5. WORKING DRAWINGS
Lecture 1
: C/C DIM
:OUTER/OUTER DIM
: DIAGONALS
: PEG NUMBERING
: COLUMN
NUMBERING
: CONVERT TO
BLOCK
: COLUMN OFFSET
DIM OPTIONAL
6. WORKING DRAWINGS
Lecture 1
: FOOTING LINES
: PCC LINES
: EXCAVATION LINE DOTTED
: FOOTING OFSET DIM
: FOOTING OUTER DIM
7. WORKING DRAWINGS
Lecture 1
: LAYER/LINEWEIGHT/ COLORS
: FOLLOW COL/ BEAM SCHEDULE
: HOW TO DECIDE COLUMN SIZES AS PER
SPAN
: HOW TO DECIDE BEAM SIZES AS PER
SPAN
: HOW TO DECIDE SLAB AS PER SPAN
8. : PLINTH BEAM SCHEDULE TO BE FOLLOWED
: BEAM NUMBER MARKING
: BEAM JOINTS WITHOUT COLUMNS
: CANTILEVER BEAMS
9. : BEAM NUMBER MARKING
: MARK TOILET/ STAIRCASE AREAS
: BEAM INNER/INNER DIMENSIONS
: OFFEST DIMENSIONS
10. WORKING DRAWINGS
Lecture 1
: SLAB BEAM
SCHEDULE TO BE
FOLLOWED
: BEAM NUMBER
MARKING
: BEAM JOINTS
WITHOUT COLUMNS
: CANTILEVER/ HIDDEN
BEAMS
: FACIA BEAMS
: SUNKEN SLABS/
BEAMS
11. : BEAM NUMBER MARKING
: MARK TOILET SUNK/ STAIRCASE ARE
: BEAM INNER/INNER DIMENSIONS
: CANTILEVER DIMENSIONS
: OFFSET DIMENSIONS
12. WORKING DRAWINGS
Lecture 1
: ONE STEP LESS IN UPPER
FLIGHT
: RISER NUMBERING
: LANDING BEAM MLB-1
: LOWERED OUTER PLINTH BEAM
: FOOTING SHAPE IN SECTIONS
: BEAMS/ FLOOR SLABS IN
SECTIONS
13.
14. WORKING DRAWINGS
Lecture 1
THANK YOU4 TYPES OF DIMENSION
LINES
1: DETAIL DIMENSION LINE
2: OFFSET DIMENSION LINE
3. OUTER DIMENSION LINE
4. CENTER LINE DIMENSIONS IN
BLOCK