SlideShare a Scribd company logo
1 of 1
Rohit Tilekar
1228 California Ave #B205  Kalamazoo, Michigan 49006  Phone: 269-271-6090  tilekar25@gmail.com
Objective
Dedicated and motivated Construction Engineering & Project Management graduate seeking entry level position as a
stepping stone to become a highly skilled Project manager of the company.
Education
 Master’s OfScience (MS) in Construction Engineering & Project Management GPA – 3.22
Western Michigan University, Anticipated Graduation Date - April 2016
(Construction Courses:Design, Analysis Construction Operations, Civil systems analysis, Sensing & Modeling
Construction Management, Construction project control, Risk Management in Construction, Civil Infrastructure
Management & Spatial Analysis and Design Of Construction Systems.)
 Bachelor’s OfScience (BS) in Civil Engineering – Merit standing. GPA – 3.75
University of Pune, Maharashtra,India July 2012
Work Experience
Nucon Builders
Pune, India Site Engineer – Residential & Commercial Buildings July-11 to July 13
 AutoCAD - Drafting, editing RCC plans and Architecture drawings obtained from Designers.
 Site Inspection - Perform inspection of construction activities to ensure conformance with approved
designs/plans.
 Managed laborers using multitasking skills, and the knowledge of CPM type functions and completed the given
tasks achieving high quality on schedule.
 Reviewed engineering designs, drawings, blueprints, and other related engineering documents to identify
potential problems ahead of time and proactively implement solutions.
 Quantity Estimation - cement, sand, aggregates, bricks, pre-cast RCC pipes, GSB-Granular Sub Base and
excavated earthen materials quantity and also the number of laborers required for any certain activity.
 Cost Estimation – Precisely prepared an estimate for all the construction materials from calculated quantities.
 Coordinated proposed changes in design with consultants and construction manager while maintaining schedule
and budget.
 Scheduling – Conducting meeting with contractors to obtain the construction schedule for each & integrate a
final schedule.
 Quality Control – Every column, slab, footing or bedding of plain concrete went through quality check in lab
making cubes and cylinders in numbers as required.
Kaviraj Enterprises
Pune,MAH Assistant Engineer Aug 09 – July 11
 Site Survey – Precisely projecting site layout from government drawings to field.
 Plot Arrangement – Organizing the layout of plots, access,margins, lighting poles and roadway design.
 Marketing – Dealing with clients, negotiating skillfully & closing the deals.
 Paperwork – Document preparation, verification and completing the
SKILLS
1. Leadership 5. Project Management 9. AutoCAD
2. Vissim Simulation 6. Team Work 10. Presentations
3. Decision Making 7. Linear Programming Model 11. Microsoft Office
4. Oral & Written Communication 8. Mathematics

More Related Content

What's hot (19)

PALANI CV
PALANI CVPALANI CV
PALANI CV
 
Cv henry oppong
Cv henry oppongCv henry oppong
Cv henry oppong
 
Importance of Quantity Survey
Importance of Quantity SurveyImportance of Quantity Survey
Importance of Quantity Survey
 
Remon Beshai Resume
Remon Beshai  ResumeRemon Beshai  Resume
Remon Beshai Resume
 
manish resume Nov 2014
manish resume Nov 2014manish resume Nov 2014
manish resume Nov 2014
 
Aditi CV
Aditi CVAditi CV
Aditi CV
 
Resume - Prakash Patil
Resume - Prakash PatilResume - Prakash Patil
Resume - Prakash Patil
 
Curriculum Vitae (Muzzafar)
Curriculum Vitae (Muzzafar)Curriculum Vitae (Muzzafar)
Curriculum Vitae (Muzzafar)
 
Anusha
AnushaAnusha
Anusha
 
CV_Ameen
CV_AmeenCV_Ameen
CV_Ameen
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 
CV_Sudipta_2017
CV_Sudipta_2017CV_Sudipta_2017
CV_Sudipta_2017
 
Resume(1)(1) - Copy
Resume(1)(1) - CopyResume(1)(1) - Copy
Resume(1)(1) - Copy
 
Faizan's_Resume_telecom CAD
Faizan's_Resume_telecom CADFaizan's_Resume_telecom CAD
Faizan's_Resume_telecom CAD
 
Er. Anand Resume
Er. Anand ResumeEr. Anand Resume
Er. Anand Resume
 
Subhash CV Dec 2016
Subhash CV Dec 2016Subhash CV Dec 2016
Subhash CV Dec 2016
 
Noufal CV
Noufal CVNoufal CV
Noufal CV
 
RESUME 2016 YASSAR - 786
RESUME 2016  YASSAR - 786RESUME 2016  YASSAR - 786
RESUME 2016 YASSAR - 786
 
Md.Maswood C.V
Md.Maswood C.VMd.Maswood C.V
Md.Maswood C.V
 

Similar to Rohit resume (20)

Resumemanishsharma (1)
Resumemanishsharma (1)Resumemanishsharma (1)
Resumemanishsharma (1)
 
Ahmed Abu Bakr CV(1)
Ahmed Abu Bakr CV(1)Ahmed Abu Bakr CV(1)
Ahmed Abu Bakr CV(1)
 
Final Resume Syed.compressed
Final Resume Syed.compressedFinal Resume Syed.compressed
Final Resume Syed.compressed
 
MY PROFILE
MY PROFILEMY PROFILE
MY PROFILE
 
Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)Resume copy jb 2015 16(1)
Resume copy jb 2015 16(1)
 
Updated CV
Updated CVUpdated CV
Updated CV
 
C .V
C .VC .V
C .V
 
---Ajinkya-- Resume
---Ajinkya-- Resume---Ajinkya-- Resume
---Ajinkya-- Resume
 
dharma updated cv_resume.docx
dharma updated cv_resume.docxdharma updated cv_resume.docx
dharma updated cv_resume.docx
 
NEW CV (2014- DEC)
NEW CV (2014- DEC)NEW CV (2014- DEC)
NEW CV (2014- DEC)
 
Eng Shahzad Alam CV
Eng Shahzad Alam CVEng Shahzad Alam CV
Eng Shahzad Alam CV
 
SUNIL
SUNILSUNIL
SUNIL
 
Final Resume
Final ResumeFinal Resume
Final Resume
 
K. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QSK. Srinivas Rao- CV - QS
K. Srinivas Rao- CV - QS
 
Final Resume
Final ResumeFinal Resume
Final Resume
 
Final Resume
Final ResumeFinal Resume
Final Resume
 
Resume - Rizal AM
Resume - Rizal AMResume - Rizal AM
Resume - Rizal AM
 
Ready for new opportunities
Ready for new opportunities Ready for new opportunities
Ready for new opportunities
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
Ajay Resume
Ajay Resume Ajay Resume
Ajay Resume
 

Recently uploaded

Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfJNTUA
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfMadan Karki
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxRashidFaridChishti
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
Low Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s HandbookLow Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s HandbookPeterJack13
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2T.D. Shashikala
 
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Nitin Sonavane
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptamrabdallah9
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...Amil baba
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1T.D. Shashikala
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Studentskannan348865
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024EMMANUELLEFRANCEHELI
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docxrahulmanepalli02
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxMANASINANDKISHORDEOR
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashidFaiyazSheikh
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualBalamuruganV28
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...IJECEIAES
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfAshrafRagab14
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfJNTUA
 

Recently uploaded (20)

Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Low Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s HandbookLow Altitude Air Defense (LAAD) Gunner’s Handbook
Low Altitude Air Defense (LAAD) Gunner’s Handbook
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
NO1 Best Powerful Vashikaran Specialist Baba Vashikaran Specialist For Love V...
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdf
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 

Rohit resume

  • 1. Rohit Tilekar 1228 California Ave #B205  Kalamazoo, Michigan 49006  Phone: 269-271-6090  tilekar25@gmail.com Objective Dedicated and motivated Construction Engineering & Project Management graduate seeking entry level position as a stepping stone to become a highly skilled Project manager of the company. Education  Master’s OfScience (MS) in Construction Engineering & Project Management GPA – 3.22 Western Michigan University, Anticipated Graduation Date - April 2016 (Construction Courses:Design, Analysis Construction Operations, Civil systems analysis, Sensing & Modeling Construction Management, Construction project control, Risk Management in Construction, Civil Infrastructure Management & Spatial Analysis and Design Of Construction Systems.)  Bachelor’s OfScience (BS) in Civil Engineering – Merit standing. GPA – 3.75 University of Pune, Maharashtra,India July 2012 Work Experience Nucon Builders Pune, India Site Engineer – Residential & Commercial Buildings July-11 to July 13  AutoCAD - Drafting, editing RCC plans and Architecture drawings obtained from Designers.  Site Inspection - Perform inspection of construction activities to ensure conformance with approved designs/plans.  Managed laborers using multitasking skills, and the knowledge of CPM type functions and completed the given tasks achieving high quality on schedule.  Reviewed engineering designs, drawings, blueprints, and other related engineering documents to identify potential problems ahead of time and proactively implement solutions.  Quantity Estimation - cement, sand, aggregates, bricks, pre-cast RCC pipes, GSB-Granular Sub Base and excavated earthen materials quantity and also the number of laborers required for any certain activity.  Cost Estimation – Precisely prepared an estimate for all the construction materials from calculated quantities.  Coordinated proposed changes in design with consultants and construction manager while maintaining schedule and budget.  Scheduling – Conducting meeting with contractors to obtain the construction schedule for each & integrate a final schedule.  Quality Control – Every column, slab, footing or bedding of plain concrete went through quality check in lab making cubes and cylinders in numbers as required. Kaviraj Enterprises Pune,MAH Assistant Engineer Aug 09 – July 11  Site Survey – Precisely projecting site layout from government drawings to field.  Plot Arrangement – Organizing the layout of plots, access,margins, lighting poles and roadway design.  Marketing – Dealing with clients, negotiating skillfully & closing the deals.  Paperwork – Document preparation, verification and completing the SKILLS 1. Leadership 5. Project Management 9. AutoCAD 2. Vissim Simulation 6. Team Work 10. Presentations 3. Decision Making 7. Linear Programming Model 11. Microsoft Office 4. Oral & Written Communication 8. Mathematics