material Testing Lab Equipments
 
Fresh concrete tests
Fresh concrete testsFresh concrete tests
Fresh concrete tests
 
CBR Test
CBR TestCBR Test
CBR Test
 
California bearing ratio test (CBR TEST)
California bearing ratio test (CBR TEST)California bearing ratio test (CBR TEST)
California bearing ratio test (CBR TEST)
 
Tests on fresh concrete SLUMP TEST VEE BEE TEST COMPACTION FACTOR TEST
Tests on fresh concrete SLUMP TEST VEE BEE TEST COMPACTION FACTOR TESTTests on fresh concrete SLUMP TEST VEE BEE TEST COMPACTION FACTOR TEST
Tests on fresh concrete SLUMP TEST VEE BEE TEST COMPACTION FACTOR TEST
 
Determining the ductility of bitumen
Determining the ductility of bitumenDetermining the ductility of bitumen
Determining the ductility of bitumen
 
Guide to sampling concrete
Guide to sampling concreteGuide to sampling concrete
Guide to sampling concrete
 
Soundness of Hydraulic Cement Paste | Jameel Academy
Soundness of Hydraulic Cement Paste | Jameel AcademySoundness of Hydraulic Cement Paste | Jameel Academy
Soundness of Hydraulic Cement Paste | Jameel Academy
 

Viewers also liked

Business Proposal (Dormitory Com Apartment)
Business Proposal (Dormitory Com Apartment)Business Proposal (Dormitory Com Apartment)
Business Proposal (Dormitory Com Apartment)Barros Jelly
 
Feasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management AspectFeasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management AspectLena Argosino
 
Door to dorm ppoint
Door to dorm ppointDoor to dorm ppoint
Door to dorm ppointdormitory
 
Door2 dorm.ppoint
Door2 dorm.ppointDoor2 dorm.ppoint
Door2 dorm.ppointdormitory
 
Business Plan : shipping container hotel construction for the Olympic Games i...
Business Plan : shipping container hotel construction for the Olympic Games i...Business Plan : shipping container hotel construction for the Olympic Games i...
Business Plan : shipping container hotel construction for the Olympic Games i...Sarah Poupineau
 
Shipping Container Architecture
Shipping Container Architecture Shipping Container Architecture
Shipping Container Architecture Nicholas Socrates
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential buildingShariful Haque Robin
 
Ppt of mini project.
Ppt of mini project.Ppt of mini project.
Ppt of mini project.saikiran_gone
 
Multi storey building design of 7 storey commercial building
Multi storey building design of 7 storey commercial buildingMulti storey building design of 7 storey commercial building
Multi storey building design of 7 storey commercial buildingRazes Dhakal
 
Feasibility Study Product Proposals
Feasibility Study Product ProposalsFeasibility Study Product Proposals
Feasibility Study Product ProposalsBryan Agustin Oculam
 
Design and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staadDesign and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staadgopichand's
 

Viewers also liked (20)

Dormitory
DormitoryDormitory
Dormitory
 
Business Proposal (Dormitory Com Apartment)
Business Proposal (Dormitory Com Apartment)Business Proposal (Dormitory Com Apartment)
Business Proposal (Dormitory Com Apartment)
 
Dormitory 2.0
Dormitory 2.0Dormitory 2.0
Dormitory 2.0
 
Dormitory
DormitoryDormitory
Dormitory
 
Simplicity dormitory
Simplicity dormitorySimplicity dormitory
Simplicity dormitory
 
Students dormitory
Students dormitoryStudents dormitory
Students dormitory
 
Dormitory case studies
Dormitory case studiesDormitory case studies
Dormitory case studies
 
Feasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management AspectFeasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management Aspect
 
Door to dorm ppoint
Door to dorm ppointDoor to dorm ppoint
Door to dorm ppoint
 
Kalayaan
KalayaanKalayaan
Kalayaan
 
Door2 dorm.ppoint
Door2 dorm.ppointDoor2 dorm.ppoint
Door2 dorm.ppoint
 
bahadin elec.eng
bahadin elec.engbahadin elec.eng
bahadin elec.eng
 
Business Plan : shipping container hotel construction for the Olympic Games i...
Business Plan : shipping container hotel construction for the Olympic Games i...Business Plan : shipping container hotel construction for the Olympic Games i...
Business Plan : shipping container hotel construction for the Olympic Games i...
 
Shipping Container Architecture
Shipping Container Architecture Shipping Container Architecture
Shipping Container Architecture
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
Mini project ppt
Mini project pptMini project ppt
Mini project ppt
 
Ppt of mini project.
Ppt of mini project.Ppt of mini project.
Ppt of mini project.
 
Multi storey building design of 7 storey commercial building
Multi storey building design of 7 storey commercial buildingMulti storey building design of 7 storey commercial building
Multi storey building design of 7 storey commercial building
 
Feasibility Study Product Proposals
Feasibility Study Product ProposalsFeasibility Study Product Proposals
Feasibility Study Product Proposals
 
Design and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staadDesign and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staad
 

Similar to Qc & dormitory

PLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxPLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxRajeshKumar25548
 
PLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxPLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxJawaharM18
 
Making and curing concrete test specimens in the
Making and curing concrete test specimens in theMaking and curing concrete test specimens in the
Making and curing concrete test specimens in theFarrukh Khan
 
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEWRE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEWJaspreet singh
 
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restoration
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / RestorationNon-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restoration
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restorationpandian18
 
Senior Design Presentation
Senior Design PresentationSenior Design Presentation
Senior Design PresentationJon Zickermann
 
Experimental study of precast portal frame
Experimental study of precast portal frameExperimental study of precast portal frame
Experimental study of precast portal frameSatish Kambaliya
 
Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory vishalgohel12195
 
1.2_Basic Engineering_Day 4.pptx
1.2_Basic Engineering_Day 4.pptx1.2_Basic Engineering_Day 4.pptx
1.2_Basic Engineering_Day 4.pptxJanak82
 
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptx
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptxPLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptx
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptxRajeshKumar25548
 
Box_Culvert_Presentation.pdf
Box_Culvert_Presentation.pdfBox_Culvert_Presentation.pdf
Box_Culvert_Presentation.pdfbdya
 
Non destructive testing of structures
Non destructive testing of structuresNon destructive testing of structures
Non destructive testing of structuressanjanam9
 
deep foundation for hidth buliding (7).ppt
deep foundation  for hidth buliding (7).pptdeep foundation  for hidth buliding (7).ppt
deep foundation for hidth buliding (7).pptAbdulwalimusemohamed
 
DESIGN OF PARTIAL MAGNETIC REPULSION FOUNDATION BUILDING BY USING U-BOOTS AND...
DESIGN OF PARTIAL MAGNETIC REPULSION FOUNDATION BUILDING BY USING U-BOOTS AND...DESIGN OF PARTIAL MAGNETIC REPULSION FOUNDATION BUILDING BY USING U-BOOTS AND...
DESIGN OF PARTIAL MAGNETIC REPULSION FOUNDATION BUILDING BY USING U-BOOTS AND...p shivashanker
 

Similar to Qc & dormitory (20)

PLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxPLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptx
 
PLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptxPLANNING, ANALYSIS, DESIGN OF.pptx
PLANNING, ANALYSIS, DESIGN OF.pptx
 
Making and curing concrete test specimens in the
Making and curing concrete test specimens in theMaking and curing concrete test specimens in the
Making and curing concrete test specimens in the
 
SPM.pptx
SPM.pptxSPM.pptx
SPM.pptx
 
deva batch FINAL PPT.pptx
deva batch FINAL PPT.pptxdeva batch FINAL PPT.pptx
deva batch FINAL PPT.pptx
 
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEWRE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
RE-DEVELOPMENT WORKS AT EAST KIDWAI NAGAR, NEW
 
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restoration
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / RestorationNon-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restoration
Non-Destructive-Testing-of-Concrete • Repair / Rehabilitation / Restoration
 
Senior Design Presentation
Senior Design PresentationSenior Design Presentation
Senior Design Presentation
 
Experimental study of precast portal frame
Experimental study of precast portal frameExperimental study of precast portal frame
Experimental study of precast portal frame
 
Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory Design, Planning and Layout of high voltage laboratory
Design, Planning and Layout of high voltage laboratory
 
1.2_Basic Engineering_Day 4.pptx
1.2_Basic Engineering_Day 4.pptx1.2_Basic Engineering_Day 4.pptx
1.2_Basic Engineering_Day 4.pptx
 
precast manholes
precast manholesprecast manholes
precast manholes
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptx
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptxPLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptx
PLANNING,ANALYSIS,DESIGN AND ESTIMATION OF A SHOPPING COMPLEX.pptx
 
Drift control of RCC Building
Drift control of RCC BuildingDrift control of RCC Building
Drift control of RCC Building
 
Box_Culvert_Presentation.pdf
Box_Culvert_Presentation.pdfBox_Culvert_Presentation.pdf
Box_Culvert_Presentation.pdf
 
Basic soils presentation
Basic soils presentation Basic soils presentation
Basic soils presentation
 
Non destructive testing of structures
Non destructive testing of structuresNon destructive testing of structures
Non destructive testing of structures
 
deep foundation for hidth buliding (7).ppt
deep foundation  for hidth buliding (7).pptdeep foundation  for hidth buliding (7).ppt
deep foundation for hidth buliding (7).ppt
 
DESIGN OF PARTIAL MAGNETIC REPULSION FOUNDATION BUILDING BY USING U-BOOTS AND...
DESIGN OF PARTIAL MAGNETIC REPULSION FOUNDATION BUILDING BY USING U-BOOTS AND...DESIGN OF PARTIAL MAGNETIC REPULSION FOUNDATION BUILDING BY USING U-BOOTS AND...
DESIGN OF PARTIAL MAGNETIC REPULSION FOUNDATION BUILDING BY USING U-BOOTS AND...
 

Qc & dormitory

  • 1. PRESENTATION ON •DESIGN OF DORMITORY (using STAAD.Pro ) • QUALITY CONTROL (QA/QC)
  • 2. INTRODUCTION TO DORMITORY: The word dormi means: sleep. So technically any "room" or space used for the purposes of "sleeping" can be called a dormitory.
  • 3. Buildup Area = 311 Sq.M Type = G+1 Designed For 80 People  Dormitory Room Size = 6.50x5.54 M Loads Considered As Per IS : 875 (II) Floor Height = 3.35m (10’6”)
  • 6.
  • 7. Isometric view Elevation
  • 8.
  • 9. REQUIREMENTS PROVIDED: Area Allotted = 3 Sq. M Per Person Water Closet = 1 Per 6 Persons Bath Room + urinal = 1 Per 6 Persons Wash Basin = 1 Per 4 Persons Store Room = 1.69x1.5 M. Corridor = 1.8 M
  • 10. DESIGN OF FOOTING: Load From Column = 946 KN Factored Load = 1419 KN Column Size = 0.23x0.45 M Footing Size = 2.0x2.2 M
  • 11. DESIGN OF BEAM: Plinth Beams = 0.3x 0.15m At Sunken Portion = 0.3x0.23m At Other Portions Roof Beams = 0.3x0.23m At Sunken Portion = 0.38x0.23m At Other Portion
  • 12. DESIGN OF COLUMN Columns = 0.45x0.23m Circular column provided for portico columns of size = 0.3ø m.
  • 15. INTRODUCTION TO QUALITY CONTROL: Quality: •A Product Should Meet Its Specification.  Quality Control: • Checking The Quality & Strength Of The Material Which Are Used In The Field. • Laboratory Quality Assurance : •Field
  • 16. SPECIFIC DUTIES OF QUALITY ENGINEER:- • Conduct The Test For Aggregates, Sand Barrow Material Etc. • To Check The Performance Of The Batching Plant Cement. • Rectification Of Failure Of Any Structure. • Monitoring Construction Methods With Respect To Environmental Changes. • Maintaining Records Of All Test Results And Approvals Or Rejection Of Completed Works.
  • 17. INFRASTRUCTURE: • Accommodation For The Testing Laboratory & Office • Technical Library • Communication Facility • Office Equipment
  • 18. TESTS: • Sieve Analysis •Specific Gravity •Flakiness Index And Elongation Index •Water Absorption Test •Compressive Strength Test •Slump Test •Core Cutting Test •Test On Cement