HR Planning at the City Hotel

The City Hotel is located in the middle of a medium-sized city. It caters mainly for business
trade during the week and for holiday trade during the weekends and in the summer. In the
summer and at weekends there is, therefore, a greater demand for catering and waiting staff as
there is a greater demand for lunches. During the same periods there is a lesser demand for
housekeeping staff as the customers are mostly longer-stay. The hotel has been gradually
improved and refurbish over the past five years, and trade, although reasonably good to begin
with, has also gradually improved over the period. There are plans to open an extension with a
further twenty bedrooms next year.

Note 1

There has been a particular problem in recruiting kitchen assistants, waiting and bar staff. This is
partly due to local competition, but also to the fact that early starting and late finishing times
make travel very difficult. Often there are no buses at these times and taxis are the only available
transport. One or two hotels in the area have begun a hotel transport system, and the City Hotel
management have decided to investigate this idea in order to attract a higher number of better
quality applicants. A second problem has been identified as the lack of availability of chefs and
receptionists of the required level of skill. It is felt that the local colleges are not producing
potential staff with sufficient skills, and therefore the management of the City Hotel have
decided to consider:

    1. A training scheme, either run internally or in conjunction with other hotels.
    2. Better wages to attract the better trained staff from other employers.
    3. Investigation of other localities and the possibility of providing more staff.

Note 2

Having mapped the environment, the hotel management looked at the demands and responses for
each priority area. For ‘customers’ the beginnings of the list are shown in Table 3.1.

Table 3.1 Demands and responses for the ‘customer’ factor
------------------------------------------------------------------------------------------------------------
Customer demands                             Responses
------------------------------------------------------------------------------------------------------------
Polite staff                                   Our staff pride themselves on being
                                                courteous

Staff understand that we                     We will make procedures quick and simple,
are busy                                      people and staff will respond to needs
                                               immediately

Sometimes we need facilities               We will be flexible and enthusiastic in
we have not arranged in                    our response
advance
And so on.
------------------------------------------------------------------------------------------------------------

Note 3

The management of the City Hotel decided that one of their key objectives over the next three
years was to become known for excellence in customer service. This was seen as a key tool to
compete with adjacent hotels. Managers used brainstorming to identify the staff behaviours that
they wanted to see in place, and summarised their ideas in the format in Table 3.2.


Table 3.2 Behavioural expectations chart: organisation goal – excellence in customer service
------------------------------------------------------------------------------------------------------------
Behaviours needed                            How to create or reinforce
------------------------------------------------------------------------------------------------------------
Address customers by name                 A customer service training course to be
                                                developed
Smile at customer                            A group incentive bonus to be paid on basis of
                                                customer feedback. Customer service meetings to
                                                be held in company time once per week
Respond to requests,
e.g. room change in
positive manner
Ask customers if everything
is to their satisfaction
Answer calls from rooms
within four rings
And so on.
------------------------------------------------------------------------------------------------------------

In addition to this a suggestion scheme was instigated to collect ideas for improvement in
customer service. A payment of £50 to be made for each successful suggestion.

Note 4

The City Hotel management has plans to open a further twenty bedrooms in a new extension
during the coming year. On the basis of this simple model the additional staff required could be
worked out as follows:

         Fifty-five bedrooms requires 60 staff.



         The ratio of staff to bedrooms is therefore 1.09 staff per bedroom.
If the same relationship were maintained (i.e. without any economies of scale) the
         additional number of staff needed would be: 20 bedrooms



         1.09 staff = 21.8 extra staff needed. Thus total staff needed would = 81.2 full-time
         equivalent staff.


Note 5

The managerial staff at the City Hotel exercised judgements on the
following human resource planning matters:

   1. Management considered the probable reasons for the relationship
      between people demand and time. It was felt that this was most
      probably due to the gradual improvement in the hotel over the last
      five years. Since this improvement had virtually reached its
      potential it was felt that the relationship between employee
      demand and time would change.
   2. Judgements had to be made on whether the occupancy of the new
      wing would immediately justify all the additional staff to be
      appointed.
   3. The management considered that since the weather had been very
      poor in the preceding summer, the bookings for the following
      summer period might be slightly down on the last year and this
      shortfall might not be made up by increasing business trade.
   4. Judgements were made as to whether staff could be better utilised,
      with the effect that the additional numbers of staff projected might
      not be so great.
Note 6

The managers of the City Hotel decided to encourage greater staff
flexibility and interchangeability. This interchangeability would be
particularly useful between waiting duties and chamber duties. At the
present time waiting duties are greatest at the weekend and least during
weekdays, whereas chamber duties are the other way around. The effect
of this is that waiting staff and chamber staff both have a number of
hours of enforced idle time, and the feeling was that there was some
overstaffing. By securing flexibility from staff (by paying a flexibility
bonus) it was felt that the smooth running and efficiency of the hotel
would be considerably increased. It was calculated that the nine chamber posts and eight
waiting posts could be covered by sixteen combined posts (all FTEs).

Note 7

Managers of the City Hotel assessed the levels of customer service at present by collecting
questionnaire data from both staff and customers and conducting a series of interviews with staff.
They also asked in what areas service could be improved and asked staff how this might be
achieved. As well as specific targets for improvement, they found many examples of systems and
organisation that did not help staff give the best customer service. Staff understood that getting
the paperwork right was more important than service to the customer in checking out and in. The
paperwork systems were over-complex and could be simplified. Also, shift-change times were
found to correspond with busy checkout times. Plans were developed to improve systems,
organisation and communication.

Note 8

The statistical analysis of staff (Table 5.3) was aimed at occupation, age and full-time equivalent
posts. This analysis was used primarily for three main purposes:

   1. Full-time equivalents needed to be worked out so that this figure could be used in other
      manpower planning calculations.
   2. To consider the occupational balance of staff and to give information which would be
      useful from the point of view of staff interchangeability.
   3. To plan for future retirements and, in consequence, look at recruitment plans and
      promotion plans.

Note 9

At the City Hotel eighteen staff had left during the preceding year. The annual labour turnover
index was therefore worked out to be:




(*The average number of staff employed over the year is different from the maximum number of
staff that have been employed and were desired to be employed.)

Note 10
At the City Hotel, of the eighteen staff that had been recruited over the year, three had been
replacements for the same kitchen assistant’s job, and two had been replacements for another
kitchen assistant’s job. The stability index was therefore worked out as:




(*At exactly one year before there were only 69 of the desired 72 staff in post.)

Note 11

A histogram (Figure 5.1) was plotted of leavers over the past year from the City Hotel. It shows
how the majority of leavers had shorter lengths of service, with periods of employment of less
than six months being most common.

Figure 3.1A histogram of the lengths of service of eighteen employees leaving the City Hotel in
the previous year

Note 12

Analysis of the age distribution (Table 5.3) indicates that there may be some difficulties with
promotions. In particular, a problem was identified for management promotions. There are four
general managers, the youngest being 21. In the past such a junior manager would have been
promoted after two years’ service, which they had just completed. The ages of the other
managers indicate that there will be no retirements in the immediate future and management staff
turnover has, in the past few years, been low. In view of this it was thought likely that the junior
manager would leave shortly. This was not desired since they were particularly able, so ways of
dealing with this promotion block were considered, such as creating a new post, which might
retain the junior manager’s services until a promotion became available.


Table 3.3 Staff by occupation, number and age
------------------------------------------------------------------------------------------------------------




There are no direct activities relating to this worked example, however there are some associated
activities:

Case study activity:

Break the students into small groups to begin to prepare a human resource plan based on the
information in the City Hotel case study. It is essential that students have pre-read the case and
are very familiar with its contents.

Ask groups to specifically design, for the City Hotel, the following in outline:

*       supply plan, *      organisation and structure plan
*       employee utilisation plan
*       training and development plan,
*       performance plan,
*       appraisal plan,
*       reward plan,
*       employee relations plan
*       communications plan

Although a number of clue are given in the case study as to activities that can be included in the
plan, there has been no attempt to make these complete, to integrate them or to consider the
knock on effects of one plan on another.

The task for the groups is to propose an integrated set of outline plans for the year ahead with an
assessment of the financial and other implications supported by a sound rationale.

Specifically stress that each of these plans must not conflict with any of the others and that they
should be mutually supportive. Students should be able to describe their plan in about 50 words
for each area, as the emphasis is not on the detail but on integration and implications.
Allow plenty of time for groups to discuss, as this is a demanding task. Report back could be in
either of two forms:

Option 1

Give each group the opportunity to present their plan to the whole group and allow for time to
question and compare different approaches to the same issues. (The groups may have decided to
meet in the meantime to do further work). This timing will be more appropriate to part-time
students already employed in the personnel function. For full time students you may wish to
delay presentation until towards the end of the course, and use this as a framework for their
ongoing interpretation and application of each session.

Option 2
The case could be used as an individual or group assignment to be presented in written form.

More Related Content

What's hot

(PP) Work life balance
 (PP) Work life balance  (PP) Work life balance
(PP) Work life balance
Fareez Zen
 
Contemporary issues in hrm
Contemporary issues in hrmContemporary issues in hrm
Contemporary issues in hrm
prakhar07
 
Causes of employee turnover Research
Causes of employee turnover ResearchCauses of employee turnover Research
Causes of employee turnover Research
Hassan Karamat Mughal
 
employee turnover
employee turnoveremployee turnover
employee turnover
amul
 
Introduction to Strategic HRM
Introduction to Strategic HRMIntroduction to Strategic HRM
Introduction to Strategic HRM
Rahul Sharma
 

What's hot (20)

(PP) Work life balance
 (PP) Work life balance  (PP) Work life balance
(PP) Work life balance
 
HR Forecasting 1.pptx
HR Forecasting 1.pptxHR Forecasting 1.pptx
HR Forecasting 1.pptx
 
Job design
Job designJob design
Job design
 
Contemporary issues in hrm
Contemporary issues in hrmContemporary issues in hrm
Contemporary issues in hrm
 
Aligning HR Strategy with Business Strategy
Aligning HR Strategy with Business Strategy Aligning HR Strategy with Business Strategy
Aligning HR Strategy with Business Strategy
 
PERFORMANCE APPRAISAL AND CASE STUDY ON MICROSOFT
PERFORMANCE APPRAISAL AND CASE STUDY ON MICROSOFTPERFORMANCE APPRAISAL AND CASE STUDY ON MICROSOFT
PERFORMANCE APPRAISAL AND CASE STUDY ON MICROSOFT
 
Strategic Hrm And Hr Scorecard
Strategic Hrm And Hr ScorecardStrategic Hrm And Hr Scorecard
Strategic Hrm And Hr Scorecard
 
Barriers to shrm
Barriers to shrmBarriers to shrm
Barriers to shrm
 
Human Resources - Recruitment Process
Human Resources - Recruitment ProcessHuman Resources - Recruitment Process
Human Resources - Recruitment Process
 
Causes of employee turnover Research
Causes of employee turnover ResearchCauses of employee turnover Research
Causes of employee turnover Research
 
WORK LIFE BALANCE
WORK LIFE BALANCEWORK LIFE BALANCE
WORK LIFE BALANCE
 
HR Audit.
HR Audit. HR Audit.
HR Audit.
 
Case study hrm
Case study hrmCase study hrm
Case study hrm
 
Impacts of HR on Employees Turnover
Impacts of HR on Employees TurnoverImpacts of HR on Employees Turnover
Impacts of HR on Employees Turnover
 
HRM IN USA
HRM IN USAHRM IN USA
HRM IN USA
 
employee turnover
employee turnoveremployee turnover
employee turnover
 
Introduction to Strategic HRM
Introduction to Strategic HRMIntroduction to Strategic HRM
Introduction to Strategic HRM
 
How to Reduce Employee Turnover
How to Reduce Employee TurnoverHow to Reduce Employee Turnover
How to Reduce Employee Turnover
 
Regression analysis in HR
Regression analysis in HRRegression analysis in HR
Regression analysis in HR
 
Job analysis HRM
Job analysis HRMJob analysis HRM
Job analysis HRM
 

Viewers also liked (10)

Human Resource Planning In Hotel Business
Human  Resource  Planning  In  Hotel  BusinessHuman  Resource  Planning  In  Hotel  Business
Human Resource Planning In Hotel Business
 
Hrm practices at marriott international
Hrm practices at marriott internationalHrm practices at marriott international
Hrm practices at marriott international
 
Hrm case study
Hrm case studyHrm case study
Hrm case study
 
HR Policies of Hotels
HR Policies of HotelsHR Policies of Hotels
HR Policies of Hotels
 
Capital Hotel Case Study
Capital Hotel Case StudyCapital Hotel Case Study
Capital Hotel Case Study
 
Employee Attendance Policy
Employee Attendance PolicyEmployee Attendance Policy
Employee Attendance Policy
 
A project report on hr practice in hotel industry
A project report on hr practice in hotel industryA project report on hr practice in hotel industry
A project report on hr practice in hotel industry
 
Human Resource Management in Hotel Industry
Human Resource Management in Hotel IndustryHuman Resource Management in Hotel Industry
Human Resource Management in Hotel Industry
 
HR Policies of Taj Hotels
HR Policies of Taj HotelsHR Policies of Taj Hotels
HR Policies of Taj Hotels
 
Introduction to Human Resource Management in Hospitality Industry
Introduction to Human Resource Management in Hospitality IndustryIntroduction to Human Resource Management in Hospitality Industry
Introduction to Human Resource Management in Hospitality Industry
 

Similar to Hrp case

Budgeting-In-Housekeeping-Department-ppt.ppt
Budgeting-In-Housekeeping-Department-ppt.pptBudgeting-In-Housekeeping-Department-ppt.ppt
Budgeting-In-Housekeeping-Department-ppt.ppt
Ramesh852110
 
BHRM II.docx. Human resources planning HRP
BHRM II.docx. Human resources planning HRPBHRM II.docx. Human resources planning HRP
BHRM II.docx. Human resources planning HRP
mollelieliakimu
 
Given that most services are intangible personal exper.docx
  Given that most services are intangible personal exper.docx  Given that most services are intangible personal exper.docx
Given that most services are intangible personal exper.docx
joyjonna282
 
Proposed+Call+Centre+Structure Know
Proposed+Call+Centre+Structure KnowProposed+Call+Centre+Structure Know
Proposed+Call+Centre+Structure Know
Raymond Koh
 

Similar to Hrp case (20)

SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTERSIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
 
Budgeting-In-Housekeeping-Department-ppt.ppt
Budgeting-In-Housekeeping-Department-ppt.pptBudgeting-In-Housekeeping-Department-ppt.ppt
Budgeting-In-Housekeeping-Department-ppt.ppt
 
Matching Supply and Demand
Matching Supply and DemandMatching Supply and Demand
Matching Supply and Demand
 
every-second-counts_QP_feb2016
every-second-counts_QP_feb2016every-second-counts_QP_feb2016
every-second-counts_QP_feb2016
 
03. Hotel Revenue Management-Six steps in RM by Dino Leonandri
03. Hotel Revenue Management-Six steps in RM by Dino Leonandri03. Hotel Revenue Management-Six steps in RM by Dino Leonandri
03. Hotel Revenue Management-Six steps in RM by Dino Leonandri
 
3 rd session hotel revenue management by dino leonandri
3 rd session hotel revenue management by dino leonandri 3 rd session hotel revenue management by dino leonandri
3 rd session hotel revenue management by dino leonandri
 
BHRM II.docx. Human resources planning HRP
BHRM II.docx. Human resources planning HRPBHRM II.docx. Human resources planning HRP
BHRM II.docx. Human resources planning HRP
 
Basic Accounting Principles #10 by dino leonandri
Basic Accounting Principles  #10 by dino leonandriBasic Accounting Principles  #10 by dino leonandri
Basic Accounting Principles #10 by dino leonandri
 
hotel revenue management #3 by dino leonandri
hotel revenue management #3 by dino leonandrihotel revenue management #3 by dino leonandri
hotel revenue management #3 by dino leonandri
 
Hotel Revenue Management #3 by Dino Leonandri
Hotel Revenue Management #3 by Dino LeonandriHotel Revenue Management #3 by Dino Leonandri
Hotel Revenue Management #3 by Dino Leonandri
 
Given that most services are intangible personal exper.docx
  Given that most services are intangible personal exper.docx  Given that most services are intangible personal exper.docx
Given that most services are intangible personal exper.docx
 
Aggregate Planning, Guide numericals
Aggregate Planning, Guide numericalsAggregate Planning, Guide numericals
Aggregate Planning, Guide numericals
 
Smu mba semester 2
Smu mba semester 2Smu mba semester 2
Smu mba semester 2
 
Block3 hpr casestudy-capitalhotel-1
Block3 hpr casestudy-capitalhotel-1Block3 hpr casestudy-capitalhotel-1
Block3 hpr casestudy-capitalhotel-1
 
CallCentreProposal1
CallCentreProposal1CallCentreProposal1
CallCentreProposal1
 
Regional Airlines - telephone reservation system analysis
Regional Airlines - telephone reservation system analysisRegional Airlines - telephone reservation system analysis
Regional Airlines - telephone reservation system analysis
 
Advanced WFM 0.pptx
Advanced WFM 0.pptxAdvanced WFM 0.pptx
Advanced WFM 0.pptx
 
Human Resource Planning.pdf
 Human Resource Planning.pdf Human Resource Planning.pdf
Human Resource Planning.pdf
 
Poor customer relationship quality at company A.pdf
Poor customer relationship quality at company A.pdfPoor customer relationship quality at company A.pdf
Poor customer relationship quality at company A.pdf
 
Proposed+Call+Centre+Structure Know
Proposed+Call+Centre+Structure KnowProposed+Call+Centre+Structure Know
Proposed+Call+Centre+Structure Know
 

More from Parameswar Rao

More from Parameswar Rao (16)

VRIO Honda and general motors
VRIO Honda and general motorsVRIO Honda and general motors
VRIO Honda and general motors
 
sustainability management challenges in defense industry
sustainability management challenges in defense industrysustainability management challenges in defense industry
sustainability management challenges in defense industry
 
Turnkey projects – professional services by paramesh
Turnkey projects – professional services by parameshTurnkey projects – professional services by paramesh
Turnkey projects – professional services by paramesh
 
Management functions by paramesh
Management functions by parameshManagement functions by paramesh
Management functions by paramesh
 
Launch of Mobile in bangladesh- IB by paramesh
Launch of Mobile in bangladesh- IB by parameshLaunch of Mobile in bangladesh- IB by paramesh
Launch of Mobile in bangladesh- IB by paramesh
 
Hris
Hris Hris
Hris
 
Bhel hr dept by paramesh
Bhel hr dept by parameshBhel hr dept by paramesh
Bhel hr dept by paramesh
 
Business cyclesby param
Business cyclesby paramBusiness cyclesby param
Business cyclesby param
 
sexual harassment at work place ppt by paramesh
sexual harassment at work place ppt by parameshsexual harassment at work place ppt by paramesh
sexual harassment at work place ppt by paramesh
 
Doing busines in india- a book review-param
Doing busines in india- a book review-paramDoing busines in india- a book review-param
Doing busines in india- a book review-param
 
relaunch of cassette tape -
relaunch of cassette tape - relaunch of cassette tape -
relaunch of cassette tape -
 
toyota compensation
toyota compensationtoyota compensation
toyota compensation
 
Job analysis real estate
Job analysis real estateJob analysis real estate
Job analysis real estate
 
nokia customer feedback form made by paramesh
nokia customer feedback form made by parameshnokia customer feedback form made by paramesh
nokia customer feedback form made by paramesh
 
Mantri mall by param
Mantri mall by paramMantri mall by param
Mantri mall by param
 
Hr philosophy of tatas by param
Hr philosophy of tatas by paramHr philosophy of tatas by param
Hr philosophy of tatas by param
 

Recently uploaded

Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 

Recently uploaded (20)

B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 

Hrp case

  • 1. HR Planning at the City Hotel The City Hotel is located in the middle of a medium-sized city. It caters mainly for business trade during the week and for holiday trade during the weekends and in the summer. In the summer and at weekends there is, therefore, a greater demand for catering and waiting staff as there is a greater demand for lunches. During the same periods there is a lesser demand for housekeeping staff as the customers are mostly longer-stay. The hotel has been gradually improved and refurbish over the past five years, and trade, although reasonably good to begin with, has also gradually improved over the period. There are plans to open an extension with a further twenty bedrooms next year. Note 1 There has been a particular problem in recruiting kitchen assistants, waiting and bar staff. This is partly due to local competition, but also to the fact that early starting and late finishing times make travel very difficult. Often there are no buses at these times and taxis are the only available transport. One or two hotels in the area have begun a hotel transport system, and the City Hotel management have decided to investigate this idea in order to attract a higher number of better quality applicants. A second problem has been identified as the lack of availability of chefs and receptionists of the required level of skill. It is felt that the local colleges are not producing potential staff with sufficient skills, and therefore the management of the City Hotel have decided to consider: 1. A training scheme, either run internally or in conjunction with other hotels. 2. Better wages to attract the better trained staff from other employers. 3. Investigation of other localities and the possibility of providing more staff. Note 2 Having mapped the environment, the hotel management looked at the demands and responses for each priority area. For ‘customers’ the beginnings of the list are shown in Table 3.1. Table 3.1 Demands and responses for the ‘customer’ factor ------------------------------------------------------------------------------------------------------------ Customer demands Responses ------------------------------------------------------------------------------------------------------------ Polite staff Our staff pride themselves on being courteous Staff understand that we We will make procedures quick and simple, are busy people and staff will respond to needs immediately Sometimes we need facilities We will be flexible and enthusiastic in we have not arranged in our response advance
  • 2. And so on. ------------------------------------------------------------------------------------------------------------ Note 3 The management of the City Hotel decided that one of their key objectives over the next three years was to become known for excellence in customer service. This was seen as a key tool to compete with adjacent hotels. Managers used brainstorming to identify the staff behaviours that they wanted to see in place, and summarised their ideas in the format in Table 3.2. Table 3.2 Behavioural expectations chart: organisation goal – excellence in customer service ------------------------------------------------------------------------------------------------------------ Behaviours needed How to create or reinforce ------------------------------------------------------------------------------------------------------------ Address customers by name A customer service training course to be developed Smile at customer A group incentive bonus to be paid on basis of customer feedback. Customer service meetings to be held in company time once per week Respond to requests, e.g. room change in positive manner Ask customers if everything is to their satisfaction Answer calls from rooms within four rings And so on. ------------------------------------------------------------------------------------------------------------ In addition to this a suggestion scheme was instigated to collect ideas for improvement in customer service. A payment of £50 to be made for each successful suggestion. Note 4 The City Hotel management has plans to open a further twenty bedrooms in a new extension during the coming year. On the basis of this simple model the additional staff required could be worked out as follows: Fifty-five bedrooms requires 60 staff. The ratio of staff to bedrooms is therefore 1.09 staff per bedroom.
  • 3. If the same relationship were maintained (i.e. without any economies of scale) the additional number of staff needed would be: 20 bedrooms 1.09 staff = 21.8 extra staff needed. Thus total staff needed would = 81.2 full-time equivalent staff. Note 5 The managerial staff at the City Hotel exercised judgements on the following human resource planning matters: 1. Management considered the probable reasons for the relationship between people demand and time. It was felt that this was most probably due to the gradual improvement in the hotel over the last five years. Since this improvement had virtually reached its potential it was felt that the relationship between employee demand and time would change. 2. Judgements had to be made on whether the occupancy of the new wing would immediately justify all the additional staff to be appointed. 3. The management considered that since the weather had been very poor in the preceding summer, the bookings for the following summer period might be slightly down on the last year and this shortfall might not be made up by increasing business trade. 4. Judgements were made as to whether staff could be better utilised, with the effect that the additional numbers of staff projected might not be so great. Note 6 The managers of the City Hotel decided to encourage greater staff flexibility and interchangeability. This interchangeability would be particularly useful between waiting duties and chamber duties. At the present time waiting duties are greatest at the weekend and least during weekdays, whereas chamber duties are the other way around. The effect
  • 4. of this is that waiting staff and chamber staff both have a number of hours of enforced idle time, and the feeling was that there was some overstaffing. By securing flexibility from staff (by paying a flexibility bonus) it was felt that the smooth running and efficiency of the hotel would be considerably increased. It was calculated that the nine chamber posts and eight waiting posts could be covered by sixteen combined posts (all FTEs). Note 7 Managers of the City Hotel assessed the levels of customer service at present by collecting questionnaire data from both staff and customers and conducting a series of interviews with staff. They also asked in what areas service could be improved and asked staff how this might be achieved. As well as specific targets for improvement, they found many examples of systems and organisation that did not help staff give the best customer service. Staff understood that getting the paperwork right was more important than service to the customer in checking out and in. The paperwork systems were over-complex and could be simplified. Also, shift-change times were found to correspond with busy checkout times. Plans were developed to improve systems, organisation and communication. Note 8 The statistical analysis of staff (Table 5.3) was aimed at occupation, age and full-time equivalent posts. This analysis was used primarily for three main purposes: 1. Full-time equivalents needed to be worked out so that this figure could be used in other manpower planning calculations. 2. To consider the occupational balance of staff and to give information which would be useful from the point of view of staff interchangeability. 3. To plan for future retirements and, in consequence, look at recruitment plans and promotion plans. Note 9 At the City Hotel eighteen staff had left during the preceding year. The annual labour turnover index was therefore worked out to be: (*The average number of staff employed over the year is different from the maximum number of staff that have been employed and were desired to be employed.) Note 10
  • 5. At the City Hotel, of the eighteen staff that had been recruited over the year, three had been replacements for the same kitchen assistant’s job, and two had been replacements for another kitchen assistant’s job. The stability index was therefore worked out as: (*At exactly one year before there were only 69 of the desired 72 staff in post.) Note 11 A histogram (Figure 5.1) was plotted of leavers over the past year from the City Hotel. It shows how the majority of leavers had shorter lengths of service, with periods of employment of less than six months being most common. Figure 3.1A histogram of the lengths of service of eighteen employees leaving the City Hotel in the previous year Note 12 Analysis of the age distribution (Table 5.3) indicates that there may be some difficulties with promotions. In particular, a problem was identified for management promotions. There are four general managers, the youngest being 21. In the past such a junior manager would have been promoted after two years’ service, which they had just completed. The ages of the other managers indicate that there will be no retirements in the immediate future and management staff turnover has, in the past few years, been low. In view of this it was thought likely that the junior manager would leave shortly. This was not desired since they were particularly able, so ways of dealing with this promotion block were considered, such as creating a new post, which might retain the junior manager’s services until a promotion became available. Table 3.3 Staff by occupation, number and age
  • 6. ------------------------------------------------------------------------------------------------------------ There are no direct activities relating to this worked example, however there are some associated activities: Case study activity: Break the students into small groups to begin to prepare a human resource plan based on the information in the City Hotel case study. It is essential that students have pre-read the case and are very familiar with its contents. Ask groups to specifically design, for the City Hotel, the following in outline: * supply plan, * organisation and structure plan * employee utilisation plan * training and development plan, * performance plan, * appraisal plan, * reward plan, * employee relations plan * communications plan Although a number of clue are given in the case study as to activities that can be included in the plan, there has been no attempt to make these complete, to integrate them or to consider the knock on effects of one plan on another. The task for the groups is to propose an integrated set of outline plans for the year ahead with an assessment of the financial and other implications supported by a sound rationale. Specifically stress that each of these plans must not conflict with any of the others and that they should be mutually supportive. Students should be able to describe their plan in about 50 words for each area, as the emphasis is not on the detail but on integration and implications.
  • 7. Allow plenty of time for groups to discuss, as this is a demanding task. Report back could be in either of two forms: Option 1 Give each group the opportunity to present their plan to the whole group and allow for time to question and compare different approaches to the same issues. (The groups may have decided to meet in the meantime to do further work). This timing will be more appropriate to part-time students already employed in the personnel function. For full time students you may wish to delay presentation until towards the end of the course, and use this as a framework for their ongoing interpretation and application of each session. Option 2 The case could be used as an individual or group assignment to be presented in written form.