Qc & dormitory
1. PRESENTATION ON
•DESIGN OF DORMITORY (using STAAD.Pro )
• QUALITY CONTROL (QA/QC)
2. INTRODUCTION TO DORMITORY:
The word dormi means: sleep. So technically
any "room" or space used for the purposes of
"sleeping" can be called a dormitory.
3. Buildup Area = 311 Sq.M
Type = G+1
Designed For 80 People
Dormitory Room Size = 6.50x5.54 M
Loads Considered As Per IS : 875 (II)
Floor Height = 3.35m (10’6”)
9. REQUIREMENTS PROVIDED:
Area Allotted = 3 Sq. M Per Person
Water Closet = 1 Per 6 Persons
Bath Room + urinal = 1 Per 6 Persons
Wash Basin = 1 Per 4 Persons
Store Room = 1.69x1.5 M.
Corridor = 1.8 M
10. DESIGN OF FOOTING:
Load From Column = 946 KN
Factored Load = 1419 KN
Column Size = 0.23x0.45 M
Footing Size = 2.0x2.2 M
11. DESIGN OF BEAM:
Plinth Beams = 0.3x 0.15m At Sunken Portion
= 0.3x0.23m At Other Portions
Roof Beams = 0.3x0.23m At Sunken Portion
= 0.38x0.23m At Other Portion
12. DESIGN OF COLUMN
Columns = 0.45x0.23m
Circular column provided for portico columns of size
= 0.3ø m.
15. INTRODUCTION TO QUALITY CONTROL:
Quality:
•A Product Should Meet Its Specification.
Quality Control:
• Checking The Quality & Strength Of The Material Which Are Used In The
Field.
• Laboratory
Quality Assurance :
•Field
16. SPECIFIC DUTIES OF QUALITY ENGINEER:-
• Conduct The Test For Aggregates, Sand Barrow Material
Etc.
• To Check The Performance Of The Batching Plant
Cement.
• Rectification Of Failure Of Any Structure.
• Monitoring Construction Methods With Respect To
Environmental Changes.
• Maintaining Records Of All Test Results And Approvals Or
Rejection Of Completed Works.
17. INFRASTRUCTURE:
• Accommodation For The Testing Laboratory
& Office
• Technical Library
• Communication Facility
• Office Equipment
18. TESTS:
• Sieve Analysis
•Specific Gravity
•Flakiness Index And Elongation Index
•Water Absorption Test
•Compressive Strength Test
•Slump Test
•Core Cutting Test
•Test On Cement