This document provides instructions for disassembling and assembling the final drive of a 365B II EXCAVATOR. It describes:
1) Disassembling the various components of the final drive by removing bolts, pins, gears, and other parts.
2) Proper cleaning and preparation of parts before assembly.
3) The assembly procedure, including installing seals, bearings, gears and other components in the correct order and orientation. Precise measurements are taken to determine the proper shim thickness.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual (JMB0000...f7djidksmd3e
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual (JMB0000...f8usiedkdmm
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual (JMB0000...paws21610697
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual (JMB0000...uddksemd8ud
This document provides instructions for disassembling and assembling the final drive of a 365B II EXCAVATOR. It describes in detail how to remove over 30 individual parts in 16 steps. Key steps include removing the final drive cover, ring gear, carrier assemblies, gears, shafts and bearings. Reassembly requires cleaning all parts, applying anti-seize compound, installing bearings and seals, and adjusting shims to achieve the proper bearing preload. Precise instructions and illustrations are provided for each step.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual (JMB0000...jdjkskmikdkmd
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar cat 365 b ii excavator (prefix jmb) service repair manual (jmb000...fios9dkksd
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual Instant ...jiuliu14811471
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual Instant ...qianxu35543635
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual (JMB0000...f7djidksmd3e
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual (JMB0000...f8usiedkdmm
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual (JMB0000...paws21610697
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual (JMB0000...uddksemd8ud
This document provides instructions for disassembling and assembling the final drive of a 365B II EXCAVATOR. It describes in detail how to remove over 30 individual parts in 16 steps. Key steps include removing the final drive cover, ring gear, carrier assemblies, gears, shafts and bearings. Reassembly requires cleaning all parts, applying anti-seize compound, installing bearings and seals, and adjusting shims to achieve the proper bearing preload. Precise instructions and illustrations are provided for each step.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual (JMB0000...jdjkskmikdkmd
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar cat 365 b ii excavator (prefix jmb) service repair manual (jmb000...fios9dkksd
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual Instant ...jiuliu14811471
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B II EXCAVATOR (Prefix JMB) Service Repair Manual Instant ...qianxu35543635
The document provides instructions for disassembling and assembling the final drive of an excavator. Key steps include:
1. Disassembling the final drive by removing gears, bearings, seals, and housing components.
2. Cleaning all parts thoroughly before assembly.
3. Assembling components in reverse order, applying anti-seize compound and determining correct shim thickness to set bearing preload.
4. Installing new seals using special tools and ensuring seals remain undamaged during assembly.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual Instant D...jiuliu14811471
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. Assembly is the reverse of disassembly and requires determining the correct shim thickness between bearings using precise measurements. Special tools are needed and surfaces must be cleaned thoroughly during both processes.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual (9TZ00001...f8usiedkdmm
This document provides instructions for disassembling and assembling the final drive of a 365B L Excavator. It describes in detail the 31 steps to disassemble the components of the final drive and the 34 steps to reassemble it. Key parts that are disassembled include the ring gear, carrier assemblies, gears, bearings and seals. The assembly process involves applying anti-seize compound, installing new seals and bearings, and using shims to achieve the correct bearing preload. Precise measurements are taken to determine the number of shims needed.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual (9TZ00001...paws21610697
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual Instant D...qianxu35543635
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual (9TZ00001...f7djidksmd3e
This document provides instructions for disassembling and assembling the final drive of a 365B L excavator. It describes in detail the 31 steps to disassemble the components of the final drive, including removing gears, shafts, carriers, and housing pieces. It then lists the 34 steps to reassemble the final drive, applying lubricants and following a process to determine the correct bearing preload using measurements and applied loads. The goal is to fully disassemble and then reassemble the final drive while ensuring all parts are clean and seals are in good condition.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual (9TZ00001...uddksemd8ud
This document provides instructions for disassembling and assembling the final drive of a 365B L Excavator. It describes in detail the 31 steps to disassemble the components of the final drive, including removing gears, shafts, bearings, seals and housing pieces. It then lists the 34 steps to reassemble the final drive, applying lubricants and following a process to determine the correct bearing preload and number of shims needed. The goal is to fully disassemble and then reassemble the final drive, ensuring all components are clean and seals are replaced as needed.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
This document provides instructions for disassembling and assembling the final drive of a 365B L Excavator. It describes in detail the 31 steps to disassemble the various components of the final drive, including removing gears, shafts, bearings, seals, and housing pieces. It then describes the 34 steps to reassemble the final drive, including applying lubricants, installing new seals and bearings, attaching housing pieces, and adjusting bearing preload using shims. The goal is to disassemble and reassemble the final drive while keeping parts in their original locations and orienting alignment marks.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual (9TZ00001...jdjkskmikdkmd
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
Caterpillar cat 365 b excavator (prefix 9tz) service repair manual (9tz00001 ...fios9dkksd
This document provides instructions for disassembling and assembling the final drive of a 365B L excavator. It describes in detail the 31 steps to disassemble the components of the final drive, including removing gears, shafts, carriers, and housing pieces. It then lists the 34 assembly steps, specifying the required tools and explaining how to install components like bearings, seals, gears, and housings back into the final drive. Precautions like cleaning parts and applying lubricants are noted.
Caterpillar cat 365 b l excavator (prefix 9tz) service repair manual (9tz0000...fios9dkksd
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. Assembly is the reverse of disassembly and requires determining the correct shim thickness between bearings using precise measurements. Special tools are needed and surfaces must be cleaned thoroughly during both processes.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. Assembly is the reverse of disassembly and requires determining the correct shim thickness between bearings using precise measurements. Special tools are needed and surfaces must be cleaned thoroughly during both processes.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. Assembly is the reverse of disassembly and requires determining the correct shim thickness between bearings using precise measurements. Special tools are needed and surfaces must be cleaned thoroughly during both processes.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. Assembly is the reverse of disassembly and requires determining the correct shim thickness between bearings using precise measurements. Special tools are needed and surfaces must be cleaned thoroughly during both processes.
Caterpillar Cat 365B and 365B L Excavator (Prefix 9PZ) Service Repair Manual ...shibi1322
The document provides instructions for disassembling and assembling a final drive for an excavator model. It describes 31 steps to disassemble the final drive by removing components like gears, bearings, seals, and housing pieces. It then describes 14 steps to reassemble the final drive, including applying lubricants, setting bearing preloads, and installing seals and gears back into their proper locations and orientations. The overall process involves separating the main housing from the motor housing and precisely reinstalling all parts.
Caterpillar Cat 365B and 365B L Excavator (Prefix 9PZ) Service Repair Manual ...8foskkdjdkdm3e
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 parts including gears, bearings, seals, and housing components. Detailed steps and illustrations are provided for each part. The assembly section outlines cleaning and inspection procedures, and reversing the disassembly steps to reinstall each part in the proper location using anti-seize compound and thread lock as needed. Bearing preload is set using shims determined by measuring gear dimensions under a calibrated press load.
Caterpillar Cat 365B and 365B L Excavator (Prefix 9PZ) Service Repair Manual ...yin9niaojiao
The document provides instructions for disassembling and assembling the final drive of an excavator. It describes 31 steps to disassemble the components of the final drive by removing bolts, gears, bearings, seals, and housing pieces. It then describes 34 steps to reassemble the final drive, including applying lubricants, setting bearing preloads, and installing seals, gears, bearings, and housing components in the reverse order of disassembly. Tools and torque specifications are provided for completing the disassembly and assembly work.
Caterpillar Cat W345B Series II Material Handler (Prefix CDY) Service Repair ...paws21610697
This document provides assembly instructions for a swing drive on a W345B Series II wheeled excavator. It includes a list of required tools and 40 steps to assemble the various components of the swing drive, such as bearings, seals, gears, and housings. Special attention is given to cleaning parts, applying lubricants, and torquing bolts to the specified values. The instructions also cover installing the assembled swing drive into the excavator's main frame.
1. Remove the fuel injection pump housing and governor from the engine as a single unit using lifting sling and hoist. Disconnect all connecting lines and tubes.
2. Disassemble the fuel injection pump housing by removing the retaining ring, filter base, tubes and other attached components.
3. Inspect all seals and gaskets, replacing any that are damaged, to prepare the housing for assembly.
More Related Content
Similar to Caterpillar Cat 365B II EXCAVATOR (Prefix DER) Service Repair Manual (DER00001 and up).pdf
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual Instant D...jiuliu14811471
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. Assembly is the reverse of disassembly and requires determining the correct shim thickness between bearings using precise measurements. Special tools are needed and surfaces must be cleaned thoroughly during both processes.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual (9TZ00001...f8usiedkdmm
This document provides instructions for disassembling and assembling the final drive of a 365B L Excavator. It describes in detail the 31 steps to disassemble the components of the final drive and the 34 steps to reassemble it. Key parts that are disassembled include the ring gear, carrier assemblies, gears, bearings and seals. The assembly process involves applying anti-seize compound, installing new seals and bearings, and using shims to achieve the correct bearing preload. Precise measurements are taken to determine the number of shims needed.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual (9TZ00001...paws21610697
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual Instant D...qianxu35543635
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual (9TZ00001...f7djidksmd3e
This document provides instructions for disassembling and assembling the final drive of a 365B L excavator. It describes in detail the 31 steps to disassemble the components of the final drive, including removing gears, shafts, carriers, and housing pieces. It then lists the 34 steps to reassemble the final drive, applying lubricants and following a process to determine the correct bearing preload using measurements and applied loads. The goal is to fully disassemble and then reassemble the final drive while ensuring all parts are clean and seals are in good condition.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual (9TZ00001...uddksemd8ud
This document provides instructions for disassembling and assembling the final drive of a 365B L Excavator. It describes in detail the 31 steps to disassemble the components of the final drive, including removing gears, shafts, bearings, seals and housing pieces. It then lists the 34 steps to reassemble the final drive, applying lubricants and following a process to determine the correct bearing preload and number of shims needed. The goal is to fully disassemble and then reassemble the final drive, ensuring all components are clean and seals are replaced as needed.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
This document provides instructions for disassembling and assembling the final drive of a 365B L Excavator. It describes in detail the 31 steps to disassemble the various components of the final drive, including removing gears, shafts, bearings, seals, and housing pieces. It then describes the 34 steps to reassemble the final drive, including applying lubricants, installing new seals and bearings, attaching housing pieces, and adjusting bearing preload using shims. The goal is to disassemble and reassemble the final drive while keeping parts in their original locations and orienting alignment marks.
Caterpillar Cat 365B L Excavator (Prefix 9TZ) Service Repair Manual (9TZ00001...jdjkskmikdkmd
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly procedure involves removing 31 parts from the final drive housing using various tools. The assembly procedure specifies 34 steps, including cleaning parts, applying lubricants, setting bearing preloads using shims, and installing seals using special tools. Proper cleaning and lubrication of parts is emphasized throughout.
Caterpillar cat 365 b excavator (prefix 9tz) service repair manual (9tz00001 ...fios9dkksd
This document provides instructions for disassembling and assembling the final drive of a 365B L excavator. It describes in detail the 31 steps to disassemble the components of the final drive, including removing gears, shafts, carriers, and housing pieces. It then lists the 34 assembly steps, specifying the required tools and explaining how to install components like bearings, seals, gears, and housings back into the final drive. Precautions like cleaning parts and applying lubricants are noted.
Caterpillar cat 365 b l excavator (prefix 9tz) service repair manual (9tz0000...fios9dkksd
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. Assembly is the reverse of disassembly and requires determining the correct shim thickness between bearings using precise measurements. Special tools are needed and surfaces must be cleaned thoroughly during both processes.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. Assembly is the reverse of disassembly and requires determining the correct shim thickness between bearings using precise measurements. Special tools are needed and surfaces must be cleaned thoroughly during both processes.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. Assembly is the reverse of disassembly and requires determining the correct shim thickness between bearings using precise measurements. Special tools are needed and surfaces must be cleaned thoroughly during both processes.
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. Assembly is the reverse of disassembly and requires determining the correct shim thickness between bearings using precise measurements. Special tools are needed and surfaces must be cleaned thoroughly during both processes.
Caterpillar Cat 365B and 365B L Excavator (Prefix 9PZ) Service Repair Manual ...shibi1322
The document provides instructions for disassembling and assembling a final drive for an excavator model. It describes 31 steps to disassemble the final drive by removing components like gears, bearings, seals, and housing pieces. It then describes 14 steps to reassemble the final drive, including applying lubricants, setting bearing preloads, and installing seals and gears back into their proper locations and orientations. The overall process involves separating the main housing from the motor housing and precisely reinstalling all parts.
Caterpillar Cat 365B and 365B L Excavator (Prefix 9PZ) Service Repair Manual ...8foskkdjdkdm3e
This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 parts including gears, bearings, seals, and housing components. Detailed steps and illustrations are provided for each part. The assembly section outlines cleaning and inspection procedures, and reversing the disassembly steps to reinstall each part in the proper location using anti-seize compound and thread lock as needed. Bearing preload is set using shims determined by measuring gear dimensions under a calibrated press load.
Caterpillar Cat 365B and 365B L Excavator (Prefix 9PZ) Service Repair Manual ...yin9niaojiao
The document provides instructions for disassembling and assembling the final drive of an excavator. It describes 31 steps to disassemble the components of the final drive by removing bolts, gears, bearings, seals, and housing pieces. It then describes 34 steps to reassemble the final drive, including applying lubricants, setting bearing preloads, and installing seals, gears, bearings, and housing components in the reverse order of disassembly. Tools and torque specifications are provided for completing the disassembly and assembly work.
Similar to Caterpillar Cat 365B II EXCAVATOR (Prefix DER) Service Repair Manual (DER00001 and up).pdf (20)
Caterpillar Cat W345B Series II Material Handler (Prefix CDY) Service Repair ...paws21610697
This document provides assembly instructions for a swing drive on a W345B Series II wheeled excavator. It includes a list of required tools and 40 steps to assemble the various components of the swing drive, such as bearings, seals, gears, and housings. Special attention is given to cleaning parts, applying lubricants, and torquing bolts to the specified values. The instructions also cover installing the assembled swing drive into the excavator's main frame.
1. Remove the fuel injection pump housing and governor from the engine as a single unit using lifting sling and hoist. Disconnect all connecting lines and tubes.
2. Disassemble the fuel injection pump housing by removing the retaining ring, filter base, tubes and other attached components.
3. Inspect all seals and gaskets, replacing any that are damaged, to prepare the housing for assembly.
This document provides installation instructions for removing and installing an axle shaft on the steering axle of an M325D Material Handler excavator. It is a 15 step process that includes draining fluids, removing bolts and pins, lifting out heavy components using lifting devices, replacing seals and bushings, and reinstalling components in reverse order. Special tools are required and Loctite threadlocker is used on reinstallation.
Caterpillar Cat M325D L MH EXCAVATOR (Prefix KAY) Service Repair Manual (KAY0...paws21610697
This document provides installation instructions for separating an upper frame from an undercarriage frame on an excavator. It outlines 33 steps including removing components like the stick, front and rear drive shafts, swivel, and left boom cylinder. It instructs using tools and lifting devices to reposition pins and plates to separate the frames while supporting heavy components weighing up to 500 pounds. Proper identification of hose and tube assemblies is noted for reinstallation.
Caterpillar Cat M325D L MH EXCAVATOR (Prefix KAY) Service Repair Manual (KAY0...paws21610697
This document provides instructions for disassembling and assembling the swing drive of an M325D L Material Handler excavator. It lists the required tools and presents a 31 step disassembly procedure and a 29 step assembly procedure. The procedures involve removing and installing various components of the swing drive like gears, shafts, bearings, seals and housings. Precautions are provided regarding cleanliness and safety.
The document provides instructions for disassembling the front and rear final drive carriers, hubs, and brakes of an M320 excavator. The 28 step procedure describes how to remove components like planetary carriers, sun gears, ring gears, brake pistons, bearings, and seals. Tools required include retaining ring pliers, pullers, wrenches, and hammers. Safety notices are provided to release hydraulic pressure and contain fluids before disassembly.
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of an M318F wheeled excavator. It lists the required tools and parts and provides step-by-step instructions and illustrations for removing components like the carrier housing, planetary gears, and brake discs, and installing components like the thrust washer, carrier gear, and retaining rings. The instructions aim to properly remove and replace these components while containing fluids and following safety procedures.
This document provides instructions for disassembling and assembling the rear axle carrier, hubs, and brakes of an M317F wheeled excavator. The disassembly procedure involves removing 23 components including carrier housing, planetary gears, thrust washers, retaining rings, and hub. The assembly procedure provides steps to install 23 components in reverse order and includes checking brake clearance and installing seals and bearings. Tools required include retaining ring pliers, drivers, spanners, pry bars, pullers, and torque wrenches.
The document provides instructions for removing and installing various components on a M317D2 Wheeled Excavator, including:
- Removing the swing gear and bearing by lifting it out after removing bolts and spacers.
- Installing the swing gear and bearing by positioning it with lifting tools, then installing bolts and spacers.
- Removing the hydraulic oil filter by taking off the cover, O-ring, and retainer, then removing the filter.
- Installing the hydraulic oil filter by reversing the removal steps.
- Removing the hydraulic tank by draining it, disconnecting hoses and fittings, and lifting it off after removing bolts.
- Installing the hydraulic tank by
The document provides instructions for disassembling and assembling the main hydraulic pump of a M317D2 Wheeled Excavator. It lists 34 steps for disassembly, removing components like pistons, springs, seals and bearings. It then lists 36 steps for assembly, replacing components and using various tools to set dimensions and install retaining rings, seals and bearings. Precision is required to mark positions of parts and reinstall components in their original orientation for proper function.
This document provides instructions for disassembling and assembling a swing drive on a wheeled excavator model M316D. The removal procedure involves releasing hydraulic pressure, removing hoses and bolts, and using lifting tools to remove the swing drive assembly. The disassembly procedure then describes using various tools to remove retaining rings, plates, discs, seals, gears, and other internal components. The assembly procedure outlines cleaning and lubricating parts, and using tools to reinstall components in reverse order, taking care to properly seat bearings and tighten nuts to the specified torques.
The document provides instructions for disassembling the front and rear axles of an M315F wheeled excavator. It lists required tools and presents a 23 step procedure for removing components like carrier housings, planetary gears, bearings, seals, and hubs. Detailed illustrations accompany each step to show how to properly disassemble parts. Safety notices are included to handle fluids and springs safely during the process.
The document provides disassembly and assembly instructions for the travel motor of an M312 excavator. It lists 44 steps to disassemble the travel motor and its components. These include removing covers, gaskets, seals, valves, springs, pins, and other parts. It then lists the assembly steps in reverse order, noting to replace all seals and gaskets, apply oil, and ensure cleanliness during assembly.
Caterpillar Cat M312 Excavator (Prefix 6TL) Service Repair Manual (6TL00001-0...paws21610697
This document provides the disassembly and assembly procedures for the swing drive of an M312 excavator. The disassembly procedure involves 28 steps to remove components such as the swing brake assembly, discs, plates, piston, seals, shaft, gears, bearings, and housing. The assembly procedure involves 17 steps and requires various tools to install components in the reverse order of disassembly while applying lubricant and ensuring proper torque specifications are achieved.
This document provides instructions for removing and installing engine oil filter bases and related components on Caterpillar 3304B and 3306B engines. The procedures describe removing the oil filter, oil filter base, gaskets and O-rings. Instructions are provided for disassembling the oil filter base by removing covers, bolts, springs and plungers. Reassembly and installation steps are also outlined. Tools required are listed for each procedure. Precautions are noted to keep parts clean and contain fluids.
Caterpillar Cat D250E II Articulated Truck (Prefix 4PS) Service Repair Manual...paws21610697
The document provides instructions for disassembling and assembling the piston pump used for steering on a D250E II Articulated Truck. The disassembly procedure involves removing 21 individual parts from the pump housing. The assembly procedure instructs assembling the 21 parts in the reverse order, applying lubrication and torque specifications as needed. Tools required include various drivers, pliers, and lubricants.
The document provides instructions for disassembling and assembling the governor of an articulated truck. It lists 57 steps to disassemble the front and rear housings of the governor. Tools required include a governor repair fixture, retaining ring pliers, pin punch, clevis driver, and legs to mount the rear housing. Cautions are provided regarding cleaning parts and containing fluids during maintenance.
The document provides instructions for disassembling and assembling a Type I governor used in Caterpillar 3114, 3116, and 3126 engines. It describes 35 steps to disassemble the governor front housing and 19 additional steps to disassemble the rear housing. Various parts are inspected for wear or damage during disassembly. Cleaning and replacement parts are also discussed. Tools required are listed.
The document provides instructions for removing and installing various engine components on a Caterpillar 3408 industrial engine, including the oil cooler, oil filter base, oil bypass valves, engine oil cooler/lines, aftercooler, and turbocharger. The procedures describe removing bolts, hoses, seals, and other parts, cleaning components, applying sealant, and reinstalling parts in reverse order.
The document provides instructions for removing and installing wheel spindles on Caterpillar articulated dump trucks. It describes removing the wheels, bearings, and seals before removing the brake shoes. It then details removing pins and springs to separate the brake shoes from the spider. Reinstallation follows the reverse order. Instructions are also given for disassembling and assembling suspension cylinders.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinForth
Brandt Hertenstein, Program Manager of the Electrification Coalition gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinForth
Cat Plein, Development & Communications Director of Forth, gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Charging Fueling & Infrastructure (CFI) Program by Kevin MillerForth
Kevin Miller, Senior Advisor, Business Models of the Joint Office of Energy and Transportation gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 365B II EXCAVATOR DER
Configuration: 365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine
Disassembly and Assembly
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems
Media Number -RENR1970-10 Publication Date -01/02/2015 Date Updated -16/02/2015
i02001476
Final Drive - Disassemble
SMCS - 4050-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Stand Group 1
B 138-7575 Link Bracket 5
C 1P-1859 Retaining Ring Pliers 1
F 154-6183 Forcing Bolt 3
G 138-7576 Link Bracket 3
Start By:
A. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove" in this
manual.
1. Thoroughly clean the outside of the final drive prior to disassembly.
1/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 1 g00595985
2. Fasten the final drive to Tooling (A), as shown. Put an alignment mark across the sections
of the final drive for assembly purposes. All parts must be reinstalled in the original
locations. The weight of the final drive is 721 kg (1590 lb).
Illustration 2 g00596007
3. Remove socket head bolts (1) from the final drive cover.
Illustration 3 g00596010
2/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 4. Fasten Tooling (B) and a suitable lifting device to cover (2), as shown.
5. Remove bolts (3) and the washers that hold the cover in place.
6. Use a soft faced hammer in order to break the seal between the cover and the ring gear.
Remove the cover. The weight of the cover is approximately 65 kg (145 lb).
Illustration 4 g00596018
7. Remove spacer (4) and the shims from the cover.
8. Remove socket head bolts (5) and ring gear (6) from the cover.
Illustration 5 g00596082
9. Remove sun gear (7). Use two people to remove carrier assembly (8) by lifting upward. The
weight of carrier assembly (8) is approximately 24 kg (55 lb).
3/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 6 g00596242
10. Use Tooling (C) in order to remove retaining rings (9) and washers (10) .
Illustration 7 g00596269
11. Remove gears (11) .
Illustration 8 g00596273
12. Remove bearings (12) and spacer (13) .
4/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 9 g00596337
13. Remove washers (16). Use suitable Tooling to remove ring (14). Remove gear (15) .
Illustration 10 g00596342
14. Remove spacer (17) .
5/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 11 g01035731
15. Fasten Tooling (B) and a suitable lifting device to carrier assembly (18). Remove the carrier
assembly. The weight of the carrier assembly is 68 kg (150 lb).
Illustration 12 g00596442
Illustration 13 g00596446
16. Drive pin (19) inward to shaft (20). Use a soft faced hammer and tap the shaft downward in
order to remove the shaft. Remove gear assembly (21) .
6/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 14 g00596485
17. Disassemble the gear assembly, as follows: washer (22), bearing (23), gear (24) and washer
(25) .
18. Repeat Steps 16 through 17 for the remaining gear assemblies.
Illustration 15 g00596764
19. Use suitable Tooling to remove ring (26). Remove gear (27) .
7/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 16 g00596790
20. Remove spacer (28) .
Illustration 17 g01035733
21. Fasten Tooling (B) and a suitable lifting device to carrier assembly (29). Remove the carrier
assembly (29). The weight of carrier assembly (29) is approximately 106 kg (235 lb).
Illustration 18 g00596816
22. Drive pin (31) inward to shaft (30). Use a soft faced hammer and tap the shaft downward in
order to remove the shaft. Remove gear assembly (32) .
8/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 19 g00596823
23. Disassemble the gear assembly, as follows: washer (33), bearing (34), gear (35), bearing
(36) and washer (37) .
24. Repeat Steps 22 through 23 for the remaining gear assemblies.
Illustration 20 g01035734
25. Fasten Tooling (B) and a suitable lifting device to gear (38), as shown. Remove the ring
gear from main housing (39). The weight of the ring gear is approximately 124 kg (275 lb).
9/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 21 g00596864
26. Remove O-ring (40) from the main housing.
Note: Place wood blocks under the final drive in order to support the motor housing.
Illustration 22 g00596901
27. Remove bolts (41) from gear (42) .
Illustration 23 g00596918
28. Install Tooling (F) in the gear, as shown. Tighten Tooling (F) evenly in order to loosen the
gear. Remove the gear from the motor housing.
10/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 24 g00596927
29. Remove shims (43) from the motor housing.
Note: The inner bearing cones and the outer bearing cones are a slip fit on the motor
housing. The inner bearing cone may stay with either housing during separation.
Illustration 25 g01035735
30. Fasten Tooling (G) and a suitable lifting device to main housing (39), as shown. Separate
the main housing from motor housing (44). The motor housing will rest on the wood blocks.
The weight of main housing (39) is approximately 188 kg (415 lb).
11/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 26 g00596986
31. Remove bearing (45) and the bearing cone from the main housing.
Illustration 27 g00596994
32. Remove Duo-Cone seal (46) from the main housing.
33. Remove bearing cups (47) and (48) from the main housing.
Illustration 28 g00597020
12/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. 34. Remove pins (49) .
35. Remove bearing (50) and the bearing cone.
36. Remove Duo-Cone seal (51) from the motor housing.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sun Nov 22 11:50:48 UTC+0800 2020
13/13
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 365B II EXCAVATOR DER
Configuration: 365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine
Disassembly and Assembly
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems
Media Number -RENR1970-10 Publication Date -01/02/2015 Date Updated -16/02/2015
i02789460
Final Drive - Assemble
SMCS - 4050-016
Assembly procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7575 Link Bracket 5
C 140-7642 Duo-Cone Seal Installer As 1
F 1P-1859 Retaining Ring Pliers 1
G 138-7576 Link Bracket 2
H 5P-3931 Anti-Seize Compound 1
J 9S-3263 Thread Lock Compound 1
K 1U-8846 Gasket Sealant 1
1. Make sure that all parts of the final drive are thoroughly clean and free of dirt and debris
prior to assembly.
Note: Check the condition of all the O-ring seals that are used in the final drive. If any of
the seals are worn or damaged, use new parts for replacement.
2. Reassemble the final drive on Tooling (A) .
1/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 1 g00599211
3. Apply Tooling (H) to the surfaces that contact the bearing cones. Install the bearing cone
with a press. Raise the temperature of bearing (50) and install bearing (50) .
4. Apply Tooling (H) to the surfaces that contact pins (49) . Install pins (49) .
Illustration 2 g00599224
5. Apply Tooling (H) to the surfaces that contact bearing cups (48) and (47) . Install bearing
cups (48) and (47) .
2/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 3 g00596986
6. Install bearing (45) and the bearing cone.
Illustration 4 g01035739
7. Attach Tooling (B) and a suitable lifting device to main housing (39) . Install the main
housing on motor housing (44) , as shown.
8. Use the following procedure to determine the bearing preload and the correct number of
shims.
Illustration 5 g00603328
a. Use a depth micrometer in order to measure the step length of the coupling gear (42) .
Take measurements at several different locations around the gear. Compute the
average of the measured dimensions and record the number. Call this dimension (X) .
b. Use a suitable press and a spacer in order to apply a load of 10000 kg (22046 lb) on
the bearings.
c. Rotate the main housing in order to seat the bearing.
d. Reduce the load on the bearings to 3700 ± 370 kg (8157 ± 815 lb).
3/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 6 g00603604
e. Maintain the load on the bearings. Use a depth micrometer and measure the distance
between the top face of motor housing and the bearing cone, as shown. Take this
measurement in several locations around the bearing. Compute the average of the
measured dimensions and record the number. Call this dimension (Y) .
f. Determine the correct thickness of the shim pack that will be installed between the
bearing cone and the coupling gear. The shim pack thickness is equal to dimension
(Y) minus dimension (X) . Tolerance for the shim pack is 0.1 mm (0.003 inch).
Note: If two shims are required, install the thinner shim next to the coupling gear
when the coupling gear is installed.
9. Attach Tooling (B) and a suitable lifting device in order to remove the main housing from
the motor housing.
Note: Refer to Disassembly and Assembly, "Duo-Cone Conventional Seals - Install".
Note: The rubber seals and all surfaces that contact the seals must be clean and dry. After
installation of the seals, apply clean SAE 30 oil on the contact surfaces of the metal seals.
Illustration 7 g00600071
4/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. 10. Use Tooling (C) to install Duo-Cone seal (46) in the main housing.
Illustration 8 g00600087
11. Use Tooling (C) to install Duo-Cone seal (51) in the motor housing.
Note: Make sure that the Duo-Cone seals are not scratched or damaged during the assembly
of the main housing or during the assembly of the motor housing. After installation of the
main housing on the motor housing, there will be a small gap between the components. The
gap is caused by the Duo-Cone seals. The gap will be eliminated during installation of the
gear.
Illustration 9 g00596986
12. Install bearing (45) and the bearing cone.
5/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 10 g01035739
13. Attach Tooling (B) and a suitable lifting device to main housing (39) . Position main
housing (39) on motor housing (44) . Make sure that the Duo-Cone seals are not scratched
or damaged during installation.
Illustration 11 g00596927
14. Place shims (43) in the correct position on the motor housing. If two shims were required,
put the thinner shim in contact with coupling gear (42) . Make sure that all of the holes in
the components are in alignment with each other.
6/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 12 g00596901
15. Put coupling gear (42) in the original position on the motor housing.
16. Apply Tooling (J) on the threads of bolts (41) . Install the bolts to secure coupling gear (42)
in place. Tighten bolts (41) evenly and tighten the bolts in diagonally opposite pairs.
Tighten bolts to a torque of 1600 ± 200 N·m (1180 ± 148 lb ft).
Illustration 13 g00596864
17. Install O-ring seal (40) in the main housing.
Illustration 14 g01035734
18. Thoroughly clean the mating surface of main housing (39) that contacts ring gear (38) .
Apply a bead of Tooling (K) on the mating surface of ring gear (38) . Use Tooling (B) and a
suitable lifting device. Place the ring gear in position on the main housing. Make sure that
the alignment mark on the main housing and the ring gear line up with each other. It may be
necessary to use a soft faced hammer to seat the ring gear on the main housing.
19. Assemble carrier assembly (29) , as follows:
7/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 15 g00596823
Illustration 16 g00603856
a. Apply clean SAE 30 oil on bearings (34) and (36) . Install bearings (34) and (36) in
planetary gear (35) .
b. Install thrust washers (33) and (37) on each side of the planetary gear.
c. Install the planetary gear and thrust washers in carrier assembly (29) .
d. Install planetary shaft (30) in carrier (29) and through planetary gear assembly (32) .
Make sure that the spring pin hole in the planetary shaft is in alignment with the
spring pin hole in the carrier.
8/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 17 g00513451
e. Install spring pin (31) in the carrier and into the planetary shaft. Make sure that the
spring pin hole in the planetary shaft is in alignment with the spring pin hole in the
carrier.
f. Orient the split in the spring pin (31) horizontally to the carrier. Align the split in the
spring pin to the left or to the right. Make a stake mark on each side of the spring pin
hole in the carrier. This will prevent the spring pin from falling out of the spring pin
hole. Each stake mark should be approximately 1.5 mm (0.06 inch) to 3.00 mm
(0.118 inch) from the outside diameter of the spring pin hole.
g. Repeat Steps 19.a through 19.f in order to install the remaining planetary gears in
carrier (29) .
Illustration 18 g01035740
20. Attach Tooling (B) and a suitable lifting device to carrier assembly (29) . Put the carrier
assembly in position in the ring gear. It may be necessary to move the carrier assembly back
and forth during installation in order to ensure that all gears engage properly.
9/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engine(...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Illustration 19 g00603929
21. Install spacer (28) on carrier assembly (29) .
22. Assemble carrier assembly (21) , as follows:
Illustration 20 g00596485
a. Apply clean SAE 30 oil on bearing (23) . Install bearing (23) in planetary gear (24) .
b. Install thrust washers (22) and (25) on each side of the planetary gear.
c. Install the thrust washers and the planetary gear in the carrier assembly (21) .
10/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
26. Illustration 21 g00596446
d. Install planetary shaft (20) in carrier (21) and through planetary gear assembly (24) .
Make sure that the spring pin hole in the carrier is in alignment with the spring pin
hole in the planetary shaft.
Illustration 22 g00596442
e. Make sure that the spring pin (19) in the planetary shaft is in alignment with the
spring pin hole in the carrier.
11/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. Illustration 23 g00513451
f. Orient the split in the spring pin (19) horizontally to the carrier. Align the split in the
spring pin to the left or to the right. Make a stake mark on each side of the spring pin
hole in the carrier. This will prevent the spring pin from falling out of the spring pin
hole. Each stake mark should be approximately 1.5 mm (0.06 inch) to 3.00 mm
(0.118 inch) from the outside diameter of the spring pin hole.
g. Repeat Steps 22.a through 22.f in order to install the remaining two planetary gears in
carrier (18) .
Illustration 24 g01035731
23. Attach Tooling (B) and a suitable lifting device to carrier assembly (18) . Position carrier
assembly (18) in ring gear (38) . Move carrier assembly (18) back and forth during the
installation in order to ensure that all gears engage properly.
12/16
365B Series II Excavator DER00001-UP (MACHINE) POWERED BY 3196 Engin...
2020/11/22
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
28. Illustration 25 g00596342
24. Install spacer (17) .
25. Assemble carrier assembly (8) , as follows:
Illustration 26 g00596337
a. Install washers (16) and gear (15) . Use suitable Tooling to install ring (14) .