CREATING A DATASET FROM EXCEL IN POWER BI REPORT BUILDER
Report exchange designer
1. Report exchange designer
1. Report Exchange DesignerReport eXchange Designer is one of the module of Oracle
Applications Business Suite.It provides generally used Fixed Asset reports that you can
modify according to yourneeds using some simple forms. These reports are run as a spawned
process and notdesigned in oracle report builder. It is generally recommended to not to
design newreports using RX but you can do so following some easy steps.
2. Steps of creating reports : 1. Creating View. 2. Creating Report 3. Creating Concurrent
Program 1. Create a view with relevant data . This view should have its first column as
REQUEST_ID.
3. 2. Create RX Report :Navigate to Report eXchange Designer responsibility ->
4. Open Setup RXi form ->
5. Select New Report from Tools Menu :
6. Enter the data as shown :Application in which youwill run the report Give any name to
your report Responsibility from where you will run the report View name you created for
report
7. Select the column you want to dsiplay on report :
8. Grouping of the data :For grouping first select the column and then press + button
(Increase Level) at right side.
9. Grouping Style :You can group left or group above your data. For that change tab to Page
Setup.On this tab you can specify what information you want to display in your report
heading.
10. Summary of data :To get summarize data like (count or summation of particular
columns) press columndetails button at bottom.Note : All these setting will be stored in
default attribute set of your report as you can seein the figure below. For your report there
may be any number of attribute set withdifferent name and with different settings(like
grouping on different column, summary ondifferent column, no of columns etc.). At the time
of execution you will be asked tospecify which attribute set report you want to run on
parameter form.
11. To copy one attribute set press Copy Attribute Set Button at bottom :
12. After copying you can modify new attribute set (like grouping, summary etc.)In above
screen you are now grouping on Work Order Type instead of Asset Number andremoved 2
columns from the same report i.e. when you run report selecting defaultattribute set these 2
columns will be shown on report but not with sandeep_set.Save all your work . you are done
with report creation.
2. 13. Find report id for this report.Goto Help->Diagnistic->ExamineSelect Reports Block and
then find Report_Id field :In above screen report id is 100183 . Note it down you will enter it
in your concurrentprogram parameter.
14. 3. Create a concurrent program . Executable : FARXPBSH. You don’t need to create or
change the executable always use FARXPBSH. Screen below is just for your referenceThis
executable publish seeded reports and reports developed by you.It is a spawned process
which is C or Pro*C program.For all the reports use this executable.
15. Concurrent Program :You can give program name same as your report name.
16. Program Parameters :Create following 4 compulsory parameters and enter the data as
shown in followingscreens :
17. Enter report id that we got at the time of report creation. --- 100183 in this case.Confirm
that display checkbox is unchecked for report_id parameter.
18. Here we specified DEFAULT as default value for Attribute Set.At run time you can
choose any attribute set you defined for this report.
19. Here we specified TEXT as default value for Output format.At runtime you can choose
other options i.e.CSV – Comma Separated ValuesHTML – HTML formatTEXT – Text
FormatTAB - Tab Delimited
20. You can specify more parameters with these compulsory parameters.Suppose you want to
specify where clause for some column.For ex : Asset Number should be in given range .For
this kind of parameter you need to specify relational operator with parameter
namesurrounded by “[“ & “]”.For Ex
:[ASSET_NUMBER>=][ASSET_NUMBER<=][ASSET_NUMBER=][ASSET_NUMBER
IS LIKE ]
21. Now you are done with program creation.Assign this program to appropriate request
group of your application .Now navigate to correct responsibility (In our example DMC
Enterprise AssetManagement) and submit the request
22. Report Output :