Change Management
V.N.Bhaskar Rao
Engineering & Construction Director
Amec Foster Wheeler India Operations
Contents
► Introduction to Change Management
► Importance of Change Management
► Process to Manage Changes
► Responsibilities
► Methodology
► Conclusions
3
Change Management
Change Management is an Inevitable Project Requirement
because, any project that has ever been completed has almost
certainly had changes to it’s scope
4
Introduction
5
Change Management
What is change?
► Change is an authorized alteration to base line scope of work initiated
by any party involved in the Project
(or)
► Change is defined as any deviation from the contractually agreed
project scope, schedule or cost.
6
Change Management
Changes can be different
► Contract Changes
► Internal Changes
7
Change Management
Types
► Scope Change
► Schedule Change
► Cost change
► Interdependence change (i.e., Scope, schedule and cost changes are
interdependent and a change to one will frequently cause changes to
one or more of the others)
It is important to understand difference between a development and a
change
8
Importance
9
Change Management
Necessity
► Modern day challenges in Project Execution
► Reduced timelines from Project Feasibility study to Implementation
► Less developed Front End Packages to Detail Engineering
► Early commitments on Procurement of Materials
► Early commitments on booking Fabrication yards, site contracts
In Summary, controlled change management is necessary to meet the
final Project Objectives
10
Process
11
Change Management
Address all aspects
► The basis for a good change management system starts with the
establishment of the scope baseline.
► A good scope change control system is one that makes sure that all of the
stakeholders concerned with the change are made aware that it is being
submitted, agreed upon, processed, disapproved or approved, and
implemented.
► Change management must be careful to ensure that budgets, schedules,
performance, and documentation are all changed to reflect the change.
12
Change Management
Identification of Changes should be timely….
13
Change Management
Identification of Changes should be structured….
14
Change Management
Change Management Objective is to safeguard interests of all stake
holders….
15
Change Management
Sequence
► Identification
► Trigger events
► Formal instructions
► External Conditions
► Contract terms
► Errors/Omissions
Pre-AFD and Post AFD changes have difference in the way they are
dealt with
16
Change Management
Sequence
► Notification
► Substantiation
► Formal Raising
17
Responsibilities
18
Change Management
Responsibilities
► PM
► To Select, establish and implement an effective and appropriate system of
Change control either database or manual system for the project and to
discuss and agree with the client.
► PEM
► To Maintain change awareness in project engineering personnel and
monitor for change activity.
► Change Coordinator
► To administer the change control procedure and change control databases
where used.
19
Change Management
Responsibilities
► Functional Leads/ All Project Personnel
► To Monitor their own scope of work, identify potential changes and bring
them to the notice of their discipline group manager using change flags.
► Functional Manager/ Leader
► To review change flags raised by their group and bring valid flags to the
attention of Area Project Engineer/ Change coordinator.
► Area Project Engineers
► To accept or reject change flags raised by managers and other discipline
group leaders and to issue accepted change flags to the change
coordinator.
20
Methodology
21
Change Management
Methods of Change Control
► Review of Design Basis
► A review of key design documents shall be carried out at project outset
against the agreed technical basis
► Client Changes
► Project personnel shall bring all potential changes initiated by the client to
the attention of their PM or PEM using change flags.
22
Change Management
Methods of Change Control
Internal Changes
► Key design documents
► Project specific listing of key design documents shall be developed under
the control of PEM for change control process immediately following the
establishment of the document management system.
► Once a key design document has been issued AFD it shall be deemed
“ frozen”.
► Any subsequent proposed internal changes (excepting to incorporate
supplier/contractor data) shall be subject to formal change control using
change flags.
23
Change Management
Methods of Change Control
► Detail documents
► Internal changes to detail documents are unlikely to have significant
impact at least until the documents have been released “ AFC”. Personnel
shall however be alert to exceptional cases- ( Advance Revision notices)
► 3D CAD Model files
► Model files shall be considered to be in a state of development until agreed
comments resulting from the formal client model reviews have been
incorporated. Files shall thereafter be electronically “locked” and subject to
formal change control.
24
Change Management
Methods of Change Control
Engineering Flow Diagrams
► Engineering flow diagrams are key design documents for which the state of
development at each revision is specifically defined.
► Design growth trending
► Significant change impact may result from small cumulative changes such
as
► Growth in I/O count for instrument control systems
► Growth in Electrical load requirements
► Growth on bulk material quantities taken off
► Growth in Piping Isometric drawing count
► Growth in estimated utility consumptions.
► Reports shall be provided to the Change coordinator at least monthly
to enable an analysis of the reason for any design growth to be
performed.
25
Change Management
Methods of Change Control
Engineering Flow Diagrams
► Internal Change Review Meeting
► To reinforce the change control process, PM shall hold internal Scope
revalidation meetings on a regular basis. This meeting shall review all
issued design documents and any other means of communication where
change may result. This meeting shall call upon individuals, as necessary ,
to provide information or clarification on a issue that may result in a change
flag.
► Changes to AFC documents:
► Any proposed Internal changes to a document AFC shall only be accepted if
► The plant would otherwise constitute a health/ safety hazard
► The plant would not otherwise confirm to agreed specs.
► There is a clear and well defined financial advantage to making the change which
clearly overweighs the change impact by a significant margin.
26
Conclusion
27
Change Management
Conclusion
► Meeting Project Objectives should be priority
► Must address interests of all Key stake holders
► Trust between stake holders (Client, Contractor, Vendors,
subcontractors) is key for successful change management
► Change Management Process should be well documented and should
stand for audit trail
28
29

More Related Content

Similar to BRVillari,AmecL11.ppt

CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docxCHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
cravennichole326
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
Lisa Cooley, LEED AP
 

Similar to BRVillari,AmecL11.ppt (20)

015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
Module 3 - IDP.ppt
Module 3 - IDP.pptModule 3 - IDP.ppt
Module 3 - IDP.ppt
 
Project change request template v2.0
Project change request template v2.0Project change request template v2.0
Project change request template v2.0
 
Change control and variations
Change control and variationsChange control and variations
Change control and variations
 
Change control and variations
Change control and variationsChange control and variations
Change control and variations
 
Supply chain management in project
Supply chain management in projectSupply chain management in project
Supply chain management in project
 
Commissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover PhaseCommissioning Best Practices to Follow during the Turnover Phase
Commissioning Best Practices to Follow during the Turnover Phase
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
13 project control & closing management
13 project control & closing management13 project control & closing management
13 project control & closing management
 
Commissioning-Best-Practices
Commissioning-Best-PracticesCommissioning-Best-Practices
Commissioning-Best-Practices
 
Best Practices of Commissioning to Follow During the Turnover Phase
Best Practices of Commissioning to Follow During the Turnover PhaseBest Practices of Commissioning to Follow During the Turnover Phase
Best Practices of Commissioning to Follow During the Turnover Phase
 
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docxCHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
CHANGE MANAGEMENT PLAN TEMPLATEIntroductionStart the developme.docx
 
Software Configuration Management
Software Configuration ManagementSoftware Configuration Management
Software Configuration Management
 
5 service transition
5 service transition5 service transition
5 service transition
 
5 service transition
5 service transition5 service transition
5 service transition
 
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
 
Lecture 2.pptx
Lecture 2.pptxLecture 2.pptx
Lecture 2.pptx
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...
 
BEST-Intro-MT (1).ppt
BEST-Intro-MT (1).pptBEST-Intro-MT (1).ppt
BEST-Intro-MT (1).ppt
 

More from rajuhaveri1

SOLIDWORKS-Shortcut-keys-document.pdf
SOLIDWORKS-Shortcut-keys-document.pdfSOLIDWORKS-Shortcut-keys-document.pdf
SOLIDWORKS-Shortcut-keys-document.pdf
rajuhaveri1
 
ECR-PCR-Supplier-Training-R3.pptx
ECR-PCR-Supplier-Training-R3.pptxECR-PCR-Supplier-Training-R3.pptx
ECR-PCR-Supplier-Training-R3.pptx
rajuhaveri1
 
Change_Management (1).ppt
Change_Management (1).pptChange_Management (1).ppt
Change_Management (1).ppt
rajuhaveri1
 
types_of_moulds-split_mould.ppt
types_of_moulds-split_mould.ppttypes_of_moulds-split_mould.ppt
types_of_moulds-split_mould.ppt
rajuhaveri1
 

More from rajuhaveri1 (8)

SOLIDWORKS-Shortcut-keys-document.pdf
SOLIDWORKS-Shortcut-keys-document.pdfSOLIDWORKS-Shortcut-keys-document.pdf
SOLIDWORKS-Shortcut-keys-document.pdf
 
ECR-PCR-Supplier-Training-R3 (1).pptx
ECR-PCR-Supplier-Training-R3 (1).pptxECR-PCR-Supplier-Training-R3 (1).pptx
ECR-PCR-Supplier-Training-R3 (1).pptx
 
ECR-PCR-Supplier-Training-R3.pptx
ECR-PCR-Supplier-Training-R3.pptxECR-PCR-Supplier-Training-R3.pptx
ECR-PCR-Supplier-Training-R3.pptx
 
Change_Management.ppt
Change_Management.pptChange_Management.ppt
Change_Management.ppt
 
Change_Management.ppt
Change_Management.pptChange_Management.ppt
Change_Management.ppt
 
Change_Management (1).ppt
Change_Management (1).pptChange_Management (1).ppt
Change_Management (1).ppt
 
Sheet metal.pptx
Sheet metal.pptxSheet metal.pptx
Sheet metal.pptx
 
types_of_moulds-split_mould.ppt
types_of_moulds-split_mould.ppttypes_of_moulds-split_mould.ppt
types_of_moulds-split_mould.ppt
 

Recently uploaded

Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
Terna SpA
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
mriyagarg453
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
MollyBrown86
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Sheetaleventcompany
 

Recently uploaded (20)

Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
 
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
VVIP Pune Call Girls Sopan Baug WhatSapp Number 8005736733 With Elite Staff A...
 
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Panjabi Bagh, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Mehsana 7001035870 Whatsapp Number, 24/07 Booking
 
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...Balaji Nagar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready...
Balaji Nagar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready...
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
Ambala Escorts Service ☎️ 6378878445 ( Sakshi Sinha ) High Profile Call Girls...
 
Call Girls Marunji Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Marunji Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Marunji Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Marunji Call Me 7737669865 Budget Friendly No Advance Booking
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings Presentation
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Kheda 7001035870 Whatsapp Number, 24/07 Booking
 
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdfITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Parvati Gaon WhatSapp Number 8005736733 With Elite Staff...
 
SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024
 

BRVillari,AmecL11.ppt

  • 1.
  • 2. Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations
  • 3. Contents ► Introduction to Change Management ► Importance of Change Management ► Process to Manage Changes ► Responsibilities ► Methodology ► Conclusions 3
  • 4. Change Management Change Management is an Inevitable Project Requirement because, any project that has ever been completed has almost certainly had changes to it’s scope 4
  • 6. Change Management What is change? ► Change is an authorized alteration to base line scope of work initiated by any party involved in the Project (or) ► Change is defined as any deviation from the contractually agreed project scope, schedule or cost. 6
  • 7. Change Management Changes can be different ► Contract Changes ► Internal Changes 7
  • 8. Change Management Types ► Scope Change ► Schedule Change ► Cost change ► Interdependence change (i.e., Scope, schedule and cost changes are interdependent and a change to one will frequently cause changes to one or more of the others) It is important to understand difference between a development and a change 8
  • 10. Change Management Necessity ► Modern day challenges in Project Execution ► Reduced timelines from Project Feasibility study to Implementation ► Less developed Front End Packages to Detail Engineering ► Early commitments on Procurement of Materials ► Early commitments on booking Fabrication yards, site contracts In Summary, controlled change management is necessary to meet the final Project Objectives 10
  • 12. Change Management Address all aspects ► The basis for a good change management system starts with the establishment of the scope baseline. ► A good scope change control system is one that makes sure that all of the stakeholders concerned with the change are made aware that it is being submitted, agreed upon, processed, disapproved or approved, and implemented. ► Change management must be careful to ensure that budgets, schedules, performance, and documentation are all changed to reflect the change. 12
  • 13. Change Management Identification of Changes should be timely…. 13
  • 14. Change Management Identification of Changes should be structured…. 14
  • 15. Change Management Change Management Objective is to safeguard interests of all stake holders…. 15
  • 16. Change Management Sequence ► Identification ► Trigger events ► Formal instructions ► External Conditions ► Contract terms ► Errors/Omissions Pre-AFD and Post AFD changes have difference in the way they are dealt with 16
  • 17. Change Management Sequence ► Notification ► Substantiation ► Formal Raising 17
  • 19. Change Management Responsibilities ► PM ► To Select, establish and implement an effective and appropriate system of Change control either database or manual system for the project and to discuss and agree with the client. ► PEM ► To Maintain change awareness in project engineering personnel and monitor for change activity. ► Change Coordinator ► To administer the change control procedure and change control databases where used. 19
  • 20. Change Management Responsibilities ► Functional Leads/ All Project Personnel ► To Monitor their own scope of work, identify potential changes and bring them to the notice of their discipline group manager using change flags. ► Functional Manager/ Leader ► To review change flags raised by their group and bring valid flags to the attention of Area Project Engineer/ Change coordinator. ► Area Project Engineers ► To accept or reject change flags raised by managers and other discipline group leaders and to issue accepted change flags to the change coordinator. 20
  • 22. Change Management Methods of Change Control ► Review of Design Basis ► A review of key design documents shall be carried out at project outset against the agreed technical basis ► Client Changes ► Project personnel shall bring all potential changes initiated by the client to the attention of their PM or PEM using change flags. 22
  • 23. Change Management Methods of Change Control Internal Changes ► Key design documents ► Project specific listing of key design documents shall be developed under the control of PEM for change control process immediately following the establishment of the document management system. ► Once a key design document has been issued AFD it shall be deemed “ frozen”. ► Any subsequent proposed internal changes (excepting to incorporate supplier/contractor data) shall be subject to formal change control using change flags. 23
  • 24. Change Management Methods of Change Control ► Detail documents ► Internal changes to detail documents are unlikely to have significant impact at least until the documents have been released “ AFC”. Personnel shall however be alert to exceptional cases- ( Advance Revision notices) ► 3D CAD Model files ► Model files shall be considered to be in a state of development until agreed comments resulting from the formal client model reviews have been incorporated. Files shall thereafter be electronically “locked” and subject to formal change control. 24
  • 25. Change Management Methods of Change Control Engineering Flow Diagrams ► Engineering flow diagrams are key design documents for which the state of development at each revision is specifically defined. ► Design growth trending ► Significant change impact may result from small cumulative changes such as ► Growth in I/O count for instrument control systems ► Growth in Electrical load requirements ► Growth on bulk material quantities taken off ► Growth in Piping Isometric drawing count ► Growth in estimated utility consumptions. ► Reports shall be provided to the Change coordinator at least monthly to enable an analysis of the reason for any design growth to be performed. 25
  • 26. Change Management Methods of Change Control Engineering Flow Diagrams ► Internal Change Review Meeting ► To reinforce the change control process, PM shall hold internal Scope revalidation meetings on a regular basis. This meeting shall review all issued design documents and any other means of communication where change may result. This meeting shall call upon individuals, as necessary , to provide information or clarification on a issue that may result in a change flag. ► Changes to AFC documents: ► Any proposed Internal changes to a document AFC shall only be accepted if ► The plant would otherwise constitute a health/ safety hazard ► The plant would not otherwise confirm to agreed specs. ► There is a clear and well defined financial advantage to making the change which clearly overweighs the change impact by a significant margin. 26
  • 28. Change Management Conclusion ► Meeting Project Objectives should be priority ► Must address interests of all Key stake holders ► Trust between stake holders (Client, Contractor, Vendors, subcontractors) is key for successful change management ► Change Management Process should be well documented and should stand for audit trail 28
  • 29. 29