This document provides instructions for disassembling and assembling the final drive of a 365B excavator. The disassembly process involves removing over 30 individual parts in a specific sequence. Assembly is the reverse of disassembly and requires determining the correct shim thickness between bearings using precise measurements. Special tools are needed and surfaces must be cleaned thoroughly during both processes.
Symptoms like intermittent starting and key recognition errors signal potential problems with your Mercedes’ EIS. Use diagnostic steps like error code checks and spare key tests. Professional diagnosis and solutions like EIS replacement ensure safe driving. Consult a qualified technician for accurate diagnosis and repair.
What Could Cause The Headlights On Your Porsche 911 To Stop WorkingLancer Service
Discover why your Porsche 911 headlights might flicker out unexpectedly. From aging bulbs to electrical gremlins and moisture mishaps, we're delving into the reasons behind the blackout. Stay tuned to illuminate the road ahead and ensure your lights shine bright for safer journeys.
Your VW's camshaft position sensor is crucial for engine performance. Signs of failure include engine misfires, difficulty starting, stalling at low speeds, reduced fuel efficiency, and the check engine light. Prompt inspection and replacement can prevent further damage and keep your VW running smoothly.
"Trans Failsafe Prog" on your BMW X5 indicates potential transmission issues requiring immediate action. This safety feature activates in response to abnormalities like low fluid levels, leaks, faulty sensors, electrical or mechanical failures, and overheating.
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...Autohaus Service and Sales
Learn what "PARKTRONIC Inoperative, See Owner's Manual" means for your Mercedes-Benz. This message indicates a malfunction in the parking assistance system, potentially due to sensor issues or electrical faults. Prompt attention is crucial to ensure safety and functionality. Follow steps outlined for diagnosis and repair in the owner's manual.
In this presentation, we have discussed a very important feature of BMW X5 cars… the Comfort Access. Things that can significantly limit its functionality. And things that you can try to restore the functionality of such a convenient feature of your vehicle.
Things to remember while upgrading the brakes of your carjennifermiller8137
Upgrading the brakes of your car? Keep these things in mind before doing so. Additionally, start using an OBD 2 GPS tracker so that you never miss a vehicle maintenance appointment. On top of this, a car GPS tracker will also let you master good driving habits that will let you increase the operational life of your car’s brakes.
Why Is Your BMW X3 Hood Not Responding To Release CommandsDart Auto
Experiencing difficulty opening your BMW X3's hood? This guide explores potential issues like mechanical obstruction, hood release mechanism failure, electrical problems, and emergency release malfunctions. Troubleshooting tips include basic checks, clearing obstructions, applying pressure, and using the emergency release.
Fleet management these days is next to impossible without connected vehicle solutions. Why? Well, fleet trackers and accompanying connected vehicle management solutions tend to offer quite a few hard-to-ignore benefits to fleet managers and businesses alike. Let’s check them out!
Learn why monitoring your Mercedes' Exhaust Back Pressure (EBP) sensor is crucial. Understand its role in engine performance and emission reduction. Discover five warning signs of EBP sensor failure, from loss of power to increased emissions. Take action promptly to avoid costly repairs and maintain your Mercedes' reliability and efficiency.
Welcome to ASP Cranes, your trusted partner for crane solutions in Raipur, Chhattisgarh! With years of experience and a commitment to excellence, we offer a comprehensive range of crane services tailored to meet your lifting and material handling needs.
At ASP Cranes, we understand the importance of reliable and efficient crane operations in various industries, from construction and manufacturing to logistics and infrastructure development. That's why we strive to deliver top-notch solutions that enhance productivity, safety, and cost-effectiveness for our clients.
Our services include:
Crane Rental: Whether you need a crawler crane for heavy lifting or a hydraulic crane for versatile operations, we have a diverse fleet of well-maintained cranes available for rent. Our rental options are flexible and can be customized to suit your project requirements.
Crane Sales: Looking to invest in a crane for your business? We offer a wide selection of new and used cranes from leading manufacturers, ensuring you find the perfect equipment to match your needs and budget.
Crane Maintenance and Repair: To ensure optimal performance and safety, regular maintenance and timely repairs are essential for cranes. Our team of skilled technicians provides comprehensive maintenance and repair services to keep your equipment running smoothly and minimize downtime.
Crane Operator Training: Proper training is crucial for safe and efficient crane operation. We offer specialized training programs conducted by certified instructors to equip operators with the skills and knowledge they need to handle cranes effectively.
Custom Solutions: We understand that every project is unique, which is why we offer custom crane solutions tailored to your specific requirements. Whether you need modifications, attachments, or specialized equipment, we can design and implement solutions that meet your needs.
At ASP Cranes, customer satisfaction is our top priority. We are dedicated to delivering reliable, cost-effective, and innovative crane solutions that exceed expectations. Contact us today to learn more about our services and how we can support your project in Raipur, Chhattisgarh, and beyond. Let ASP Cranes be your trusted partner for all your crane needs!
What Are The Immediate Steps To Take When The VW Temperature Light Starts Fla...Import Motorworks
Learn how to respond when the red temperature light flashes in your VW with this presentation. From checking coolant levels to seeking professional help, follow these steps promptly to prevent engine damage and ensure safety on the road.
2. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 365B EXCAVATOR 9TZ
Configuration: 365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine
Disassembly and Assembly
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems
Media Number -RENR1970-10 Publication Date -01/02/2015 Date Updated -16/02/2015
i02001476
Final Drive - Disassemble
SMCS - 4050-015
Disassembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Stand Group 1
B 138-7575 Link Bracket 5
C 1P-1859 Retaining Ring Pliers 1
F 154-6183 Forcing Bolt 3
G 138-7576 Link Bracket 3
Start By:
A. Remove the final drive. Refer to Disassembly and Assembly, "Final Drive - Remove" in this
manual.
1. Thoroughly clean the outside of the final drive prior to disassembly.
1/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
3. Illustration 1 g00595985
2. Fasten the final drive to Tooling (A), as shown. Put an alignment mark across the sections
of the final drive for assembly purposes. All parts must be reinstalled in the original
locations. The weight of the final drive is 721 kg (1590 lb).
Illustration 2 g00596007
3. Remove socket head bolts (1) from the final drive cover.
Illustration 3 g00596010
2/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
4. 4. Fasten Tooling (B) and a suitable lifting device to cover (2), as shown.
5. Remove bolts (3) and the washers that hold the cover in place.
6. Use a soft faced hammer in order to break the seal between the cover and the ring gear.
Remove the cover. The weight of the cover is approximately 65 kg (145 lb).
Illustration 4 g00596018
7. Remove spacer (4) and the shims from the cover.
8. Remove socket head bolts (5) and ring gear (6) from the cover.
Illustration 5 g00596082
9. Remove sun gear (7). Use two people to remove carrier assembly (8) by lifting upward. The
weight of carrier assembly (8) is approximately 24 kg (55 lb).
3/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
5. Illustration 6 g00596242
10. Use Tooling (C) in order to remove retaining rings (9) and washers (10) .
Illustration 7 g00596269
11. Remove gears (11) .
Illustration 8 g00596273
12. Remove bearings (12) and spacer (13) .
4/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
6. Illustration 9 g00596337
13. Remove washers (16). Use suitable Tooling to remove ring (14). Remove gear (15) .
Illustration 10 g00596342
14. Remove spacer (17) .
5/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
7. Illustration 11 g01035731
15. Fasten Tooling (B) and a suitable lifting device to carrier assembly (18). Remove the carrier
assembly. The weight of the carrier assembly is 68 kg (150 lb).
Illustration 12 g00596442
Illustration 13 g00596446
16. Drive pin (19) inward to shaft (20). Use a soft faced hammer and tap the shaft downward in
order to remove the shaft. Remove gear assembly (21) .
6/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
8. Illustration 14 g00596485
17. Disassemble the gear assembly, as follows: washer (22), bearing (23), gear (24) and washer
(25) .
18. Repeat Steps 16 through 17 for the remaining gear assemblies.
Illustration 15 g00596764
19. Use suitable Tooling to remove ring (26). Remove gear (27) .
7/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
9. Illustration 16 g00596790
20. Remove spacer (28) .
Illustration 17 g01035733
21. Fasten Tooling (B) and a suitable lifting device to carrier assembly (29). Remove the carrier
assembly (29). The weight of carrier assembly (29) is approximately 106 kg (235 lb).
Illustration 18 g00596816
22. Drive pin (31) inward to shaft (30). Use a soft faced hammer and tap the shaft downward in
order to remove the shaft. Remove gear assembly (32) .
8/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
10. Illustration 19 g00596823
23. Disassemble the gear assembly, as follows: washer (33), bearing (34), gear (35), bearing
(36) and washer (37) .
24. Repeat Steps 22 through 23 for the remaining gear assemblies.
Illustration 20 g01035734
25. Fasten Tooling (B) and a suitable lifting device to gear (38), as shown. Remove the ring
gear from main housing (39). The weight of the ring gear is approximately 124 kg (275 lb).
9/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
11. Illustration 21 g00596864
26. Remove O-ring (40) from the main housing.
Note: Place wood blocks under the final drive in order to support the motor housing.
Illustration 22 g00596901
27. Remove bolts (41) from gear (42) .
Illustration 23 g00596918
28. Install Tooling (F) in the gear, as shown. Tighten Tooling (F) evenly in order to loosen the
gear. Remove the gear from the motor housing.
10/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEB...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
12. Illustration 24 g00596927
29. Remove shims (43) from the motor housing.
Note: The inner bearing cones and the outer bearing cones are a slip fit on the motor
housing. The inner bearing cone may stay with either housing during separation.
Illustration 25 g01035735
30. Fasten Tooling (G) and a suitable lifting device to main housing (39), as shown. Separate
the main housing from motor housing (44). The motor housing will rest on the wood blocks.
The weight of main housing (39) is approximately 188 kg (415 lb).
11/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEB...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
13. Illustration 26 g00596986
31. Remove bearing (45) and the bearing cone from the main housing.
Illustration 27 g00596994
32. Remove Duo-Cone seal (46) from the main housing.
33. Remove bearing cups (47) and (48) from the main housing.
Illustration 28 g00597020
12/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEB...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
14. 34. Remove pins (49) .
35. Remove bearing (50) and the bearing cone.
36. Remove Duo-Cone seal (51) from the motor housing.
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Thu Dec 10 15:59:32 UTC+0800 2020
13/13
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEB...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
15. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 365B EXCAVATOR 9TZ
Configuration: 365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine
Disassembly and Assembly
365B, 365B Series II, 365BL and 365BL Series II Excavators Machine Systems
Media Number -RENR1970-10 Publication Date -01/02/2015 Date Updated -16/02/2015
i02789460
Final Drive - Assemble
SMCS - 4050-016
Assembly procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7575 Link Bracket 5
C 140-7642 Duo-Cone Seal Installer As 1
F 1P-1859 Retaining Ring Pliers 1
G 138-7576 Link Bracket 2
H 5P-3931 Anti-Seize Compound 1
J 9S-3263 Thread Lock Compound 1
K 1U-8846 Gasket Sealant 1
1. Make sure that all parts of the final drive are thoroughly clean and free of dirt and debris
prior to assembly.
Note: Check the condition of all the O-ring seals that are used in the final drive. If any of
the seals are worn or damaged, use new parts for replacement.
2. Reassemble the final drive on Tooling (A) .
1/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
16. Illustration 1 g00599211
3. Apply Tooling (H) to the surfaces that contact the bearing cones. Install the bearing cone
with a press. Raise the temperature of bearing (50) and install bearing (50) .
4. Apply Tooling (H) to the surfaces that contact pins (49) . Install pins (49) .
Illustration 2 g00599224
5. Apply Tooling (H) to the surfaces that contact bearing cups (48) and (47) . Install bearing
cups (48) and (47) .
2/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
17. Illustration 3 g00596986
6. Install bearing (45) and the bearing cone.
Illustration 4 g01035739
7. Attach Tooling (B) and a suitable lifting device to main housing (39) . Install the main
housing on motor housing (44) , as shown.
8. Use the following procedure to determine the bearing preload and the correct number of
shims.
Illustration 5 g00603328
a. Use a depth micrometer in order to measure the step length of the coupling gear (42) .
Take measurements at several different locations around the gear. Compute the
average of the measured dimensions and record the number. Call this dimension (X) .
b. Use a suitable press and a spacer in order to apply a load of 10000 kg (22046 lb) on
the bearings.
c. Rotate the main housing in order to seat the bearing.
d. Reduce the load on the bearings to 3700 ± 370 kg (8157 ± 815 lb).
3/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
18. Illustration 6 g00603604
e. Maintain the load on the bearings. Use a depth micrometer and measure the distance
between the top face of motor housing and the bearing cone, as shown. Take this
measurement in several locations around the bearing. Compute the average of the
measured dimensions and record the number. Call this dimension (Y) .
f. Determine the correct thickness of the shim pack that will be installed between the
bearing cone and the coupling gear. The shim pack thickness is equal to dimension
(Y) minus dimension (X) . Tolerance for the shim pack is 0.1 mm (0.003 inch).
Note: If two shims are required, install the thinner shim next to the coupling gear
when the coupling gear is installed.
9. Attach Tooling (B) and a suitable lifting device in order to remove the main housing from
the motor housing.
Note: Refer to Disassembly and Assembly, "Duo-Cone Conventional Seals - Install".
Note: The rubber seals and all surfaces that contact the seals must be clean and dry. After
installation of the seals, apply clean SAE 30 oil on the contact surfaces of the metal seals.
Illustration 7 g00600071
4/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
19. 10. Use Tooling (C) to install Duo-Cone seal (46) in the main housing.
Illustration 8 g00600087
11. Use Tooling (C) to install Duo-Cone seal (51) in the motor housing.
Note: Make sure that the Duo-Cone seals are not scratched or damaged during the assembly
of the main housing or during the assembly of the motor housing. After installation of the
main housing on the motor housing, there will be a small gap between the components. The
gap is caused by the Duo-Cone seals. The gap will be eliminated during installation of the
gear.
Illustration 9 g00596986
12. Install bearing (45) and the bearing cone.
5/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
20. Illustration 10 g01035739
13. Attach Tooling (B) and a suitable lifting device to main housing (39) . Position main
housing (39) on motor housing (44) . Make sure that the Duo-Cone seals are not scratched
or damaged during installation.
Illustration 11 g00596927
14. Place shims (43) in the correct position on the motor housing. If two shims were required,
put the thinner shim in contact with coupling gear (42) . Make sure that all of the holes in
the components are in alignment with each other.
6/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
21. Illustration 12 g00596901
15. Put coupling gear (42) in the original position on the motor housing.
16. Apply Tooling (J) on the threads of bolts (41) . Install the bolts to secure coupling gear (42)
in place. Tighten bolts (41) evenly and tighten the bolts in diagonally opposite pairs.
Tighten bolts to a torque of 1600 ± 200 N·m (1180 ± 148 lb ft).
Illustration 13 g00596864
17. Install O-ring seal (40) in the main housing.
Illustration 14 g01035734
18. Thoroughly clean the mating surface of main housing (39) that contacts ring gear (38) .
Apply a bead of Tooling (K) on the mating surface of ring gear (38) . Use Tooling (B) and a
suitable lifting device. Place the ring gear in position on the main housing. Make sure that
the alignment mark on the main housing and the ring gear line up with each other. It may be
necessary to use a soft faced hammer to seat the ring gear on the main housing.
19. Assemble carrier assembly (29) , as follows:
7/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
22. Illustration 15 g00596823
Illustration 16 g00603856
a. Apply clean SAE 30 oil on bearings (34) and (36) . Install bearings (34) and (36) in
planetary gear (35) .
b. Install thrust washers (33) and (37) on each side of the planetary gear.
c. Install the planetary gear and thrust washers in carrier assembly (29) .
d. Install planetary shaft (30) in carrier (29) and through planetary gear assembly (32) .
Make sure that the spring pin hole in the planetary shaft is in alignment with the
spring pin hole in the carrier.
8/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
23. Illustration 17 g00513451
e. Install spring pin (31) in the carrier and into the planetary shaft. Make sure that the
spring pin hole in the planetary shaft is in alignment with the spring pin hole in the
carrier.
f. Orient the split in the spring pin (31) horizontally to the carrier. Align the split in the
spring pin to the left or to the right. Make a stake mark on each side of the spring pin
hole in the carrier. This will prevent the spring pin from falling out of the spring pin
hole. Each stake mark should be approximately 1.5 mm (0.06 inch) to 3.00 mm
(0.118 inch) from the outside diameter of the spring pin hole.
g. Repeat Steps 19.a through 19.f in order to install the remaining planetary gears in
carrier (29) .
Illustration 18 g01035740
20. Attach Tooling (B) and a suitable lifting device to carrier assembly (29) . Put the carrier
assembly in position in the ring gear. It may be necessary to move the carrier assembly back
and forth during installation in order to ensure that all gears engage properly.
9/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEBP2...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
24. Illustration 19 g00603929
21. Install spacer (28) on carrier assembly (29) .
22. Assemble carrier assembly (21) , as follows:
Illustration 20 g00596485
a. Apply clean SAE 30 oil on bearing (23) . Install bearing (23) in planetary gear (24) .
b. Install thrust washers (22) and (25) on each side of the planetary gear.
c. Install the thrust washers and the planetary gear in the carrier assembly (21) .
10/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEB...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
25. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
26. Illustration 21 g00596446
d. Install planetary shaft (20) in carrier (21) and through planetary gear assembly (24) .
Make sure that the spring pin hole in the carrier is in alignment with the spring pin
hole in the planetary shaft.
Illustration 22 g00596442
e. Make sure that the spring pin (19) in the planetary shaft is in alignment with the
spring pin hole in the carrier.
11/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEB...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
27. Illustration 23 g00513451
f. Orient the split in the spring pin (19) horizontally to the carrier. Align the split in the
spring pin to the left or to the right. Make a stake mark on each side of the spring pin
hole in the carrier. This will prevent the spring pin from falling out of the spring pin
hole. Each stake mark should be approximately 1.5 mm (0.06 inch) to 3.00 mm
(0.118 inch) from the outside diameter of the spring pin hole.
g. Repeat Steps 22.a through 22.f in order to install the remaining two planetary gears in
carrier (18) .
Illustration 24 g01035731
23. Attach Tooling (B) and a suitable lifting device to carrier assembly (18) . Position carrier
assembly (18) in ring gear (38) . Move carrier assembly (18) back and forth during the
installation in order to ensure that all gears engage properly.
12/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEB...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...
28. Illustration 25 g00596342
24. Install spacer (17) .
25. Assemble carrier assembly (8) , as follows:
Illustration 26 g00596337
a. Install washers (16) and gear (15) . Use suitable Tooling to install ring (14) .
Illustration 27 g00596273
13/16
365B L Excavators 9TZ00001-UP (MACHINE) POWERED BY 3196 Engine(SEB...
2020/12/10
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis...