4. Functions
• Regulate electrical safety and compliance in the NT
• Inspections
• Incidents
• Investigations
• Regulations
• Standards development with;
• Other entities in the NT
• Other regulators – Australia and New Zealand.
5. Solar PV inspections
• Solar PV presents specific challenges and risks
• Approximately 1 Megawatt each month installed in the NT
• Domestic and
• Commercial
The majority of solar PV installed on the roof
8. What are we looking for in installations?
• Safety – free from defects
• Injury from the installation - electrical
• Damage caused by the installation – fire – loose equipment
• Compliance with standards and regulations
• To ensure the safety over the life of the installation
• Long term operation where possible
• Safety of the community
10. Safety and compliance
Effect of fire can be significant.
Cause:
Suspected to be due to rain leaking into
electrical components.
11. Accessing the installation
• Accessing the roof
• Ladders – manual handling
• Roof safety
• Edge protection
• Harness – wearing - securing - using
• Securing the harness point
• Heat, carrying equipment
• Slips, trips and falls
12. Inspection Example
Access ?
17 Metres to lower edge
21 metres at apex
No ready means of:
• Access
• Edge protection
• Fall prevention
SpanLift – Palmerston BMX
13. Logistics of using a Drone
What do we need?
• A suitable drone
• Training
• Licences
• Clearances
• Permission
• Insurance
• Procedure
15. Selecting a suitable drone
DJI Phantom 4 Pro
• Stable
• Good quality
• Easy to fly
• Flight time
• Collision alarms
• High definition images
• Cost effective
• Spare parts available
16. Training – need to be licensed:
• Air space zone classifications
• Within 3 Nautical Miles of a controlled airfield
• Restricted zones
• Danger Zones
• Uncontrolled airfields
• RAAF controlled areas
• NO FLY Zones
• National Parks
• Sacred land
• Unrestricted zones – basic controls.
17. Training
Remote Pilot Licence (RePl) for commercial work includes
air radio operator
• 5 days training theory and practice
• Flight training
• Emergency procedures
• Techniques and Practice.
18. CASA requires compliance:
• Drone registration
• Remote Operators Certificate (ReOC)
• Development of procedures and
manuals
• Chief Pilot
• Chief Maintenance Officer
Licence to operate commercially
Practices
19. Flight authorisations are required
to fly within 3 Nautical Miles (5.5.
Km) of a controlled airfield.
Unrestricted zones allow flights
following Rules for drones.
Flight Authorisation
20. Unrestricted Zones
Fly your drone (25 Kg or less):
• No closer than 3nm (5.5. Km) of a controlled
airport.
• Within visual line of sight
• Below 120 metres (400 ft)
• In daylight only
• No closer than 30 Metres to any person not
associated with the drone.
• Not above any person
• Not near an emergency situation
• Not near any aircraft.
21. Permissions
Gain the permission of the owner
or occupier before inspection.
Explain the safety requirements
Be aware of privacy concerns.
22. Procedures
• Pre – planning
• Viability
• Location
• Authorisation
• Weather and conditions
• Physical restrictions
• Moral considerations
23. Is the solution efficient?
• Removes:
• Risk of roof access
• Manual Handling of ladders
• Slips, trips and falls
• Rescue requirement
• Damage to installation – with care.
24. Achievements
• Access areas that would be dangerous by roof access.
• High definition images
• Overhead images to clearly identify the location
• Underneath panels
• Faster
• Copy of overhead image to the owner.
• Reduce if not eliminate injury risks.
25. Limitations
Cost of Remote Piloted Aircraft System (RPAS) – drone
Training
Learning competencies
Developing requirements for CASA compliance
Internal processes
Procedures
Operational limitations.
Maintenance – Lithium Ion battery life.
26. Support
CASA provides both online and telephone services to assist.
CASA approved software apps
• Location
• Safety and
• Compliance with rules.
Local companies that provide support and assistance.
27. Success or failure ?
Benefits:
• Safety improvement
• Accessibility of unreachable areas
• Versatility of being able to deploy in your own timeframe
• Due to the number of flights performed – cost and time effective