SlideShare a Scribd company logo
1 of 41
SCHOOL IMPROVEMENT PLAN 
Guiding Principles 
CORE VALUES 
 Systematic Leadership 
 Respectful School Children 
 Excellent Performance 
VISION 
By 2016, San Antonio Elementary School is an institution recognized for its good 
governance and well- developed individuals who are competitive in all aspects of life, morally 
upright and God-loving citizens. 
MISSION 
To provide quality education that is accessible to all and lays the foundation of life-long 
learning and services for the common good. 
OBJECTIVES 
By the end of 2016, San Antonio Elementary School shall have met the following 
objectives: 
1. Responded to the pupils’ need in acquiring increased mastery level of skills and learning 
competencies in all tool subjects and basic information technology knowledge in the 
intermediate levels. 
2. Increased NAT-MPS ratings in all core subjects. 
3. Given due recognition to teachers, pupils and stakeholders who are instrumental to the 
realization of school’s aspirations.
SCHOOL IMPROVEMENT PLAN 
SCHOOL PROFILE 
San Antonio Elementary School is located in Barangay San Antonio which is under the fast-improving 
municipality of Manukan, Zamboanga del Norte. The school offers free education 
ranging from Kindergarten, Grade I to Grade 6 levels of elementary education. Its teaching staff 
is composed of 10 regular permanent teachers: five (5) are Teacher I, one (1) Teacher II, three 
(3) Teacher III and one (1) Master Teacher. Mrs. LORDJETA P. LADEZA (ESHT – II) is a 
Head Teacher who has been in such position for three years already and a MAED Graduate in 
Misamis University Ozamiz City. 
All San Antonio teachers are graduates of Bachelor’s Degree in Elementary Education 
(BEED or BSEED). One of them is a MAED graduate, three (3) have Completed Academic 
Requirements for MAED, while the rest have their masteral units in relevant graduate courses. 
Hence, all of them are certified professional teachers who are capable to teach according to the 
national standards. (See Table 1 below) 
Table 1. TEACHERS’ PROFILE 
Teachers Sex Birth 
date 
Grade 
Level 
Educ’l 
Qualifi 
cation 
Position MA/ 
Ed. D. 
CS 
Eligibility 
Civil 
Service 
Status 
Length 
of 
Service 
Hasmin T. Ajo F 12/01/84 I-A BEED T-I 9 LET Reg/perm 1 
Daleth B. Dondoyano F 10/20/86 I-B BEED T-I 9 LET Reg/perm 2 
Norma P. Vallecer F 04/03/71 II-A BSEED T-III CAR PBET Reg/perm 18 
Maria Corazon R. 
F 04/09/68 II-B BSEED T-III CAR PBET Reg/perm 20 
Magsayo 
Marcelina M. 
Manuales 
F 06/06/64 III-A BSEED T-II 30 LET Reg/perm 17 
Lelibeth E. Ruiz F 05/08/80 III-B BEED T-I MAED PBET Reg/perm 2 
Helen A. Langamin F 01/11/79 IV BEED T-I 9 LET Reg/perm 10 
Jacinto M. Labucay M 08/17/59 V BSAED T-III 27 PBET Reg/perm 28 
Gondelina S. Velasco F 03/28/57 VI BSIE MT- II CAR PBET Reg/perm 31 
Nora B. Vallecer F 06/14/82 KT BSEED T-I ECE LET Reg/perm 2 
Lordjeta P. Ladeza F 08/05/64 SH BSAED ESHT- II MAED LET Reg/perm 18 
The school has 4 buildings comprising of 10 classrooms accommodated in by the 
Kindergarten class as well as the Grade I to VI classes. Each classroom, excluding the Grade III-B 
has its own comfort room with top water supply available of the school populace. 
The school has three (3) buildings before comprising of eight (8) classrooms. Due to the 
increased of enrolment, one (1) school building, two (2) classrooms newly constructed and 
completed last January 2013. Before the newly building constructed there was leveling of the 
school site, eight hundred (800) liters crude oil worth forty thousand eight hundred pesos (P 40, 
800.00) solicited from the supportive Barangay officials, PTA and stakeholders. The school has 
temporary semi-concrete outdoor stage that needs repair. The front, back, right and left side of 
the school has no fence. Such problem is primarily cause by the school financial shortage.
SCHOOL IMPROVEMENT PLAN 
These numerous improvements in all classrooms, the making of comfort rooms which are 
functional for the pupils, the construction of other tangible projects such as mini-parks or 
learning parks, Math parks as seen within the school vicinity, are just part and parcel of the 
realization of the unified goals of the internal and external stakeholders in providing a conducive 
learning environment for the children. 
Currently the school has twenty five (25) desks, one hundred twenty five (125) armchairs, 
ten (10) tables and sixty (60) chairs. Each classroom has an electrical connection, although some 
bulbs were not maintained. Thus, there is considerable shortage of lighting facilities such as 
fluorescent lamps to illuminate the rooms especially during bad weathers. Added to this problem, 
is the inadequacy of electrical wiring connections and the main switch or circuit breakers. Such 
problem is primarily caused by the school’s financial shortage. 
As regards the Grade VI National Achievement Test (NAT) for the current school (2012- 
2013), the following figures indicated and found in Table 2 are significantly low as compared 
with the previous two (2) years’ results. A significant leap of ratings was shown in the first 2- 
year data. However, the most recent year showed a decrease. (Please refer to Table 2). 
Table 2. Comparative National Achievement MPS Test Results of Grade VI by Subject Area 
90 
80 
70 
60 
50 
40 
30 
20 
10 
0 
3 - YEAR COMPARATIVE NAT - MPS Ratings 
SY 2010-2011 
(80.96) 
SY 2011-2012 
(78.19) 
SY 2012-2013 
(54.40) 
3 - YEAR COMPARATIVE NAT 
- MPS Ratings
SCHOOL IMPROVEMENT PLAN 
Administration and supervision of the school head is regularly done at least 4 times a 
week using the STAR and SCOPE observation in order to improve teachers’ competencies and 
to promote quality education. 
The General PTA participation to school activities and undertakings is rated 88% while 
Homeroom PTA participation is rated at 85%. During Brigada Eskwela maximum participation 
rate 85% has been constantly attained. 
Community Profile 
Brief history: 
Barangay San Antonio is suited in the northeast portion of Manukan Municipality, along 
the national highway going to Manukan Municipality, with a land area of __________ square 
kilometers. 
San Antonio emerged from an uncertain legend, as the origin of its name before was 
Lipras, is the Sitio of Villaramos. It was name San Antonio in the honor of their denoted Saint 
San Antonio de Padua. 
Its climatic conditions are wet and dry seasons. During the months of March and May, 
the place experiences the pronounced, driest of the year. The residents major source of income is 
farming and fishing with some derives from small business with the above average of populace 
are employed both in public and private sector. Their common products are corn and coconut. 
Some of its people are employed in fishing. Most women residents are plain housewives. 
Barangay San Antonio is out from typhoon except on the occasional heavy downforce of 
rains during rainy season which causes the drainage to over flow the low level land. 
The ethnicity of Barangay San Antonio populace majority is Bisaya. Only few of this 
number are Subanens. There are a lot religious affiliations in this locality. Nevertheless a huge 
fraction of them are Roman Catholics. 
Its distance from Poblacion is 8 kilometers and 27 kilometers to Dipolog City. San 
Antonio population has grown into a total of 2, 230 comprising of at least 460 families dwelling 
harmoniously and speaking the major dialect or mother tongue “Sinugbuanong Bisaya”. The 
people are hospitable, generous and the barangay officials are diligent towards their 
responsibility to their constituent. 
With regard to its economic status, farming is main source of livelihood. Internal Revenue 
Allotment (IRA) is P1.4 million. RPT is P3, 000.00, Business Tax is at the rate of P3, 000.00 and 
other miscellaneous tax is P2, 000.00. Other important details of the community profile include 
the following general information:
SCHOOL IMPROVEMENT PLAN 
Elected and Appointed Barangay Officials 
Punong Barangay: Hon. Lee A. Adaza 
Barangay Kagawad: Hon. Jimuel P.Salvo 
Hon. Elvira S. Belocura 
Hon. Miguelito B. Vallecer 
Hon. Orlando D. Georpe 
Hon. Edgar P. Magbanua 
Hon. Nancy M. Gumban 
Hon. Melvin S. Aniñon 
SK Chairman: Erwin A. Dela Cruz 
Barangay Secretary: Elvy I. Pialago 
Barangay Treaasurer: Regelita G. Tampus 
Infrastructure Facilities 
Road Network: 
Provincial Road: 10 kilometers 
Concrete Road: 10 kilometers 
Gravel: none 
Transport Utilities: Public/Private Utility Jeepneys and Vans, Public Utility 
Public Facilities: Multipurpose Hall, Day Care Center 
Recreational Facilities: Covered Court, Basketball Court 
Water Facilities: Deep Well/ Jet Matic Pump 
Power and Energy Source: ZANECO 
Communication Facilities: SMART Communications 
Over the years, the municipality of Manukan has grown economically and industrially. 
On the contrary, Barangay San Antonio as one of its exterior barangays has not gone abreast 
with such improvement. Perhaps, this is an effect of the stagnancy of its business and economic 
status. Moreover, Manukan II District being parcel of the community of Manukan has managed 
to have its own source of revenue from the municipal school board. As such, it spends the equal 
share of annual budget allocation with the other district, Manukan I. 
In as far as expenditures on education is concerned, Barangay San Antonio has been 
responsive to the immediate needs of the school. Although it’s financial assistance is limited to 
security services. In addition to the resources of finance, Manukan II District budget allocation 
for the past years has increased in staggered manner as shown in Figure 3, the schools of 
Manukan II District including (San Antonio Elementary School) receives a total appropriations 
of Three Hundred Sixteen Thousand Five Hundred Pesos (P316, 500.00). This amount is an 
equal (50%) share obtained from the Municipal School Board funding allocation for SY 2013 for 
the two districts of DepEd, Manukan.
SCHOOL IMPROVEMENT PLAN 
MUNICIPAL SCHOOL BOARD EXPENDITURE 
PROGRAM FOR BUDGET YEAR 2013 
( MANUKAN II DISTRICT ) 
24,000 
ESTIMATED INCOME BUDGET FOR FISCAL YEAR 2013 
Sources: 
Additional One Percent (1%) Tax On Real Property = P225, 000 
Add: Surplus FY 2013 = P 91, 500 
Total: P 316, 500 
Personal Services: 
Salary/wages (School Board/PARA Teachers 
P 125,000.00 
Maintenance & Other Operating Expenses 
1. Training Expenses = 20,000.00 
2. Aid for Scouting/Athletic Activities = 70, 000.00 
3. Acquisition/Procurement of Educational Materials = 45,000.00 
4. Payment of Electrical Consumption = 6,000.00 
5. Repair & Maintenance of School Buildings = 26,500.00 
P167, 500.00 
Capital Outlay 
Acquisition of Office Equipment 
P 24,000.00 
GRAND TOTAL: P 316, 500.00 
125,000 
167,500 
Personal Services 
Maintenance & Other 
Operating Expenses 
Capital Outlay
SCHOOL IMPROVEMENT PLAN 
SWOT Analysis 
Internal 
Assessment 
External 
Assessment 
Strengths 
1. Competence/ resourcefulness, 
positive work attitude of teachers. 
2. Beautiful learning parks & well-structured 
classrooms. 
3. Well- organized and comparative 
PTA officials. 
4. Low performance in NAT Gr. VI 
5. Punctuality and obedience of 
pupils. 
6. Stability of SBM Grants to be used 
by PARDOs. 
Weaknesses 
1. Low economic status of most 
parents which lead to absenteeism. 
2. Dilapidated stage and no school 
perimeter fence. 
3. Proximity/ distance of pupils’ home 
to two (2) other adjacent schools than 
San Antonio Elementary School. 
4. Poor study habits of pupils and/ or 
PARDOs. 
5. Lack of computer ICT teacher to 
prepare instructional modules for the 
pupils. 
6. Open area no school perimeter 
fence that welcomes potential 
thieves/robbers. 
7. Worn out/leaking pipelines that 
caused high cost of electric/water bills 
and hinders access of water supply in 
most classrooms. 
Opportunities 
1. Active and supportive external 
stakeholders (Parents/LGU/Brgy. 
Officials). 
2. Easy access to the local 
elective officials. 
3. Stability of school MOOE 
disbursement. 
S- O 
*With concerned effort of teachers 
and parents & full support of barangay 
officials and politicians, the physical 
and academic aspects of the school 
will flourish. 
*With the use of 
SBRMS/SBM/MOOE funds, Teachers 
and PARDOs will be provided 
instructional materials and school 
supplies and ZERO dropouts will be 
maintained. 
W- O 
*Encourage stakeholders to bring in 
assistance for projects to be realized. 
*Maximize pupils’ learning with the 
regular use of 
e-Classroom instruction and hands -on 
activities in all subjects of all grade 
levels. 
Threats 
1. Prone to flooding. 
2. Prone to theft and robbery of 
equipments/facilities. 
3. High risk of pupil gambling 
and cutting of classes. 
4. Lack of pupil’s budget for 
food at home & school supplies 
and materials. 
S-T 
*Tap with external stakeholders to 
implement pending projects (fence, 
dilapidated stage and etc.) 
*Blotter in the local police station all 
theft incidence in school, maximize 
school security status thru regular 
monitoring and night time roving of 
watchman/ barangay tanod, and 
ensure pupils’ 100% attendance 
during class hours. 
*Sustaining enrolment rate and 
beautiful learning environment and 
competent teaching staff. 
W-T 
*Utilize the SBM/MOOE funds for the 
benefit of PARDOs and pupils 
belonging to low income generating 
families. 
*Monitoring of regular attendance of 
pupils that will eradicate absenteeism 
and raise the NAT- MPS results and 
prevent them in transferring to 
adjacent schools. 
*Coordinate with local/barangay 
officials and make constant follow-up 
for the speedy implementation of the 
fencing or drainage project that was 
brought into a resolution.
SCHOOL IMPROVEMENT PLAN 
SCHOOL IMPROVEMENT PLAN 
VMOKRAPISPATRES 
School: San Antonio Elementary School 
District: MANUKAN II 
School I.D: 124531 
Strategic and Operational Plan for Implementation 
Vision: By 2016, San Antonio Elementary School is an institution recognized for its good governance and well- develop individuals 
who are competitive in all aspects of life, morally upright and God-loving citizens 
Mission: To provide quality education that is accessible to all and lays the foundation of life-long learning and services for the 
common good. 
Objective: By the end of 2016, San Antonio Elementary School shall have met the following objectives: 
1. ZERO dropout rate and sustain or increase the enrolment and participation rate in all grade levels 
2. Responded to the pupils’ need in acquiring increased mastery level of skills and learning competencies in all tool subjects and 
basic information technology knowledge in the intermediate levels 
3. Increased NAT-MPS rating in all core subjects 
4. Given due recognition to teachers, pupils & stakeholders who are instrumental to the realization of school’s aspiration 
KRA Performance Indicators Strategies Program Activities Task Resources 
1. To 
increase 
enrolment 
rate by 2% 
from 
baseline of 
320 
2. Maintain 
ZERO 
dropout rate 
2012-2013 
(actual) 
2013-2014 
(target) 
2014-2015 
(target) 
2015-2016 
(target) 
-Evaluate 
enrolment 
data and its 
possible 
causes & 
factors 
-Address to 
the material 
needs 
PARDOs 
and draw out 
st rong 
commitment 
from 
concerned 
parents of 
PARDOs 
-Enrolment 
campaign 
-DORP 
implementation 
-Enhance 
SBM 
implementation 
1. Engage in house-to- 
house enrolment 
campaign & home 
visit 
2. Decrease the 
amount of PTA 
donat ions 
1. Allocate funds 
taken from the SBM 
grant to provide 
school supplies for 
PARDOs 
2. Signing of 
revised MOA 
between School 
Head, PTA 
Officers, Teachers 
& PARDO parents 
1. Ident ify pupils to 
enroll at San 
Antonio Elementary 
School 
2. Call for GPTA 
meet ing to 
deliberate, discuss 
and amend previous 
rates of donations 
1. Prepare budget 
and purchase school 
supplies and 
materials for 
PARDOs 
2.Dist ribute 
materials based on 
the list of PARDOs 
3. Part ies will sign 
the MOA during the 
PTA meeting 
People Physical Pesos 
ENROLMENT RATE: 
School 
Head, 
PTA 
Officers, 
Teachers 
School 
Head, 
PTA 
Officers, 
Teachers 
& Parents 
of 
PARDOs 
Enrolment 
forms, 
Minutes of 
PTA 
meet ing 
T reasurer’s 
report 
Writ ten 
MOA, 
SIP/AIP, 
School 
Supplies 
and 
materials 
P25,000.00 
90.00% 
95.00% 
95.78% 
96.78% 
DROPOUT RATE: 
0% 
0% 
0% 
0%
SCHOOL IMPROVEMENT PLAN 
KRA Performance Indicator Strategies Program Activities Task Resources 
3. Increase 
NAT-MPS 
in all core 
subjects 
4. To aim at 
least one (1) 
award 
annually, 
two (2) for 
the school, 
two (2) for 
the teachers, 
and two (2) 
for the 
pupils 
2012-2013 
(actual) 
2013-2014 
(target) 
2014-2015 
(target) 
2015-2016 
(target) 
-Promote 
teaching 
competence 
of teachers 
-Track down 
pupils 
performance 
in school, 
community 
and home 
-Part icipate in 
all act ivit ies 
in school, 
dist rict , 
congressional, 
division, 
regional and 
division 
levels 
-Ut ilizat ion 
of remedial 
hours for 
NAT review 
sessions 
during the 4th 
quarter to 
increase 
pupils’ 
performance 
level 
-St rengthen 
commitment 
among 
teachers and 
pupils in 
at taining 
success, 
victory and 
honor for 
San Antonio 
Elementary 
School 
1. Craft a t raining 
suited to the 
ident ified least - 
learned 
skills/competencies 
of pupils 
2. Full 
implementation of 
remedial program 
1. Review potential 
pupils in daily 
basis for at least 1 
hour a day in order 
to excel in various 
academic 
competitions 
2. Encourage 
teachers to extend 
their effort and 
t ime in coaching 
their pupils 
1. Review 
NAT results to 
ident ify the 
gaps 
2.Arrange a 
schedule of 
meet ing with 
parents to 
discuss the 
outcomes of the 
NAT-MPS 
3. Assess the 3- 
year 
comparative 
data on NAT 
results to 
resolve the 
gaps 
1. Acquire 
mult iple 
reviewers and 
updated 
information 
from various 
sources 
(internet, other 
schools/dist rict) 
2. Give rewards 
to deserving 
pupils and 
teachers 
People Physical Pesos 
54.40% 
75% 
80% 
85% 
School 
Head, 
Teachers 
School 
Head, 
Teachers, 
Pupils 
NAT 
reviewers, 
Test Item 
Bank, books, 
internet - 
generated 
handouts, 
commercial 
NAT 
reviewers 
Cert ificates 
of 
Recognit ion/ 
Merit / 
Part icipation, 
t rophies or 
medals, 
monetary 
rewards 
P1, 000.00 
P2, 500.00
SCHOOL IMPROVEMENT PLAN 
Table 1. TEACHERS’ PROFILE 
Teachers Sex Birth 
date 
Grade 
Level 
Educ’l 
Qualifi 
cation 
Position MA/ 
Ed. D. 
CS 
Eligibility 
Civil 
Service 
Status 
Length 
of 
Service 
Hasmin T. Ajo F 12/01/84 I-A BEED T-I 9 LET Reg/perm 1 
Daleth B. Dondoyano F 10/20/86 I-B BEED T-I 9 LET Reg/perm 2 
Norma P. Vallecer F 04/03/71 II-A BSEED T-III CAR PBET Reg/perm 18 
Maria Corazon R. 
F 04/09/68 II-B BSEED T-III CAR PBET Reg/perm 20 
Magsayo 
Marcelina M. 
Manuales 
F 06/06/64 III-A BSEED T-II 30 LET Reg/perm 17 
Lelibeth E. Ruiz F 05/08/80 III-B BEED T-I MAED PBET Reg/perm 2 
Helen A. Langamin F 01/11/79 IV BEED T-I 9 LET Reg/perm 10 
Jacinto M. Labucay M 08/17/59 V BSAED T-III 27 PBET Reg/perm 28 
Gondelina S. Velasco F 03/28/57 VI BSIE MT- II CAR PBET Reg/perm 31 
Nora B. Vallecer F 06/14/82 KT BSEED T-I ECE LET Reg/perm 2 
Lordjeta P. Ladeza F 08/05/64 SH BSAED ESHT- II MAED LET Reg/perm 18 
Based on Table 1, the working force of San Antonio Elementary School comprises of ten 
(10) regular permanent classroom teachers. It also includes one (1) full-fledged Head Teacher II 
and MAED graduate. These teachers are all graduates of Bachelor’s Degree in Elementary 
Education. Three (3) have completed the academic requirements (CAR) for such degree and one 
(1) successfully graduated as MAED while the rest have their Masteral Units in relevant graduate 
courses. 
The teacher-pupil ratio for the current school year is at 1:36---significantly lower than the 
National Standards which is 50 pupils per classroom. San Antonio Elementary School is near to 
Dohinob Elementary School and is quite accessible to the residents in the barangay. Perhaps, this 
has something in relation which has affected the low ratio stated above. Likewise, the 
neighboring barangay school, Villaramos Elementary School, has more accessibility advantage 
for the pupils residing within the boundaries of Villaramos creek and Dohinob. 
Apparently, the data shows that the ratio of teacher to pupil is lower than National 
Standards. However, it is expected that the enrolment will continue to increase in the succeeding 
years due to the full implementation of the K to 12 Education Program along with the 
sustainability of the Pantawid Pamilyang Pilipino Program (4Ps) and that ratio will probably 
change. 
At frequent times in the previous years, though, teachers may have allowed their pupils to 
stay outside of their classroom for the purpose of training them how to do tasks such as cleaning 
and the like. Consequently, it boiled down to the fluctuation of NAT results during the past 
years. However, after conducting a collaborative, rigid and comprehensive review by the 
teachers in all grade levels, the latest overall NAT result showed a large scale of impact to the 
school, as it made a huge decrease by 23.79% below the National Standards, adding the fact that
SCHOOL IMPROVEMENT PLAN 
NAT MPS results in all provision of adequate, appropriate and ideal learning materials for all 
core subjects is even demanded from teachers in all grade levels. 
Pupils’ proper study habits in reading and teachers’ efficiency in teaching the core 
subjects complemented by the appropriate strategies for teaching reading with comprehension--- 
these are practically attainable. Yet it is quite difficult to be realized with scanty materials for 
this purpose. The teacher, therefore, needs to apply initiative measures such as utilizing vacant 
time in coaching or mentoring her problematic pupils in reading and providing improvised 
reading materials to fit their needs. Otherwise, her learners will gradually become frustrated 
readers at the end of the school year. 
Inadequacy of supply of some reference books, publications journals and other reading 
materials had proved to stoop down the Reading Assessment results of some pupils, regardless of 
how they perform in other forms of tests. For this, the school strives to eradicate the problems 
concerning poor reading comprehension by acquiring additional reading materials for mini 
library, not just limited to textbooks, manuals and workbooks but also updated versions of 
reading kits, suitable for various grade levels. By doing so, children’s reading experiences would 
contribute a positive influence on their intellect and foster to develop their love for reading. 
School feeding in every grade level once a week thru Gulayan sa Paaralan program is a 
good source of nutritious food which may be accessible for the children if and only if the School 
Canteen provides and vends foods of these kind and quality. Also, prohibiting the display or sale 
of junk foods during peak snack hours greatly aids the improvement of children’s health while 
they are in their learning period. Healthy foods within reach can certainly boost proper nutrition 
which eventually augments and sustain their good academic performance, and teaches them how 
to grow a healthy and longer life. In addition, the presence of a functional health facility in 
school enhances the aspiration of having a healthier learning environment for the school 
children. 
Low NAT – MPS Results 
in all Core Subjects and 
Reading Assessment 
Results 
Figure 2a. Effects of Physical and Ancillary Facilities on Low NAT Results in all Core 
Subjects and Pupils’ Reading Performance 
Lack of full-time Library 
In charge and Remedial 
Teacher to assist and 
mentor pupils & teachers 
Teachers’ 
improper use of 
remedial sessions 
Lack of supply of reference 
books, multi-media 
facilities & other reading 
materials in mini library
SCHOOL IMPROVEMENT PLAN 
Figure 1. 3 - Year Comparative Data on NAT - MPS Results 
50.28 49.16 
54.68 
46.4 
59.84 
70 
60 
50 
40 
30 
20 
10 
0 
English Science Math HEKASI Filipno 
2012 - 2013 
52.07 
79.63 79.81 
82.38 
64.75 
84.38 
90 
80 
70 
60 
50 
40 
30 
20 
10 
0 
English Science Math HEKASI Filipino 
2011 - 2012 
78.19
SCHOOL IMPROVEMENT PLAN 
80.63 
79.81 
82.5 
82 
81.5 
81 
80.5 
80 
79.5 
79 
78.5 
A. 1.2. Physical and Ancillary Services 
81.61 
The lack of instructional facilities that solely serve for the purpose of delivering quality 
results needs immediate attention to expedite its implementation. Of course, with an ample 
furnishing of apparatus, equipments and tools could certainly help carry out a positive outcome 
on the fields of Information Technology, Home Economics, Industrial Arts, etc. Other ancillary 
facilities like the Learning Resource Center or the Library, Computer Laboratory, Music Room, 
School Canteen and Clinic Facilities in particular are also of great value to achieve the goal of 
incurring an outstanding NAT Rating. 
Laboratory classes held in classrooms instead of an ideal computer or science room. This 
is quite an obstacle in delivering quality education. On the other hand, this shortcoming has been 
considered one of the focused issues which the SPT has been looking into the past few years. 
How to resolve this, still largely depends on the availability of financial resources and 
stakeholders’ commitment. 
Based on the schools’ NAT results in all core subjects, the past two years had showed 
significant stagnancy and stability at low rates. 
79.63 
82.2 
78 
English Science Math HEKASI Filipino 
2010 - 2011 
80.96
SCHOOL IMPROVEMENT PLAN 
Figure 2.b. Effects of Pupils’ Health on Low NAT Results in all Core Subjects and Reading 
Performance 
A. 1. 3. Learning Materials and Equipments 
Textbooks play an essential and valuable component in a school’s enduring tasks to 
educate the children. At present, majority of public schools suffer scarcity if not lack of 
textbooks and San Antonio Elementary School among those. 
The illustration below gives valuable information on textbook-pupil ratio. On the 
average, the percent distribution of textbooks to all levels was 1:2 ratio and shortage of textbooks 
(Filipino 2 & 4, Sibika 1 & 4, and Science 3 & 6) was still a problem for Grades II & III. No 
textbooks in MSEP 3 – 6, EPP 4 – 6, Character Education (Kindergarten to Grade 6) available 
for usage by the pupils and teachers. 
Kinder = 1:10 
Gr. I = 1:2 
Gr. II = 1:2 
Gr. III = 1:1 
Gr. IV = 1:1 
Gr. V = 1:2 
Gr. VI = 1:2 
ENGLISH 
Kinder = 1:10 
Gr. I = 1:1 
Gr. II = 1:2 
Gr. III = 1:1 
Gr. IV = 1:1 
Gr. V = 1:1 
Gr. VI = 1:1 
MATH 
Kinder = 1:10 
Gr. I = 0 
Gr. II = 0 
Gr. III = 1:2 
Gr. IV = 1:1 
Gr. V = 1:2 
Gr. VI = 1:2 
SCIENCE 
Kinder = 1:10 
Gr. I = 1:1 
Gr. II = 1:2 
Gr. III = 1:2 
Gr. IV = 1:2 
Gr. V = 1:2 
Gr. VI = 1:2 
FILIPINO 
Kinder = 0 
Gr. I = 1:2 
Gr. II = 1:3 
Gr. III = 1:1 
Gr. IV = 1:2 
Gr. V = 1:1 
Gr. VI = 1:1 
HEKASI 
Kinder = 0 
Gr. I = 0 
Gr. II = 0 
Gr. III = 0 
Gr. IV = 1:6 
Gr. V = 1:3 
Gr. VI = 1:10 
EPP 
Kinder = 0 
Gr. I = 1:4 
Gr. II = 0 
Gr. III = 0 
Gr. IV = 1:6 
Gr. V = 1:3 
Gr. VI = 0 
MSEP 
Kinder = 0 
Gr. I = 1:12 
Gr. II = 0 
Gr. III = 0 
Gr. IV = 0 
Gr. V = 0 
Gr. VI = 0 
CHAR. ED. 
Nutritious hot 
lunch not 
regularly 
served to the 
pupils 
Lack of 
balance diet of 
pupils 
Low NAT – MPS 
Results in all 
Core Subjects & 
Reading 
Performance
SCHOOL IMPROVEMENT PLAN 
A. 2. QUALITY AND RELEVANCE OF BASIC EDUCATION 
A. 2. 1 Pupils’ Performance 
NAT MPS results on the 2-year data demonstrated decreasing all core subjects, which 
had reduced by 29.35% compared to the year before. In other subjects though, a remarkable 
sprint ranged at 24.54% in Filipino, followed by leaps of 27.7% in HEKASI, 18.25% in Science 
and 30.65% in Mathematics. This over-all tally of MPS in NAT results manifested an exemplary 
improvement based on the National Standards and shown a gargantuan leap of 23.79% from the 
last year’s figure of 78.19%. (See Figure 3 below) 
Figure 3. 3 - Year Comparative Data on NAT - MPS Results 
90 
80 
70 
60 
50 
40 
30 
20 
10 
0 
SY 2010-2011 SY 2011-2012 SY 2012-2013 
A.2.2. Curriculum Implementation and Instructional Delivery 
ENGLISH 
SCIENCE 
MATH 
FILIPINO 
HEKASI 
The curriculum implementation and instruction delivery were executed with utmost 
concern for the last three (3) years in expectancy to get affirmative results in pupils performance. 
Moreover, the supervision ratio delivered by the School Head for those years suggested an 
average of 1:10 supervision ratio for the most recent year stays at 1:10 which implies less than 
the standards required by the Division Office. 
A thorough evaluation on the facts based on how instruction is being delivered and 
implemented by the teachers in each grade was gathered. Based on the conducted STAR and 
SCOPE observations of the School Head herself, most teachers lack the appropriate instructional 
materials and innovative strategies in teaching.
SCHOOL IMPROVEMENT PLAN 
In some cases, there were those who were not following the desirable techniques and 
methods in teaching which made learning opportunities complex and difficult to grasp and be 
understood by the slow learner. To elaborate, these strategies should have been in consonance 
with latest trend in teaching, particularly addressing to the needs of the immediate learners. 
Certainly, one of these strategies would include the 2C2IA, CLT and the like which involve 
wholesome activities implemented thru diverse initiatives. This significantly influenced the 
stagnation of low reading performance and Phil-IRI results in at 45% of the pupils in the primary 
grade levels. 
Kindergarten, being institutionalized in its initial implementation thru the K to 12 Basic 
Education Curriculum, is currently in making efforts in terms of instructional delivery despite the 
lack and inadequacy of instructional ad learning materials given to the kindergarten Teacher 
Program sessions. 
In the K to 12 Basic Education Program, the curriculum will be decongested so as to 
allow mastery of learning. In fact, with the principle of using MTB-MLE (Mother-Tongue Based 
Multi-Lingual Education) as the medium of instruction, based on the lingua franca on the certain 
community or area, it will gradually enable the learners to express to the maximum their insights 
or feelings on each lesson in their familiar and most convenient ways. 
I same manner, the use of MTB-MLE in the curriculum reduces the burden of the 
teachers for such reason that the subjects are limited to English, Science, Mathematics, Filipino 
and HEKASI in their concise and brief form taking into consideration and major concern on the 
learning competencies to be developed. This implies that teachers master the contents and 
competencies to keep themselves focused on what areas should be developed. 
FIGURE 4. Relationship of Curriculum Implementation and Instructional Delivery with 
Learning Outcomes of Pupils in the Primary Grade Levels 
HIGH LEARNING 
OUTCOMES 
LOW LEARNING 
OUTCOMES 
TRAINED TEACHERS ON 
INNOVATIVE STRATEGIES 
IN TEACHING 
UTILIZATION OF 
ADEQUATE LEARNING 
MATERIALS AND 
EQUIPMENTS 
UTILIZATION OF 
TRADITIONAL TEACHING 
TECHNIQUES 
UNAVAILABILITY OF 
ADEQUATE TEACHING 
EQUIPMENTS AND 
LEARNING MATERIALS 
UNTRAINED TEACHERS ON 
INNOVATIVE STRATEGIES 
IN TEACHING
SCHOOL IMPROVEMENT PLAN 
A. 2.3. Staff Development 
Teachers Sex Birth 
date 
Grade 
Level 
Educ’l 
Qualifi 
cation 
Position MA/ 
Ed. D. 
CS 
Eligibility 
Civil 
Service 
Status 
Length 
of 
Service 
Hasmin T. Ajo F 12/01/84 I-A BEED T-I 9 LET Reg/perm 1 
Daleth B. Dondoyano F 10/20/86 I-B BEED T-I 9 LET Reg/perm 2 
Norma P. Vallecer F 04/03/71 II-A BSEED T-III CAR PBET Reg/perm 18 
Maria Corazon R. 
F 04/09/68 II-B BSEED T-III CAR PBET Reg/perm 20 
Magsayo 
Marcelina M. 
Manuales 
F 06/06/64 III-A BSEED T-II 30 LET Reg/perm 17 
Lelibeth E. Ruiz F 05/08/80 III-B BEED T-I MAED PBET Reg/perm 2 
Helen A. Langamin F 01/11/79 IV BEED T-I 9 LET Reg/perm 10 
Jacinto M. Labucay M 08/17/59 V BSAED T-III 27 PBET Reg/perm 28 
Gondelina S. Velasco F 03/28/57 VI BSIE MT- II CAR PBET Reg/perm 31 
Nora B. Vallecer F 06/14/82 KT BSEED T-I ECE LET Reg/perm 2 
Lordjeta P. Ladeza F 08/05/64 SH BSAED ESHT- II MAED LET Reg/perm 18 
The teaching staff of San Antonio Elementary School is manned by a full- fledged 
Elementary School Head Teachers II and MAED Graduate with ten (10) young and dynamic 
teachers who have highly qualified educational background and experience in the field. Six (6) 
of these teachers have units in Master Degree in Elementary Education, three (3) had completed 
MA academic requirements, and one (1) had successfully graduated with the degree in MAED. 
All teachers deployed in school are LET and PBET passers. 
With regard to length of service in the DepED, one (1) San Antonio Elementary School 
Teachers have thirty one (31) years or more work experience, two (2) have more than twenty 
(20) years, three (3) have more than ten (10) years and only one (1) have barely 4 years work 
experience. 
Educational qualification among San Antonio Elementary School Teachers was not a 
significant issue due to the fact that in the next two (2) years, 90% of this number shall have 
completed their graduate courses. However, most of these teachers have not yet attended 
Regional and National Trainings which are relevant to their respective subject/grade level 
assignments. This is direly needed for the development and enhancement of their skills and 
abilities to teach the varied learning areas. Hence, these teachers must undergo 
trainings/seminars/workshops with proper identification of the division.
SCHOOL IMPROVEMENT PLAN 
A.3.1. School Management and Administration 
The school is spearheaded and led by a full- fledged Head Teacher with background in 
educational management. She works at least eight (8) hours a day from Mondays thru Fridays 
and extends working hours on Saturdays or Sunday, whenever required. Observation of classes is 
done as scheduled every week, stipulated in the daily time schedule for administration and 
supervision. Checking of lesson plans, staff meetings and other related activities are regularly 
done by the School Head. She regularly assists the teachers in school to facilitate teaching and 
learning. 
Sometimes she gets out of school to transact official business or submit reports in the 
Division Office, to attend sessions in the Barangay Council or the Sangguniang Bayan for the 
purpose of soliciting or requesting assistance for the implementation of school’s planned 
projects. At times, she coordinates with the DSWD local officers and municipal link to facilitate 
the Family Development Sessions (FDS) of the 4Ps program whenever needed. 
For the past few years, effective management and administration had been assiduously 
enforced in order to meet the planning standards. Recognition and commendation were given to 
deserving pupils who excel both in academic and non-academic competitions. Honor pupils were 
given certificates especially those in the “Top 10 List”. These were initiated to enthuse and 
motivate pupils to do better in their studies. 
The School Head also endorsed such method to promote teachers’ competitiveness and 
influence them to implement some interventions to be able to enhance pupils’ interest to perform 
better if not excellent. 
A.3.2. Parents’/Stakeholders’ Participation 
Parents’ Participation 
School Year 
2010 - 2011 2011 - 2012 2012 - 2013 
General PTA 85% 88% 90% 
Homeroom 80% 82% 85% 
Brigada Eskwela 82% 85% 88% 
Alumni Association 70% 75% 80% 
The General Parents Teachers’ Association (GPTA) composed of its officials, members 
and stakeholders serve as lone vital backbone that sustains the existence of a school. It has 
almost three hundred (300) active and committed parents to support the programs and activities 
of San Antonio Elementary School.
SCHOOL IMPROVEMENT PLAN 
For the SY 2010 – 2011, a large fraction of these parents were not yet oriented on the real 
purpose of the so-called Brigada Eskwela and some of them even refused to give donations and 
settle other financial obligations to the school. However, due to extended information and 
constant motivation thru homeroom gatherings where teacher advisers made clear everything 
that has to be done for the school, the negative ideas turned into positive insights and 
commitment. 
Likewise, the School Head called for an open forum to sort our problems and complaints 
and eventually came up with genuine commitment and pledged dedication of the PTA officials to 
support every project or program that the school has to undertake in the years thereafter. In 
addition, the School Governing Council was organized to fully exercise their duties and 
responsibilities complementing the role of the PTA for steadfast improvement of the school. 
As per record, parent’s and stakeholder’s participation is evidently increasing. Donations 
for projects and equipments from external stakeholders flooded in during the most recent school 
year. This only shows that people are getting educated with regard to common good personal 
accountability for community development. 
Figure 5. Parents’/Stakeholders’ Participation in San Antonio Elementary School 
Projects and Programs 
school activities 
SY 2012 – 2013 
3. 40% of solicited projects from external 
stakeholders has been materialized 1. GPTA meeting have 90% parents 
1. GPTA meeting have 88% parents 
attendance 
2. Alumni Association has been re-organized 
and actively participated in 
SY 2011 – 2012 
SY 2010 – 2011 
SY 2010 – 2011 
attendance 
2. Alumni Association has actively 
participated in school activities and donated 
financial support 
3. 50% of solicited projects from external 
stakeholders has been materialized and 
implemented 
1. GPTA meeting have 85% parents 
attendance 
2. Alumni Association extends only 75% 
commitment in terms financial support to the 
school 
3. 35% of external stakeholders and prospect 
donors showed possibility of sponsoring a 
project
SCHOOL IMPROVEMENT PLAN 
A.3.3. Resource Mobilization / Public Expenditure 
Community involvement in the mobilization of resources is evident for the past three (3) 
years. Stakeholders rendered unprecedented support in every endeavor that the school had to take 
in realizing its goal and objectives. Lobbying for financial support was done whenever deemed 
necessary in carrying out DepED programs and projects. 
With the full implementation of School Based Management (SBM), the school takes 
advantage of generating more programs and activities that would cater to the needs of the school. 
This endeavor goes hand in hand with the full involvement of the General PTA and initiated thru 
lay outing and preparation of the budget in consonance with school Annual Implementation Plan 
(AIP), sorting out priority projects as to their need and immediacy. 
Recently, the school received an additional one (1) school building and two (2) 
classrooms from the office of the Congressman of the 2nd District, Hon. Rosendo S. Labadlabad. 
The aforementioned one (1) school building and two (2) classrooms is just parcel of the 
blessing that San Antonio Elementary School had been using for the children. Surely, more big 
things are coming their way in the next school year. All of these should not have been possible 
without the full support of the GPTA, the Barangay Captain and Councilors, the LGU and the 
DepED Division Office. This is one story of success that the school populace will have to 
cherish forever. 
A.3.4 Environment 
San Antonio Elementary School perimeter is widely opened because we don’t have 
fence, that is, the concreted parts are in the frontage and sides. The rear portion of the fence is 
not closed and still made available as pathway for residents at the back of the school buildings. 
As far as area is concerned, the San Antonio Elementary School is ideally a small 
Elementary School that can accommodate a maximum of ten (10) classes: primary and 
intermediate grade levels. It has grounds at the back of the school building where carabao grasses 
are grown for landscape which requires regular trimming. At the heart of this campus are more 
than ten (10) old Mahogany and five (5) Mango trees which were intentionally grown for its 
bearing fruits and its shade. 
Despite the efforts of the school populace to grow lots of flowers and cultivate vegetable 
gardens, near the dilapidated stage at the back of the school building. 
Water system is considerably convenient and available thru pipelines that were installed 
with the financial assistance from private and stakeholders donors. However, its maintenance and 
operation requires a regular financial resource from the school’s MOOE budget allocation.
SCHOOL IMPROVEMENT PLAN 
A.4. SCHOOL PERFORMANCE INDICATOR 
KEY INDICATOR 
School Year 2012 – 2013 
MALE FEMALE Total Rate 
Enrolment Rate 87% 89% 88% 
Participation Rate 87% 88% 87% 
Cohort Survival Rate 41% 58% 48% 
Retention Rate 79% 87% 82% 
Transition Rate 121% 100% 111% 
Repetition Rate 5% 2% 3.5% 
Completion Rate 41% 58% 48% 
Promotion Rate 100% 100% 100% 
Graduation Rate 100% 100% 100% 
Dropout Rate 0% 0% 0% 
Failure Rate 0% 100% 0% 
B. Program Indicator 
Data for SY 2012 – 2013 
Total Rate 
Teacher-Pupil Ratio 320/9 1:36 
Textbook-Pupil Ratio 320/1,584 1:2 
Teacher’s Manual Ratio 9/29 1:1 
Classroom-Class Ratio 10/10 1:1 
Classroom-Pupil Ratio 320/9 1:37
SCHOOL IMPROVEMENT PLAN 
EFA GOALS 
School: San Antonio Elementary School 
EFA Goals Objectively Verifiable Indicator (OVI) Means of 
Verification 
(MOV) 
Important 
Assumption 
2011-2012 2012-2013 2013-2014 
1. To increase school 
participation and 
totally eradicate 
dropout/ maintain zero 
dropout in the first 
three grades 
Increased enrolment in the first three grades from 
____ to ____ 
GRADE 1: 
Performance 
Indicators 
Enrolment Data 
Form 3 
57 
GRADE 2: 
72 
GRADE 3: 
65 
Decreased number of PARDOs in the first three 
grades from 20% to 5% 
GRADE 1: 
8 5 
GRADE 2: 
6 3 
GRADE 3: 
2 0 
2. To complete the full 
cycle of basic 
education schooling 
with satisfactory 
achievement levels by 
all at every grade level 
Increase completion rate from 75% to 88% 
75% 88% 
Increase cohort-survival rate from 75% to 80% 
75% 77% 79% 
3. Total community 
commitment of basic 
education 
competencies for all 
Increased number of stakeholders’ participation 
75% 80% 85% 
Increased amount of funding from Provincial 
Government / LGU 
70% 80% 85% 
SCHOOL Goals 
1. Improve learner 
performance 
Increased NAT-MPS results in all core subjects 
baseline of 80.96% 
80.96% 78.19% 82% 
2. Increase 
participation rate 
Increase participation rate from 80% to 100% 
87% 89% 91% 
Purpose 
Improve capacity of 
the School Head in 
managing delivery of 
educational services 
Maintain and sustain the school level practice of 
SBM in the Advanced Level 
SBM Grand 
Report 
Level 1 Level 1 Level 2 
Enhance teacher’s/ 
instructional managers/ 
facilitators’ 
competencies 
Increased number of teachers demonstrating 
performance thru NCBTS 
CB-PAST 
Certificates from 
INSETs 
4 6 10
SCHOOL IMPROVEMENT PLAN 
Contributory Objectives Objectively Verifiable Indicator (OVI) Means of 
Verification 
(MOV) 
Important 
Assumption 
2011-2012 2012-2013 2013-2014 
A. Provision of Access Skilled non-teaching personnel for San 
Antonio Elementary School 
Approved 
appointments 
1. Hire Skilled non-teaching 
personnel 
0 0 1 
2. Renovation/ major 
repair of outdoor stage 
Dilapidated outdoor stage/ rehabilitated and 
repaired thru SBRMS funds 
Certificate of 
Inspection; 
pictorial report 
0 0 1 
3. Increase availability of 
instructional and learning 
materials such as 
textbooks and manuals 
Requested additional textbooks and manuals 
thru the Division Office 
Acceptance report 
Delivery receipts 
85% 90% 100% 
4. Classroom repair Classroom repaired and ceiling rehabilitated Certificate of 
Inspection; 
pictorial report 
0 0 1 
5. Initiate interventions to 
arrest the instances to 
having PARDOs in school 
and maintain the ZERO 
dropout rate of San 
Antonio Elementary 
School 
PARDOs provided with supplies and materials 
for sustenance of education 
Acknowledgement 
receipts, proofs of 
purchase, duly 
accomplished 
release forms 
0 0 0 
6. Make instructional and 
learning materials & 
equipments available 
Availability of learning materials and 
equipments attained 
TEXTBOOKS 
Grade Baseline Forecasted Years 
2012 2013 2014 
I 30 49 52 
II 30 41 50 
III 24 34 45 
IV 40 48 58 
V 20 52 84 
VI 33 43 52 
Textbook and 
property inventory 
report obtained 
from school 
property custodian 
B. Quality and Relevance 
1. Improve teaching and 
computer literacy skills of 
San Antonio Elementary 
School Teachers 
Seven (7) teachers attended school-based ICT 
training 
Certificate of 
attendance; 
Training 
design/matrix 
0 0 7 
2. Conduct school-based 
INSET for teachers 
Ten (10) teachers trained on least learned skills 
in English, Math, Science, Filipino, MSEP and 
HEKASI 
Training design, 
training matrix, 
certificate of 
attendance 
0 0 10
SCHOOL IMPROVEMENT PLAN 
Contributory Objectives Objectively Verifiable Indicator (OVI) Means of 
Verification 
(MOV) 
Important 
Assumption 
2011-2012 2012-2013 2013-2014 
3. Improve nutritional 
status of pupils 
Food supplement, medicines and vitamins 
procured and distributed 
FACILITY Baseline 
Forecasted Years 
2012 2013 2014 
Supplemental Feeding 30 49 52 
Deworming 30 41 50 
Vitamin A Capsule 24 34 45 
Iron Supplements 40 48 58 
Vit. C Supplements 20 52 84 
a) Monitoring 
report 
b) Nutritional 
status report 
c) Clinic reports 
4. Improve reading 
performance of pupils 
Intensive Reading Recovery Program and 
Remedial Reading sessions implemented by 
teachers in all grade levels 
Baseline 
Forecasted Years 
2012 2013 2014 
1 8 9 12 
Phil-IRI and 
ERCAP results 
5.Put up an extension 
room (Reading Recovery 
Room) 
Reading Recovery room provided Pictorial report 
0 1 1 
6. Procurement/Purchase/ 
Acquire modern 
instructional facilities and 
set of musical instruments 
Computer set with projector and set of musical 
instruments acquired 
FACILITY Baseline 
Forecasted Years 
2012 2013 2014 
Computer Set 0 0 0 
Canon Printer w/ Scanner 0 0 0 
Canon Printer 0 0 0 
LCD Projector 0 0 0 
Interactive Whiteboard 0 0 0 
Bass Drums 0 0 0 
Document Camera 0 0 0 
Certificate of 
Acceptance, 
Delivery receipts 
C. School Management 
1. Improve attendance rate 
of pupils 
Percentage of Attendance raised from 84% to 
100% 
Baseline 
Forecasted Years 
2012 2013 2014 
84% 90% 92% 
Form 1 per Grade 
level; 
Performance 
Indicators 
2. Maximize the 
attendance of parents in 
meetings 
Increase the attendance of parents from 75% to 
100 % 
Baseline 
Forecasted Years 
2012 2013 2014 
75% 85% 90% 
Attendance sheets, 
logbook 
3. Improve the attendance 
of stakeholders during 
Brigada Eskwela 
Increase the participation rate of parents during 
Brigada Eskwela 
Baseline 
Forecasted Years 
2012 2013 2014 
75% 85% 88% 
Attendance sheets 
4. Improve the school 
grounds 
Sustained the cleanliness of the school grounds 
Baseline 
Forecasted Years 
2012 2013 2014 
80% 82% 85% 
Pictorial 
5. Provide containers for 
biodegradable and non-biodegradable 
wastes 
Provided at least 8 containers for 
biodegradable and non-biodegradable wastes 
Baseline 
Forecasted Years 
2012 2013 2014 
0% 0% 0% 
6. Construction of 
concrete perimeter fence 
Constructed 6 linear feet by 7 feet high 
concrete perimeter fence 
Program of works, 
Pictorial
SCHOOL IMPROVEMENT PLAN 
3. PHYSICAL FACILITIES & ANCILLARY SERVICES 
Improve physical aspect of the school  Maintain school cleanliness, sanitation at all 
times 
 Improve/Preserve the structures found in the 
learning parks 
Need functional Computer Laboratory and 
Construction of Comfort Room outside the 
school 
 Asked functional computer laboratory equipped 
with multi-media and modernized computer 
accessories 
 Find ways and means in seeking funds for the 
project 
 Solicit funds from Government and Private 
stakeholders group 
Immediate repair and renovation of outdoor 
stage/classroom wall/ceiling 
 Send letter request to concerned office for the 
immediate grant of the repair/renovation 
Construction of a Standard Home Economics 
building to cater the needs and practical art 
works of the intermediate classes, and canteen 
 Seek funds for the construction of a Home 
Economics building and school canteen as soon 
as possible 
Renovation of old cottage which was used as 
office of the School Head 
 Seek and request funds from concerned office 
for the renovation 
Need paint for 3 school building with 8 
classroom for the ceiling 
 Bring out the problem to the SDS for 
immediate action on the matter 
Construction of additional 1 school building 
with 2 classrooms and school perimeter fence 
by phase and rip rapping in front of the school 
building 
 Joint resolution made from the school and 
barangay officials 
4. MANPOWER SERVICES 
Ask for additional teacher to teach in grade IV  Bring out the problem to the Schools Division 
Superintendent for immediate action on the 
matter 
Request for the hiring of additional school 
personnel (watchman, janitor, utility worker) 
 Bring out the problem to the Schools Division 
Superintendent for immediate action on the 
matter 
SCHOOL PRIORITY IMPROVEMENT AREAS 
Priority Improvement Areas Suggested Interventions 
1. LEARNER PERFORMANCE 
Increased NAT-MPS Result in all Core Subject  Promote involvement of all teaching personnel 
in the school during the conduct of NAT review 
in monthly basis 
 Enforce the proper implementation of the 
PELC in order to accomplish it at least 3 weeks 
before the NAT schedule 
Totally eradicate the PARDOs (Pupils -at-risk 
of Dropping out) in all grade levels 
 Initiate possible interventions that would arrest 
the incidence of dropout in all grade levels 
 Orient concerned parents of PARDOs on the 
significance of SBM and their vital role in the 
educational aspect of their children 
 Draw out parents’ commitment to arrest 
dropout incidence among their children thru 
signing the written agreement (MOA)
SCHOOL IMPROVEMENT PLAN 
Priority Improvement Areas Suggested Interventions 
Lessen or totally eradicate frustration level in 
reading of pupils in the first three grade levels 
 Provide reading materials in the mini-library of 
each classroom (Grade 1-3) to boost their 
interest and love in reading 
 Require a reading recovery corner for each 
classroom 
 Encourage teachers to regularly use innovative 
strategies in the teaching of English (Reading) 
subject 
Improve pupils reading performance level in 
the Phil-IRI Results for Grades 1-6 
 Provide intensive program for remedial reading 
class hours with more focus in the primary 
levels of education 
 Encourage the intensive effort of the teachers to 
conduct one-on-one reading tutorials for pupils 
who have frustrated reading levels during the 
pretest 
 Provide sufficient reading materials that are 
relevant, appropriate and comprehensive for 
every grade level 
 Provide multimedia equipments / 
intervention/instruction that are utilized and 
made available to improve instruction 
2. TEACHER PERFORMANCE 
Upgrade teachers’ competencies  Attend national/regional/division INSET, 
seminars and workshops to enhance teachers 
competencies in teaching as well as 
Information and Communication Technology 
(ICT) 
 Supply teachers with adequate instructional 
materials and devices 
 Intensively promote Learning Partnership 
Program (LPP) among San Antonio Elementary 
School Teachers 
 Encourage teachers to enroll in graduate and 
post-graduate studies (M.A. and Doctorate) 
 Conduct a school-based INSET on the teaching 
of core subjects (English, Science, Math) 
Orient teachers on the handling of PARDOs in 
their class 
 Conduct briefing/orientation on PARDOs for 
San Antonio Elementary School Teachers 
 Encourage teachers to monitor their pupils 
performance and keep updates of their 
attendance and absences, if any, with the 
parents during monthly Homeroom meetings 
 Motivate teachers to conduct home visitation 
for the sake of PARDOs, whenever the dire 
need arises
SCHOOL IMPROVEMENT PLAN 
PROGRAM AND ACTION PLANS 
Promoting quality education to uplift the achievement rate in the local and national 
assessments is the focal target of San Antonio Elementary School. This goal can only be reached 
with the webbed efforts of the School Head, the teaching staff, the pupils, the PTA, the 
community and the stakeholders. For without any one these strands our desire to improve the 
NAT-MPS as well as the reading performance of our pupils would not be feasible. Hopefully, 
this aspiration will be launched successfully and achieved positive outcomes in the next three to 
five years. However, aiming for that high mark can only be fulfilled considering some factors 
that would intervene in the process of accomplishing it. 
Our first main focus is on how to maintain, sustain the consistency of academic 
performance of our pupils, not only in the NAT, but also in reading. Although there has been a 
significant increase manifested in most of the learning areas in the NAT, there is still a need to 
improve the MPS in all core subject. Perhaps, there is a relevant connection between the reading 
performances of the sixth graders with their performance. Poor reading performance, if not 
addressed promptly and properly, will have a great impact in the succeeding years. This is the 
reason why we choose to prioritize the improvement of our pupils reading performance. Among 
the initiatives stipulated are: providing intensive remedial reading class/ reading recovery 
program in the first three grade levels of elementary education. 
A considerable effect that PARDOs incidence may bring pushes the alarm to involve the 
concerned parents in attaining a zero dropout rate San Antonio Elementary School in the next 
three to five years or more. By doing so, the possibility of achieving 100% participation and 
graduation rates will be much easier. 
Secondly, we encourage the teachers to upgrade their teaching competencies and 
professional advancement to keep themselves abreast of the growing innovations and trends in 
teaching which are vital to pupils’ performance in the macro-skills being developed. School-based, 
division, regional and national INSETs facilitate them to cope with this target. School-based 
Learning Partnership program (LLP) needs to be intensified and implemented by the 
School Head and trained mentors or learning partners for this purpose. Moreover the need to 
conduct a school-based ICT training is given more emphasis in the next school year in order to 
maximize teachers’ competency in basic computer knowledge and skills. 
For teacher’s professional advancement, they are also encouraged to pursue and finish 
their graduate and/ or post-graduate studies to further improve their professional qualifications 
and competencies. 
Thirdly, we aim to provide the schoolchildren with a clean, conducive and safe learning 
environment. This goal can be attained by improving the physical showcase of the school. The 
presence of learning parks can be influential to their learning outcomes which therefore connoted
SCHOOL IMPROVEMENT PLAN 
that there is always a need to preserve, maintain or even enhance these structures. It is also 
necessary to construct additional facilities like functional Science Laboratory, Health Facility, 
Learning Resource Center, standard Home Economics building, Industrial Arts building and 
other edifices to cater the pupils’ need for optimum and lifelong learning convenience and higher 
learning outcomes. 
Added to these, the School Head has to discover ways and means to have additional 
teachers and non-teaching personnel, library in charge who is ready to extend a helping hand for 
the improvement of the pupils’ basic computer skills and reading performance. Likewise, hiring 
additional school personnel to serve as watchman/utility worker janitor would bring forth better 
outcomes in relation to the school’s physical plant and ancillary services. 
Finally, there should be efficient management of the school I accordance with the 
standards set by the National Office to perfectly meet the school’s objectives. There has to be 
regular monitoring and close supervision of classes and full time implementation of remedial 
reading instruction (reading recovery program) to totally eradicate the frustration level of the 
pupils in the first three grade levels. 
Community involvement hastens the development of good rapport among parents in the 
neighborhood. Aside from this, financial concerns play an integral part in the triumphant 
realization of this School Improvement Plan. Hence, all individuals involved in this plan are part 
and parcel of this success. 
Honestly, the school is financially incapacitated and unstable to carry out this plan: its 
realization definitely lies on the solid support from external sources, that is, the stakeholders. The 
best option to take is to present this plan to all concerned stakeholders with hopeful expectation 
that they would be able to share and tap other agencies in order to make this huge dream a 
reality for San Antonio Elementary School. 
MONITORING AND EVALUATION PLAN 
This School Improvement Plan (SIP) is determined to deliver better learning atmosphere. 
The application of diverse schemes that aims for such purpose will be closely monitored and 
scrupulously evaluated whether this plans really ensemble the present needs of the learners and 
at the same time meets the standards set out. 
Methodical and systematic monitoring on this SIP shall be observed specifically on a 
regular basis. There shall be proper documentation in every monitoring activity made. 
Testimonies of pupils, parents and stakeholders shall be properly verified to check the validity of 
its outcomes. Evaluation of each application shall be demonstrated and noted. A timely updated
SCHOOL IMPROVEMENT PLAN 
profile is of great assistance so as to facilitate the appraisal of the desired plan. In such manner, 
the need to enhance and modify this SIP in the future will be worth the sweat and the cost. 
A disciplined monitoring and evaluation plan eventually bring about affirmative results, 
and therefore reduces wastage of funds, time and effort. 
ANNEXES 
 School Report Card 
 Data Interpretation Template 
 School Operating Budget 
 Annual Implementation Plan 
 3-Year Work And Financial Plan 
 Monitoring And Evaluation Plan 
 Stream Diagnostic Chart 
DATA INTERPRETATION CHART 
A 
B 
Area 
C 
Interpretation 
PROVISION OF ACCESS Personnel The teaching personnel of San Antonio 
Elementary School needs one (1) 
additional teacher, specifically for Grade 
VI 
Needs one (1) utility worker to do multi-tasked 
functions for the school’s security 
and ground maintenance 
The latest teacher-pupil ratio meets the 
national standard 
Physical and ancillary 
Services 
Classroom furniture, desks, tables and 
chairs are not enough for pupils sand 
teachers 
Needs a standard computer laboratory, 
HE building, Industrial Arts building and 
permanent Grade 6 classroom 
Needs school perimeter fence and main 
gate is needed 
Learning Materials and 
Services 
The shortage of textbooks is not yet 
resolved 
Generally, learning equipments and 
facilities for the last three did not meet 
the DepED’s national standards 
The necessity to have a functional health 
facility, school canteen and LRC is 
deemed a priority
SCHOOL IMPROVEMENT PLAN 
A 
B 
Area 
C 
Interpretation 
QUALITY AND 
RELEVANCE OF BASIC 
EDUCATION 
Learner Performance The learner performance for the past 
three (3) years showed fluctuation, 
perhaps due to the diversion of attention 
in giving emphasis to least mastered 
competencies in English, Math, Science, 
HEKASI and Filipino 
The latest NAT results showed better 
outcome compared to the previous year’s 
Curriculum 
Implementation/Instructional 
Delivery 
Teacher’s portfolio needs updating; the 
use of PELC is strictly directed by the 
School Head for the teachers 
The latest NAT results showed better 
outcome compared to the previous year’s 
Classroom observation and supervision 
needs upgrading and schedule 
improvement with the use of STAR and 
SCOPE that are in consonance with the 
NCBTS 
Reading Recovery Program to be 
initiated in the succeeding years to 
ensure zero non-reader 
Staff Development The School Head of San Antonio 
Elementary School needs to enhance 
professional qualification such as 
passing the NEAP or completing her MA 
degree 
Only one (1) teacher has completed 
MAED degree, mostly have 18 to 32 
MAED units; a few have not yet enrolled 
in graduate courses 
SCHOOL 
MANAGEMENT OF 
EDUCATIONAL 
SERVICES 
Management and 
Administration 
Time for follow-up of projects and 
requests made for the stakeholders need 
proper scheduling so as not to overlap 
with the daily and weekly administrative 
and supervisory program 
Stakeholders’ Participation Involvement and commitment from 
stakeholders is maximized thru material 
donations and financial assistance 
More donors from the LGU and NGOs 
are expected to be accounted for in the 
next school year 
Brigada Eskwela implementation needs 
optimum monitoring and intensive 
advocacy 
Instructional Supervision The School Head needs more time to be 
allotted for observation/supervision of 
classes
SCHOOL IMPROVEMENT PLAN 
A B 
Area 
C 
Interpretation 
Public Expenditure The external stakeholders show much 
amount or donations by 
providing/allocating budget for the 
rehabilitation/repair of school buildings 
and amenities 
Environment There has been few reports of 
theft/robbery during the last two years 
Only one (1) incident of teacher-pupil, 
teacher-parent for the previous year 
OTHERS Reconstruction of dilapidated 
stage, repair of ceiling and 
completion of school 
perimeter fence 
Damaged concrete fence and gate 
shutters due to typhoon needs immediate 
rehabilitation to avoid more problems in 
the future 
The sides and rear part of the school 
needs complete fencing to avoid 
incidence of theft/robbery and 
destruction of school properties 
Procurement of at least 4 
waste containers 
(biodegradable/non-biodegradable) 
Temporary garbage pits has been filled 
out, thus resulted to improper waste 
disposal 
There is a dire need for waste 
segregation to ensure that garbage are 
kept and cleanliness around the school 
premises is maintained
SCHOOL IMPROVEMENT PLAN 
3 – YEAR WORK AND FINANCIAL PLAN 
SAN ANTONIO ELEMENTARY SCHOOL 
Fiscal Year 2013 – 2016 
PRIORITY 
IMPROVEMENT 
AREAS 
OBJECTIVES PROGRAMS, 
PROJECTS, ACTIVITIES 
RESOURCE 
REQUIREMENTS 
TIMELINE AMOUNT AND TARGET SOURCES OF FUNDS 
YEAR 1 
(2013) 
YEAR 2 
(2014) 
YEAR 3 
(2015) 
MOOE SBM 
GRANT 
LGU SBRMS PTA DEPED OTHERS 
A. Provision of 
Equi table Access 
To repair and 
repaint 
classroom 
building 
Request the SDS of 
Zamboanga del Norte 
Division to provide 
funding allocat ion for 
repair 
P 50, 000 
1 
1 
1 
50,000 
To employ the 
availability of 
inst ruct ional/ 
learning 
materials 
Request more textbooks 
from the Division Office to 
at tain (100%) or 1:1 
Textbook-pupil ratio 
Division Supply 
Office 
1 
1 
1 
9,200 
Procure instructional 
materials to be used by 
teachers in their daily 
classroom activities 
MOOE 
1 
1 
1 
26,572.75 
6,272.66 
B. Quality and 
Relevance of 
Basic Education 
To improve 
teaching skills 
and 
competencies 
of teachers 
At tend division, regional 
and other relevant t rainings 
seminars for professional 
growth; at tend GAD 
Training 
MOOE 
1 
1 
1 
1,500 
3,000 
3,000 
Conduct in-service t raining 
on least learned areas to 
at tain consistently 
increasing NAT results 
thru the ut ilization of funds 
from SBM Grant 
SBM Grant 
1 
1 
6,300 
6,300 
Procure t raining supplies 
and materials to be ut ilized 
during the conduct of 
school-based INSET for 
least -learned skills in all 
core subjects 
SBM Grant 
1 
1 
1 
37,400 
Allocate budget for 
t ransportation, 
meals/snacks of trainers 
and teacher participants 
SBM Grant 
1 
1 
1 
12,500 
12,500 
12,500 
Allocate budget for 
meals/snacks of parents 
and teachers of PARDOs 
during the follow-up 
orientation 
SBM Grant 
1 
7,750
SCHOOL IMPROVEMENT PLAN 
PRIORITY 
IMPROVEMENT 
AREAS 
OBJECTIVES PROGRAMS, 
PROJECTS, ACTIVITIES 
RESOURCE 
REQUIREMENTS 
TIMELINE AMOUNT AND TARGET SOURCES OF FUNDS 
YEAR 1 
(2013) 
YEAR 2 
(2014) 
YEAR 3 
(2015) 
MOOE SBM 
GRANT 
LGU SBRMS PTA DEPED OTHERS 
To conduct 
school-based 
ICT t raining 
for teachers 
Prepare training matrix and 
design, budgetary layout 
for the activity 
SBM Grant 
1 
1 
1 
2,500 
2,500 
2,500 
Allocate budget for hands-on 
ICT t raining materials 
t ransportation/meals & 
snacks of t rainers & 
teacher participants 
MOOE/ SBM Grant 
1 
1 
15,000 
20,000 
Improve the 
school’s basic 
services to its 
clientele 
Allocate budget for 
print ing, reproduction and 
binding of handouts for the 
ICT t raining manual, 
cert ificates and forms 
SBM Grant 
1 
1 
1 
3,000 
3,000 
3,000 
Allocate budget for 
miscellaneous expenses for 
the school in the 
processing of SBM 
Grant /MOOE/SBRMS 
liquidat ion as reflected in 
the School Operating 
Budget 
MOOE 
1 
1 
1 
4,813 
Improvement of 
inst ruct ion thru the 
use of mult imedia 
and IT equipments 
Request 
Division 
Office for 
elect rical 
paraphernalia 
for the e-classroom 
Request the SDS Division 
to allocate funding for 
elect rical paraphernalia for 
installat ion in the computer 
laboratory and submit 
program of work for the 
project 
DepED Division 
Office 
1 
1 
1 
13,000 
Implementation of 
DORP 
Sustain zero 
dropout and 
eradicate 
PARDO cases 
thru DORP 
implementation 
Provide school supplies 
and ID to PARDOs from 
Kindergarten to Grade VI 
classes 
SBM Grant 
1 
1 
1 
25,500 
25,500 
25,500 
To improve 
the Nut ritional 
Status of 
below normal 
pupils 
Supplementary Feeding 
Program to be sponsored 
by stakeholders, SBM 
Grant and the use of 
Gulayan sa Paaralan in the 
parents’ preparation of 
daily hot lunch 
External 
st akeholders’ 
donat ions 
1 
1 
1 
9,000
SCHOOL IMPROVEMENT PLAN 
PRIORITY 
IMPROVEMENT 
AREAS 
OBJECTIVES PROGRAMS, 
PROJECTS, ACTIVITIES 
RESOURCE 
REQUIREMENTS 
TIMELINE AMOUNT AND TARGET SOURCES OF FUNDS 
YEAR 1 
(2013) 
YEAR 2 
(2014) 
YEAR 3 
(2015) 
MOOE SBM 
GRANT 
LGU SBRMS PTA DEPED OTHERS 
C. School 
Management 
To maintain 
school plant’s 
cleanliness 
and 
availability of 
manual 
equipments/fa 
cilit ies/janitori 
al and security 
services 
Allocate enough budget for 
paint ing of the school 
building 
MOOE/PTA 
fund/External 
stakeholders 
1 1 
1 
3,000 
3,000 
3,000 
1,500 
Allocate funds for payment 
of elect rical billings of the 
whole year 
MOOE 
1 
1 
1 
5,500 
5,500 
5,500 
2,000 
2,000 
2,000 
Allocate funds for salary 
payment of 
watchman/security during 
schooldays, Saturdays and 
Sundays 
MOOE 
1 
1 
7,500 
7,500 
To construct 
School Head 
Office and 
Comfort 
Room 
School Head requests LGU 
for funding of materials, 
internal and external 
stakeholders to provide for 
the labor and painting 
expenses 
LGU/PTA/ External 
stakeholders 
1 
1 
1 
30,000 
5,000 
10,000 
To construct 
the concrete 
school 
perimeter 
fence and 
school 
building 
Submit a resolut ion 
request ing Provincial 
Government through SP 
members for funding 
allocat ion for the concrete 
school perimeter fence and 
addit ional 1 school 
building and 2 classrooms 
Provincial 
Government 
1 
1 
1 
500,000 
500,000 
To improve 
t he school’s 
physical 
appearance 
Request the parents and 
stakeholders for 100% 
part icipation during the 
Brigada Eskwela through 
the teachers/class advisers 
from Kindergarten to 
Grade VI for the project 
implementation : extreme 
makeover of ground 
landscaping and 
replacement of old plants 
and repair of benches and 
pathways 
Solicit funds from 
stakeholders for the 
repaint ing of learning 
parks and other st ructures 
Internal and 
External 
Stakeholders 
1 
1 
1 
5,000
SCHOOL IMPROVEMENT PLAN 
PRIORITY 
IMPROVEMENT 
AREAS 
OBJECTIVES PROGRAMS, 
PROJECTS, ACTIVITIES 
RESOURCE 
REQUIREMENTS 
TIMELINE AMOUNT AND TARGET SOURCES OF FUNDS 
YEAR 1 
(2013) 
YEAR 2 
(2014) 
YEAR 3 
(2015) 
MOOE SBM 
GRANT 
LGU SBRMS PTA DEPED OTHERS 
Implement WOW Program 
thru proper waste 
segregat ion by making a 
painted compost pit for 
each grade level 
Internal and 
External 
Stakeholders 
1 
1 
1 
1,500 
To repair and 
repaint 3 
school 
buildings with 
8 classrooms 
for the ceiling 
Ut ilize the school MOOE 
for repainting of ceiling 
MOOE 
1 
1 
1 
3,000 
3,000 
3,000 
46,000 
1,000 
Prepared by: 
LORDJETA P. LADEZA 
ESHT – II 
Recommending Approval: 
ERVIE A. ACAYLAR DR. JULIET J. VELASCO 
Division SBM Coordinator SBM Coordinator, 2nd Congressional District 
APPROVED: 
DR. LILIA E. ABELLO 
Assistant Schools Division Superintendent 
SBM In – Charge
SCHOOL IMPROVEMENT PLAN 
ANNUAL IMPLEMENTATION PLAN 
SAN ANTONIO ELEMENTARY SCHOOL 
Fi scal Year 2013 
A B C D E F 
PRIORITY 
IMPROVEMENT 
AREAS 
OBJECTIVES PROGRAMS, 
PROJECTS, 
ACTIVITIES 
RESOURCE 
REQUIREMENT 
TIME FRAME SOURCES AND AMOUNT OF FUNDS 
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MOOE SBM 
GRANT 
SBRMS LGU PTA DEPED OTHERS 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 
A. Provision of 
Equi table 
Access 
To repair and 
repaint classroom 
building 
Request the SDS 
Zamboanga del 
Norte Division to 
provide funding 
allocat ion for its 
major 
repair/repainting 
3 0,000 
50,000 
To employ the 
availability of 
inst ruct ional/ 
learning 
materials 
Request more 
textbooks from 
the Division 
Office to at tain 
1:1 Textbook-pupil 
rat io 
(100%) 
8,000 
8,000 
8,000 
Procure 
inst ruct ional 
materials to be 
used by teachers 
in their daily 
classroom 
act ivit ies 
5,500 
5,500 
5,500 
5,500 
2 2,000 
B. Quality and 
Relevance of 
Basic Education 
To improve 
teaching skills 
and 
competencies of 
teachers 
At tend division, 
regional and 
other relevant 
t rainings and 
seminars for 
professional 
growth 
2,500 
2,500 
Conduct in-service 
t raining 
on least learned 
areas to at tain 
consistently 
increasing NAT 
results thru the 
ut ilizat ion of 
funds from SBM 
Grant 
5,500 
5,500
SCHOOL IMPROVEMENT PLAN 
A B C D E F 
PRIORITY 
IMPROVEMENT 
AREAS 
OBJECTIVES PROGRAMS, 
PROJECTS, 
ACTIVITIES 
RESOURCE 
REQUIREMENT 
TIME FRAME SOURCES AND AMOUNT OF FUNDS 
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MOOE SBM 
GRANT 
SBRMS LGU PTA DEPED OTHERS 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 
Procure t raining 
supplies and 
materials to be 
ut ilized during 
the conduct of 
school-based 
INSET in all 
core subjects 
2 0,000 
20,000 
Allocate budget 
for 
t ransportation, 
meals/snacks of 
t rainers and 
teacher 
part icipants 
2,000 
2,000 
To conduct 
school-based ICT 
t raining for 
teachers 
Allocate budget 
for ICT t raining 
materials, 
t ransportation/m 
eals/snacks of 
t rainers and 
teacher 
part icipants 
3,000 
3,000 
Allocate budget 
for meals/snacks 
of parents and 
teachers of 
PARDOs during 
the follow-up 
orientation 
5,000 
5,000 
Improve the 
school’s basic 
services to its 
clientele 
Allocate budget 
for printing, 
reproduct ion and 
binding of 
handouts for the 
ICT t raining 
manual, 
cert ificates and 
forms 
5,000 
5,000
SCHOOL IMPROVEMENT PLAN 
A B C D E F 
PRIORITY 
IMPROVEMENT 
AREAS 
OBJECTIVES PROGRAMS, 
PROJECTS, 
ACTIVITIES 
RESOURCE 
REQUIREMENT 
TIME FRAME SOURCES AND AMOUNT OF FUNDS 
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MOOE SBM 
GRANT 
SBRMS LGU PTA DEPED OTHERS 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 
Allocate budget 
for 
miscellaneous 
expenses for the 
school in the 
processing of 
SBM 
Grant /MOOE/SB 
RMS/ liquidat ion 
as reflected in 
the School 
Operat ing 
Budget 
4,813 
4,813 
Implementation 
of DORP 
Sustain zero 
dropout and 
eradicate 
PARDO cases 
thru DORP 
implementation 
Provide school 
supplies and ID 
to PARDOs from 
Kindergarten to 
Grade VI classes 
15,000 
To improve the 
Nut rit ional Status 
of below normal 
pupils 
Supplementary 
Feeding Program 
to be sponsored 
by stakeholders, 
SBM Grant and 
the use of 
Gulayan sa 
Paaralan in the 
parent s’ 
preparation of 
daily hot lunch 
3,000 
3,000 
3,000 
9,000 
Improvement of 
instruction thru 
the use of 
multimedia and 
IT equipments 
To request for 
adequate number 
of computer sets 
and accessories, 
LCD Projector 
and printer to 
maximize 
inst ruct ional and 
learning 
experiences of 
both teachers and 
pupils 
Request the 
Local 
Government Unit 
thru the 
Municipal 
Mayor’s Office 
and the 
Municipal 
Engineering 
Office to inspect 
and install 
appropriate 
elect rical wirings 
for the computer 
laboratory 
1 3,000 
1 3,000
SCHOOL IMPROVEMENT PLAN 
A B C D E F 
PRIORITY 
IMPROVEMENT 
AREAS 
OBJECTIVES PROGRAMS, 
PROJECTS, 
ACTIVITIES 
RESOURCE 
REQUIREMENT 
TIME FRAME SOURCES AND AMOUNT OF FUNDS 
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MOOE SBM 
GRANT 
SBRMS LGU PTA DEPED OTHERS 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 
C. School 
Management 
To maintain 
school plant’s 
cleanliness and 
availability of 
manual 
equipments/facili 
t ies/janitorial and 
security services 
Renovate and 
repair of an 
outdoor stage 
2 0,000 
15,000 
5,000 
Allocate enough 
budget for rip 
rapping in front 
of the school 
building 
2 0,000 
5,000 
1 5,000 
Allocate funds 
for payment of 
elect rical billings 
of the whole year 
926.30 
1,437.73 
2,364.0 3 
5,500 
Allocate funds 
for salary 
payment of 
watchman/securi 
ty during 
schooldays, 
Saturdays and 
Sundays 
3,500 
To improve the 
school’s physical 
appearance 
Request the 
parents and 
stakeholders for 
100% 
part icipation 
during the 
Brigada Eskwela 
thru all the class 
advisers for the 
ext reme 
makeover of 
ground 
landscaping and 
replacement of 
old plants and 
repair of benches 
and pathways
SCHOOL IMPROVEMENT PLAN 
A B C D E F 
PRIORITY 
IMPROVEMENT 
AREAS 
OBJECTIVES PROGRAMS, 
PROJECTS, 
ACTIVITIES 
RESOURCE 
REQUIREMENT 
TIME FRAME SOURCES AND AMOUNT OF FUNDS 
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MOOE SBM 
GRANT 
SBRMS LGU PTA DEPED OTHERS 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 
Solicit funds 
from 
stakeholders for 
the repainting of 
learning parks 
and other 
st ructures 
5,000 
5,000 
Implement 
WOW Program 
thru proper waste 
segregat ion by 
making a painted 
compost pit for 
each grade level 
1,500 
Ut ilize the 
school MOOE 
for the repair and 
installat ion and 
repaint ing of 
school building 
3,000 
1,000 
Prepared by: 
LORDJETA P. LADEZA 
ESHT – II 
Recommending Approval: 
ERVIE A. ACAYLAR DR. JULIET J. VELASCO 
Division SBM Coordinator SBM Coordinator, 2nd Congressional District 
APPROVED: 
DR. LILIA E. ABELLO 
Assistant Schools Division Superintendent 
SBM In – Charge
SCHOOL IMPROVEMENT PLAN

More Related Content

What's hot

Accomplishment report in guidance
Accomplishment report in guidanceAccomplishment report in guidance
Accomplishment report in guidanceAllan Ferros
 
MASTER-TEACHERS-TECHNICAL-ASSITANCE-PLAN NOVEMBER 2022.docx
MASTER-TEACHERS-TECHNICAL-ASSITANCE-PLAN NOVEMBER 2022.docxMASTER-TEACHERS-TECHNICAL-ASSITANCE-PLAN NOVEMBER 2022.docx
MASTER-TEACHERS-TECHNICAL-ASSITANCE-PLAN NOVEMBER 2022.docxPHILIP OMAR FAMULARCANO
 
SCHOOL IMPROVEMENT PLAN OF CANTAO-AN ELEMENTARY SCHOOL
SCHOOL IMPROVEMENT PLAN OF CANTAO-AN ELEMENTARY SCHOOLSCHOOL IMPROVEMENT PLAN OF CANTAO-AN ELEMENTARY SCHOOL
SCHOOL IMPROVEMENT PLAN OF CANTAO-AN ELEMENTARY SCHOOLLindy Pujante
 
Action plan on child protection policy 2021
Action plan on child protection policy 2021Action plan on child protection policy 2021
Action plan on child protection policy 2021wena henorga
 
action plan in reading.docx
action plan in reading.docxaction plan in reading.docx
action plan in reading.docxJenniferSayong1
 
Gad plan and budget 2019
Gad plan and budget 2019Gad plan and budget 2019
Gad plan and budget 2019andrelyn diaz
 
GAD-Plan-and-Budget-2023.docx
GAD-Plan-and-Budget-2023.docxGAD-Plan-and-Budget-2023.docx
GAD-Plan-and-Budget-2023.docxJaveGeneDeAquino1
 
Work experience sheet jinilin
Work experience sheet jinilinWork experience sheet jinilin
Work experience sheet jinilinjennylynroncales
 
Brigada eskwela proposal
Brigada eskwela proposalBrigada eskwela proposal
Brigada eskwela proposalPaul Bryan Bron
 
Innovation Project Proposal in DepEd - Super Draft
Innovation Project Proposal in DepEd - Super DraftInnovation Project Proposal in DepEd - Super Draft
Innovation Project Proposal in DepEd - Super DraftGlenn Rivera
 
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022Lindy Pujante
 
2 professional development_plan, pllp, action plan, 21st classroom
2 professional development_plan, pllp, action plan, 21st classroom2 professional development_plan, pllp, action plan, 21st classroom
2 professional development_plan, pllp, action plan, 21st classroomjojit apiong
 
SMEA-FIRST-2022-2023.pptx
SMEA-FIRST-2022-2023.pptxSMEA-FIRST-2022-2023.pptx
SMEA-FIRST-2022-2023.pptxJoel Rodriguez
 
MENTORING AND COACHING FORM.docx
MENTORING AND COACHING FORM.docxMENTORING AND COACHING FORM.docx
MENTORING AND COACHING FORM.docxMamaanunPS
 
PTA Accomplishment report
PTA Accomplishment reportPTA Accomplishment report
PTA Accomplishment reportWilly Rodriguez
 
DepEd Order no. 36 s. 2016
DepEd Order no. 36 s. 2016DepEd Order no. 36 s. 2016
DepEd Order no. 36 s. 2016Vera Salamat
 

What's hot (20)

Accomplishment report in guidance
Accomplishment report in guidanceAccomplishment report in guidance
Accomplishment report in guidance
 
MASTER-TEACHERS-TECHNICAL-ASSITANCE-PLAN NOVEMBER 2022.docx
MASTER-TEACHERS-TECHNICAL-ASSITANCE-PLAN NOVEMBER 2022.docxMASTER-TEACHERS-TECHNICAL-ASSITANCE-PLAN NOVEMBER 2022.docx
MASTER-TEACHERS-TECHNICAL-ASSITANCE-PLAN NOVEMBER 2022.docx
 
SCHOOL IMPROVEMENT PLAN OF CANTAO-AN ELEMENTARY SCHOOL
SCHOOL IMPROVEMENT PLAN OF CANTAO-AN ELEMENTARY SCHOOLSCHOOL IMPROVEMENT PLAN OF CANTAO-AN ELEMENTARY SCHOOL
SCHOOL IMPROVEMENT PLAN OF CANTAO-AN ELEMENTARY SCHOOL
 
Action plan on child protection policy 2021
Action plan on child protection policy 2021Action plan on child protection policy 2021
Action plan on child protection policy 2021
 
action plan in reading.docx
action plan in reading.docxaction plan in reading.docx
action plan in reading.docx
 
Gad plan and budget 2019
Gad plan and budget 2019Gad plan and budget 2019
Gad plan and budget 2019
 
GAD-Plan-and-Budget-2023.docx
GAD-Plan-and-Budget-2023.docxGAD-Plan-and-Budget-2023.docx
GAD-Plan-and-Budget-2023.docx
 
cot in rpms forms
cot in rpms formscot in rpms forms
cot in rpms forms
 
Brigada eskwela
Brigada eskwelaBrigada eskwela
Brigada eskwela
 
Work experience sheet jinilin
Work experience sheet jinilinWork experience sheet jinilin
Work experience sheet jinilin
 
Brigada eskwela proposal
Brigada eskwela proposalBrigada eskwela proposal
Brigada eskwela proposal
 
LAC PLAN_2022-2023.docx
LAC PLAN_2022-2023.docxLAC PLAN_2022-2023.docx
LAC PLAN_2022-2023.docx
 
Innovation Project Proposal in DepEd - Super Draft
Innovation Project Proposal in DepEd - Super DraftInnovation Project Proposal in DepEd - Super Draft
Innovation Project Proposal in DepEd - Super Draft
 
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
NAALAD ELEM SCHOOL IMPROVEMENT PLAN 2019-2022
 
2 professional development_plan, pllp, action plan, 21st classroom
2 professional development_plan, pllp, action plan, 21st classroom2 professional development_plan, pllp, action plan, 21st classroom
2 professional development_plan, pllp, action plan, 21st classroom
 
SMEA-FIRST-2022-2023.pptx
SMEA-FIRST-2022-2023.pptxSMEA-FIRST-2022-2023.pptx
SMEA-FIRST-2022-2023.pptx
 
MENTORING AND COACHING FORM.docx
MENTORING AND COACHING FORM.docxMENTORING AND COACHING FORM.docx
MENTORING AND COACHING FORM.docx
 
PTA Accomplishment report
PTA Accomplishment reportPTA Accomplishment report
PTA Accomplishment report
 
DepEd Order no. 36 s. 2016
DepEd Order no. 36 s. 2016DepEd Order no. 36 s. 2016
DepEd Order no. 36 s. 2016
 
Balik Eskwela Narrative report
Balik Eskwela Narrative report Balik Eskwela Narrative report
Balik Eskwela Narrative report
 

Viewers also liked

Individual work plan compilation on different subject areas
Individual work plan compilation on different subject areas Individual work plan compilation on different subject areas
Individual work plan compilation on different subject areas Reon Zedval
 
School Improvement Plan
School Improvement PlanSchool Improvement Plan
School Improvement Plancyril coscos
 
Strategic planning- from DepEd
Strategic planning- from DepEdStrategic planning- from DepEd
Strategic planning- from DepEdSeven De Los Reyes
 
Suggested business plan format
Suggested business plan formatSuggested business plan format
Suggested business plan formatLoewen Kho
 
6 SWOT Analysis Examples to Help You Write Your Own
6 SWOT Analysis Examples to Help You Write Your Own6 SWOT Analysis Examples to Help You Write Your Own
6 SWOT Analysis Examples to Help You Write Your OwnPalo Alto Software
 
SAMPLE ACTION PLAN
SAMPLE ACTION PLAN SAMPLE ACTION PLAN
SAMPLE ACTION PLAN jwalts
 
Certification del carmen
Certification   del carmenCertification   del carmen
Certification del carmenIj Gesta
 
Reflections on the Implementation of Pantawid Pamilyang Pilipino Program (a.k...
Reflections on the Implementation of Pantawid Pamilyang Pilipino Program (a.k...Reflections on the Implementation of Pantawid Pamilyang Pilipino Program (a.k...
Reflections on the Implementation of Pantawid Pamilyang Pilipino Program (a.k...Vanessa Garingo
 
Action plan-spg-2015-2016 (1)
Action plan-spg-2015-2016 (1)Action plan-spg-2015-2016 (1)
Action plan-spg-2015-2016 (1)whengz18
 
Project report on quesstionire with parents before starting the school
Project report on quesstionire with parents before starting the schoolProject report on quesstionire with parents before starting the school
Project report on quesstionire with parents before starting the schoolAyesha Hamid
 
Harrisburg School District 2013 Financial Statements
Harrisburg School District 2013 Financial StatementsHarrisburg School District 2013 Financial Statements
Harrisburg School District 2013 Financial Statementstodaysthedayhbg
 
After opening an appeals case by pro se litigants – 9th circuit
After opening an appeals case by pro se litigants – 9th circuitAfter opening an appeals case by pro se litigants – 9th circuit
After opening an appeals case by pro se litigants – 9th circuitUmesh Heendeniya
 
Brigada eskwela
Brigada eskwela Brigada eskwela
Brigada eskwela Mj_jose
 

Viewers also liked (20)

Individual work plan compilation on different subject areas
Individual work plan compilation on different subject areas Individual work plan compilation on different subject areas
Individual work plan compilation on different subject areas
 
School Improvement Plan
School Improvement PlanSchool Improvement Plan
School Improvement Plan
 
Strategic planning- from DepEd
Strategic planning- from DepEdStrategic planning- from DepEd
Strategic planning- from DepEd
 
School Improvement Plan
School Improvement PlanSchool Improvement Plan
School Improvement Plan
 
Suggested business plan format
Suggested business plan formatSuggested business plan format
Suggested business plan format
 
Action plan ssg
Action plan ssgAction plan ssg
Action plan ssg
 
6 SWOT Analysis Examples to Help You Write Your Own
6 SWOT Analysis Examples to Help You Write Your Own6 SWOT Analysis Examples to Help You Write Your Own
6 SWOT Analysis Examples to Help You Write Your Own
 
HRPTA Agenda
HRPTA AgendaHRPTA Agenda
HRPTA Agenda
 
SAMPLE ACTION PLAN
SAMPLE ACTION PLAN SAMPLE ACTION PLAN
SAMPLE ACTION PLAN
 
Certification del carmen
Certification   del carmenCertification   del carmen
Certification del carmen
 
Sample action plan
Sample action planSample action plan
Sample action plan
 
Reflections on the Implementation of Pantawid Pamilyang Pilipino Program (a.k...
Reflections on the Implementation of Pantawid Pamilyang Pilipino Program (a.k...Reflections on the Implementation of Pantawid Pamilyang Pilipino Program (a.k...
Reflections on the Implementation of Pantawid Pamilyang Pilipino Program (a.k...
 
Action plan-spg-2015-2016 (1)
Action plan-spg-2015-2016 (1)Action plan-spg-2015-2016 (1)
Action plan-spg-2015-2016 (1)
 
Project report on quesstionire with parents before starting the school
Project report on quesstionire with parents before starting the schoolProject report on quesstionire with parents before starting the school
Project report on quesstionire with parents before starting the school
 
Grading sh-learners
Grading sh-learnersGrading sh-learners
Grading sh-learners
 
Harrisburg School District 2013 Financial Statements
Harrisburg School District 2013 Financial StatementsHarrisburg School District 2013 Financial Statements
Harrisburg School District 2013 Financial Statements
 
After opening an appeals case by pro se litigants – 9th circuit
After opening an appeals case by pro se litigants – 9th circuitAfter opening an appeals case by pro se litigants – 9th circuit
After opening an appeals case by pro se litigants – 9th circuit
 
SWOT Examples PM 401
SWOT Examples PM 401SWOT Examples PM 401
SWOT Examples PM 401
 
Philippines - subnational development processes
Philippines - subnational development processesPhilippines - subnational development processes
Philippines - subnational development processes
 
Brigada eskwela
Brigada eskwela Brigada eskwela
Brigada eskwela
 

Similar to Sip new guiding principles

Cacawan sip 2014-2016 final 3
Cacawan sip 2014-2016 final 3Cacawan sip 2014-2016 final 3
Cacawan sip 2014-2016 final 3Vic Mari Sumagay
 
TECT 4306 Spring 2016 Project 2 Diversity in Adult Education
TECT 4306 Spring 2016 Project 2 Diversity in Adult EducationTECT 4306 Spring 2016 Project 2 Diversity in Adult Education
TECT 4306 Spring 2016 Project 2 Diversity in Adult EducationPatrice Clayton
 
JBlocker Contextual Analysis of the Learning Community
JBlocker Contextual Analysis of the Learning CommunityJBlocker Contextual Analysis of the Learning Community
JBlocker Contextual Analysis of the Learning Communityjblockermedia
 
Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Michael McDermott
 
Pdnhs school improvement plan (sy 2011 2014) 0014-c
Pdnhs school improvement plan (sy 2011 2014) 0014-cPdnhs school improvement plan (sy 2011 2014) 0014-c
Pdnhs school improvement plan (sy 2011 2014) 0014-crajnulada
 
Budgeting as a vehicle for accomplishing priorities sps 2 16 09b
Budgeting as a vehicle for accomplishing priorities sps 2 16 09bBudgeting as a vehicle for accomplishing priorities sps 2 16 09b
Budgeting as a vehicle for accomplishing priorities sps 2 16 09bWilliam Smith
 
Yes Yes For Prescott Education
Yes Yes For Prescott EducationYes Yes For Prescott Education
Yes Yes For Prescott Educationprescottaz
 
Factors Determining Educational System_.pptx
Factors Determining Educational System_.pptxFactors Determining Educational System_.pptx
Factors Determining Educational System_.pptxPrasanthP71
 
Government policies - Education - Ontario - June 2017
Government policies -  Education - Ontario - June 2017Government policies -  Education - Ontario - June 2017
Government policies - Education - Ontario - June 2017paul young cpa, cga
 
ENCLOSURE-NO.1-TO-DM-SGOD-NO.-211-S.-2021.pdf
ENCLOSURE-NO.1-TO-DM-SGOD-NO.-211-S.-2021.pdfENCLOSURE-NO.1-TO-DM-SGOD-NO.-211-S.-2021.pdf
ENCLOSURE-NO.1-TO-DM-SGOD-NO.-211-S.-2021.pdfJonelynCastor
 
Superintendent's Weekly Review - St. John, Florida
Superintendent's Weekly Review - St. John, FloridaSuperintendent's Weekly Review - St. John, Florida
Superintendent's Weekly Review - St. John, FloridaPacettiBay
 
2014.2015. Final Education Budget 3.1%
2014.2015. Final Education Budget 3.1%2014.2015. Final Education Budget 3.1%
2014.2015. Final Education Budget 3.1%Lynn McMullin
 
The Lighthouse Club in Manila 2014 charity report
The Lighthouse Club in Manila 2014 charity reportThe Lighthouse Club in Manila 2014 charity report
The Lighthouse Club in Manila 2014 charity reportlhapr
 

Similar to Sip new guiding principles (20)

Cacawan sip 2014-2016 final 3
Cacawan sip 2014-2016 final 3Cacawan sip 2014-2016 final 3
Cacawan sip 2014-2016 final 3
 
TECT 4306 Spring 2016 Project 2 Diversity in Adult Education
TECT 4306 Spring 2016 Project 2 Diversity in Adult EducationTECT 4306 Spring 2016 Project 2 Diversity in Adult Education
TECT 4306 Spring 2016 Project 2 Diversity in Adult Education
 
JBlocker Contextual Analysis of the Learning Community
JBlocker Contextual Analysis of the Learning CommunityJBlocker Contextual Analysis of the Learning Community
JBlocker Contextual Analysis of the Learning Community
 
Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012Vote Yes for Tipp City Schools 2012
Vote Yes for Tipp City Schools 2012
 
Pdnhs school improvement plan (sy 2011 2014) 0014-c
Pdnhs school improvement plan (sy 2011 2014) 0014-cPdnhs school improvement plan (sy 2011 2014) 0014-c
Pdnhs school improvement plan (sy 2011 2014) 0014-c
 
Budgeting as a vehicle for accomplishing priorities sps 2 16 09b
Budgeting as a vehicle for accomplishing priorities sps 2 16 09bBudgeting as a vehicle for accomplishing priorities sps 2 16 09b
Budgeting as a vehicle for accomplishing priorities sps 2 16 09b
 
Yes Yes For Prescott Education
Yes Yes For Prescott EducationYes Yes For Prescott Education
Yes Yes For Prescott Education
 
Blockerjb smp1
Blockerjb smp1Blockerjb smp1
Blockerjb smp1
 
Chamber presentation 12 09-10 (kb final)
Chamber  presentation 12 09-10 (kb final)Chamber  presentation 12 09-10 (kb final)
Chamber presentation 12 09-10 (kb final)
 
Factors Determining Educational System_.pptx
Factors Determining Educational System_.pptxFactors Determining Educational System_.pptx
Factors Determining Educational System_.pptx
 
2010 report on status of educaiton rusd
2010 report on status of educaiton rusd2010 report on status of educaiton rusd
2010 report on status of educaiton rusd
 
2015 - 2016 Budget Presentation to Boards
2015 - 2016 Budget Presentation to Boards2015 - 2016 Budget Presentation to Boards
2015 - 2016 Budget Presentation to Boards
 
Government policies - Education - Ontario - June 2017
Government policies -  Education - Ontario - June 2017Government policies -  Education - Ontario - June 2017
Government policies - Education - Ontario - June 2017
 
ENCLOSURE-NO.1-TO-DM-SGOD-NO.-211-S.-2021.pdf
ENCLOSURE-NO.1-TO-DM-SGOD-NO.-211-S.-2021.pdfENCLOSURE-NO.1-TO-DM-SGOD-NO.-211-S.-2021.pdf
ENCLOSURE-NO.1-TO-DM-SGOD-NO.-211-S.-2021.pdf
 
Blog budget presentation
Blog budget presentationBlog budget presentation
Blog budget presentation
 
Sch bd rec fy18
Sch bd rec   fy18Sch bd rec   fy18
Sch bd rec fy18
 
Superintendent's Weekly Review - St. John, Florida
Superintendent's Weekly Review - St. John, FloridaSuperintendent's Weekly Review - St. John, Florida
Superintendent's Weekly Review - St. John, Florida
 
2014.2015. Final Education Budget 3.1%
2014.2015. Final Education Budget 3.1%2014.2015. Final Education Budget 3.1%
2014.2015. Final Education Budget 3.1%
 
The Lighthouse Club in Manila 2014 charity report
The Lighthouse Club in Manila 2014 charity reportThe Lighthouse Club in Manila 2014 charity report
The Lighthouse Club in Manila 2014 charity report
 
Sta. Rita Elementary School - School Flyer FY 2013
Sta. Rita Elementary School - School Flyer FY 2013Sta. Rita Elementary School - School Flyer FY 2013
Sta. Rita Elementary School - School Flyer FY 2013
 

More from Rophelee Saladaga

Catholic Faith Defender "namatay inyong dios"
Catholic Faith Defender "namatay inyong dios"Catholic Faith Defender "namatay inyong dios"
Catholic Faith Defender "namatay inyong dios"Rophelee Saladaga
 
Cfd contradiction "Cielbert A. Dondoyano
Cfd contradiction "Cielbert A. DondoyanoCfd contradiction "Cielbert A. Dondoyano
Cfd contradiction "Cielbert A. DondoyanoRophelee Saladaga
 
Cfd December 25, hindi sigurado naku po.
Cfd December 25, hindi sigurado naku po.Cfd December 25, hindi sigurado naku po.
Cfd December 25, hindi sigurado naku po.Rophelee Saladaga
 
Form 6-leave-application-form
Form 6-leave-application-formForm 6-leave-application-form
Form 6-leave-application-formRophelee Saladaga
 
Lesson plan multiplication g.3
Lesson plan multiplication g.3Lesson plan multiplication g.3
Lesson plan multiplication g.3Rophelee Saladaga
 
Lesson plan math 6 -word problems on 4 operations
Lesson plan math  6 -word problems on 4 operationsLesson plan math  6 -word problems on 4 operations
Lesson plan math 6 -word problems on 4 operationsRophelee Saladaga
 
Lesson plan math 6 -hindu arabic - roman
Lesson plan math  6 -hindu arabic - romanLesson plan math  6 -hindu arabic - roman
Lesson plan math 6 -hindu arabic - romanRophelee Saladaga
 
Lesson plan hks 6 -palatandaan ng kaunlaran sa pulitika
Lesson plan hks 6 -palatandaan ng kaunlaran sa pulitikaLesson plan hks 6 -palatandaan ng kaunlaran sa pulitika
Lesson plan hks 6 -palatandaan ng kaunlaran sa pulitikaRophelee Saladaga
 
Lesson plan hks 6 -kahalagahan ng edukasyon at kalusugan
Lesson plan hks 6 -kahalagahan ng edukasyon at kalusuganLesson plan hks 6 -kahalagahan ng edukasyon at kalusugan
Lesson plan hks 6 -kahalagahan ng edukasyon at kalusuganRophelee Saladaga
 

More from Rophelee Saladaga (20)

Dugo, dinuguan
Dugo, dinuguanDugo, dinuguan
Dugo, dinuguan
 
Namatay ang dios
Namatay ang diosNamatay ang dios
Namatay ang dios
 
Suhol sa pari, misa
Suhol sa pari, misaSuhol sa pari, misa
Suhol sa pari, misa
 
Catholic Faith Defender "namatay inyong dios"
Catholic Faith Defender "namatay inyong dios"Catholic Faith Defender "namatay inyong dios"
Catholic Faith Defender "namatay inyong dios"
 
CFDestroyer
CFDestroyerCFDestroyer
CFDestroyer
 
Cfd contradiction "Cielbert A. Dondoyano
Cfd contradiction "Cielbert A. DondoyanoCfd contradiction "Cielbert A. Dondoyano
Cfd contradiction "Cielbert A. Dondoyano
 
Cfd December 25, hindi sigurado naku po.
Cfd December 25, hindi sigurado naku po.Cfd December 25, hindi sigurado naku po.
Cfd December 25, hindi sigurado naku po.
 
Ang pagkakaisa
Ang pagkakaisaAng pagkakaisa
Ang pagkakaisa
 
Letter double pay
Letter double payLetter double pay
Letter double pay
 
Form 6-leave-application-form
Form 6-leave-application-formForm 6-leave-application-form
Form 6-leave-application-form
 
Daily Lesson log
Daily Lesson logDaily Lesson log
Daily Lesson log
 
Clearance gao
Clearance gaoClearance gao
Clearance gao
 
Nat reviewer
Nat reviewerNat reviewer
Nat reviewer
 
Pagkain ng Dinuguan
Pagkain ng DinuguanPagkain ng Dinuguan
Pagkain ng Dinuguan
 
Lesson plan science kinder
Lesson plan science kinderLesson plan science kinder
Lesson plan science kinder
 
Lesson plan multiplication g.3
Lesson plan multiplication g.3Lesson plan multiplication g.3
Lesson plan multiplication g.3
 
Lesson plan math 6 -word problems on 4 operations
Lesson plan math  6 -word problems on 4 operationsLesson plan math  6 -word problems on 4 operations
Lesson plan math 6 -word problems on 4 operations
 
Lesson plan math 6 -hindu arabic - roman
Lesson plan math  6 -hindu arabic - romanLesson plan math  6 -hindu arabic - roman
Lesson plan math 6 -hindu arabic - roman
 
Lesson plan hks 6 -palatandaan ng kaunlaran sa pulitika
Lesson plan hks 6 -palatandaan ng kaunlaran sa pulitikaLesson plan hks 6 -palatandaan ng kaunlaran sa pulitika
Lesson plan hks 6 -palatandaan ng kaunlaran sa pulitika
 
Lesson plan hks 6 -kahalagahan ng edukasyon at kalusugan
Lesson plan hks 6 -kahalagahan ng edukasyon at kalusuganLesson plan hks 6 -kahalagahan ng edukasyon at kalusugan
Lesson plan hks 6 -kahalagahan ng edukasyon at kalusugan
 

Recently uploaded

Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxAmita Gupta
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 

Recently uploaded (20)

Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 

Sip new guiding principles

  • 1. SCHOOL IMPROVEMENT PLAN Guiding Principles CORE VALUES  Systematic Leadership  Respectful School Children  Excellent Performance VISION By 2016, San Antonio Elementary School is an institution recognized for its good governance and well- developed individuals who are competitive in all aspects of life, morally upright and God-loving citizens. MISSION To provide quality education that is accessible to all and lays the foundation of life-long learning and services for the common good. OBJECTIVES By the end of 2016, San Antonio Elementary School shall have met the following objectives: 1. Responded to the pupils’ need in acquiring increased mastery level of skills and learning competencies in all tool subjects and basic information technology knowledge in the intermediate levels. 2. Increased NAT-MPS ratings in all core subjects. 3. Given due recognition to teachers, pupils and stakeholders who are instrumental to the realization of school’s aspirations.
  • 2. SCHOOL IMPROVEMENT PLAN SCHOOL PROFILE San Antonio Elementary School is located in Barangay San Antonio which is under the fast-improving municipality of Manukan, Zamboanga del Norte. The school offers free education ranging from Kindergarten, Grade I to Grade 6 levels of elementary education. Its teaching staff is composed of 10 regular permanent teachers: five (5) are Teacher I, one (1) Teacher II, three (3) Teacher III and one (1) Master Teacher. Mrs. LORDJETA P. LADEZA (ESHT – II) is a Head Teacher who has been in such position for three years already and a MAED Graduate in Misamis University Ozamiz City. All San Antonio teachers are graduates of Bachelor’s Degree in Elementary Education (BEED or BSEED). One of them is a MAED graduate, three (3) have Completed Academic Requirements for MAED, while the rest have their masteral units in relevant graduate courses. Hence, all of them are certified professional teachers who are capable to teach according to the national standards. (See Table 1 below) Table 1. TEACHERS’ PROFILE Teachers Sex Birth date Grade Level Educ’l Qualifi cation Position MA/ Ed. D. CS Eligibility Civil Service Status Length of Service Hasmin T. Ajo F 12/01/84 I-A BEED T-I 9 LET Reg/perm 1 Daleth B. Dondoyano F 10/20/86 I-B BEED T-I 9 LET Reg/perm 2 Norma P. Vallecer F 04/03/71 II-A BSEED T-III CAR PBET Reg/perm 18 Maria Corazon R. F 04/09/68 II-B BSEED T-III CAR PBET Reg/perm 20 Magsayo Marcelina M. Manuales F 06/06/64 III-A BSEED T-II 30 LET Reg/perm 17 Lelibeth E. Ruiz F 05/08/80 III-B BEED T-I MAED PBET Reg/perm 2 Helen A. Langamin F 01/11/79 IV BEED T-I 9 LET Reg/perm 10 Jacinto M. Labucay M 08/17/59 V BSAED T-III 27 PBET Reg/perm 28 Gondelina S. Velasco F 03/28/57 VI BSIE MT- II CAR PBET Reg/perm 31 Nora B. Vallecer F 06/14/82 KT BSEED T-I ECE LET Reg/perm 2 Lordjeta P. Ladeza F 08/05/64 SH BSAED ESHT- II MAED LET Reg/perm 18 The school has 4 buildings comprising of 10 classrooms accommodated in by the Kindergarten class as well as the Grade I to VI classes. Each classroom, excluding the Grade III-B has its own comfort room with top water supply available of the school populace. The school has three (3) buildings before comprising of eight (8) classrooms. Due to the increased of enrolment, one (1) school building, two (2) classrooms newly constructed and completed last January 2013. Before the newly building constructed there was leveling of the school site, eight hundred (800) liters crude oil worth forty thousand eight hundred pesos (P 40, 800.00) solicited from the supportive Barangay officials, PTA and stakeholders. The school has temporary semi-concrete outdoor stage that needs repair. The front, back, right and left side of the school has no fence. Such problem is primarily cause by the school financial shortage.
  • 3. SCHOOL IMPROVEMENT PLAN These numerous improvements in all classrooms, the making of comfort rooms which are functional for the pupils, the construction of other tangible projects such as mini-parks or learning parks, Math parks as seen within the school vicinity, are just part and parcel of the realization of the unified goals of the internal and external stakeholders in providing a conducive learning environment for the children. Currently the school has twenty five (25) desks, one hundred twenty five (125) armchairs, ten (10) tables and sixty (60) chairs. Each classroom has an electrical connection, although some bulbs were not maintained. Thus, there is considerable shortage of lighting facilities such as fluorescent lamps to illuminate the rooms especially during bad weathers. Added to this problem, is the inadequacy of electrical wiring connections and the main switch or circuit breakers. Such problem is primarily caused by the school’s financial shortage. As regards the Grade VI National Achievement Test (NAT) for the current school (2012- 2013), the following figures indicated and found in Table 2 are significantly low as compared with the previous two (2) years’ results. A significant leap of ratings was shown in the first 2- year data. However, the most recent year showed a decrease. (Please refer to Table 2). Table 2. Comparative National Achievement MPS Test Results of Grade VI by Subject Area 90 80 70 60 50 40 30 20 10 0 3 - YEAR COMPARATIVE NAT - MPS Ratings SY 2010-2011 (80.96) SY 2011-2012 (78.19) SY 2012-2013 (54.40) 3 - YEAR COMPARATIVE NAT - MPS Ratings
  • 4. SCHOOL IMPROVEMENT PLAN Administration and supervision of the school head is regularly done at least 4 times a week using the STAR and SCOPE observation in order to improve teachers’ competencies and to promote quality education. The General PTA participation to school activities and undertakings is rated 88% while Homeroom PTA participation is rated at 85%. During Brigada Eskwela maximum participation rate 85% has been constantly attained. Community Profile Brief history: Barangay San Antonio is suited in the northeast portion of Manukan Municipality, along the national highway going to Manukan Municipality, with a land area of __________ square kilometers. San Antonio emerged from an uncertain legend, as the origin of its name before was Lipras, is the Sitio of Villaramos. It was name San Antonio in the honor of their denoted Saint San Antonio de Padua. Its climatic conditions are wet and dry seasons. During the months of March and May, the place experiences the pronounced, driest of the year. The residents major source of income is farming and fishing with some derives from small business with the above average of populace are employed both in public and private sector. Their common products are corn and coconut. Some of its people are employed in fishing. Most women residents are plain housewives. Barangay San Antonio is out from typhoon except on the occasional heavy downforce of rains during rainy season which causes the drainage to over flow the low level land. The ethnicity of Barangay San Antonio populace majority is Bisaya. Only few of this number are Subanens. There are a lot religious affiliations in this locality. Nevertheless a huge fraction of them are Roman Catholics. Its distance from Poblacion is 8 kilometers and 27 kilometers to Dipolog City. San Antonio population has grown into a total of 2, 230 comprising of at least 460 families dwelling harmoniously and speaking the major dialect or mother tongue “Sinugbuanong Bisaya”. The people are hospitable, generous and the barangay officials are diligent towards their responsibility to their constituent. With regard to its economic status, farming is main source of livelihood. Internal Revenue Allotment (IRA) is P1.4 million. RPT is P3, 000.00, Business Tax is at the rate of P3, 000.00 and other miscellaneous tax is P2, 000.00. Other important details of the community profile include the following general information:
  • 5. SCHOOL IMPROVEMENT PLAN Elected and Appointed Barangay Officials Punong Barangay: Hon. Lee A. Adaza Barangay Kagawad: Hon. Jimuel P.Salvo Hon. Elvira S. Belocura Hon. Miguelito B. Vallecer Hon. Orlando D. Georpe Hon. Edgar P. Magbanua Hon. Nancy M. Gumban Hon. Melvin S. Aniñon SK Chairman: Erwin A. Dela Cruz Barangay Secretary: Elvy I. Pialago Barangay Treaasurer: Regelita G. Tampus Infrastructure Facilities Road Network: Provincial Road: 10 kilometers Concrete Road: 10 kilometers Gravel: none Transport Utilities: Public/Private Utility Jeepneys and Vans, Public Utility Public Facilities: Multipurpose Hall, Day Care Center Recreational Facilities: Covered Court, Basketball Court Water Facilities: Deep Well/ Jet Matic Pump Power and Energy Source: ZANECO Communication Facilities: SMART Communications Over the years, the municipality of Manukan has grown economically and industrially. On the contrary, Barangay San Antonio as one of its exterior barangays has not gone abreast with such improvement. Perhaps, this is an effect of the stagnancy of its business and economic status. Moreover, Manukan II District being parcel of the community of Manukan has managed to have its own source of revenue from the municipal school board. As such, it spends the equal share of annual budget allocation with the other district, Manukan I. In as far as expenditures on education is concerned, Barangay San Antonio has been responsive to the immediate needs of the school. Although it’s financial assistance is limited to security services. In addition to the resources of finance, Manukan II District budget allocation for the past years has increased in staggered manner as shown in Figure 3, the schools of Manukan II District including (San Antonio Elementary School) receives a total appropriations of Three Hundred Sixteen Thousand Five Hundred Pesos (P316, 500.00). This amount is an equal (50%) share obtained from the Municipal School Board funding allocation for SY 2013 for the two districts of DepEd, Manukan.
  • 6. SCHOOL IMPROVEMENT PLAN MUNICIPAL SCHOOL BOARD EXPENDITURE PROGRAM FOR BUDGET YEAR 2013 ( MANUKAN II DISTRICT ) 24,000 ESTIMATED INCOME BUDGET FOR FISCAL YEAR 2013 Sources: Additional One Percent (1%) Tax On Real Property = P225, 000 Add: Surplus FY 2013 = P 91, 500 Total: P 316, 500 Personal Services: Salary/wages (School Board/PARA Teachers P 125,000.00 Maintenance & Other Operating Expenses 1. Training Expenses = 20,000.00 2. Aid for Scouting/Athletic Activities = 70, 000.00 3. Acquisition/Procurement of Educational Materials = 45,000.00 4. Payment of Electrical Consumption = 6,000.00 5. Repair & Maintenance of School Buildings = 26,500.00 P167, 500.00 Capital Outlay Acquisition of Office Equipment P 24,000.00 GRAND TOTAL: P 316, 500.00 125,000 167,500 Personal Services Maintenance & Other Operating Expenses Capital Outlay
  • 7. SCHOOL IMPROVEMENT PLAN SWOT Analysis Internal Assessment External Assessment Strengths 1. Competence/ resourcefulness, positive work attitude of teachers. 2. Beautiful learning parks & well-structured classrooms. 3. Well- organized and comparative PTA officials. 4. Low performance in NAT Gr. VI 5. Punctuality and obedience of pupils. 6. Stability of SBM Grants to be used by PARDOs. Weaknesses 1. Low economic status of most parents which lead to absenteeism. 2. Dilapidated stage and no school perimeter fence. 3. Proximity/ distance of pupils’ home to two (2) other adjacent schools than San Antonio Elementary School. 4. Poor study habits of pupils and/ or PARDOs. 5. Lack of computer ICT teacher to prepare instructional modules for the pupils. 6. Open area no school perimeter fence that welcomes potential thieves/robbers. 7. Worn out/leaking pipelines that caused high cost of electric/water bills and hinders access of water supply in most classrooms. Opportunities 1. Active and supportive external stakeholders (Parents/LGU/Brgy. Officials). 2. Easy access to the local elective officials. 3. Stability of school MOOE disbursement. S- O *With concerned effort of teachers and parents & full support of barangay officials and politicians, the physical and academic aspects of the school will flourish. *With the use of SBRMS/SBM/MOOE funds, Teachers and PARDOs will be provided instructional materials and school supplies and ZERO dropouts will be maintained. W- O *Encourage stakeholders to bring in assistance for projects to be realized. *Maximize pupils’ learning with the regular use of e-Classroom instruction and hands -on activities in all subjects of all grade levels. Threats 1. Prone to flooding. 2. Prone to theft and robbery of equipments/facilities. 3. High risk of pupil gambling and cutting of classes. 4. Lack of pupil’s budget for food at home & school supplies and materials. S-T *Tap with external stakeholders to implement pending projects (fence, dilapidated stage and etc.) *Blotter in the local police station all theft incidence in school, maximize school security status thru regular monitoring and night time roving of watchman/ barangay tanod, and ensure pupils’ 100% attendance during class hours. *Sustaining enrolment rate and beautiful learning environment and competent teaching staff. W-T *Utilize the SBM/MOOE funds for the benefit of PARDOs and pupils belonging to low income generating families. *Monitoring of regular attendance of pupils that will eradicate absenteeism and raise the NAT- MPS results and prevent them in transferring to adjacent schools. *Coordinate with local/barangay officials and make constant follow-up for the speedy implementation of the fencing or drainage project that was brought into a resolution.
  • 8. SCHOOL IMPROVEMENT PLAN SCHOOL IMPROVEMENT PLAN VMOKRAPISPATRES School: San Antonio Elementary School District: MANUKAN II School I.D: 124531 Strategic and Operational Plan for Implementation Vision: By 2016, San Antonio Elementary School is an institution recognized for its good governance and well- develop individuals who are competitive in all aspects of life, morally upright and God-loving citizens Mission: To provide quality education that is accessible to all and lays the foundation of life-long learning and services for the common good. Objective: By the end of 2016, San Antonio Elementary School shall have met the following objectives: 1. ZERO dropout rate and sustain or increase the enrolment and participation rate in all grade levels 2. Responded to the pupils’ need in acquiring increased mastery level of skills and learning competencies in all tool subjects and basic information technology knowledge in the intermediate levels 3. Increased NAT-MPS rating in all core subjects 4. Given due recognition to teachers, pupils & stakeholders who are instrumental to the realization of school’s aspiration KRA Performance Indicators Strategies Program Activities Task Resources 1. To increase enrolment rate by 2% from baseline of 320 2. Maintain ZERO dropout rate 2012-2013 (actual) 2013-2014 (target) 2014-2015 (target) 2015-2016 (target) -Evaluate enrolment data and its possible causes & factors -Address to the material needs PARDOs and draw out st rong commitment from concerned parents of PARDOs -Enrolment campaign -DORP implementation -Enhance SBM implementation 1. Engage in house-to- house enrolment campaign & home visit 2. Decrease the amount of PTA donat ions 1. Allocate funds taken from the SBM grant to provide school supplies for PARDOs 2. Signing of revised MOA between School Head, PTA Officers, Teachers & PARDO parents 1. Ident ify pupils to enroll at San Antonio Elementary School 2. Call for GPTA meet ing to deliberate, discuss and amend previous rates of donations 1. Prepare budget and purchase school supplies and materials for PARDOs 2.Dist ribute materials based on the list of PARDOs 3. Part ies will sign the MOA during the PTA meeting People Physical Pesos ENROLMENT RATE: School Head, PTA Officers, Teachers School Head, PTA Officers, Teachers & Parents of PARDOs Enrolment forms, Minutes of PTA meet ing T reasurer’s report Writ ten MOA, SIP/AIP, School Supplies and materials P25,000.00 90.00% 95.00% 95.78% 96.78% DROPOUT RATE: 0% 0% 0% 0%
  • 9. SCHOOL IMPROVEMENT PLAN KRA Performance Indicator Strategies Program Activities Task Resources 3. Increase NAT-MPS in all core subjects 4. To aim at least one (1) award annually, two (2) for the school, two (2) for the teachers, and two (2) for the pupils 2012-2013 (actual) 2013-2014 (target) 2014-2015 (target) 2015-2016 (target) -Promote teaching competence of teachers -Track down pupils performance in school, community and home -Part icipate in all act ivit ies in school, dist rict , congressional, division, regional and division levels -Ut ilizat ion of remedial hours for NAT review sessions during the 4th quarter to increase pupils’ performance level -St rengthen commitment among teachers and pupils in at taining success, victory and honor for San Antonio Elementary School 1. Craft a t raining suited to the ident ified least - learned skills/competencies of pupils 2. Full implementation of remedial program 1. Review potential pupils in daily basis for at least 1 hour a day in order to excel in various academic competitions 2. Encourage teachers to extend their effort and t ime in coaching their pupils 1. Review NAT results to ident ify the gaps 2.Arrange a schedule of meet ing with parents to discuss the outcomes of the NAT-MPS 3. Assess the 3- year comparative data on NAT results to resolve the gaps 1. Acquire mult iple reviewers and updated information from various sources (internet, other schools/dist rict) 2. Give rewards to deserving pupils and teachers People Physical Pesos 54.40% 75% 80% 85% School Head, Teachers School Head, Teachers, Pupils NAT reviewers, Test Item Bank, books, internet - generated handouts, commercial NAT reviewers Cert ificates of Recognit ion/ Merit / Part icipation, t rophies or medals, monetary rewards P1, 000.00 P2, 500.00
  • 10. SCHOOL IMPROVEMENT PLAN Table 1. TEACHERS’ PROFILE Teachers Sex Birth date Grade Level Educ’l Qualifi cation Position MA/ Ed. D. CS Eligibility Civil Service Status Length of Service Hasmin T. Ajo F 12/01/84 I-A BEED T-I 9 LET Reg/perm 1 Daleth B. Dondoyano F 10/20/86 I-B BEED T-I 9 LET Reg/perm 2 Norma P. Vallecer F 04/03/71 II-A BSEED T-III CAR PBET Reg/perm 18 Maria Corazon R. F 04/09/68 II-B BSEED T-III CAR PBET Reg/perm 20 Magsayo Marcelina M. Manuales F 06/06/64 III-A BSEED T-II 30 LET Reg/perm 17 Lelibeth E. Ruiz F 05/08/80 III-B BEED T-I MAED PBET Reg/perm 2 Helen A. Langamin F 01/11/79 IV BEED T-I 9 LET Reg/perm 10 Jacinto M. Labucay M 08/17/59 V BSAED T-III 27 PBET Reg/perm 28 Gondelina S. Velasco F 03/28/57 VI BSIE MT- II CAR PBET Reg/perm 31 Nora B. Vallecer F 06/14/82 KT BSEED T-I ECE LET Reg/perm 2 Lordjeta P. Ladeza F 08/05/64 SH BSAED ESHT- II MAED LET Reg/perm 18 Based on Table 1, the working force of San Antonio Elementary School comprises of ten (10) regular permanent classroom teachers. It also includes one (1) full-fledged Head Teacher II and MAED graduate. These teachers are all graduates of Bachelor’s Degree in Elementary Education. Three (3) have completed the academic requirements (CAR) for such degree and one (1) successfully graduated as MAED while the rest have their Masteral Units in relevant graduate courses. The teacher-pupil ratio for the current school year is at 1:36---significantly lower than the National Standards which is 50 pupils per classroom. San Antonio Elementary School is near to Dohinob Elementary School and is quite accessible to the residents in the barangay. Perhaps, this has something in relation which has affected the low ratio stated above. Likewise, the neighboring barangay school, Villaramos Elementary School, has more accessibility advantage for the pupils residing within the boundaries of Villaramos creek and Dohinob. Apparently, the data shows that the ratio of teacher to pupil is lower than National Standards. However, it is expected that the enrolment will continue to increase in the succeeding years due to the full implementation of the K to 12 Education Program along with the sustainability of the Pantawid Pamilyang Pilipino Program (4Ps) and that ratio will probably change. At frequent times in the previous years, though, teachers may have allowed their pupils to stay outside of their classroom for the purpose of training them how to do tasks such as cleaning and the like. Consequently, it boiled down to the fluctuation of NAT results during the past years. However, after conducting a collaborative, rigid and comprehensive review by the teachers in all grade levels, the latest overall NAT result showed a large scale of impact to the school, as it made a huge decrease by 23.79% below the National Standards, adding the fact that
  • 11. SCHOOL IMPROVEMENT PLAN NAT MPS results in all provision of adequate, appropriate and ideal learning materials for all core subjects is even demanded from teachers in all grade levels. Pupils’ proper study habits in reading and teachers’ efficiency in teaching the core subjects complemented by the appropriate strategies for teaching reading with comprehension--- these are practically attainable. Yet it is quite difficult to be realized with scanty materials for this purpose. The teacher, therefore, needs to apply initiative measures such as utilizing vacant time in coaching or mentoring her problematic pupils in reading and providing improvised reading materials to fit their needs. Otherwise, her learners will gradually become frustrated readers at the end of the school year. Inadequacy of supply of some reference books, publications journals and other reading materials had proved to stoop down the Reading Assessment results of some pupils, regardless of how they perform in other forms of tests. For this, the school strives to eradicate the problems concerning poor reading comprehension by acquiring additional reading materials for mini library, not just limited to textbooks, manuals and workbooks but also updated versions of reading kits, suitable for various grade levels. By doing so, children’s reading experiences would contribute a positive influence on their intellect and foster to develop their love for reading. School feeding in every grade level once a week thru Gulayan sa Paaralan program is a good source of nutritious food which may be accessible for the children if and only if the School Canteen provides and vends foods of these kind and quality. Also, prohibiting the display or sale of junk foods during peak snack hours greatly aids the improvement of children’s health while they are in their learning period. Healthy foods within reach can certainly boost proper nutrition which eventually augments and sustain their good academic performance, and teaches them how to grow a healthy and longer life. In addition, the presence of a functional health facility in school enhances the aspiration of having a healthier learning environment for the school children. Low NAT – MPS Results in all Core Subjects and Reading Assessment Results Figure 2a. Effects of Physical and Ancillary Facilities on Low NAT Results in all Core Subjects and Pupils’ Reading Performance Lack of full-time Library In charge and Remedial Teacher to assist and mentor pupils & teachers Teachers’ improper use of remedial sessions Lack of supply of reference books, multi-media facilities & other reading materials in mini library
  • 12. SCHOOL IMPROVEMENT PLAN Figure 1. 3 - Year Comparative Data on NAT - MPS Results 50.28 49.16 54.68 46.4 59.84 70 60 50 40 30 20 10 0 English Science Math HEKASI Filipno 2012 - 2013 52.07 79.63 79.81 82.38 64.75 84.38 90 80 70 60 50 40 30 20 10 0 English Science Math HEKASI Filipino 2011 - 2012 78.19
  • 13. SCHOOL IMPROVEMENT PLAN 80.63 79.81 82.5 82 81.5 81 80.5 80 79.5 79 78.5 A. 1.2. Physical and Ancillary Services 81.61 The lack of instructional facilities that solely serve for the purpose of delivering quality results needs immediate attention to expedite its implementation. Of course, with an ample furnishing of apparatus, equipments and tools could certainly help carry out a positive outcome on the fields of Information Technology, Home Economics, Industrial Arts, etc. Other ancillary facilities like the Learning Resource Center or the Library, Computer Laboratory, Music Room, School Canteen and Clinic Facilities in particular are also of great value to achieve the goal of incurring an outstanding NAT Rating. Laboratory classes held in classrooms instead of an ideal computer or science room. This is quite an obstacle in delivering quality education. On the other hand, this shortcoming has been considered one of the focused issues which the SPT has been looking into the past few years. How to resolve this, still largely depends on the availability of financial resources and stakeholders’ commitment. Based on the schools’ NAT results in all core subjects, the past two years had showed significant stagnancy and stability at low rates. 79.63 82.2 78 English Science Math HEKASI Filipino 2010 - 2011 80.96
  • 14. SCHOOL IMPROVEMENT PLAN Figure 2.b. Effects of Pupils’ Health on Low NAT Results in all Core Subjects and Reading Performance A. 1. 3. Learning Materials and Equipments Textbooks play an essential and valuable component in a school’s enduring tasks to educate the children. At present, majority of public schools suffer scarcity if not lack of textbooks and San Antonio Elementary School among those. The illustration below gives valuable information on textbook-pupil ratio. On the average, the percent distribution of textbooks to all levels was 1:2 ratio and shortage of textbooks (Filipino 2 & 4, Sibika 1 & 4, and Science 3 & 6) was still a problem for Grades II & III. No textbooks in MSEP 3 – 6, EPP 4 – 6, Character Education (Kindergarten to Grade 6) available for usage by the pupils and teachers. Kinder = 1:10 Gr. I = 1:2 Gr. II = 1:2 Gr. III = 1:1 Gr. IV = 1:1 Gr. V = 1:2 Gr. VI = 1:2 ENGLISH Kinder = 1:10 Gr. I = 1:1 Gr. II = 1:2 Gr. III = 1:1 Gr. IV = 1:1 Gr. V = 1:1 Gr. VI = 1:1 MATH Kinder = 1:10 Gr. I = 0 Gr. II = 0 Gr. III = 1:2 Gr. IV = 1:1 Gr. V = 1:2 Gr. VI = 1:2 SCIENCE Kinder = 1:10 Gr. I = 1:1 Gr. II = 1:2 Gr. III = 1:2 Gr. IV = 1:2 Gr. V = 1:2 Gr. VI = 1:2 FILIPINO Kinder = 0 Gr. I = 1:2 Gr. II = 1:3 Gr. III = 1:1 Gr. IV = 1:2 Gr. V = 1:1 Gr. VI = 1:1 HEKASI Kinder = 0 Gr. I = 0 Gr. II = 0 Gr. III = 0 Gr. IV = 1:6 Gr. V = 1:3 Gr. VI = 1:10 EPP Kinder = 0 Gr. I = 1:4 Gr. II = 0 Gr. III = 0 Gr. IV = 1:6 Gr. V = 1:3 Gr. VI = 0 MSEP Kinder = 0 Gr. I = 1:12 Gr. II = 0 Gr. III = 0 Gr. IV = 0 Gr. V = 0 Gr. VI = 0 CHAR. ED. Nutritious hot lunch not regularly served to the pupils Lack of balance diet of pupils Low NAT – MPS Results in all Core Subjects & Reading Performance
  • 15. SCHOOL IMPROVEMENT PLAN A. 2. QUALITY AND RELEVANCE OF BASIC EDUCATION A. 2. 1 Pupils’ Performance NAT MPS results on the 2-year data demonstrated decreasing all core subjects, which had reduced by 29.35% compared to the year before. In other subjects though, a remarkable sprint ranged at 24.54% in Filipino, followed by leaps of 27.7% in HEKASI, 18.25% in Science and 30.65% in Mathematics. This over-all tally of MPS in NAT results manifested an exemplary improvement based on the National Standards and shown a gargantuan leap of 23.79% from the last year’s figure of 78.19%. (See Figure 3 below) Figure 3. 3 - Year Comparative Data on NAT - MPS Results 90 80 70 60 50 40 30 20 10 0 SY 2010-2011 SY 2011-2012 SY 2012-2013 A.2.2. Curriculum Implementation and Instructional Delivery ENGLISH SCIENCE MATH FILIPINO HEKASI The curriculum implementation and instruction delivery were executed with utmost concern for the last three (3) years in expectancy to get affirmative results in pupils performance. Moreover, the supervision ratio delivered by the School Head for those years suggested an average of 1:10 supervision ratio for the most recent year stays at 1:10 which implies less than the standards required by the Division Office. A thorough evaluation on the facts based on how instruction is being delivered and implemented by the teachers in each grade was gathered. Based on the conducted STAR and SCOPE observations of the School Head herself, most teachers lack the appropriate instructional materials and innovative strategies in teaching.
  • 16. SCHOOL IMPROVEMENT PLAN In some cases, there were those who were not following the desirable techniques and methods in teaching which made learning opportunities complex and difficult to grasp and be understood by the slow learner. To elaborate, these strategies should have been in consonance with latest trend in teaching, particularly addressing to the needs of the immediate learners. Certainly, one of these strategies would include the 2C2IA, CLT and the like which involve wholesome activities implemented thru diverse initiatives. This significantly influenced the stagnation of low reading performance and Phil-IRI results in at 45% of the pupils in the primary grade levels. Kindergarten, being institutionalized in its initial implementation thru the K to 12 Basic Education Curriculum, is currently in making efforts in terms of instructional delivery despite the lack and inadequacy of instructional ad learning materials given to the kindergarten Teacher Program sessions. In the K to 12 Basic Education Program, the curriculum will be decongested so as to allow mastery of learning. In fact, with the principle of using MTB-MLE (Mother-Tongue Based Multi-Lingual Education) as the medium of instruction, based on the lingua franca on the certain community or area, it will gradually enable the learners to express to the maximum their insights or feelings on each lesson in their familiar and most convenient ways. I same manner, the use of MTB-MLE in the curriculum reduces the burden of the teachers for such reason that the subjects are limited to English, Science, Mathematics, Filipino and HEKASI in their concise and brief form taking into consideration and major concern on the learning competencies to be developed. This implies that teachers master the contents and competencies to keep themselves focused on what areas should be developed. FIGURE 4. Relationship of Curriculum Implementation and Instructional Delivery with Learning Outcomes of Pupils in the Primary Grade Levels HIGH LEARNING OUTCOMES LOW LEARNING OUTCOMES TRAINED TEACHERS ON INNOVATIVE STRATEGIES IN TEACHING UTILIZATION OF ADEQUATE LEARNING MATERIALS AND EQUIPMENTS UTILIZATION OF TRADITIONAL TEACHING TECHNIQUES UNAVAILABILITY OF ADEQUATE TEACHING EQUIPMENTS AND LEARNING MATERIALS UNTRAINED TEACHERS ON INNOVATIVE STRATEGIES IN TEACHING
  • 17. SCHOOL IMPROVEMENT PLAN A. 2.3. Staff Development Teachers Sex Birth date Grade Level Educ’l Qualifi cation Position MA/ Ed. D. CS Eligibility Civil Service Status Length of Service Hasmin T. Ajo F 12/01/84 I-A BEED T-I 9 LET Reg/perm 1 Daleth B. Dondoyano F 10/20/86 I-B BEED T-I 9 LET Reg/perm 2 Norma P. Vallecer F 04/03/71 II-A BSEED T-III CAR PBET Reg/perm 18 Maria Corazon R. F 04/09/68 II-B BSEED T-III CAR PBET Reg/perm 20 Magsayo Marcelina M. Manuales F 06/06/64 III-A BSEED T-II 30 LET Reg/perm 17 Lelibeth E. Ruiz F 05/08/80 III-B BEED T-I MAED PBET Reg/perm 2 Helen A. Langamin F 01/11/79 IV BEED T-I 9 LET Reg/perm 10 Jacinto M. Labucay M 08/17/59 V BSAED T-III 27 PBET Reg/perm 28 Gondelina S. Velasco F 03/28/57 VI BSIE MT- II CAR PBET Reg/perm 31 Nora B. Vallecer F 06/14/82 KT BSEED T-I ECE LET Reg/perm 2 Lordjeta P. Ladeza F 08/05/64 SH BSAED ESHT- II MAED LET Reg/perm 18 The teaching staff of San Antonio Elementary School is manned by a full- fledged Elementary School Head Teachers II and MAED Graduate with ten (10) young and dynamic teachers who have highly qualified educational background and experience in the field. Six (6) of these teachers have units in Master Degree in Elementary Education, three (3) had completed MA academic requirements, and one (1) had successfully graduated with the degree in MAED. All teachers deployed in school are LET and PBET passers. With regard to length of service in the DepED, one (1) San Antonio Elementary School Teachers have thirty one (31) years or more work experience, two (2) have more than twenty (20) years, three (3) have more than ten (10) years and only one (1) have barely 4 years work experience. Educational qualification among San Antonio Elementary School Teachers was not a significant issue due to the fact that in the next two (2) years, 90% of this number shall have completed their graduate courses. However, most of these teachers have not yet attended Regional and National Trainings which are relevant to their respective subject/grade level assignments. This is direly needed for the development and enhancement of their skills and abilities to teach the varied learning areas. Hence, these teachers must undergo trainings/seminars/workshops with proper identification of the division.
  • 18. SCHOOL IMPROVEMENT PLAN A.3.1. School Management and Administration The school is spearheaded and led by a full- fledged Head Teacher with background in educational management. She works at least eight (8) hours a day from Mondays thru Fridays and extends working hours on Saturdays or Sunday, whenever required. Observation of classes is done as scheduled every week, stipulated in the daily time schedule for administration and supervision. Checking of lesson plans, staff meetings and other related activities are regularly done by the School Head. She regularly assists the teachers in school to facilitate teaching and learning. Sometimes she gets out of school to transact official business or submit reports in the Division Office, to attend sessions in the Barangay Council or the Sangguniang Bayan for the purpose of soliciting or requesting assistance for the implementation of school’s planned projects. At times, she coordinates with the DSWD local officers and municipal link to facilitate the Family Development Sessions (FDS) of the 4Ps program whenever needed. For the past few years, effective management and administration had been assiduously enforced in order to meet the planning standards. Recognition and commendation were given to deserving pupils who excel both in academic and non-academic competitions. Honor pupils were given certificates especially those in the “Top 10 List”. These were initiated to enthuse and motivate pupils to do better in their studies. The School Head also endorsed such method to promote teachers’ competitiveness and influence them to implement some interventions to be able to enhance pupils’ interest to perform better if not excellent. A.3.2. Parents’/Stakeholders’ Participation Parents’ Participation School Year 2010 - 2011 2011 - 2012 2012 - 2013 General PTA 85% 88% 90% Homeroom 80% 82% 85% Brigada Eskwela 82% 85% 88% Alumni Association 70% 75% 80% The General Parents Teachers’ Association (GPTA) composed of its officials, members and stakeholders serve as lone vital backbone that sustains the existence of a school. It has almost three hundred (300) active and committed parents to support the programs and activities of San Antonio Elementary School.
  • 19. SCHOOL IMPROVEMENT PLAN For the SY 2010 – 2011, a large fraction of these parents were not yet oriented on the real purpose of the so-called Brigada Eskwela and some of them even refused to give donations and settle other financial obligations to the school. However, due to extended information and constant motivation thru homeroom gatherings where teacher advisers made clear everything that has to be done for the school, the negative ideas turned into positive insights and commitment. Likewise, the School Head called for an open forum to sort our problems and complaints and eventually came up with genuine commitment and pledged dedication of the PTA officials to support every project or program that the school has to undertake in the years thereafter. In addition, the School Governing Council was organized to fully exercise their duties and responsibilities complementing the role of the PTA for steadfast improvement of the school. As per record, parent’s and stakeholder’s participation is evidently increasing. Donations for projects and equipments from external stakeholders flooded in during the most recent school year. This only shows that people are getting educated with regard to common good personal accountability for community development. Figure 5. Parents’/Stakeholders’ Participation in San Antonio Elementary School Projects and Programs school activities SY 2012 – 2013 3. 40% of solicited projects from external stakeholders has been materialized 1. GPTA meeting have 90% parents 1. GPTA meeting have 88% parents attendance 2. Alumni Association has been re-organized and actively participated in SY 2011 – 2012 SY 2010 – 2011 SY 2010 – 2011 attendance 2. Alumni Association has actively participated in school activities and donated financial support 3. 50% of solicited projects from external stakeholders has been materialized and implemented 1. GPTA meeting have 85% parents attendance 2. Alumni Association extends only 75% commitment in terms financial support to the school 3. 35% of external stakeholders and prospect donors showed possibility of sponsoring a project
  • 20. SCHOOL IMPROVEMENT PLAN A.3.3. Resource Mobilization / Public Expenditure Community involvement in the mobilization of resources is evident for the past three (3) years. Stakeholders rendered unprecedented support in every endeavor that the school had to take in realizing its goal and objectives. Lobbying for financial support was done whenever deemed necessary in carrying out DepED programs and projects. With the full implementation of School Based Management (SBM), the school takes advantage of generating more programs and activities that would cater to the needs of the school. This endeavor goes hand in hand with the full involvement of the General PTA and initiated thru lay outing and preparation of the budget in consonance with school Annual Implementation Plan (AIP), sorting out priority projects as to their need and immediacy. Recently, the school received an additional one (1) school building and two (2) classrooms from the office of the Congressman of the 2nd District, Hon. Rosendo S. Labadlabad. The aforementioned one (1) school building and two (2) classrooms is just parcel of the blessing that San Antonio Elementary School had been using for the children. Surely, more big things are coming their way in the next school year. All of these should not have been possible without the full support of the GPTA, the Barangay Captain and Councilors, the LGU and the DepED Division Office. This is one story of success that the school populace will have to cherish forever. A.3.4 Environment San Antonio Elementary School perimeter is widely opened because we don’t have fence, that is, the concreted parts are in the frontage and sides. The rear portion of the fence is not closed and still made available as pathway for residents at the back of the school buildings. As far as area is concerned, the San Antonio Elementary School is ideally a small Elementary School that can accommodate a maximum of ten (10) classes: primary and intermediate grade levels. It has grounds at the back of the school building where carabao grasses are grown for landscape which requires regular trimming. At the heart of this campus are more than ten (10) old Mahogany and five (5) Mango trees which were intentionally grown for its bearing fruits and its shade. Despite the efforts of the school populace to grow lots of flowers and cultivate vegetable gardens, near the dilapidated stage at the back of the school building. Water system is considerably convenient and available thru pipelines that were installed with the financial assistance from private and stakeholders donors. However, its maintenance and operation requires a regular financial resource from the school’s MOOE budget allocation.
  • 21. SCHOOL IMPROVEMENT PLAN A.4. SCHOOL PERFORMANCE INDICATOR KEY INDICATOR School Year 2012 – 2013 MALE FEMALE Total Rate Enrolment Rate 87% 89% 88% Participation Rate 87% 88% 87% Cohort Survival Rate 41% 58% 48% Retention Rate 79% 87% 82% Transition Rate 121% 100% 111% Repetition Rate 5% 2% 3.5% Completion Rate 41% 58% 48% Promotion Rate 100% 100% 100% Graduation Rate 100% 100% 100% Dropout Rate 0% 0% 0% Failure Rate 0% 100% 0% B. Program Indicator Data for SY 2012 – 2013 Total Rate Teacher-Pupil Ratio 320/9 1:36 Textbook-Pupil Ratio 320/1,584 1:2 Teacher’s Manual Ratio 9/29 1:1 Classroom-Class Ratio 10/10 1:1 Classroom-Pupil Ratio 320/9 1:37
  • 22. SCHOOL IMPROVEMENT PLAN EFA GOALS School: San Antonio Elementary School EFA Goals Objectively Verifiable Indicator (OVI) Means of Verification (MOV) Important Assumption 2011-2012 2012-2013 2013-2014 1. To increase school participation and totally eradicate dropout/ maintain zero dropout in the first three grades Increased enrolment in the first three grades from ____ to ____ GRADE 1: Performance Indicators Enrolment Data Form 3 57 GRADE 2: 72 GRADE 3: 65 Decreased number of PARDOs in the first three grades from 20% to 5% GRADE 1: 8 5 GRADE 2: 6 3 GRADE 3: 2 0 2. To complete the full cycle of basic education schooling with satisfactory achievement levels by all at every grade level Increase completion rate from 75% to 88% 75% 88% Increase cohort-survival rate from 75% to 80% 75% 77% 79% 3. Total community commitment of basic education competencies for all Increased number of stakeholders’ participation 75% 80% 85% Increased amount of funding from Provincial Government / LGU 70% 80% 85% SCHOOL Goals 1. Improve learner performance Increased NAT-MPS results in all core subjects baseline of 80.96% 80.96% 78.19% 82% 2. Increase participation rate Increase participation rate from 80% to 100% 87% 89% 91% Purpose Improve capacity of the School Head in managing delivery of educational services Maintain and sustain the school level practice of SBM in the Advanced Level SBM Grand Report Level 1 Level 1 Level 2 Enhance teacher’s/ instructional managers/ facilitators’ competencies Increased number of teachers demonstrating performance thru NCBTS CB-PAST Certificates from INSETs 4 6 10
  • 23. SCHOOL IMPROVEMENT PLAN Contributory Objectives Objectively Verifiable Indicator (OVI) Means of Verification (MOV) Important Assumption 2011-2012 2012-2013 2013-2014 A. Provision of Access Skilled non-teaching personnel for San Antonio Elementary School Approved appointments 1. Hire Skilled non-teaching personnel 0 0 1 2. Renovation/ major repair of outdoor stage Dilapidated outdoor stage/ rehabilitated and repaired thru SBRMS funds Certificate of Inspection; pictorial report 0 0 1 3. Increase availability of instructional and learning materials such as textbooks and manuals Requested additional textbooks and manuals thru the Division Office Acceptance report Delivery receipts 85% 90% 100% 4. Classroom repair Classroom repaired and ceiling rehabilitated Certificate of Inspection; pictorial report 0 0 1 5. Initiate interventions to arrest the instances to having PARDOs in school and maintain the ZERO dropout rate of San Antonio Elementary School PARDOs provided with supplies and materials for sustenance of education Acknowledgement receipts, proofs of purchase, duly accomplished release forms 0 0 0 6. Make instructional and learning materials & equipments available Availability of learning materials and equipments attained TEXTBOOKS Grade Baseline Forecasted Years 2012 2013 2014 I 30 49 52 II 30 41 50 III 24 34 45 IV 40 48 58 V 20 52 84 VI 33 43 52 Textbook and property inventory report obtained from school property custodian B. Quality and Relevance 1. Improve teaching and computer literacy skills of San Antonio Elementary School Teachers Seven (7) teachers attended school-based ICT training Certificate of attendance; Training design/matrix 0 0 7 2. Conduct school-based INSET for teachers Ten (10) teachers trained on least learned skills in English, Math, Science, Filipino, MSEP and HEKASI Training design, training matrix, certificate of attendance 0 0 10
  • 24. SCHOOL IMPROVEMENT PLAN Contributory Objectives Objectively Verifiable Indicator (OVI) Means of Verification (MOV) Important Assumption 2011-2012 2012-2013 2013-2014 3. Improve nutritional status of pupils Food supplement, medicines and vitamins procured and distributed FACILITY Baseline Forecasted Years 2012 2013 2014 Supplemental Feeding 30 49 52 Deworming 30 41 50 Vitamin A Capsule 24 34 45 Iron Supplements 40 48 58 Vit. C Supplements 20 52 84 a) Monitoring report b) Nutritional status report c) Clinic reports 4. Improve reading performance of pupils Intensive Reading Recovery Program and Remedial Reading sessions implemented by teachers in all grade levels Baseline Forecasted Years 2012 2013 2014 1 8 9 12 Phil-IRI and ERCAP results 5.Put up an extension room (Reading Recovery Room) Reading Recovery room provided Pictorial report 0 1 1 6. Procurement/Purchase/ Acquire modern instructional facilities and set of musical instruments Computer set with projector and set of musical instruments acquired FACILITY Baseline Forecasted Years 2012 2013 2014 Computer Set 0 0 0 Canon Printer w/ Scanner 0 0 0 Canon Printer 0 0 0 LCD Projector 0 0 0 Interactive Whiteboard 0 0 0 Bass Drums 0 0 0 Document Camera 0 0 0 Certificate of Acceptance, Delivery receipts C. School Management 1. Improve attendance rate of pupils Percentage of Attendance raised from 84% to 100% Baseline Forecasted Years 2012 2013 2014 84% 90% 92% Form 1 per Grade level; Performance Indicators 2. Maximize the attendance of parents in meetings Increase the attendance of parents from 75% to 100 % Baseline Forecasted Years 2012 2013 2014 75% 85% 90% Attendance sheets, logbook 3. Improve the attendance of stakeholders during Brigada Eskwela Increase the participation rate of parents during Brigada Eskwela Baseline Forecasted Years 2012 2013 2014 75% 85% 88% Attendance sheets 4. Improve the school grounds Sustained the cleanliness of the school grounds Baseline Forecasted Years 2012 2013 2014 80% 82% 85% Pictorial 5. Provide containers for biodegradable and non-biodegradable wastes Provided at least 8 containers for biodegradable and non-biodegradable wastes Baseline Forecasted Years 2012 2013 2014 0% 0% 0% 6. Construction of concrete perimeter fence Constructed 6 linear feet by 7 feet high concrete perimeter fence Program of works, Pictorial
  • 25. SCHOOL IMPROVEMENT PLAN 3. PHYSICAL FACILITIES & ANCILLARY SERVICES Improve physical aspect of the school  Maintain school cleanliness, sanitation at all times  Improve/Preserve the structures found in the learning parks Need functional Computer Laboratory and Construction of Comfort Room outside the school  Asked functional computer laboratory equipped with multi-media and modernized computer accessories  Find ways and means in seeking funds for the project  Solicit funds from Government and Private stakeholders group Immediate repair and renovation of outdoor stage/classroom wall/ceiling  Send letter request to concerned office for the immediate grant of the repair/renovation Construction of a Standard Home Economics building to cater the needs and practical art works of the intermediate classes, and canteen  Seek funds for the construction of a Home Economics building and school canteen as soon as possible Renovation of old cottage which was used as office of the School Head  Seek and request funds from concerned office for the renovation Need paint for 3 school building with 8 classroom for the ceiling  Bring out the problem to the SDS for immediate action on the matter Construction of additional 1 school building with 2 classrooms and school perimeter fence by phase and rip rapping in front of the school building  Joint resolution made from the school and barangay officials 4. MANPOWER SERVICES Ask for additional teacher to teach in grade IV  Bring out the problem to the Schools Division Superintendent for immediate action on the matter Request for the hiring of additional school personnel (watchman, janitor, utility worker)  Bring out the problem to the Schools Division Superintendent for immediate action on the matter SCHOOL PRIORITY IMPROVEMENT AREAS Priority Improvement Areas Suggested Interventions 1. LEARNER PERFORMANCE Increased NAT-MPS Result in all Core Subject  Promote involvement of all teaching personnel in the school during the conduct of NAT review in monthly basis  Enforce the proper implementation of the PELC in order to accomplish it at least 3 weeks before the NAT schedule Totally eradicate the PARDOs (Pupils -at-risk of Dropping out) in all grade levels  Initiate possible interventions that would arrest the incidence of dropout in all grade levels  Orient concerned parents of PARDOs on the significance of SBM and their vital role in the educational aspect of their children  Draw out parents’ commitment to arrest dropout incidence among their children thru signing the written agreement (MOA)
  • 26. SCHOOL IMPROVEMENT PLAN Priority Improvement Areas Suggested Interventions Lessen or totally eradicate frustration level in reading of pupils in the first three grade levels  Provide reading materials in the mini-library of each classroom (Grade 1-3) to boost their interest and love in reading  Require a reading recovery corner for each classroom  Encourage teachers to regularly use innovative strategies in the teaching of English (Reading) subject Improve pupils reading performance level in the Phil-IRI Results for Grades 1-6  Provide intensive program for remedial reading class hours with more focus in the primary levels of education  Encourage the intensive effort of the teachers to conduct one-on-one reading tutorials for pupils who have frustrated reading levels during the pretest  Provide sufficient reading materials that are relevant, appropriate and comprehensive for every grade level  Provide multimedia equipments / intervention/instruction that are utilized and made available to improve instruction 2. TEACHER PERFORMANCE Upgrade teachers’ competencies  Attend national/regional/division INSET, seminars and workshops to enhance teachers competencies in teaching as well as Information and Communication Technology (ICT)  Supply teachers with adequate instructional materials and devices  Intensively promote Learning Partnership Program (LPP) among San Antonio Elementary School Teachers  Encourage teachers to enroll in graduate and post-graduate studies (M.A. and Doctorate)  Conduct a school-based INSET on the teaching of core subjects (English, Science, Math) Orient teachers on the handling of PARDOs in their class  Conduct briefing/orientation on PARDOs for San Antonio Elementary School Teachers  Encourage teachers to monitor their pupils performance and keep updates of their attendance and absences, if any, with the parents during monthly Homeroom meetings  Motivate teachers to conduct home visitation for the sake of PARDOs, whenever the dire need arises
  • 27. SCHOOL IMPROVEMENT PLAN PROGRAM AND ACTION PLANS Promoting quality education to uplift the achievement rate in the local and national assessments is the focal target of San Antonio Elementary School. This goal can only be reached with the webbed efforts of the School Head, the teaching staff, the pupils, the PTA, the community and the stakeholders. For without any one these strands our desire to improve the NAT-MPS as well as the reading performance of our pupils would not be feasible. Hopefully, this aspiration will be launched successfully and achieved positive outcomes in the next three to five years. However, aiming for that high mark can only be fulfilled considering some factors that would intervene in the process of accomplishing it. Our first main focus is on how to maintain, sustain the consistency of academic performance of our pupils, not only in the NAT, but also in reading. Although there has been a significant increase manifested in most of the learning areas in the NAT, there is still a need to improve the MPS in all core subject. Perhaps, there is a relevant connection between the reading performances of the sixth graders with their performance. Poor reading performance, if not addressed promptly and properly, will have a great impact in the succeeding years. This is the reason why we choose to prioritize the improvement of our pupils reading performance. Among the initiatives stipulated are: providing intensive remedial reading class/ reading recovery program in the first three grade levels of elementary education. A considerable effect that PARDOs incidence may bring pushes the alarm to involve the concerned parents in attaining a zero dropout rate San Antonio Elementary School in the next three to five years or more. By doing so, the possibility of achieving 100% participation and graduation rates will be much easier. Secondly, we encourage the teachers to upgrade their teaching competencies and professional advancement to keep themselves abreast of the growing innovations and trends in teaching which are vital to pupils’ performance in the macro-skills being developed. School-based, division, regional and national INSETs facilitate them to cope with this target. School-based Learning Partnership program (LLP) needs to be intensified and implemented by the School Head and trained mentors or learning partners for this purpose. Moreover the need to conduct a school-based ICT training is given more emphasis in the next school year in order to maximize teachers’ competency in basic computer knowledge and skills. For teacher’s professional advancement, they are also encouraged to pursue and finish their graduate and/ or post-graduate studies to further improve their professional qualifications and competencies. Thirdly, we aim to provide the schoolchildren with a clean, conducive and safe learning environment. This goal can be attained by improving the physical showcase of the school. The presence of learning parks can be influential to their learning outcomes which therefore connoted
  • 28. SCHOOL IMPROVEMENT PLAN that there is always a need to preserve, maintain or even enhance these structures. It is also necessary to construct additional facilities like functional Science Laboratory, Health Facility, Learning Resource Center, standard Home Economics building, Industrial Arts building and other edifices to cater the pupils’ need for optimum and lifelong learning convenience and higher learning outcomes. Added to these, the School Head has to discover ways and means to have additional teachers and non-teaching personnel, library in charge who is ready to extend a helping hand for the improvement of the pupils’ basic computer skills and reading performance. Likewise, hiring additional school personnel to serve as watchman/utility worker janitor would bring forth better outcomes in relation to the school’s physical plant and ancillary services. Finally, there should be efficient management of the school I accordance with the standards set by the National Office to perfectly meet the school’s objectives. There has to be regular monitoring and close supervision of classes and full time implementation of remedial reading instruction (reading recovery program) to totally eradicate the frustration level of the pupils in the first three grade levels. Community involvement hastens the development of good rapport among parents in the neighborhood. Aside from this, financial concerns play an integral part in the triumphant realization of this School Improvement Plan. Hence, all individuals involved in this plan are part and parcel of this success. Honestly, the school is financially incapacitated and unstable to carry out this plan: its realization definitely lies on the solid support from external sources, that is, the stakeholders. The best option to take is to present this plan to all concerned stakeholders with hopeful expectation that they would be able to share and tap other agencies in order to make this huge dream a reality for San Antonio Elementary School. MONITORING AND EVALUATION PLAN This School Improvement Plan (SIP) is determined to deliver better learning atmosphere. The application of diverse schemes that aims for such purpose will be closely monitored and scrupulously evaluated whether this plans really ensemble the present needs of the learners and at the same time meets the standards set out. Methodical and systematic monitoring on this SIP shall be observed specifically on a regular basis. There shall be proper documentation in every monitoring activity made. Testimonies of pupils, parents and stakeholders shall be properly verified to check the validity of its outcomes. Evaluation of each application shall be demonstrated and noted. A timely updated
  • 29. SCHOOL IMPROVEMENT PLAN profile is of great assistance so as to facilitate the appraisal of the desired plan. In such manner, the need to enhance and modify this SIP in the future will be worth the sweat and the cost. A disciplined monitoring and evaluation plan eventually bring about affirmative results, and therefore reduces wastage of funds, time and effort. ANNEXES  School Report Card  Data Interpretation Template  School Operating Budget  Annual Implementation Plan  3-Year Work And Financial Plan  Monitoring And Evaluation Plan  Stream Diagnostic Chart DATA INTERPRETATION CHART A B Area C Interpretation PROVISION OF ACCESS Personnel The teaching personnel of San Antonio Elementary School needs one (1) additional teacher, specifically for Grade VI Needs one (1) utility worker to do multi-tasked functions for the school’s security and ground maintenance The latest teacher-pupil ratio meets the national standard Physical and ancillary Services Classroom furniture, desks, tables and chairs are not enough for pupils sand teachers Needs a standard computer laboratory, HE building, Industrial Arts building and permanent Grade 6 classroom Needs school perimeter fence and main gate is needed Learning Materials and Services The shortage of textbooks is not yet resolved Generally, learning equipments and facilities for the last three did not meet the DepED’s national standards The necessity to have a functional health facility, school canteen and LRC is deemed a priority
  • 30. SCHOOL IMPROVEMENT PLAN A B Area C Interpretation QUALITY AND RELEVANCE OF BASIC EDUCATION Learner Performance The learner performance for the past three (3) years showed fluctuation, perhaps due to the diversion of attention in giving emphasis to least mastered competencies in English, Math, Science, HEKASI and Filipino The latest NAT results showed better outcome compared to the previous year’s Curriculum Implementation/Instructional Delivery Teacher’s portfolio needs updating; the use of PELC is strictly directed by the School Head for the teachers The latest NAT results showed better outcome compared to the previous year’s Classroom observation and supervision needs upgrading and schedule improvement with the use of STAR and SCOPE that are in consonance with the NCBTS Reading Recovery Program to be initiated in the succeeding years to ensure zero non-reader Staff Development The School Head of San Antonio Elementary School needs to enhance professional qualification such as passing the NEAP or completing her MA degree Only one (1) teacher has completed MAED degree, mostly have 18 to 32 MAED units; a few have not yet enrolled in graduate courses SCHOOL MANAGEMENT OF EDUCATIONAL SERVICES Management and Administration Time for follow-up of projects and requests made for the stakeholders need proper scheduling so as not to overlap with the daily and weekly administrative and supervisory program Stakeholders’ Participation Involvement and commitment from stakeholders is maximized thru material donations and financial assistance More donors from the LGU and NGOs are expected to be accounted for in the next school year Brigada Eskwela implementation needs optimum monitoring and intensive advocacy Instructional Supervision The School Head needs more time to be allotted for observation/supervision of classes
  • 31. SCHOOL IMPROVEMENT PLAN A B Area C Interpretation Public Expenditure The external stakeholders show much amount or donations by providing/allocating budget for the rehabilitation/repair of school buildings and amenities Environment There has been few reports of theft/robbery during the last two years Only one (1) incident of teacher-pupil, teacher-parent for the previous year OTHERS Reconstruction of dilapidated stage, repair of ceiling and completion of school perimeter fence Damaged concrete fence and gate shutters due to typhoon needs immediate rehabilitation to avoid more problems in the future The sides and rear part of the school needs complete fencing to avoid incidence of theft/robbery and destruction of school properties Procurement of at least 4 waste containers (biodegradable/non-biodegradable) Temporary garbage pits has been filled out, thus resulted to improper waste disposal There is a dire need for waste segregation to ensure that garbage are kept and cleanliness around the school premises is maintained
  • 32. SCHOOL IMPROVEMENT PLAN 3 – YEAR WORK AND FINANCIAL PLAN SAN ANTONIO ELEMENTARY SCHOOL Fiscal Year 2013 – 2016 PRIORITY IMPROVEMENT AREAS OBJECTIVES PROGRAMS, PROJECTS, ACTIVITIES RESOURCE REQUIREMENTS TIMELINE AMOUNT AND TARGET SOURCES OF FUNDS YEAR 1 (2013) YEAR 2 (2014) YEAR 3 (2015) MOOE SBM GRANT LGU SBRMS PTA DEPED OTHERS A. Provision of Equi table Access To repair and repaint classroom building Request the SDS of Zamboanga del Norte Division to provide funding allocat ion for repair P 50, 000 1 1 1 50,000 To employ the availability of inst ruct ional/ learning materials Request more textbooks from the Division Office to at tain (100%) or 1:1 Textbook-pupil ratio Division Supply Office 1 1 1 9,200 Procure instructional materials to be used by teachers in their daily classroom activities MOOE 1 1 1 26,572.75 6,272.66 B. Quality and Relevance of Basic Education To improve teaching skills and competencies of teachers At tend division, regional and other relevant t rainings seminars for professional growth; at tend GAD Training MOOE 1 1 1 1,500 3,000 3,000 Conduct in-service t raining on least learned areas to at tain consistently increasing NAT results thru the ut ilization of funds from SBM Grant SBM Grant 1 1 6,300 6,300 Procure t raining supplies and materials to be ut ilized during the conduct of school-based INSET for least -learned skills in all core subjects SBM Grant 1 1 1 37,400 Allocate budget for t ransportation, meals/snacks of trainers and teacher participants SBM Grant 1 1 1 12,500 12,500 12,500 Allocate budget for meals/snacks of parents and teachers of PARDOs during the follow-up orientation SBM Grant 1 7,750
  • 33. SCHOOL IMPROVEMENT PLAN PRIORITY IMPROVEMENT AREAS OBJECTIVES PROGRAMS, PROJECTS, ACTIVITIES RESOURCE REQUIREMENTS TIMELINE AMOUNT AND TARGET SOURCES OF FUNDS YEAR 1 (2013) YEAR 2 (2014) YEAR 3 (2015) MOOE SBM GRANT LGU SBRMS PTA DEPED OTHERS To conduct school-based ICT t raining for teachers Prepare training matrix and design, budgetary layout for the activity SBM Grant 1 1 1 2,500 2,500 2,500 Allocate budget for hands-on ICT t raining materials t ransportation/meals & snacks of t rainers & teacher participants MOOE/ SBM Grant 1 1 15,000 20,000 Improve the school’s basic services to its clientele Allocate budget for print ing, reproduction and binding of handouts for the ICT t raining manual, cert ificates and forms SBM Grant 1 1 1 3,000 3,000 3,000 Allocate budget for miscellaneous expenses for the school in the processing of SBM Grant /MOOE/SBRMS liquidat ion as reflected in the School Operating Budget MOOE 1 1 1 4,813 Improvement of inst ruct ion thru the use of mult imedia and IT equipments Request Division Office for elect rical paraphernalia for the e-classroom Request the SDS Division to allocate funding for elect rical paraphernalia for installat ion in the computer laboratory and submit program of work for the project DepED Division Office 1 1 1 13,000 Implementation of DORP Sustain zero dropout and eradicate PARDO cases thru DORP implementation Provide school supplies and ID to PARDOs from Kindergarten to Grade VI classes SBM Grant 1 1 1 25,500 25,500 25,500 To improve the Nut ritional Status of below normal pupils Supplementary Feeding Program to be sponsored by stakeholders, SBM Grant and the use of Gulayan sa Paaralan in the parents’ preparation of daily hot lunch External st akeholders’ donat ions 1 1 1 9,000
  • 34. SCHOOL IMPROVEMENT PLAN PRIORITY IMPROVEMENT AREAS OBJECTIVES PROGRAMS, PROJECTS, ACTIVITIES RESOURCE REQUIREMENTS TIMELINE AMOUNT AND TARGET SOURCES OF FUNDS YEAR 1 (2013) YEAR 2 (2014) YEAR 3 (2015) MOOE SBM GRANT LGU SBRMS PTA DEPED OTHERS C. School Management To maintain school plant’s cleanliness and availability of manual equipments/fa cilit ies/janitori al and security services Allocate enough budget for paint ing of the school building MOOE/PTA fund/External stakeholders 1 1 1 3,000 3,000 3,000 1,500 Allocate funds for payment of elect rical billings of the whole year MOOE 1 1 1 5,500 5,500 5,500 2,000 2,000 2,000 Allocate funds for salary payment of watchman/security during schooldays, Saturdays and Sundays MOOE 1 1 7,500 7,500 To construct School Head Office and Comfort Room School Head requests LGU for funding of materials, internal and external stakeholders to provide for the labor and painting expenses LGU/PTA/ External stakeholders 1 1 1 30,000 5,000 10,000 To construct the concrete school perimeter fence and school building Submit a resolut ion request ing Provincial Government through SP members for funding allocat ion for the concrete school perimeter fence and addit ional 1 school building and 2 classrooms Provincial Government 1 1 1 500,000 500,000 To improve t he school’s physical appearance Request the parents and stakeholders for 100% part icipation during the Brigada Eskwela through the teachers/class advisers from Kindergarten to Grade VI for the project implementation : extreme makeover of ground landscaping and replacement of old plants and repair of benches and pathways Solicit funds from stakeholders for the repaint ing of learning parks and other st ructures Internal and External Stakeholders 1 1 1 5,000
  • 35. SCHOOL IMPROVEMENT PLAN PRIORITY IMPROVEMENT AREAS OBJECTIVES PROGRAMS, PROJECTS, ACTIVITIES RESOURCE REQUIREMENTS TIMELINE AMOUNT AND TARGET SOURCES OF FUNDS YEAR 1 (2013) YEAR 2 (2014) YEAR 3 (2015) MOOE SBM GRANT LGU SBRMS PTA DEPED OTHERS Implement WOW Program thru proper waste segregat ion by making a painted compost pit for each grade level Internal and External Stakeholders 1 1 1 1,500 To repair and repaint 3 school buildings with 8 classrooms for the ceiling Ut ilize the school MOOE for repainting of ceiling MOOE 1 1 1 3,000 3,000 3,000 46,000 1,000 Prepared by: LORDJETA P. LADEZA ESHT – II Recommending Approval: ERVIE A. ACAYLAR DR. JULIET J. VELASCO Division SBM Coordinator SBM Coordinator, 2nd Congressional District APPROVED: DR. LILIA E. ABELLO Assistant Schools Division Superintendent SBM In – Charge
  • 36. SCHOOL IMPROVEMENT PLAN ANNUAL IMPLEMENTATION PLAN SAN ANTONIO ELEMENTARY SCHOOL Fi scal Year 2013 A B C D E F PRIORITY IMPROVEMENT AREAS OBJECTIVES PROGRAMS, PROJECTS, ACTIVITIES RESOURCE REQUIREMENT TIME FRAME SOURCES AND AMOUNT OF FUNDS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MOOE SBM GRANT SBRMS LGU PTA DEPED OTHERS Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec A. Provision of Equi table Access To repair and repaint classroom building Request the SDS Zamboanga del Norte Division to provide funding allocat ion for its major repair/repainting 3 0,000 50,000 To employ the availability of inst ruct ional/ learning materials Request more textbooks from the Division Office to at tain 1:1 Textbook-pupil rat io (100%) 8,000 8,000 8,000 Procure inst ruct ional materials to be used by teachers in their daily classroom act ivit ies 5,500 5,500 5,500 5,500 2 2,000 B. Quality and Relevance of Basic Education To improve teaching skills and competencies of teachers At tend division, regional and other relevant t rainings and seminars for professional growth 2,500 2,500 Conduct in-service t raining on least learned areas to at tain consistently increasing NAT results thru the ut ilizat ion of funds from SBM Grant 5,500 5,500
  • 37. SCHOOL IMPROVEMENT PLAN A B C D E F PRIORITY IMPROVEMENT AREAS OBJECTIVES PROGRAMS, PROJECTS, ACTIVITIES RESOURCE REQUIREMENT TIME FRAME SOURCES AND AMOUNT OF FUNDS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MOOE SBM GRANT SBRMS LGU PTA DEPED OTHERS Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Procure t raining supplies and materials to be ut ilized during the conduct of school-based INSET in all core subjects 2 0,000 20,000 Allocate budget for t ransportation, meals/snacks of t rainers and teacher part icipants 2,000 2,000 To conduct school-based ICT t raining for teachers Allocate budget for ICT t raining materials, t ransportation/m eals/snacks of t rainers and teacher part icipants 3,000 3,000 Allocate budget for meals/snacks of parents and teachers of PARDOs during the follow-up orientation 5,000 5,000 Improve the school’s basic services to its clientele Allocate budget for printing, reproduct ion and binding of handouts for the ICT t raining manual, cert ificates and forms 5,000 5,000
  • 38. SCHOOL IMPROVEMENT PLAN A B C D E F PRIORITY IMPROVEMENT AREAS OBJECTIVES PROGRAMS, PROJECTS, ACTIVITIES RESOURCE REQUIREMENT TIME FRAME SOURCES AND AMOUNT OF FUNDS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MOOE SBM GRANT SBRMS LGU PTA DEPED OTHERS Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Allocate budget for miscellaneous expenses for the school in the processing of SBM Grant /MOOE/SB RMS/ liquidat ion as reflected in the School Operat ing Budget 4,813 4,813 Implementation of DORP Sustain zero dropout and eradicate PARDO cases thru DORP implementation Provide school supplies and ID to PARDOs from Kindergarten to Grade VI classes 15,000 To improve the Nut rit ional Status of below normal pupils Supplementary Feeding Program to be sponsored by stakeholders, SBM Grant and the use of Gulayan sa Paaralan in the parent s’ preparation of daily hot lunch 3,000 3,000 3,000 9,000 Improvement of instruction thru the use of multimedia and IT equipments To request for adequate number of computer sets and accessories, LCD Projector and printer to maximize inst ruct ional and learning experiences of both teachers and pupils Request the Local Government Unit thru the Municipal Mayor’s Office and the Municipal Engineering Office to inspect and install appropriate elect rical wirings for the computer laboratory 1 3,000 1 3,000
  • 39. SCHOOL IMPROVEMENT PLAN A B C D E F PRIORITY IMPROVEMENT AREAS OBJECTIVES PROGRAMS, PROJECTS, ACTIVITIES RESOURCE REQUIREMENT TIME FRAME SOURCES AND AMOUNT OF FUNDS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MOOE SBM GRANT SBRMS LGU PTA DEPED OTHERS Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec C. School Management To maintain school plant’s cleanliness and availability of manual equipments/facili t ies/janitorial and security services Renovate and repair of an outdoor stage 2 0,000 15,000 5,000 Allocate enough budget for rip rapping in front of the school building 2 0,000 5,000 1 5,000 Allocate funds for payment of elect rical billings of the whole year 926.30 1,437.73 2,364.0 3 5,500 Allocate funds for salary payment of watchman/securi ty during schooldays, Saturdays and Sundays 3,500 To improve the school’s physical appearance Request the parents and stakeholders for 100% part icipation during the Brigada Eskwela thru all the class advisers for the ext reme makeover of ground landscaping and replacement of old plants and repair of benches and pathways
  • 40. SCHOOL IMPROVEMENT PLAN A B C D E F PRIORITY IMPROVEMENT AREAS OBJECTIVES PROGRAMS, PROJECTS, ACTIVITIES RESOURCE REQUIREMENT TIME FRAME SOURCES AND AMOUNT OF FUNDS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 MOOE SBM GRANT SBRMS LGU PTA DEPED OTHERS Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Solicit funds from stakeholders for the repainting of learning parks and other st ructures 5,000 5,000 Implement WOW Program thru proper waste segregat ion by making a painted compost pit for each grade level 1,500 Ut ilize the school MOOE for the repair and installat ion and repaint ing of school building 3,000 1,000 Prepared by: LORDJETA P. LADEZA ESHT – II Recommending Approval: ERVIE A. ACAYLAR DR. JULIET J. VELASCO Division SBM Coordinator SBM Coordinator, 2nd Congressional District APPROVED: DR. LILIA E. ABELLO Assistant Schools Division Superintendent SBM In – Charge